Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #52176 next resume »»
CONTACT INFORMATION:
View contact information...

Profile

Innovative Professional with 26 years of progressive experience in engineering design, maintenance planning and management, including 16 years in the Oil/Gas industry.

Expertise in maintenance plans with strong analytical background, significant experience in the definition of key performance indicators (KPI,s) and analyses, Asset integrity assurance, availability and reliability facilities modeling with special expertise in the utilization of the computerized maintenance management system (CMMS) 'Maximo'.

Excellent leadership and management, capability thrive in both independent and collaborative work environments, Pacesetter who utilizes continuous improvement methodologies to ensure that infrastructure will support growth and makes recommendations on which area value will study. Profound skills in lecturing and presentations adopting creative demonstration techniques to improve operations and productivity.

Competency in trouble shooting with wide experience in maintenance of electrical equipment, generators, motors, HV transformers, overhead lines combined with proficiency to implement critical failure analysis in the same areas including mechanical and instrumentation systems.

Significant skills in the design of projects related to power distribution, HV transmission, electrical drive speed control systems, and conveyers speed load control systems, switch board systems, general process plant, PLCs, building systems and sport facilities. Design experiences further include hydraulic control system.

Result – Oriental professional who view challenge as opportunity, and also has solid grasp of key business drives and corporate function.

International Standards (Extent of knowledge and application)

Australian Standards, ISO, ICE61508/ IEC61511, British Standard,

Computer Skills
Significant knowledge of CMMS (MAXIMO) Computerized Management Maintenance System, AutoCAD, MS Office,
Qualification

1982 – 1984 M. Sc. Electrical Engineer - Faculty of Technology. (UMIST, Manchester, UK.)
1981 – 1982 Postgraduate Diploma in Elec. Power Transmission & Distribution, (UMIST. UK)
1972 – 1977 B.Sc. Bachelor of Science in Electrical Power Engineering

EXPERIENCE HIGHLIGHTS

1999 - 2006 Senior Maintenance Planning Coordinator Abu Dhabi for Onshore Oil Operation, UAE
1996 - 1999 Senior Electrical Maintenance Engineer Abu Dhabi for Onshore Oil Operation, UAE
1995 - 1996 Electrical Engineer / Project Engineer Atlas Group PTY LTD, Australia
1990 - 1994 Maintenance Engineer (Planning) Abu Dhabi for Onshore Oil Operation, UAE
1984 - 1989 Assistant Managers / Director of Technical Bureau Syrian Railways, Damascus, Syria
(1985 – 1989) Lecturer (Part Time) - Damascus University, Syria
1980 - 1984 Research for the degree of M. Sc/Ph. D in Electrical Power Engineer
University of Manchester Institute of since and technology (UMIST), Manchester UK
1978 - 1980 Electrical Engineer Housing Establishments, Damascus, Syria

PROFESSIONAL

1999 – 2006 Senior Maintenance Planning Coordinator
Abu Dhabi for Onshore Oil Operation, UAE (Fly in/Out Working Cycle 36/24Days)

Accomplishments:

1. Key contribution to the Asset Integrity Management System AIMS, as an active core team member, developed three structures for setting the Key performance Indicators (KPI's) of plant remnant life, integrity compliance, and plant critical safety System.
2. Prepared the fundamental report of plant Reliability & Availability modeling for existing facilities of major units associated with gas intake. (Base case, 250 MBOPD sustainable), and contribute in developing (1.4-1.8) MBOPD availability modeling.
3. Prepared full studies on reliability and availability modeling of the existing gas turbines in the crude oil processing plant (4 Avon/ 7.5 MW and 2 Frame-5/ 18.5MW)
4. Contributed to the investigation of the root causes of several accidents within the fields, (Certify panel member for the review of incident investigation reports in Oil field)
5. Completed the roll out and commissioning the Computerized Maintenance Management System (Maximo) in the base oil Field.
6. Contributed to the development of the structure of asset register data in the Computerized Maintenance Management System (Maximo) and assuming custodianship of the company CMMS relevant practices.
7. Developed and set up the Maintenance Key Performance Indicators (KPI) formulas including the determination of targets for man power utilization, maintenance cost, etc., and implemented in the system (CMMS) successfully.
8. Established maintenance plans for power distribution in relation to the company grid and prepared planning strategy for overhead line maintenance and overhaul of prime movers on the surface facilities at the water Injection Clusters.
9. Established full documentation reference for the business of maintenance planning to be used in the training of newcomers and reinforce the knowledge of the CMMS / Maximo users throughout the field developing and delivering full training programs through lecturers.
10. Involved in maintenance optimization program as a team member for Bab
11. Setting up the matrix for the authority hierarchy in the CMMS system
12. Implemented the formal safety procedure in the CMMS system.
13. Contributed to the implementation of the new stock policy in the company as a team member.
14. Contributed to the risk assessment in implementation the new version of CMMS Maximo 4.2 and Maximo 6.

1996 - 1999 Senior Electrical Maintenance Engineer
Abu Dhabi for Onshore Oil Operation, UAE (Fly in/Out Working Cycle 36/24Days)

Accomplishments:

1. Established 5 years maintenance plan for the company grid, six 33kv overhead line including the on-line changing of insulators from porcelain to silicon rubber (free of maintenance).
2. Established full studies of the reliability and availability for gas generators turbine (4 Avon & 2 Frame).
3. Contributed to the setting up of the specification and scope of work for changing the 33KV over head line wires to wolf wire and contributing in the tendering process.
4. Investigating some major accidents, in particular; for 33KV overhead line and set the procedure to avoid future recurrence.
5. Modified switchboards in the pig receiver launcher area for safety compliance, establishing the full design package using the AutoCAD program.
6. Developed switching procedure and maneuvering between the 33kv over head line to maintain the production by increasing the availability of supply to 21 Water Injection clusters, five remote degassing stations (RDS / crude oil), and five remote manifold stations (RMS / Gas gathering stations) in addition to other loads.
7. Commissioning of the 132KV over headline project.
8. Carried out overhaul of Gas Turbine Avon 7.5 MW and frame (5) 18.5MW
9. Carried out FAT testing of 36 Volt Transformers (VT) /132kv in coordination with Siemens / Germany. The VT 's were installed and commissioned successfully.
10. Contributed to the updating of the load shedding study for Bab field
11. Member of CABIT team sponsored by company managements to Investigate and develop solution to reduce the recruitment time for new national and expatriate employees.

1995 - 1996 Electrical Engineer-Project
Atlas Group PTY LTD, Alexandra Drive, WA 6062 Australia

Main achievements:

15. Responsible for Electrical Power Distribution at a large industrial site including new project. (Anaerobic of Municipal Soil Waste)
a. Participated to HazOp study of the project Anaerobic of Municipal Soil Waste b. Established the safety operation procedure for the plant including the safety tagging system in coordination with the safety department.
c. Work out to reduce of the effect of the harmonics caused by the Invertors, by installing capacitors bank.
d. Established in and maintaining on-site power generation e. Liaising with consultants, subcontractors and suppliers, as well as in-house electricians to plan, control and maintenance records for existing installation f. Involved with hazard and operability studies for the new project as well as development of safety system, including electrical testing and tagging procedure.
g. Investigate and advice on feasibility and option for proposed projects, prepare construction schedule and maintain records.
h. Introduced and establish coding/tagging system for all equipment in preparation for using the computerized maintenance scheduling system.

2. Designing the electrical system for the new project including switchboards, control panel layout, instrumentation, earthling system, and lightening protection.
a. Designed and supervised the fabrication of the double busbar main witch board b. Designed the electrical distribution network for the new projects and supervise the fabrication of the distribution of the switchboard internally.
c. Designed the control circuit of the hydraulic machine used to operate the shredder, and tremors/drums.
d. Designed electrical distribution of the new extension of the company e. Designed the circuit heat control of the project's pilot and contribute in the research f. Designed the power distribution and circuit control for the water system including timer and level sensors.
g. Set-up logic control procedure for PLC.

3. Supervising and control of all the installation relating to the project a. Supervised the installations of the cables and hydraulic pump and the motors for the conveyers.
b. Coordinate with the consultant and the supplier to Install the motors speed controlled through the inverters used for the conveyers in the recycle plant c. Studied and installed two 100kw inverters to control the motors rotating the two trommels used for recycles (4.2 m diameter and 30 m Long)
d. Supervise the installation of the two gas turbine 500KVA
e. Set up and supervising the execution of the earthing system to obtain" one Ohm" as Australian Standard.

1990-1994 Maintenance Engineers (Planning)
Abu Dhabi for Onshore Oil Operation, UAE
Accomplishments:
1. Established Maintenance Planning section team in export terminal, and work in Data gathering of all equipment in the terminal including the new oil tanks in the farm
2. Introduced the standard procedure and job plans into the system
3. Worked on coding and tagging of all equipment in the terminal and establish hierarchy structure including the maintainable unit to be used for generating the work order on monthly bases.
4. Commission three new storage tanks, each has size of 1 million barrels of crud oil in the export terminal (Jabal Dahnna).

1984 - 1989 Assistant Managers for Technical Affairs/Director of Technical Bureau
General establishment of The Syrian Railways, Damascus, Syria
Accomplishments:
1. Monitoring & coordinating between the activities of various sites engineering section and participated to the projects studies and set up the specification of technical equipment under construction.
2. Designed a new power supply and switch board distribution for the manufacturers and workshops, and supervised the projects related to network distribution of the substations.
3. Planned and set up new maintenance strategy for Diesel-Electrical Locomotive and develop new technical program of repair operation.
4. Supervised the fabrication parts produced in workshop for the locomotive, and Participated in the classification of the materials of the main store
5. Participated in project to studies the electrification of railways (as a member of Damascus metro committee)

1985 - 1989 Lecturer (Part Time) - Damascus University

Supervising the following final year projects:
1988-1989 Study and design small air turbine to produce energy capacity of 2 KW
1987-1988 Design and fabricate of the protection relay 30mA (differentiation currents) to protect the humans from any fault occurs on domestic and industrial equipment.
1986-1987 Study and design the invertor's bridges to control the speed of the induction motors.
1986-1985 Study the requirement of the electrical railway between the locations of Damascus city and Bludan town (56Km).

1978 - 1980 Electrical Engineer, (Housing Establishments, Syria)

Accomplishments:
1. Designed and supervised the production of the electrical boards for the compound buildings and industrial plant, and established a new production line of switchboards for industrial purposes.
2. Supervised the installation of HV central transformers, overhead line, and MV underground cable together with electrical switchboard.
3. In charge in the maintenance of the machinery workshops in the company projects distributed over Damascus city and its suburb including, diesel generators, cranes, concrete mixture machine, pumps and motors.

Technical Development/ Conferences/

Attended many courses similar to the following:
o Workshop/course on Instrumented Protective Function (IPF) Management System & SIL Assessment - SGS: M269P (Shell)
o Leadership employee dialog o Incident Investigation and root cause analysis o Maintenance assessment & Benchmarking o Maximo user group International Conference on 9/4/2001- Dubai, UAE
o Maximo ME user group International Conference on 9/4

View contact information...
«« previous resume next resume »»
Search Results (Resumes 1901 to 1950 of 7055)Go to Search Parameters...
Brief Description
B.Tech from IITK, 6 yr exp. in piping stress on CAESAR II, Triflex. Review of lines on PDMS & Smart review. worked with bechtel, chemtex, Citec(Finland)
A Logging Analyst in the Syrian Petroleum Company. A Petrophysicist in Al Furat Petroleum Company, responsible for many fields for all petrophysical operations and formation evaluations. Petrophysics section head, Wireline logging, perforation and core analysis contract holder.
Extensive Wonderware software experience including Industrial Application Server and System Platform products. Expert industrial PC skills. Extensive experience with Microsoft Virtual Server and Terminal Server products.
I have involved in petrochemical, oil/gas, and heavy industrial projects. I have strong academic achievements, excellent interpersonal skills, and positive attitude, Commitment and desire to perform engineering design. I am also exceptionally well organized and highly motivated and able to pull toge
To obtain a challenging position in your organization where my technical and management skills can be effectively honed and utilized and to gain practical experience in the realm of Civil/Structural Engineering.
Over Eight years of multidisciplinary Civil Engineering experience
Instrumentation & Maintenance industrial Engineer
Substation primary design engineer for high voltage substation
DEEE with 4 years Triconex Knowledge
I had passed bachelors degree in safety and fire engineering.Passed NEBOSH international certificate in occupational Safety and health.
I have 13 years in piping design and drafting field for Oil and gas industry
I possess hands on experience in developing EMS (ISO 14001) and OHSMS (OHSAS 18001) procedures in line with International best practices, performing HSE audits, leading EIA and Risk Assessment study teams, assisting in development of emergency response / contingency plans e.t.c,
Vast experience of planning, Management reporting, Refinery Economics,Vast experience in Petroleum Refining. Confident and result-oriented, Able to analyze and apply problem solving and decision-making techniques to achieve desired objectives within target deadlines.
16+ years experience HVAC Engineer with intension to work in Oil and Gas field
Sr. Projejct Document Controller-Exp of 12 years in Oil & Gas/Power Project Industry
Thirteen (13) years of extensive and diversified experience in managing and leading variety of upstream Oil & Gas handling, Chemical & Petrochemical Projects.
About 16 yrs of experience in the field of Civil Engineering Design, Construction & Inspection and Document Control for turn over (Piping Test Packages, Punch list & etc) & dbase management using MS Access program.
Electrical Intrument & Control System
Lead Mechanical Engineer, 17 years of experience in preparation of Specification/ Material Requisition/ Proposal/ Scope of Work; Design Basis and calculations, Technical & Cost Evaluation; Vendor Drawing Review, Static, Rotating and Material Handling Equipment and Mechanical Packages
Senior Piping Designer with 20+ years experience. AutoCAD, AutoPlant, Excel, Access, Word, Outlook.
Wireline supervisor or wireline consultant
Geoscientist with experience of working in a multidisciplinary team in a major E and P company. Experienced in Seismic modelling and Interpretation, and reservoir modelling. Holds an M.Sc in Petroleum Geoscience.
Process Engineer with over 11 years oil and gas engineering background. Design experience of Liquefied Natural Gas import terminals and process simulation experience of base load liquefaction trains.
Structural engineer with over 14 years experience in EPC projects (grass root and revamp) in refineries, petrochemical plants, spinning mill, cement plant & other industrial units.
OBJECTIVE: To utilize my experience in manufacturing and construction. Using various software programs, and engineering disciplines, (24,000hrs) Of AUTOCAD experience.
More than 14 years process & project engineer experience in Oil & Gas and Oil Refinery.
CAREER OBJECTIVE A suitable, challenging, and rewarding position in Petroleum Engineering.
Working Experiences as Senior Process Engineer from 1992 - 2003 in LNG/ LPG Plant of PT. Badak NGL in Bontang East Kalimantan Indonesia. I have been working for PT. Badak NGL over 20 years. Previous Job experienced in PT. Badak as Senior Production Planning Engineer from 1983 - 1991.
ERP Consultant (functional and technical) : MFG-PRO and Progress, Axapta, Movex, SAP Software Development Project Manager : Visual Basic, Oracle, Access, SQL-Server
I have multilingual skills and am fluent at Russian, Turkish and good atdrilling
Proactive and skilled professional with a solid supervisory background and experience developed on projects in Venezuela
Good Capability and ability to get goal the project with safety, quality, planning and costing
Using FEM packages (COSMOS, ALGOR) to analyze structures and components (Stress, Stiffness, Fatigue, etc). Document drafting and review (Calculations, P&IDs, MITPs, etc.).
More than 23 years experience as Sr. rotating techn/foreman in the refinery, responsible for the repair, troubleshooting, modification, preventive and predictive maint. of all rotating equipt.; ensure safety, planning, scheduling of personnels, preparations of tools and spare parts.
Stress Analysis of critical lines connected to static as well as rotating equipments like exchangers, columns, reactors, pumps, compressors. Super high pressure steam lines, lines connected to ‘cold box’ (Cryogenic lines), and expansion loop sizing for rack lines, analysis of pressure safety valves
A highly experienced MBA professional with exceptional interpersonal and communication skills and an external extensive background in the following broad-based competencies: Procurement/Supply Chain Management Strategic Planning; Contract Negotiation; Business Development
Wire line logging: done a special six months course on wire line loggingIn which I Have studied all the logs their specifications, uses, tools, interpretation etc, like gamma ray, sp log sonic log, neutron porosity logResistivity & conductivity log, density &photo electric factor log etc.
Crude oil storage tank construction experience as per API 650/653
i am looking for dimensional survey engineer job. i have complite Diploma in Marine & Offshore Technology.i have been work for Keppel fels Shipyard 3yers. Dyna-Mac shipyard 1.5years. now working for Norce offshore in Indonesia for DLB Projct.
I Mr. Noel C. Atienza 12 almost 12 years experience in oil and gas as a senior mechanical technician, including as a machinery supervisor. I'm permanent residence in singapore
a great job seeker of electrical field
Pipeline Integrity Engineer / Project Engineer / Design Engineer
Technical Assistant to Reservoir/Production/Petroleum Engineering.
BSc Chemical Engineer Having Six Year experience in Petrochemical Industry
Currently working in SNC LAVALIN ENGG INDIA LTD. Mumbai and deputed to SNC LAVALIN EUROPE B.V. BRANCH to Shaybah, saudi arabia as a PDS ADMINISTRATOR. My job profile is related to Piping Engineering and PDS(PLANT DESIGN SOFTWARE),RIS (Relational Interface
Controls and Instrumentation Engineer / ESD-Triconex & DeltaV SIS/ 6+year Exp
Provide structural engineering, construction management, real estate due diligence and expert witness services.
Innovative Professional with 26 years of progressive experience in engineering design, maintenance planning and management, including 16 years in the Oil/Gas industry.
Over 18 years experience in construction, installation and mechanical assemblies, heavy
My background has 15 years of Heavy chemicals, Dyes, Petrochemicals process safety and Refinery Construction HSE experience in India as well as foreign countries Recently acquired NEBOSH Qualification
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   [ 39 ]   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
CATEGORIES: Engineering/Technicians;
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com