Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #57414 next resume »»
CONTACT INFORMATION:
View contact information...

Key
Qualification
. More than 25 years experience in electrical field combined with DCS-PLC programme.
21 years work experience in Oil,Gas and Petrochemicals Industry.
10 years experience as a crew trainer in power unit transformers 6Kv/0.4Kv and electricalfield.
6 years experience in construction site field.
Experience of high /medium/ low voltage systems, design of power generation system and earthing systems.
Very good knowledge of electrical installation techniques.
Familiar with the determination of fault levels, specification of secure supplies, motors and other electrical equipment.
Practiced in the use of computer based design packages.
Familiar with HVAC systems and PC programme(word,excel,autocad)
Bio Data

Countries Worked In: Turkmenistan,Gabon,Libya,Angola.
Countries Lived In: Austria, Germany,France,Turkish,Turkmenisten,Gabon,Italy,
Norwey, Tunisia,Libya,Angola
Foreign Languages: Russian-very good level of both, English-very good level of both,
French-pretty good level of both, Italian-pretty good level of both

Work Experience
Period:Present
Position:Electrical Supervisor
Company&Location:Amec Spie Capag France-Soyo town, Angola
. Responsible for all site erection electrical works to a new life camp situated in Soyo town(onshore)on border with Congo and at over 500 Km from central office Amec
Spie Luanda.
Coordinating and supervising of Earthing System, Cable Grooves,Lightning System
Internal-External Lighting, using power supply from set generators Eneria
440KvA(three pic.)by TGBT 0,4Kv,bus-bare 1600A,Schneider Switch Gear 800 A, mounting of electrical panels(250A),conections and electrical equipment 380v-220v ensure that the subcontractor's works complies with the contract, drawings and specifications.
Commissioning and start-up of set generators,TGBT,electrical panels to every area calculated(three accommodation area,kitchen area,office area, clinic area mec&electrical workshops,utilities area(pomp station,water trat.plant,water tanks fire pomps...)
Daily Subcontractors Time Sheet and daily report to Construction Manager regarding electrical works progress.etaps of installations and eficientsy solutions for electrical works.
Responsible for electrical work permits ensuring that the works comply with all
Health,Safety,and Environment (HSE) issues.

Period: Oct. 2006 – April 2007
Position: Site Electrical Supervisor (contractor)
Company & Location: Takenaka Europe GmBh-Ploiesti town Romania
Providing of engineering design guidance, supervision and design checking of all electrical design work per project requirements including: Single Line
Diagrams,Transformer Station Drawing20Kv/0,4Kv, Power and Control Layout
Drawings, Cable Trays & Conduit Layout Drawings, Lighting & Grounding
Layout Drawings,Cable & Conduit Schedules, Control Schematics & Wiring
Diagrams and Electrical Specifications.
Monitoring,supervising all electrical subcontractors works,erection,precomm.
commissioning and start-up for a new factory Calsonic Kansei ensure that the electrical works comply with the contract requirements and the project execution is in accordance with policies, procedures, systems, and requirements.
Responsible to review and approve electrical designs, supervise the erection, testing and commissioning of power station, to ensure that the subcontractor's works complies with the contract, drawings and specifications.
Carry out work in accordance with project and client engineering Health,Safety,
Environmental,QA-QS and report progress and problem areas related to the execution of the work.
Reasposible for all the electrical works including Transformer station
20Kv/0,4Kv,Medium voltage-Low voltage Distribution,Lightning and
Grounding,Lighting-Sockets,Weak Currents Installation(Tel.&Lan conduit,
Automatic fire alarm system,Public Address system,Security System,
CCTv system,MATv system)

Period: Nov.2005 – Oct.2006
Position: HVAC-Electrical Spc.Tehnician
Company & Location:ENI-GAS Sabratha Platform Libya
Responsible for all HVAC department in production activities in the oil and gas treatment plant(proces and utilities units).
Training course for the HVAC Libyan technicians team regarding operation
Parameters and procedure during start-up, normal operation,shut-down,
Alarm,Fire&Gas and Emergency Shut-Down System pipelines,P&ID with help of DCS
program and field instrumentation for the HVAC system.
Responsible for a good function to MCC panels,PLC panels useing all test equipment required for a loop testing.
Responsible for loop troubleshootings (electrical,instr.,mech.)and for daily report,daily work permits depending on necessity and preventive maintenance-daily reports with regard to the system problems and solutions to maintenance superintendent.
Operates HVAC system through PLC and control system and immediate checks of equipments in case of alarms or false alarms and takes neccesary actions.
Checks for all HVAC rotating machinery,HVAC system,Clima system,cooling water pumps and the temperatures through display system and PLC and immediate visual equipment control on Living Quarter and Top Side for preventive maintenance reports.

Period: Mai 2005-Oct.2005
Position: Site Electrical Supervisor Coordinator (subcontractor)
Company & Location: SOGEC Gabon-West Africa
For six months I had contract with SOGEC-Gabon for Gabon President
Palace site in Oiem town at over 600 Km from central officeSOGEC- Libreville.
Responsible to finish of project work,in accordance with the Discipline Design
Instructions,including the company and Project Procedures on Safety and Quality
Control within the man hour and cost budgets and the project schedule targets to the air condition system,TVsystem,telephone system,external-internallighting system to power station.
Responsible for the control of electrical construction quality assurance,look after the plans concerning the inspection and testing of electrical materials and control as-
built documentation preparation.
Verification and approval acts of hidden work and completion, assess the electrical work site progress and supervising electrical construction work to ensure a minimal environmental.ensuring that the electrical work comply with all Health,Safety,and
Environment (HSE) issues.
Review the project execution schedule by the cost and Planing Department.
In addition providing contracts and salary week for the daily workers,materials,tools accomodation,meals,transportation in-out to site for Gabonien technicians arrived from central office SOGEC-Libreville.
I was connected for this program full time to take care of whole project.

Period: Oct.2003-April 2005
Position: HVAC-Electrical Engineer
Company & Location: Bouygues France ;Asghabat-Archabil(Firuza)Turkmenistan
Preventive and corrective maintenance full-time work for Turkmenistan
President Palace Archabil (Firuza).
Monitoring of power station6Kv/0,4Kv(Schneider Electric Transf.)1600KVA
Diesel generator sets(Cummins) UPS(Liebert),HVAC systems controlled by
Honeywwell Data acoquisition,processing and command equipment(Excel
500/600-software Excel100-PLCS,ABB-ACS400 frequency and power converters, fema pressure transmitters,Honeywell temperatire transducers)units for cool and heat water production (Carrier Coolers and Lacaze heaters,hydromodules
Salmson)water and air traitment units(Aqua des UV 30)
Responsible for monitoring plants parameters(electrical,utilities,HVAC,mechanical, instrumental) through display system and PLC and takes the best decisions for corrective actioons.
Operates HVAC system through PLC and control system and immediate checks of equipments in case of alarms or false alarms and takes neccesary actions.
Checks all rotating machinery,HVAC Units,all standby emergency equipments(Diesel generators,fire water pumps)every two hours day or night and anallyses data collected for preventive maintenance.
Supervising and checking electrical power supply( 6Kv/0,4Kv,UPS room,6Kv room,transformers,0,4Kv room, MCC panels) 15HVAC Units and plant utilities for a good function useing all test equipment required.
Responsible for preventive maintenance,solutions of all troubleshootings electrical-
instr.,mech,HVAC various power utilities equipment and water tratment
Responsible for daily work permits,daily report, cause and effects of the field reading loop diagrams and sheets-reports to maintenance supervisor.
Identyfing any risks which may effect the work schedule or budget.
Responsible for all field operations in power station(high,medium,low voltage)
UPS,water production and treatment by offering supervision and quality control.
Training course for Turkmenian team programme regarding operation parameters and procedures during start-up,normal operation,shut-down to power station,plant utilities, diesel generator sets,HVAC system,HSE, useing DCS
and field instrumentation.
The last three months I have worked in site for precommissioning HVAC system at Comercial Bank, Expositional Palace Asghabat Turkmenistan,buildings with over ten floors.

Period: 2000-2003
Position: Electrical Supervisor Coordinator
Company & Location: Oztasar U K-Baicoi Romania
Responsible for all site erection electrical works to the new ready-made clothes manufacturer ( 4phases)offices and utilites in accordance with the Design
Instructions and Procedures on Safety and Quality Control.
Responsible for daily work permits ensuring that the works comply with all
Health,Safety,and Environment (HSE) issues.
Coordinating and supervising of Earthing System, Lightning System, mounting of electrical panels and electrical equipment 380v-220v ensure that the subcontractor's works complies with the contract, drawings and specifications.
Erection,pre-commissiong,commissioning and start-up internal and external lighting System,generators set,air conditioning system,security system and utilities.
Erection of metalic network pipe for the air pressure to in-out compressors room and in all the production halls by weldings useing different sizes of metalic pipe.
Supervising and coordinating works for fire alarm system, metalic pipes installation for utilities (water networks,boilers, toilets,showers,washing machines,etc...)
Supervising works to cutting tables(wood and metalic profiles, size14m/1,80m for cutting area,metalic doors by welding useing different metalic profiles.
Weekly reports with regard to work sheet,materials,controls as-built
Documentation preparation, works site progress to Project Manager.

Period: 1999 – 2000
Position: Chief Electrical Team
Company & Location:DIS-INTERPLAST Italy-Filipestide Targ,Prahova County-Romania
Erection, pre-commissioning, commissioning and start-up electrical installation works together with an Italian team from Sinergia Italiana for the new socks factory,offices and utilities.
Supervising and coordonating electrical works for Grounding and Lighning installation,Cable Tray installation,Low Voltage Panels installation and equipments, External and Internal Lighting, Air Conditioning System,Security
System,Tv System.
Supervising and coordinating works for metallic pipe installation for the air pressure from the compressors room to all the factory area.

Period:1978-1999
Position:Lead Electrical Shift –Power Plant
Company&Location:Petrotel-Lukoil Refinery Ploiesti Romania
Supervising and coordinating activity of the four electricians in power units transf.6Kv/0,4Kv and responsible for all the monuvers 6Kv/0,4Kv.
Monitoring preventive maintenance and planned maintenance tasks in line with the installation maintenance schedule on electrical installation, including protection relays,LV, MV, HV, switchgears and drives.
Responsible for the safe and efficient maintenance of power systems so as to efficiently meet business requirements within the framework of Permit to
Work and Health & Safety at Work guidelines and requirement.
Reparing engines and electric equipment in the principal workshop for the electrical installation of a high and low tension to power unit transformers
Servicing, repairing, intervention and monuvering 6kv/0.4kv it practically ment constant with providing with electricity for production plants.
I changed the work place into principal power unit transformers 400kv/110kv.
More than 10 years I've worked in Gas Plant and in over 20 worked years I've changed the majority power production plants of Petrotel-Lukoil Refinery.

Period: 1977-1978
Position:Electrical Technician
Company&Location:T.I.A.B Bucharest -5Ploiesti Site Romania
Everything that made me become a skilled electrician, started training and working for this company.The main duties required to be performed by an electrician in construction
I've learnt and practiced while working for this company.
The operations include everything needed on a construction site in the electrical field like erection of power plant,power stations,power substation, mounting of high- medium voltage transformers(630KVA,1000KVA,1600KVA,
, 2000KVA) cable trays,digging trenches,grounding and lightning system, laying conduits underground,calculate the proper lenghts and sizes off setting saddling,connecting electrical wires to control panels,protection system
(fuses,breackers,relays)fixtures,outlets,machinery equipment.

Education Nov. 2005 Training Center course(Pavia-Italy)for basic off shore Safety
Induction&Emegency (included Huet and EBS) Expiry Nov.2009
1982-1987 Polytechnical Institute Bucharest(section-Electrotechnical)
1974-1978-High School Diploma Energetics Ploiesti(electro-mechanics section)
1977-1978-T.I.A.B-awarded diploma of moumting electrician for automatic
Electrical installation.
1967-1974 Elementary School Ploiesti

Practical Skills
Good practical backgrounding electrical-mechanical fields.
Familiar with GE Power Generation Equipment
Experience with hook up,commissioning,and start up of high,medium and low voltage electrical system.
Good knowledge of electrical power and control hardware and systems up to and including the medium voltage level
Good knowledge and practical backgrounding regardingwelding,pipes and metalic profiles.
Ability to adjust quickly to new technologies and different cultural and working envirorment.
Experience in working in bad wather condition and on the constructions site conditions.
Abilty to handle tight deadlines.
Good experience in leading my subordinates.
Great ability to work in any kind type of construction.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 1801 to 1850 of 6742)Go to Search Parameters...
Brief Description
I am a Canadian citizen having 17 years solid building construction, Civil and structural design, quality Management, project management, construction Management. a dedicated team player/leader exhibiting a high level of energy and initiative under pressure.
Please see resume for full details. Thank you
Over 26 years experience, 16 of which are with major foreign oil companies employment in specialized gas field operations which have included pre-commissioning and commissioning activities in the onshore and offshore Oil and Gas industry.
to secure a responsible position as an electrical engineer.
I am Mechanical Engineer with 18+ years of rich experience in the field of oil & gas industry.
15 years of utility/specialty chemical management experience.
. I have strong leadership skills and proven ability to manage and motivate a team to achieve assigned results. Through my previous jobs, I have learnt to provide and maintain consistent high standards and service.
Presents and reports the project status to the top management.
I am expert in Mechatronics field.
As an ambitious, inquisitive, self motivated engineer, I have been working as a workover & completion engineer since 2004. Cementing, acidizing, fishing, drilling, offshore gas well completion, deep shore well completion are the main subjects of my experience.
07 years extensive experience holding a various positions in different phase of the projects in the field of Instrument Pre-commissioning, commissioning, start up,
I am a Mechanical Engineer and have more than 6 Years Experience in Piping Design and Stress Analysis Engineering. I have worked with CAESAR II software in developing Piping Stress Analysis and I also have substantial experience in the design of interactive CAD software; Moreover, my job involves sp
GIS/CAD specialist
As Cathodic Protection Engineer in Power Plant / Oil & Gas Industries with about 7 years experience; having knowledge on diverse Construction/Engineering Design /Commissioning/Maintenance activities with extensive experience on Cathodic Protection with NACE Level II certification.
I am searching for a job as a pipping stress and supporting engineer in KL, Malasia and I am expert in using CAESAR II and PDMS and ANSYS soft ware
Mechanical / Electrical experience in Boilers, pumps, HVAC Systems, Compressors, steam systems and ancillary services, DHW skids, Chillers, Cooling Towers, Clean steam Boilers, Purified Water Systems, waste water, Low voltage Electrical Systems, Preventive Maintenance Systems.
A highly motivated, adaptable MSc graduate.
Surface well test engineer
Structural Designer With 9Yrs. PDS,Microstation & Autocad Experience
More than 25 years experience in electrical field.
I am a Piping Engineer experienced in Piping Stress analysis, Complete Piping engineering activities, PDS expertise. I believe that my enclosed resume will demonstrate that I have the characteristics and experience you seek.
Over 14 yr of experience in dealing with Automation, Instrumentation & control systems. 11 years in Project Sales. Working experience with Honeywell & Yokogawa. Presently, located at Doha, Qatar, working with Automation/IT Company.Handling DCS, PLC, FGD System,Field Instruments.
An Electrical Engineer with over 12 years of hands-on experience in Maintenance of Assets and Utilities in a Gas based Petrochemical plant and Integrated Steel Plant with Rich Managerial and technical capabilities in Installation/Commissioning and Upkeep of Electrical Equipments.
AWS, CSWIP 3.1 AND ASNT LEVEL II IN RT,UT,MPI & DPI
Pipe stress engineer with eight years experience.Software Caesar II.
8 + years Oil & Gas field experience in Instrumentation and Control engineering. Lastly Worked as Assistant Resident Engineer for Tyco Fire & Security, UAE
Electronic/Instrumentation Engineer with experience on Electronic control systems ,PLCs,Maintenance of Downhole instrumentation systems etc
11years experience in the field Mechanical Maintenance of Machine shop and Foundry
Gas turbine, Boiler, Water treatment, Oil and gas operator
Condition monitoring Engineer with 7 years experience in oil and gas industry
I have been involved with many projects throughout these regions, from Heavy Construction, Platform Installation and Inspection IRM programs.Also I have more than 3 years experience in NDT/Welding Inspector in various project. I just recently pass my Subsea Insp. Controller CSWIP 3.4U(TWI-UK).
Piping, mechanical, stress analysis, nuclear
KNPC & KOC approved planning engineer for EPC projects,Involved in Planning and coordination for the KNPC GRTA- 2006 shutdownInvolved in Planning of Major Shutdown for KOC -GC 27
An experienced metocean engineer/hydrographic surveyor/GIS technician/coastal engineer seeking suitable positions in related fields
Welding and NDT Supervisor, Lifting Equipment Inspector
Subsea Pipeline & Riser Installation engineering with Offpipe or Orcina Software(Orca Lay, Orca Flex
Computer :
My expertise includes strong hands-on technical skills with ECLIPSE and MBAL software applications. I am highly skilled in EOS fluid characterization, well test analysis, reservoir modelling, manage mature reservoirs, well monitoring
Welding Superintendent: SSCL. DME (3years welding), WI (QA/QC) 1992, Safety Training qualified and 21 Years Experience (QA/QC Welding Engineer-01 Year; Welding Supervisor--12 Years; Welding Educator-04 Years; Welding Instructor-02 Years) in working with ASME, AWS, API standard in EPC Industries
Electrical Manager with 18 years of hands on Experience of Executing Green field Engineerg project of Copper SX & EW, Cobalt SX &EW, Leaching and Flotation plant. Electrical equipments ranging from HT & LT panels, HT & LT motors upto 7700kw, variable frequency drives upto 5000kW, Hot & Wet ESP's.
Ten (10) years of accumulated experience in construction engineering, project planning using Primavera P3 ver. 3.1 for more than six (6) years, and project management. Last seven (9) years with Saudi Arabian Oil Company (Saudi Aramco), Saudi Electricity Co. - Eastern Region Branch (SEC-ERB) and Saud
cartographer - gis
Internationally experienced and trained professional in Instrumentation and Control Systems. Experienced in the design, control philosophy, MMI/HMI generation, implementation, start-up, commissioning, and operation of DCS, SCADA, and PLC.
Occupational Health And Safety Professional, Post Graduate Cert. In OHS&E Management
Technically accomplished & competent professional with over 9+ years’ rich experience on Refinery Inspection department Activities, starting from Refinery construction stage to pre-commissioning and Normal operation. Currently working as Assistant Manager (Inspection) with NRL
Having total 11 years experience out of which 10 years in Oil & Gas and Shipbuilding Industry as an Cost Estimator, Cost Control Engineer, Tender Coordinator and HSEQA Adviser in the leading FPSO/FSO Company, Shipbuilding/ship repair and conversion yard.
Chemical Engineer. Main experience as chemical treatment and corrosion engineer in Oil&Gas facilities (gas, steam and water injection plants, tank farms). Engineering and field experience. Oilfield chemicals selection and testing. Process optimization. Control and Instrumentation experience.
Wellsite geologist, wireline corelation, mapping, pressure detection, hands on well control advisor, well design, rheology and hydraulics solutions.
Experience in Safety / Loss Prevention Engineering and Risk Assessment Studies
B.E. Mechanical Engineer, Middle Management Maintenance Executive. Demonstrated willingness and ability to quickly acquire new expertise, solving problems related with Rotating Equipment reliability and performance. Looking for challenging opportunity and career advancement.
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   [ 37 ]   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
CATEGORIES: Engineering/Technicians;
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2008 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com