For the past Thirteen years Involved in Senior QA/QC Engineer, Welding Engineer, Certification Inspection, Testing for Offshore / Onshore Installation, Handled major EPC contracts for construction of oil and gas projects (on and offshore). Asset Integrity Management Reliability Engineering, Plant Inspection, Risk Base Inspection, Rehabilitation, Revamping, Maintenance, Turnaround, Refineries, Petrochemicals and Fertilizers Companies Inspection and Shutdown Activities.

OFFSHORE – Worked for Certification, Inspection, Construction, Installation, Revamping, Maintenance and Rehabilitation Project of Offshore Complexes ( Asset Integrity Management Project ), Construction & Installation of 27 Jackets and Top Side Installation as Process Platform, Wellhead Platforms, Flare Platform, Accommodation Platform, water Injection Platform and similar other, Three leg & Four leg Jacket Installation with Conductors, Transition Pieces, Boat Landing, Risers, Bridges as well as several Sub Sea Pipe line Laying on Pipe Lay Barge with Manual as well as Automatic Welding by Serimet Dasa Saturnax Dual torches system, Miller and CRC Equipments, Shore Pulling and AUTO UT Inspection & Hook Up, Re-Vamping of Offshore Platform. Involved in External Three layer Polypropylene, Neoprene Riser, Bend, Elbow Coating.

ONSHORE – Worked for Certification And Inspection of Cross Country Pipeline Laying with Automatic Welding by Serimer Dasa, Miller and CRC Equipments and AUTO UT by RTD and Weldsonics, Construction of Jackets, Topside, Bridges, Construction work for LNG Plant Fabrication Work shop for Pressure Vessels, Heat Exchangers, Tanks etc, Shut Down Inspection Works, Testing Lab, Failure Analysis with a Senior Metallurgist. Worked in Pipe Mill ( PLS & NPCC Yard ) for Coating of Sub-sea Pipeline and cross country pipeline for Coal Tar Enamel & Concrete Coating.

PLANT ENGINEER – Worked for Certification And Inspection of Shut Down jobs for Refineries, Petrochemicals and Fertilizers Companies, Risk assessment Of Piping, Vessels, Tanks, Risers, Offshore / Onshore facilities, Familiar with GALIOM Software. Plant Integrity Engineer - Rehabilitation Project of Offshore Complexes ( Asset Integrity Management Project ) as per API 653 Tank Inspection, API 510 Pressure Vessel Inspection, API 570 Piping Inspection.
Conducted Lectures for ASNT Level I & II for welding & Metallurgy

Familiar with Manual, Semi-Automatic & Automatic Welding for SMAW, TIG, SAW, FCAW, ESW, GMAW & MIG Welding Process in respect to preparing / review WPS, PQR, Online weld inspection, Repair works and Trouble Shooting. Familiar with ECA Calculation

Computer Exposure working knowledge for day to day QC Documentation.

Conversant with good working knowledge in the frequent use of International codes & Standards
Such as ASME VIII, IX, II, V, B31.3, AWS D1.1, EN 287 & 288, API 1104, DNV Rules for Sub Sea Pipe line Laying, BS 4515, API 510, API RP 572, API RP 576, API RP 577, API RP 571.

WORKED FOR

GUPCO, Egypt, Sarawak Hydro Malaysia, PTT Exploration & Production, Town Gas (Hong kong – China ), BTC ( BOTAS ) Turkey, Shell Iran, British Petroleum, MAERSK Oil Qatar, Crain Energy Australia, TOTAL, ONGC India.

ACADEMIC QUALIFICATION

1. Bachelor of Engineer In Metallurgy from Government College of Engineering Pune.
2. Diploma In Mechanical Engineering from Government Polytechnic Nasik.

TECHNICAL QUALIFICATION

1. Lead Assessor ( ISO 9000 series ) Certified by Lloyds, Cert. No 05 / 1551
2. Internal Auditor ISO 9001 *2000
3. API 510 - Pressure Vessel Inspector, Certificate number 28073
4. API 570 - Authorized Piping Inspector, Certificate number 29124
5. API 653 - Above ground Storage Tank Inspector, Certificate number 28544
6. Certified Senior Welding Inspector ( 3.2) by CSWIP, Certificate number 6178 / 2
7. CSWIP Radiographic Film Interpreter. Certificate number 6178 / 2
8. Certified ASNT Level II AUT Interpreter as per SNT-TC-1A in Automated Ultrasonic Testing Interpretation, familiar with TOFD, Auto UT, P Scan.
9. Certified Welding Inspector ( 3.1 ) by CSWIP
10. Certified Welding Inspector ISNT
11. Certified as per SNT-TC-1A ASNT Level II in:
a)Ultrasonic Testing b) Radiographic Testing c) Magnetic Particle Testing d) Dye Penetrant Testing
12. British Gas Painting Inspector Gr. III, Certificate number 1029 / 2
13. Pipeline Corrosion Engineer NACE India
14. Pressure Equipment Directive Surveyor
15. Piping Draftsmanship.

SAFETY COURSES

1)First Aid Course. 2)HSE Induction Course. 3)H2S Awareness & Escape 4) Permit to Work Applicant Course.5)Gas Testing Course. 6)Fire Fighting Training Course 7) Offshore Sea Survival

October 2006 To Date

Employer MAERSK OIL QATAR.
Designation Client Representative ( Onshore / Offshore )
Project: Construction and Installation of Five Jackets with Top Side and 350 Km Of Sub Sea Pipe Line Laying of various diameter ( NPCC Barge ), BLOCK 5 Development Project

Work Involved Representing client ( MAERSK OIL QATAR ) to supervise work done by the EPC contractor ( NPCC ) for their Offshore / Onshore Activities.
Monitor the Coal Tar Enamel and concrete coating in the Pipe Mill and Neoprene Riser, Bend, Elbow Coating on Offshore as per MOQ Specification & ITP.
* Supervises the Quality Control functions\activities of a project. Review of ECA Calculation,
Witness Preparation of PQT and laboratory testing for PQR including HIC test
* Evaluates the qualifications of welders and Non Destructive Test-NDT technicians with regard to the activities assigned. Witness the NDT ongoing for Onshore activity ( RT, UT, MT ). Process involved SMAW, SAW, FCAW ( Semi Automatic and Automatic )
* Ensures the correct application of Quality Control phases for offshore / Onshore construction.
* To confirm, that all sites/barge activities are carried out according to referenced documentation, Review the Auto UT Graph for the ongoing Offshore Su-Sea Pipeline laying work.
* Raises Corrective Action/Non-conformance reports as required and monitors their development and resolution.

December 2005 to September 2006

PROJECT: - Rehabilitation Project of Offshore Complexes, Asset Integrity Management. Employer: - Germanischer Lloyd Offshore and Industrial Services, Egypt
Position: - Plant Integrity Engineer
Work Involved: - Rick assessment Of Piping, Vessels, Tanks, Risers, Offshore / Onshore facilities and M36 Complex utilizing the GLO GALIOM Software and providing a Data processing Coordinator Manage Data Entry and Application Configuration.
Rehabilitation of BP- GUPCO – offshore and onshore facility in the Gulf of Suez –Fitness For Service repairs, modifying, upgrading of entire facility consisting of offshore production complex, and Onshore process unit.
Witness, review, supervise and approve mechanical and inspection contractor's work.
Co-ordinate with rope access teams - facility personnel- mechanical contractor and maintenance teams. Selection of appropriate NDT techniques for supplementing Inspection Close Visual inspection of Tanks, Piping and Vessels as per API 653, API 570 and API 510 respectively.
Finding out the test points required for further studies for calculating remaining life.
Base line inspection of Tanks, Piping and Vessels.
Corrosion Monitoring of Tanks, Piping and Vessels.
Co-ordinate and help Corrosion / Reliability Engineer for Calculating and reporting the weakest area of Piping and Vessels, as per API 579 Level 1 and 2 Studies.

November 2004 to November 2005

Employer ABS Consulting, Singapore
Designation Certification Authority Representative
Project ( Site 2 ) PTT Exploration & Production Installation Of Offshore Fixed AWP 2 Wellhead Platform ( Jacket / Deck ) at Arthit Asset, Gulf Of Thailand Project.

Work Involved: Certification And Inspection of Jacket and Top side Installation of Offshore work including Lifting, Floatation and Upending and on Bottom Stability, Installation of Jacket and Leveling, Installation of Foundation, Deck Structure, Review & Approve Offshore WPQT, WPS,WQT, Process involved SMAW, Conduct & Verify the Exact Location Offshore, Welding Visual Inspection, NDE, Dimensional Control, Daily Report and Completion Certification.
Project ( Site 1 ) Town Gas Shenzhen To Tai Po Twin Sub Sea Gas pipe Line Project, Hong Kong
Designation Technical Representative

Work Involved: Certification And Inspection of Welders Qualification, Inspection of day to day Welding activity, Review of ECA Calculation, Process Involved SMAW, MIG ( Auto Welding ), Interpret Radiographs, Monitor UT, MT conducted for Repair Welds, Coating Activities Internal & External, Conduct Audits & continuous monitoring the implemented corrective actions for the Non Conformity arising, Review Procedures Verify & Approve, Conduct meeting with Contractor. Monitor External Three layer Polypropylene, Neoprene Riser, Bend, Elbow Coating.

August 2003 to November 2004

Employer TUV Anlagentechnik, Germany
Designation Welding and NDT Expert
Site Baku Tbilisi Ceyhan Crude Oil Cross Country Pipe Line Laying Project, Turkey
Project Laying of 34" and 42" dia. Pipeline of 350 KM using Automatic Welding & AutoUT.
Work Involved: Certification And Inspection of quality requirements for the activities stated in ITP, Witness Welding procedure and welder qualification review Process MIG ( CRC Automatic Welding ) TIG and SMAW, QAP, Review of ECA Calculation Welding procedure, material inspection and review mill certificate, fit-up check, RT film interpretation, tie –in inspection, Repair and Cut-Outs,
Coating inspection review Auto UT Graphs. River Crossing, Road Crossing, Rain Crossing, Familiar with Horizontal Boring works

October 2002 to July 2003

Employer Hyundai Heavy Industries, Qatar
Designation Senior Inspector ( Offshore )
Site 6 BLOCK 5 Development Project for MAERSK OIL QATAR
Project Construction & Installation of 11 Jackets, Top side and Related facilities i.e. Gas Compression Facilities, Accommodation Platform and Bridge, Flare Platform, Well head Platform and Water Injection Platform.
Work Involved: Duties included work related to QA/QC activities and follow up for client's approval. Prepare proposals for site technical query, site waiver and non-conformance corrective action and monitor actions taken for close out. Determine the number of welders to be qualified on specific WPS for the project and supervised qualification test. Prepare progress and completion reports. Correlate and submit final documentation package. Supervise welding, painting and dimensional control inspectors.

May 2002 to September 2002

Employer Hyundai Heavy Industries, Brunei
Designation QA/ QC Inspector ( Offshore )
Site 5 East Hp Gas Expansion Pipeline project for Brunei Shell Petroleum
Site 4 Bp Nam Con Son Gas project for British Petroleum, Vietnam.
Project: Installation of Sub Sea Pipeline laying of 75Km using Automatic Welding & Inspection with Auto UT, which include Shore pulling, 3 Riser & Dog Leg Installation. Jacket & Top side Installation for British Petroleum Project.
Work Involved: Monitoring all the QA/QC activities (Review of ECA Calculation, MIG Process ) for the project until the final compellation of dossier package involving the whole scope of work. On board HD 2500 Pipe lay Barge. NDT technicians (Automatic Ultrasonic Testing of RTD) in aspect of quality acceptance of work as per International codes & Company specification.

Nov 2001 to April 2002

Employer Hyundai Heavy Industries, India
Designation QA/ QC Inspector ( Offshore )
Site 3 Bombay High Offshore for HV Well & Lakshmi Project.
Project Sub Sea Pipeline Laying, 16 Risers, Three Jacket, with 12 conductors & Three Top Side Installation for ONGC & Crain Energy- Australia
Work Involved: Responsible for Inspection of welding, Reviewing radiographs, Scrutinized Ultrasonic testing report and painting /coating in aspect of quality assurance, quality control, Inspection, testing &
Quality acceptance of works. Performing quality and compliance audits and inspection of effectiveness, development and implementation of drawings and determining the extent of NDT required as per client's specifications and prepares NDT drawings. Performed welding inspection in all phases of project and coordinate with NDT supervisor for the scheduling/testing of welds subject to NDT.

August 2001 to October 2001

Employer Offshore Testing & Inspection Services Pvt. Ltd. India
Designation Metallurgist
Worked Involved Micro sample Examination for both ferrous & Non Ferrous Samples, Macro Examination, Failure Analysis, Corrosion Testing for HIC, SSCC, IGC Practices, monitoring
NDT Activities, Supervising Destructive Testing Activities for Procedure qualification as per codes & other routine works related to laboratory, worked for site Activities for shut down jobs for Pressure

Vessels, Heat Exchangers, Columns, Tanks, Pre-Headers for Reliance Petro Chemical Ind. Kribco Fertilizer Company and various other, In-house training for Welders & welding Supervisors. Responsible for Internal Quality Audits in aspect of Quality Assurance / quality Control implementation and to provide corrective action.

Feb 2001 to July 2001

Employer Hyundai Heavy Industries, Iran
Designation QA/ QC Inspector ( Offshore )
Site 2 Soroosh and Nowrooz Integrate Field Development Project for Shell ( Iran )
Project Soroosh and Nowrooz Integrate Development Project EPIC 1.2 nos., installation of anchor pile, chains and Dynamic risers for FSU, Installation of Risers, PLEM with associated tie-In spools and Four well head platforms and Jacket onboard HD 2500 and SHL Stanislav Yudin.
Site1 PTTEP Bongkot Field Development Project Phase 3 B ( Gulf of Thailand )Installation of Two wellhead platform ( jacket, deck, boat landing and vent boom) including risers and doglegs and Sub Sea Pipe line laying Project.
Work Involved: Conducting Welders Qualification test, Duties include supervision of discipline inspectors for welding, painting and dimensional control. Review NDE, painting and other related reports witness the preparation of grout samples and strength for 24 hrs and 28 days cube test.

March 1998 to Jan 2001

Employer Ace Pipeline Contracts Pvt. Ltd. India
Designation Welding Engineer.
Site Worked for various companies like ELF gas, Nico, GAIL, BPCL, HPCL & KIOCL for Cross country pipe line Laying,.
Work Involved: Preparing welding procedures, Coordinating with the Client & Third party inspection agencies, attending meetings with them as Contractor representative, welding procedures & welder qualifications, review of QC plan, procedures, materials, inspection and review of mill certificates, fit-up inspections, RT films review, pipe strings lowering and joining, tie ins inspections, coating inspection, witness of hydrostatic tests, visual inspection of prepared welds, controlling waders and scrutinize ultrasonic and other NDT reports. Maintaining daily progress reports. Preparing Final Dossier
Involved in River Crossing, Road Crossing, Rain Crossing, Familiar with Horizontal Boring works.

Jan 1993 to Dec 1994
Employer Chaitaniya Const & Eng. Pvt. Ltd, India
Designation Supervisor.

Work Involved: Responsible for progress monitoring, supervising and control quality of welding and in painting aspect of assurance, quality control, inspection, testing & quality acceptance of works for fabrication of Pressure vessels, tanks, Piping works & Heat Exchangers. Process involved – SMAW, TIG, SAW.

Reference: Will be provided on request.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 1201 to 1250 of 6396)Go to Search Parameters...
Brief Description
A Chemical Engineer (B. Sc., M.Sc.)
I have 9 yrs experience as a Planning Engineer in Oil and Gas sector, please let me know if any suitable vacance available for my knowledge and Experience.
Seeking a challenging career as a Reservoir/Petroleum/Production Engineer in an E&P Company
15 years of progressive experience and responsibility with documented success in the areas of drilling, workover, completions, engineering, operations and supervision at various organizational levels. I’m seeking a challenging position as a Drilling &/or Work-over Engineer / Superintendent.
18 years experience in process design of refinery and petrochemical units.
Over 14 Years in Maintenance planning, Shutdown/Turnaround Planning in petrochemical Industries. And also in Maintenance of various Rotating and Static Equipment ;Construction Planning including costing.
A consulting petroleum engineer / project management position in a challenging environment which requires significant technical expertise. Available for immediate travel, domestic or worldwide.
I am a Chemical Engineer having more than 18 years experience in various Oil Processing / Gas Treatment / Petrochemical Process Plants . I have 6 years of Onshore / Offshore Oil / Gas Plants Operational Experience as a Production Supervisor.
Job Title : Software Enginer Education : Ordinary Degree in Bachelor of Science Previous Employer: Motorola Australia Software Centre
Expert in understanding permeability of the carbonate reservoirs. With this help reservoir engineers can do their well level simulation rather easily. Fees are charged for every foot of well data studied. Work will be done at the place of the expert.
More than fourteen years hands-on and supervisory experience in Petroleum Refineries in Qatar, Saudi Arabia and Pakistan. Have been analyzing samples from all streams of different units. Have been acting as Lab. Group Leader during Group Leader's leave/absence.
6 years experience in the field of Mechanical, Piping Engineering Design / Drafting. A variety of successful projects for oil & gas, chemical and cement plants. Design, Drafting, CADD, and checking experience that includes supervision, conceptual layout, piping design, pipe supports, fabrication dra
Instrument and metering technician
Mechanical Designer with over 10 years of experience in plant, equipments and structural drafting of oil & Gas industries, Seeking a challenging Respectable and Responsible Assignment in the field of structural Engineering, that encourages continuous learning and Creativity, Provides Exposure to ne
A well rounded drilling personnel with a unique experience in drilling and completion / work over operations
CADD/Draftsman (Multi-Discipline), can well operate AutoCAD R14, 2000, 2002, 2004,2005,2006,2007 Autocad Building System (ABS 2007.1). Computer literate in Microsoft Excel, Word, Power Point & Photo Editor.
Over twenty years in plants, and pipeline construction, Inspection and supervision, including several overseas assignments.
Quantity Surveyor/Estimator (Mechanical)
Instrumentation Engineer with 15 years of experience in maintenance, teaching and construction
- Good at English and drilling software.
Extensive experience in electrical mechanical completion, pre-commissioning, commissioning and operation of drilling rigs, FPSO’s, power plants & other projects including oil & gas in Africa, Asia, Australia, Middle East and South America.
•M.Sc. in Geology with specialization in Petroleum Geology and Biostratigraphy. •Working as a Geological Consultant and providing Wellsite Geological Services to the clients within Canada and overseas.
20-years experience in the oil exploration industry (12-years in the field and 8-years in the office). Present position as Project Coordinator for Baker Hughes INTEQ. IWCF Well Control Supervisor Level (Surface BOP) and LRQA Internal QMS Auditor. BSc. Ongoing MSc in Petroleum Engineering.
16 years of Piping & Pipelines Project Management/Project Execution experience in the Industries like Refineries, Hydrocarbon, Petrochemical and Oil&Gas(Cross Country Pipelines, Booster Pump stations, Oil Station, Gas Station, Up-Stream flow Lines).
I have diploma with 20 years experience in construction/maintenance. 10 years in oil industries maintenance, also witness commissioning and start up of new installations in the refinery. Hands on experience in 33/11/3.3kv/440v systems.Available in one month time notice period.
Specializing in ICT/SCADA planning Proven Technical & Management Expertise with 14 years Experience overseas-Kuwait and Japan.
See resume
Resume for Project engineer position
Expert INSTRUMENTATION , SCADA, TELECOM , DCS OR SAP / ERP , DESIGN , ENGINEERING , PROJECT MANAGEMENT , OPERATION AND MAINTENANCE , TECHNICAL SERVICES , ISO’S ETC
Industrial engineer, ample experience in catalytic cracking technology and liquefied natural gas, seeks position to apply knowledge acquired as researcher over past four years. Having lived in Latin America and Western Europe, have developed effective multi-cultural skills.
18 years of experiance in handling L.T and H.T motors in power and steam plant
Sr Drilling Engineer, Night Drilling Supervisor, Contracts Engineer, Trainer, Operations Planner
Project Manager with 9 yrs experience PLC,DCS,SCADA based Industrial Automation and Power Projects
I have 9 years of subtstantial experience in piping design.
EEng, MBA and a partial (ongoing) Master in GISc. 16 years designing, developing and implementing GIS. Strong experience on MapInfo / MapBasic development, and on several MapInfo products and other GIS and computer languages. Also experienced in Project Management, QA and as Technical Instructor
Chemical engineer with over eight years experience in an oil refinery. Utilize exemplary leadership, time-management, critical thinking/analysis, problem resolution, written/verbal communication and human resources management skills to plan and schedule operational, production and dispatch facility
• Using STAAD and AUTOCAD for Design and Detailing of Buildings and Civil Engineering Structures. Design and construction of pipeline, building and civil engineering structures, Pipeline integrity assessment and asset management , ISO 9001:2000 Qulaity Management System lead Auditor ,
Sr. Drilling & Completion Consultant
Installation, Wiring, Loop checking, Calibration commissioning of new electrical instrument and project
Petrophysicist (Senior Geoscientist) with almost 7 years experience, Skills: Log Analysis and interpretation (Cased Hole/Open Hole) Integrated core and log data analysis, petrophysical moddeling, reserves evaluation, base knowledge of seismic interpretaion
Firoz Khan, A NACE CP Level 2 , have had a great deal of corrosion / Cathodic Protection experience in Pipelines, Above/Under ground storage tanks, Jetty & Offshore Structure. Have done a lot of CP Surveys also.
I have M.Sc. in Mechanical Engineering and as a Piping Engineer I have 7 years experience both in design and construction phases of oil, gas and petrochemical projects led by International firms like TECHNIP and LINDE.
My career ambition is to be working for a firm that allows me to work with Electrical Power Generation, High Voltage/Low Voltage Power Supply Systems, Sub-stations, Distribution, Transmission Lines, Protection and Metering Scheme Design, Installation, Testing, Modification and Maintenance. Qualific
I have dedicated 14 years in the corrosion protection, corrosion monitoring, material selection and material upgradation in Oil and gas based industries. For the last two years I have been associated with the Inspection Management System and Risk Based Inspection programme being developed.
Expert in alignment, maintenence, troublrshooting, overhouling with nice computer knowledge
Fourteen years of experience in Estimation & Proposal preparation of Co - Generation Boilers, Refineries & Oil, Gas and Petrochemical Plants. Well versed in all aspects of Estimation and commercial terms & conditions of contract.
Excellent working knowledge in Piping stress analysis using caesar II
Instrument Engineer with MBA having 10 years Expeience in Refinery & Chemical Industries Project & Maintenance.
Stractural/ Mechanical Engineering
Having Over 10 years of experience in Documentation in Oil & Gas Industry using EDMS
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   [ 25 ]   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
CATEGORIES: Engineering/Technicians;
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com