Education
BE in Petroleum Engineering (Aggregate 80.56% with first class 2nd position)
Mehran University Jamshoro-Pakistan, 2005.
Final Year Project
¡* Comparative Study of RFT & MDT Wire line Formation testing tools ¡ ¨.
Experience
January 23, 2007 Orient Petroleum International Inc. Drilling Engineer
- Working as Drilling engineer with Orient Petroleum International Inc. Responsibilities include on-site Drilling Hydraulics optimization and close eye on a Drilling operation on directional Wells. Currently I am working on GWDC- Rig-173, with Power Rating of 2000hp, minimum lifting capacity of 500ton, rotary opening of 37-1/2 ¡ ¨ & Setback Capacity of 497klbs. This Rig utilizes three F-1600 Mud pumps (Equivalent to National-1600), manufactured by Bao Manufacturers. With this Rig we have successfully completed a Deep Deviated Well penetrated in Data Formation at the TVD of 17450 FT. Currently we are working on an other Deep well as re-entry to re-test and re-open the zone of interest.
January 01, 2005 — January 20, 2007 Mari Gas Company Ltd
Assistant Drilling Engineer
- Worked as Drilling engineer/Night Pusher on Company's own Skytop Brewster Rig. I completed a project of Drilling Of Three Wells penetrated in Pirkoh Lime stone. Project started on Dec 05, 2006 and completed on Jan 18, 2007. Drilling utilizes two mud pumps as; Oil Well — 350PT & Gardener Denver PZ-7. Oil well-350PT had 5 ¡ ¨ Liner size & 7 ¡ ¨ Stroke length, but for Pz-7 & ¡ ¨ Liner with 7 ¡ ¨ Stroke length was used (As per Hydraulics requirements).
Rotary Opening was 18 ¡ ¨, well drilling profile was as: 20 ¡ ¨ Conductor, 13-3/8 ¡ ¨ Surface Casing, 9-5/8 ¡ ¨ Intermediate Casing & 7 ¡ ¨ Production Casing or in some cases liner.
- Worked as DST Supervisor for Hycarbex Well ¡* Al Ali-1 ¡ ¨, penetrated in Sui Main Limestone Formation.
- Worked as on-site Shift Engineer/Night Drilling Supervisor during drilling of Ziarat Exploratory Well-1 spudded on 28 Sept. 2005 and continued till 28th Dec. 2005. This was a hard-rock deviated well @ 15 ¢X in active tectonic stress area with shallow gas, mud losses, complex well control issues & High H2S concentrations.
- Worked as Trainee Engineer during Drilling/Completion of exploratory well, Mari SML-1, Spudded on 16th Feb & continued to 24th April 2005 by Schlumberger Rig-60.
Internships
Ogdcl
- Passaki Oil Field — Well Operations / Production Facilities
- Workover of Passaki # 1 for Installation/Reversal of Jet Pump Facility
Mari Gas Company Ltd
- Involved in Maintenance of Company's own Skytop Brewster Rig
- Workover of Water Disposal Well
Computer Skills
- MS Office
- I have prepared a detailed Excel Sheet of Routine Formulas used During Drilling
Short Courses & Workshops
- Valid H2S Emergency Escape Training Certificate
Iftikhar Hyder Butt, Safety Engineer, Rutledge H2S, (February 2007).
- Directional Drilling Techniques
Mr. Riaz Ur Rehman Qureshi, Directional Driller, Baker Hughes INTEQ (January 2003).
- The Art of Mud Logging
Mr. Riaz Ur Rehman, Directional Driller, Baker Hughes INTEQ (Aug, 2003).
- Liner Hanger Applications in Pakistan
Mr. Sartaj Ali Shah, District Engineer, Baker Oil Tools (September 2003).
- An Integrated Approach for Prospect Evaluation Techniques
Mr. Tufail Ahmed, Operations Geologist, Mari Gas Company. (March 2003).
- Workshop on wire line logging
Mr. M. Nawaz Bugti, Expl. Geologist, Pakistan Petroleum Ltd. (Sep.2004).
- H2S Emergency Escape Training Certificate
Mubbashir Maqbool, Safety Engineer, Rutledge H2S, (November 2005).
- Positive Displacement Compressor Performance Optimization
Mr. Allah Baksh, Reliability Engineer, BP Pakistan (Mar 2006)
- Wire Line Logging and Interpretation
Mr. Masatoshi Nishi, Country Manager Schlumberger Pakistan (Jan 2005)
Publications
- Prepared ¡* Well Drilling Program ¡ ¨ for deep exploratory Well drilled in Lower Indus Basin of Pakistan, Orient Petroleum International, 2007.
- Prepared ¡* Well Drilling & Completion Report ¡ ¨ for three Wells, Mari Gas Company Ltd, 2007.
- Publication ¡* Impact of Hydrocarbons on Environment ¡ ¨
(Annual Journal of Institute of Engineers Pakistan, Mehran Chapter-2003).
- Publication ¡* Design of Perforation Strategy on the basis of Flow Efficiency ¡ ¨ (SPE-Mehran Student Journal 2003).
- Compiled a ¡* Manual of Internal Corrosion ¡ ¨, Mari Gas Company Ltd (2006).
- Prepared a Detailed Study Report on ¡* Pipe Line Leak Analysis Techniques ¡ ¨, Mari Gas Company Ltd.
Achievements and Distinctions
- Worked as Executive member of SPE - Mehran Student Chapter for year -2003
- Received SPE and PAPG Scholastic Achievement Awards for Year 2003 and 2004, respectively.
- Received 1st Place award in ¡ ¨Inter-batch Presentation Contest ¡ ¨ arranged by SPE Mehran Student Chapter for year-2003.
- Received ¡* Best Member of the Month ¡ ¨ award, from SPE, Mehran Student Chapter, 2003.
- Mehran University awarded four times meritorious scholarship.
Professional Associations
- Member, Society of Petroleum Engineers (SPE)