Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #58323
next resume »»
CONTACT INFORMATION:
View contact information...
Qualification
1. B.E. Mechanical from NED University, Karachi in August 1998 (First Division).
2. MBA in International Business from Institute of Business Administration in June 2006 (Cumulative GPA 3.15).
Career Details
ORGANIZATION DESIGNATION PERIOD
ILF Consulting Engineers (Abu Dhabi) Senior Pipeline Engineer August 2007 – To date
Eni Pakistan Limited Project Coordinator Jan. 2006 – July 2007
Petrosin Engineering (Pvt.) Ltd. Mechanical Design/Estimation Engineer Jan. 2004 – Dec. 2005
ENAR Petrotech Services (Pvt.) Ltd. Mechanical/Pipeline Engineer July 1999 – Dec. 2003
Responsibilities as Pipeline Engineer
 Involved in Establishment & Preparation of Pipeline System Design Basis, Conceptual Design, Feasibility/FEED Studies and Basic/Detailed Engineering Design
 Preformed Hydraulic Analysis for Single & Multi-Phase Pipeline Systems, Flow-Lines And Multi-Product Pipeline Systems in View of Life Of Pipeline Throughput Requirements
 Understanding of Hydraulic & Surge Analysis for Liquid Pipelines Using "Hydraulics/Surge Analysis Software" and Development of Operating & Control Philosophy Based on Pipeline Valve Closure and Pump Shutdown Cases
 Pipeline Thickness Calculations & Material Selection (API 5L). Telescopy (Thickness Variation along Pipeline Length) of Pipeline Diameter Leading to Pipeline Material Cost (CAPEX) Optimization
 Pipeline Economic Diameter Selection Based on Optimized CAPEX and OPEX (Life Cycle Costing) for the Life of Pipeline System
 Performed Interface Length and Volume Calculations for Muti-Product Pipeline System in View of Products Density Differences as well as Tankage Sizing for Interface Volumes Based on Operational Philosophy and Batching Schedule
 Understanding of Industry Codes & Standards (ANSI B31.4, B31.8, B16.5, API 5L, API 6D, ASME Section VIII Etc.) and Recommended Practices
 Development and Selection of Optimum Main and Intermediate Pumping/Compressor Station Configuration and Pumping/Compressor Arrangement in view of Hydraulic Limitations, Flange Rating Limitation, Life of the Pipeline, Throughput Phasing/Requirement etc
 Understanding of Pig Launching and Receiving Facilities for Pipeline and Flow-Lines
 Involved in Preparation of Pumping & Terminal Station PFDs/P&IDs, Alignment Sheets, Plot Plan, Gas, Piping Layouts, Isometrics, Bill of Materials etc.
 Development of Overview Maps, Key Plans, Alignment Sheets for Flowlines and Pipelines
 Involved in Project Specifications, Data Sheets & Purchase Requisitions and Project Cost Estimation
 Involvement in Pipeline Basic & Detailed Engineering Development and Review/Check of Contractors Engineering Documentation Keeping in view of HSE, Quality, Cost, Schedule, Environmental, Regulatory Issues etc.
 Involvement in Site Surveys, Pipeline/Flow-Line Rout Survey and Selection in view of HSE Requirement, Route Optimization, Constructability, Local Regulatory Requirement, Environmental Issues etc.
 Involved in In-Principal Route Approvals with Town Planning for Proposed Pipeline Route and Coordination with Fujairah, Ras-Al-Khaimah, Sharjah and Al-Ain Town Planning
 Technical and Commercial Evaluation of Bidders Proposal, Vendors Quotations & Contracting Services
Responsibilities as Project Coordinator
 Looked after Non-Operated Joint Venture (JV) & Asset Management for Field Development Capital Projects with Gas Field Operators (BHP Billiton, OMV and Petronas)
 Involved in Project Quality Assurance Reviews (QAR) Especially for Emission Reduction, Field Compression and New Well Development Projects for Different Phases of a Project Such as Feasibility Study (Concept Selection), FEED Study (Concept Definition), Basic & Detailed Engineering Design, Construction, Commissioning and Handover to Production
 Preparation & Submission of Decision Support Packages (DSPs Related to Technical Documents & Economic Analysis) for Project Quality Assurance Review by BU and HQ as per ENI's Opportunity & Project Development System (OPDS Manual) and QAR Procedures
 Development Project Tracking in terms of Quality, Cost, Time & Resources and Involvement in Engineering/Technical Workshops, Engineering Design Reviews, Work Programs, Procurement Strategy, Project Implementation Strategy, Contracting Strategy (Single Sourcing or Competitive Bidding), Contract Award/Bid Evaluation & Assessment for JV Projects
 Liaison with Internal Departments such as Exploration, Reservoir, Drilling, Engineering, HSE and Accounts/Finance as Well as with Operators for Operations Management
 Integration of data and Information Related to Development Projects for Consolidated Field Development Scenario in terms of CAPEX Spending Pattern with Respect to Time
 Review, Comment and Approval of Operator's AFEs & Contact Awards for Development/Up-Gradation/Modification Projects such as Well Drilling, Completion Jobs, Work-Overs, Wellhead Tie-in & Flow-Line Installation, Gas Processing Plant Up-Gradation and Modifications etc.
 Preparation of Internal Memos for AFEs and Contract Awards Approvals with BU Management
 Preparation and Approval of Master Plans, Long Term Investment Plans & Fours Years Plans Especially Allocation of CAPEX in view of Established Field Development Plans and Current Field Changes
 Review of Operator's Budgets and Preparation of Internal Annual Budgets, Quarterly Forecasts of Spends and Approval with BU and HQ Management
 Assisting in Project Economic Evaluation Based on CAPEX And OPEX (Life Cycle Costing), Cash Flow Generation, Project Overall and Incremental NPV/IRR, Hurdle Rate Consideration etc.
 Review and Approval of Operator's Cost Reports such as Operator's Cash Calls, Billing Statements etc. for Project/Operations Cost Tracking
 Involvement in Technical and Commercial Evaluations of Development Projects for Joint Venture to Assess ENI's Investment Interest
 Scope of Work Review and Technical & Commercial Queries for Field Development Projects with Operator in Consultation with Relevant Department(S) such as Exploration, Reservoir, Drilling, Engineering, HSE etc. for Project Justification
 Review and Comments on OCM/TCM and Workshops Material to Identify Decision Points and Effectively Present ENI's Viewpoint on Different JV Matters
 Weekly and Monthly Assets Performance Reporting in Coordination with Operator Activities
Responsibilities as Mechanical Process Engineer
Understanding of Process Concepts, System Design Basis, Process Configurations etc.
Understanding of Process & Hydraulic Simulations for Upstream/Down Stream Facilities and PFDs & P&IDs
Good Understanding of Hydraulic/Process Simulation and Line/Equipment Sizing for Upstream/Down Stream Facilities including Pipelines, Flowlines, Plant Piping, Terminal Piping, Gathering & Distribution Networks for Single and Multi-Phase Flow Systems
Hydraulic Simulation and Analysis Expertise in Term of Development of Single Hydraulic Network for a Process Plant/Pipeline Networks, Flowline Gathering/Manifold System etc. Engineering Interpretations and Recommendations for Optimum Utilization
Process Technology Concept and Selection such as Amine, Membranes, Dehydration etc.
Line Size Selection for Wellsite / Plant / Terminal Piping for Single/Multi-Phase Flow and Equipment Size Selection such as Main Line Pumps, Booster Pumps, Storage Tanks, Dyke Walls, Three Phase Separator, Metering Systems, Terminal Piping, Control Valves, PSV etc.
Concept of Flare and Blow Down Systems Sizing
Analysis of Existing Pump Performance & Suitability under New Service Conditions
Control and Operating Philosophies for Wellsite/Plant/Terminal Operations
Development of Cause and Effect Matrix & Participation in Project HAZOP Activities
Development of Plot Plan, Equipment Layout, Piping Layouts, Sectional Details, Piping Isometrics Including Bill of Materials and Through Understanding of Piping Material Specs
Preparation of Technical Specs, Data Sheets and Purchase Requisition for Equipment and Piping Materials
Preparation of Detailed/Consolidated BOMs, Material Requisitions and Cost Estimates
Mechanical Design of Pressure Vessels as per ASME Section VIII Division I
Technical evaluation of client inquires, cost estimation and preparation of scope of work and bid proposal
Evaluation of commercial terms as per client inquiry document and company's standard terms
Look after in-house design activities regarding mechanical design, piping design, piping layouts, isometrics, BOMs etc.
Material selection for pressure vessels and process equipment as per service conditions
Development and issuance of the relevant documents and drawings such as P&IDs, piping plans, isometrics, BOM etc. for construction works to client and production department
Other Responsibilities and Interpersonal Skills
Communication & Coordination with Client, Vendors, Contractor at Site & Other Stakeholders
Internal Departmental Interface, Communication and Coordination
Identification of Bottlenecks and Resolving them Through Discussion & Coordination
Effective Engineering Input/Advice during each Phase of Project Leading to Optimization of Project Economics and Value
Look after In-House Design Activities regarding Process/Mechanical/Piping Design, Piping Layouts, Isometrics, BOMs etc.
Development of Technical Proposals in view of Client Needs
Preparation of Tender Documents for Engineering, Procurement & Construction
Preparation of Feasibility, Technical and Progress Reports as well as Asset Reporting to HQ
Technical and Commercial Evaluation of Bids and Recommendations
Projects as Project Coordinator
Following is the brief of projects handled at Eni Pakistan:
1. Emission Reduction Project: The purpose of this project is to overcome plant emissions and comply with local environmental standards. I actively involved in concept selection phase to finalize the alternative(s) proposed by UOP in feasibility study as well as scope of work review, AFE/contract award approval, project economics etc. The project cost was estimated as US$ 15 MM. Major highlights of project: Process optimization options for emission control as well as process efficiency enhancement and Installation of UOP PSA unit for HC recovery in vent gas.
2. Sawan Gas Compression Project: This involves the installation of compression facility to overcome declining behavior of the field and to somewhat sustain production rates. I involved in concept selection and definition phases for field compression, review of scope and contract award approval for FEED. Two options worked out Wellhead Compression and Front End Compression in view of wells production profiles. The project cost was estimated around US$ 330 MM. Turbo-Compressors were proposed with parallel and series machines in view of life of field and declining production rates.
3. Flowline & Tie-in Projects: I have handled number of number of flowline & tie-in projects for Joint Venture to line up new well for flowing to gas processing plant. Such projects normally involve the project technical review, AFE approvals, contract award approvals, project cost optimization through technical concerns, investment proposal preparation for Eni headquarters etc. Every new well costs for JV around Well Drilling & Completion US$ 8-10 MM and flowline installation US$ 4-6 MM. Most of the flowline projects are of Duplex Steel because of high level of H2S.
Projects as Pipeline Engineer
I have involved in following pipeline/flowline projects as Pipeline Engineer:
1. White Oil Pipeline Project (WOPP) for Pak Arab Pipeline Company Ltd. (PAPCO): This project entails the preparation of FEED document and detailed engineering for 780 km long HSD pipeline from Karachi to Multan. I involved in pipeline hydraulics, economic diameter selection, pumping/terminal system design, surge analysis, control/operating philosophy, alignment sheets, P&IDs, Data Sheets, BOQs & cost estimates etc. The project has an estimated worth of USD 600 million.
2. Taru Jabba Pipeline Project (Attock Refinery Ltd.): This project involves preparation of FEED and EPC tender document for 12" multi-product pipeline 160 km long transporting HSD, MS, KERO and JP-1 and 6" Jet fuel pipeline to Peshawer-25 km. I had similar responsibilities as mentioned in above White Oil Pipeline Project.
3. Feasibility Study for Crude Storage System & HSD Pipeline (Pakistan Refinery Ltd.) The study involves the installation of strategic Crude Oil storage and pipelines. The scope includes the three pipelines for crude and one for HSD transportation. Six (06) storage tanks of each 220' dia. x 48' height (225000 Mtons) were proposed. Dyke Wall calculations, hydraulics analysis, line size selection & optimization, preliminary BOQs, fire-fighting facility requirements were also carried out.
4. Study of Interchangeability of Korangi Keamari Pipelines (NRL): This study was performed to assess the interchangeability of Keamari-Korangi KK-Pipelines dia. 8" and 6" for new service (flow/pressure) conditions for Black (HSD, LDO) and White (Naphtha, MS, KERO, JP-1 & JP-4) Products. This includes system bottlenecks identification, pipeline hydraulics, maximum flow handling check, suitability of pumping units, mechanical integrity check (thk calc).
5. ENI Wellhead Compression and Flowline Installation Project: It includes the installation of two rental Wellhead Compressor Packages of 9.0 and 7.0 mmscfd to enhance the deliverability of depleting wells. Project scope includes scope of supply preparation, bid evaluations, flowline hydraulics, manifold/wellhead P&IDs/piping layouts update, BOQs, flowline survey & alignment sheets and project HAZOP.
6. Projects with ILF: I have involved a bit in three pipeline related projects in this short period. SWCC heavy fuel oil pipeline project: P&IDs review, mechanical specifications, equipment data sheets, bill of materials, line/equipment list etc. Dolphin Energy's Fujairah-Taweelah gas pipeline project: P&IDs and hydraulic study review, valve data sheets review, material specification review etc. Transco's New Water Pipeline Project: routing survey, coordination with municipalities on behalf of Transco for In-principal NOCs, technical meetings with Transco for data gathering etc.
7. ADOC 131 Pig Traps Project: My role in this project as a process/pipeline engineer. This project is the detailed engineering of 131 pig traps across all ADCO fields, which involves the modifications, up-gradation and replacement of pig traps based on a safety and integrity study recommendations. I am involved in preparation of basis of design, project P&IDs, line lists, pipeline/pig trap thickness verification, mechanical key interlocking for safe operation etc.
Projects as Mechanical Process Engineer
I have involved in following projects as Mechanical Process Engineer:
1. Qadirpur Capacity Enhancement Project (OGDCL): It involves new membrane train installation and plant capacity enhancement from 260 to 500 mmscfd by installing improved UOP patent CA+ membranes. I involved in overall plant hydraulics including sales gas network, permeate piping, compressor discharge, regeneration gas circuit to check (in terms of pressure drop) the suitability of existing piping, control valves, heat exchangers, existing membranes, recycle compressor and other equipment. Also, develop BOQs, preliminary cost estimates, instrument data sheets etc.
2. National Refinery Ltd. (NRL) MEK-II Lube Expansion Revamp Project: It involves the installation of New Exxon Mobile patent Dill Chill Process Technology to enhance the capacity and efficiency of the existing lube refinery systems and other related process. My responsibility was to check the adequacy of existing pumping arrangements for new service conditions and sizing of new pumps connecting the existing process piping systems, to identify bottlenecks of existing piping systems and to suggest modifications in existing system e.g. change of impeller, driver adequacy, under-sizing of piping etc.
3. Modification of Crude Transfer Lines (PRL): This modification work involves the installation of new process piping system from Crude Tower to Furnace because of inefficiency of existing lines. The scope covers hydraulics of new two-phase piping system, P&ID revision, BOQs, piping layouts/isometrics, stress analysis.
4. OGDCL Low Temperature Three-Phase Separator: Supply of skid mounted low temperature 3-phase separator package with on skid piping. The scope includes detailed design, procurement and fabrication for packaged unit. I involved in finalization of separator size, vessel thickness calculations as per ASME section VIII Div.1, preparation of mechanical/piping design, BOM consolidation, identification of long lead items etc.
5. OGDCL 3-Phase 1st Stage Separators: Supply of two skid mounted 3-phase separator packages with on skid piping. The scope includes the detailed engineering, procurement and fabrication of separator package. I was involved in preparation of detailed drawings, BOM consolidation, material procurement and other design issues.
6. Fuji Fertilizer (FFC) Distillation Column: This project involves engineering, procurement and fabrication of distillation column. I was involved in vetting of detailed drawings, consolidation of BOM, procurement of materials as per specifications, coordination with inventory department for project materials etc.
7. Bid Preparation for OPI's H2S Removal and Dehydration Plant: Scope of this bid covers the complete Design (basic and Detailed), Procurement, Construction, Installation, Commissioning and Start-up. I involved in the following activities such as initial correspondence to finalize the project design basis, development of P&IDs with process engineer, PSV/control valve/ line sizing, development of preliminary BOQs and overall cost estimates, and preparation of bid document.
8. Bid Preparation for OPI's 3-Phase Separators: Scope of the bid involves the supply of two numbers 3-Phase Separator including detailed engineering, procurement and fabrication of the package. These separators are planned to be installed at ETF. I involved in finalization of separator size, vessel thickness calculations as per ASME section VIII Div.1, preparation of mechanical/piping design, BOM consolidation, cost estimation, identification of long lead items etc.
Knowledge of Codes & Standards
Knowledge of various API, ANSI, ASME, NACE, NFPA etc. Codes & Standards and Recommended International Practices.
Computer Competency
 HYSYS (Process Simulation Software)  PAULA PLUS for Liquid Pipelines Hydraulics Analysis
 KORF (Advanced Hydraulic Simulation)  PSIM – Pumps and Liquid pipeline simulation software
 Crosby Valve Sizing – PSV Sizing  Fisher First vue & Nelprof - PCV sizing
 Paragon – 2 & 3 Phase vessel sizing/rating  ISIZE- FE, RO, PCV, PSV sizing
 AutoCAD - Drafting Software  MS Word, Excel, Power Point, Internet and Emails
Interest & Activities
 Reading books specially technical  Surfing Internet for useful information
 Watching and playing cricket  Long walks for relaxation
Communication
Good written and spoken communication skills in English & Urdu.
Personal Data
Date of birth: January 19, 1975 Marital status: Single
Passport # AA1797191 UAE driving License # 593692
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 1401 to 1450 of 7014)
Go to Search Parameters...
Brief Description
Twenty-two years experience in production, reservoir and evaluation engineering of both major and independent oil companies. Areas of experience include Rocky Mountain, Mid-continent, West Texas, Gulf Coast, Argentina, and Venezuela.
Managed and implemented product, equipment, and process design/modifications in manufacturing and engineering including new product introductions.
I am a Mechanical Engineer with extensive experience in project management, terminal facilities, pipeline design, construction, operations, maintenance and onshore/offshore equipment specifications.
OBJECTIVE A Production engineer/Technologist with 20 year’s experience in the oil industry in Nigeria and the Netherlands.
Sole Proprietor of Bass Energy Company, a consulting firm specializing in drilling, operations and producing property acquisitions. Available for domestic and international assignments.
Summary Job Description: Senior Petroleum/Production/Reservoir Engineer specializing in: Field / Well Performance and Analysis Production Monitoring and Enhancement Cost Reduction and Optimization Team Management
20 years in Civil Finishing works / Insulation as Per CINI /Waterproofing/Anticorrosive Treatment/Painting as per ERS.
17 Years experience as a well log analyst. Contract handling, work over planning, production logging interpretation, management services, asset management ect.
Dear Employers, Through my resume you could evaluate my qualifications and experience in the field of ELECTRICAL & ELECTRONIC ENGINEERING – installation, maintenance and repair of different types of equipment.
I am a mechanical engineer. At Present days, I am working at PT. EXSPAN NUSANTARA as Production and Facility Engineer. My main responsibilities are handling crude oil production and optimization and designing and optimizing facilities.
25+ years experience - Gulf of Mexico, California, Alaska, and International. Fast working, self-starting, and dependable. Team player or individual contributor. Computer experience includes Landmark SeisWorks, Z-Map+, StratWorks, EarthCube, Geosoft "Montaj", and Stratimagic.
I have been working in the Petrochemical and Refining area since 1982 up to date from the level of control & optimization engineering up to Consultant level going through Management and Advisor positions. Open for opportunities overseas. Available September 2004 for new challenges.
Although its cyclical nature has separated me from the oil and gas industry for several years, the new amenable political climate has restored my excitement at the prospect of applying my expertise to new and challenging projects and I believe that my education and experience aptly prepares me.
Job Application
Process engineer . Results oriented Professional Engineer with 11+ years experience in oil & gas in multi positions design/supervisory/instructorMulti-disciplined versatility with superb trouble-shooting and analytical skills to assess problems and provide expert on-site reliability solutions .
Pipeline-Mechanical-Engineer
Experience of Ammonia / Urea Operations and process engineering
QHSE Supervisor/ HSE Supervisor/ H2S Specialist
14 years of national and international experience in onshore/offshore feasibility studies, process simulations, detailed process design, project execution, cost estimating, proposal preparation, project management, operations, plant performance tests, and quality control.
Electrical/Instrumentation Technician, Offshore/Onshore Oil Gas and Marine
Position as Electrical Designer that will utilize strong professional skills, educational background and capability to work well within an organization.
Experieinced EPC Oil and Gas Senior Expeditor clients Imperial Oil Petro Canada Suncor Husky Worley Shell Murphy. Conventional oil, naturral gas, heavy oil, SAGD, compressors HMU
Piping Designer, Piping Design Engineer, Piping Engineer, PDMS, Tribon, CADWorx, AutoCad
Experience in autocad, microstation, smartplant p&id, manual drafting
AUTOMATION ENGINEER with experience in Design, Engineering, Commisioning and Testing of DCS/PLC/ Safety Systems including Triconex, FSC, Experion pks systems
Free!
Core Competencies: Project Management, Operations, Reliability & Integrity Improvement Process(ORIP), Drilling & Production Startups, Well & Pipeline Operations, Team Leadership & Collaboration, Process Improvements, Operational Performance Benchmarking, Oil & Gas Production Optimization, Drill Stem
PDS PIPING DESIGNER
A 32-year-old Married Algerian Citizen, Graduate Telecoms Engineer specialized in wireless, and SCADA Systems with an experience in providing desktop, network and communications support. Excellent team working abilities and a high degree of flexibility.
Degree Mechanical Engineer - Piping Design
Assist General Manager
IRCA Certified ISO QMS 2000 Lead Auditor (No:01181089) IRCA Certified ISO 14000 EMS Auditor IRCA Certified OHSAS 18001 OHSMS Auditor Certified Quality Auditor (ASQ CQA) Certified Welding Inspector AWS CWI Certified Quality Manager (CQM)
I am a Petrophysicist with 6 years and 10 months of work experience in petrophysical evaluation.
Experience in installation and commissioning of manufacturing and utility machinery
Subsea Engineer with over 10 years of extensive project level experience in deepwater subsea tiebacks in the Gulf of Mexico. Majority of experience has been as a client representative for both minor and major oil companies working on a range of successful projects
I am a very goal driven individual who has been in the drilling industry since 1999. I began my career with Precision Drilling as a driller. I then got a petroleum engineering degree with distinction and have since been working with ConocoPhillips Canada as a Drilling Engineer.
I have 33 years experience in design/construction project management on Petro-chemical Projects which include upstream oil and gas, refinery projects and chemical projects. I have managed both green-field and brown-field projects on schedule and within agreed budgets.
Qualified like Mettalurgical Engineer, specialty Metallurgical Processing, Internal Auditor for Quality Systems in accordance with ISO 9000 series, Computers abillities..
Experienced HDD Engineer
Petroleum Engineer with 9 years of experience in gas and petroleum reservoirs
•Geomodeller with 8 years of experience in exploration and development geology.
Refinery Planning and LP (PIMS) modelling, RefSYS, Hysys simulations
Professional Experience: Worked with A. K. Hydrocarbons (International Logging Overseas Inc, Singapore) Kalyan, Mumbai as a Tr.Mud Logger from Sept 2004 to July 2005. Since, Sept 2004 I have been assigned to work with Cairn Energy in Rajasthan project. As a Trainee Mud Logger my j
Completed 2.6 years of experience in Offshore filed. Currently working in L&T as a Senior Engineer
QA/QC / NDT Supervisor/Technician
5 Yrs Experience of Application / Systems / Automation Control Engineering
I have been working in the oil and gas industry for more than 8 years now i have done frac, wireline ,Analytical Chemist and pump,motor and seal testing and failure analysis too so i feel i know important things about the industry by now . And is something i want to do all my life for myself .
I have 17 years valuable experience: 6 years I was working in the gulf of suiz petroleum co. in Egypt. 11 years I was and still working in Abu Dhabi water and electricity authority in UAE.
Petroleum Technologist with 12 yrs of experience. Strong skills in fracturing, oil and gas completions and workover practices. Team player with dedication to safety and doing it right the first time.
experiment in the works (ruling) shut down of plants (three, year and Ten-year) ,on well and deposit field(drilling, wire and slick line fracturation,performing,coiled tubing, clean up and well testing )with the companies as HALLUBURTON,SHLUMBERGER,WEATHERFORD,BJSP….big experiment in the field of co
E&IT Project Engineer expert in FPSO/FSO/FSRU/FPU
First
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
[ 29 ]
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
CATEGORIES:
Engineering/Technicians;
INDUSTRIES:
Petroleum/Oil/Gas;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com