PLANNING ENGINEER

QUALIFICATIONS:
Bachelor of Science in Mechanical Engineering (Aggregate First Division) from University of Engineering & Technology Lahore, Pakistan.
UAE License No.: 730744.
Language: English, Urdu, Hindi and Punjabi.
Membership: Life time membership with Pakistan Engineering Council.

MAJOR PROJECTS & ASSIGNMENTS
Planning Engineer during Fabrication of 9 Pressure Vessels for Fisia Italipiantti, 64 Nos. of Tanks for ADNOC, 980 Tons of Structural Steel for Al-Gurair Oil Mills. Light Structural Steel works for Kellogg Brown and Root (KBR) USA, DEWA, DUBAL and Al-Bhar.
Planning Incharge during Installation of Electrical Power Skids Project in Bu Hasa – U.A.E.
Planning Incharge during Construction of Bobi LPG Plant with OGDC – Pakistan.
Planning Incharge during Construction of LASMO Bhit Gas Field Project – Pakistan.
Planning Engineer during construction of OMV-Gas Field Development Project – Pakistan.
Planning Engineer during Construction of Gasco upgrade project (Revamp Area) – UAE.
Planning Engineer during Fabrication of 20 LPG Bowzers for Sudan, 9 Bullets for Eared Gas.
Planning & Cost Engineer during the Construction Phase of PARCO Refinery – Pakistan.

EXPERIENCE SUMMARY
Dutco McConnell Dowell (ME) LLC Dubai. (Jan 2005 TO DATE)
Project Planning Engineer
Responsibilities
Carry out the Planning, Costing and Cost Control Planning functions for Projects.
Provide overall progress reports and other reports related to schedule and cost as required by the Project Control Manager / Project Manager.
Provide liaison with the Tender department and develop tender programme.
Monitor and coordinate the preparation maintenance and change of construction schedule, methods, manning charts and equipment requirements. Advise on action to be taken to prevent or improve undesirable tends in progress.
Evaluate monthly progress claim and variation claim.

Pot line 7 Mechanical Work for Dubai Aluminum Company Ltd., Dubai. (Jan 2005 to Date)
Project Value US $ 5.0 million
Fabrication and Installation of Aluminum Cathode Bus Ring, Trench Busbar, Compressed Air system, Aluminum Silos and its Structural Steel; installation of Pot shell, Superstructure, Dense Phase system and Busbar monitoring system.

Cast House No. 3 Mechanical Work for Dubai Aluminum Company Dubai, (Jan 2005 to Date)
Project Value US $ 1.0 million
Fabrication and Installation of piping works including Compressed Air, Argon, Fuel Gas, Fire Water, Portable Water, Unblended Water system piping and its Structural Steel, Hydro testing, blasting, and painting works.

26" Gas Pipeline Project for Toshiba Corporation, Dubai. (Jan 2005 to Date)
Project Value US $ 0.65 million
Fabrication and Installation of 26" Gas pipeline 600 Meter Line with two branches including large bore, small bore, Tie-ins connections, structural steel supports, hydro testing, painting, cathodic protection, Electrical and Instrumentation works.

PREVIOUS (COMPANIES)

Headline Engineering L.L.C. Dubai. (Mar 2003 to Dec. 2004)
Planning Engineer
Responsibilities
Made plan on Primavera Project Planner, MS Project and monitoring the progress.
Correspondence with the clients on incoming, out going issues including design, quality, progress, variation in original scope and cost related issues.
Internal correspondence with Estimation, Design, Purchase, Quality and Production departments.

MS Tanks for Abu Dhabi National Oil Co. (ADNOC), Abu Dhabi. (Mar 2003 to Dec 2004)
Project Value US $ 0.50 million
Fabrication 64 nos. of Fuel Tanks including fittings, blasting and painting.

Pressure Vessel for Fisia Italimpianti, Abu Dhabi. (Mar 2003 to Sep 2004)
Project Value US $ 1.0 million
Fabrication of 09 Pressure Vessels including internal and external pipe fittings, blasting, painting and internal rubber lining.

Structural Steel Trusses for Al-Ghurair Oil Mill, Dubai. (Mar 2003 to Aug 2004)
Project Value US $ 3.1 million
Fabrication and Installation of 980 tons of Heavy and medium size structural steel for Truss work, Purlins, Sag Rods, canopies and structural supports.

Descon Engineering Abu Dhabi, UAE. (Oct. 2002 to Feb. 2003)
Planning Incharge
Responsibilities
To collect, review and discuss work order inputs, resource requirements with concerned departments to prepare & monitor work programs for repairs, preventive & predictive maintenance, plant shutdowns, & turnarounds.
To plan for required infra structure to ensure timely availability. Made two types of work permits that is hot permit and cold permit before Installation of each cluster and start work with the approval of client.

Electrical Power Skids for ADCO at Bu Hasa. (Oct 2002 to Jan 2003)
Project Value US $ 1.15 million
Fabrication and Installation of 40 clusters including Panel board and Panel Switch installation, transformers installation, HV and LV cable termination and connection with overhead transmission line and shutdown.

Siemens Pakistan Engineering Company. (Feb. 2002 to Oct.2003)
Planning Incharge
Responsibilities
Two different projects one with client LASMO Bhit Gas Field Project and other with ENAR/OGDCL Bobi LPG Plant.
Progress Monitoring and Time Scheduling of all mechanical works e.g. fabrication and erection of Steel Structure, Piping, Tanks and Equipment installation on Primavera Project Planner. Ver. 2.0b.
Made Level II, Level III and Level IV schedule as per client requirements and submit every week to the client.

Bobi LPG Plant for OGDCL Pakistan. (Aug 2002 to Oct 2003)
Project Value US $ 1.04 million
Fabrication and Installation of Piping including compressed air, nitrogen gas and firewater on the racks and sleepers. Structural steel fabrication and installation, Fabrication and Instillation of LPG storage Tanks and Water Tank. Installation of equipment including filters, bullets and heat exchangers.

Bhit Gas Field for LASMO Oil and Gas Company. (Feb 2002 to Aug 2003)
Project Value US $ 6.17 million
Fabrication and Installation of Piping including compressed air, nitrogen gas and firewater on the racks and sleepers. Structural steel fabrication and installation, Fabrication and Instillation of LPG storage Tanks and Water Tank. Installation of equipment including filters, bullets and heat exchangers.

Descon Engineering Limited. (April 1999 to Jan.2002)
Planning Engineer
Responsibilities
Served three years with this organization on different positions e.g., as a Planning Engineer, Cost Engineer and Site Engineer.
Assigned as a Cost Engineer in OMV-Kadanwari Upgrade and Miano Field Development Project. Cost Centre wise estimate the overall Project cost involving Original Work & Additional Work with Project Variable cost & Fixed cost. Preparation of claim for extra work & Re-work Expenses.
Assigned as a Planning Engineer in GASCO. Planned the erection of piping and structure activities with work front availability. Daily updated the progress in DPMS (Descon Project Management system) network.
Assigned as a Planning Engineer in Descon Engineering Works. DEW is a fabrication workshop, which deals with the fabrication of pressure vessels, Boilers, heat exchangers and tanks.
Study the drawings, made Indent for local Procurement, Co-ordinate with Production, deal with Sub Contractors and make schedule in P3.
To study the drawings made the material requisitions, control the issued and in stock material.
Prepared weekly & monthly schedule for the installation of Centrifugal & Reciprocating Compressors.

OMV-Upgrade Gas Field Development Project for OMV (Mar 2001 to Jan 2002)
Project Value US $ 3.1 million
Fabrication and Installation of CS, MS, Alloy Steel, Galvanized and SS piping, Equipment Installation including Filters, Pressure Vessels, Storage Tanks and Pumps, Structural Steel and its supports. Tie-Ins connections with the existing lines.

Gasco Ruwais Upgrade Project (RUP) for GASCO Abu Dhabi. (Oct 2000 to Feb 2001)
Project Value US $ 15.4 million
Plan the fabrication and installation activities including Piping, Static Equipment, Rotary Equipments and Structural Steel installation in Train 1 and Revamp area 701.

Fabrication of LPG Bowzers for Sudan Gas. (May 2000 to Sep 2000)
Project Value US $ 1.4 million
Descon Engineering Works (DEW) is a Fabrication workshop having heavy Furnace as well. Project was to fabricate 20 nos. of LPG Bowsers including Dish Ends bending, rolling, welding, Normalizing (Heat treatment), and fitting accessories like King Pin, Fire Extinguisher Box, Emergency Sign Board and Lifting Lugs, Mud Guards manufacturing and Painting.

Fabrication of Pressure Vessels for Erad Gas Pakistan (May 2000 to Sep 2000)
Project Value US $ 0.54 million
Fabrication of 8 nos. of Pressure vessels for Erad Gas Pakistan including Machining, Welding, Fittings and Painting.

Pak Arab Refinery (PARCO) Project Pakistan. (Apr 1999 to Apr 2000)
Project Value US $ 26.54 million
Study the Isometric drawings and made the material requisitions. Monitor overall Installation activities in Area 300 including Piping, Equipment, Structural Steel and Insulation works. Prepared the schedule for the installation of Centrifugal & Reciprocating Compressors.

TRAINING & COURSES
HSE: Achieved "safety awareness program - Modules 1-10" Award from Marubeni Corporation Japan.
Permit to Work: Attend a training program of "ADCO permit to work (Job Performer)" from National Training Centre Abu Dhabi.

SPECIFIC SKILLS
Good understanding of Fabrication drawings, isometrics drawings, piping plans, piping BOQ preparation & piping supports.
Progress Measuring/Reporting system synchronizes with Client's system.
Cost Monitoring Reports.
Sub-Contracting (Manpower, equipment & special services).
Exposure with Quality Management concepts (ISO 9000 Series)
Document Controlling to meet ISO standards.
Communicate with clients, 3rd parties and vendors.

COMPUTER SKILLS
Auto Cad: Attend one-month training program of "Auto-Cad for professionals" release 14.
Primavera Project Planner (3.0) from Descon Engineering Ltd. Head Office Lahore – Pakistan.
Operating System: - Windows 98, 2000, XP.
Other Packages: - MS Office, Adobe Acrobat etc.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 3701 to 3750 of 6411)Go to Search Parameters...
Brief Description
PIPING DESIGNER ,FOR PETROLEUM DEVOLOPMENT OF OMAN ,FOR LAST 2 YEAR ,AND IAM A DIPLOMA IN MECHANICAL ENGINEER PASSED OUT IN 2006,MY KEY SKILL IS AUTO CAD AND PDMS
Project/Site management with thorough knowledge of Mechanical equipment installing works, pressure parts and piping erection works welding and NDT, Civil Works, Electrical and I&C installing works, QA/QC and HSE procedures
Professional experience of 17 years, working in international companies, high technology company, engineering company and others.
Electrical Engineer. Brazilian, International experience Nigeria, Guinea Bissau, East Timor, Technical Services Manager, General Manager. Fluent English, Portuguese, Spanish, German
my profile includes modelling of instruments, prepartation of layouts, installtion details,etc
Very competitive on calibration and trouble shooting of instruments with morethan 5 years experienced on oil and gas refineries
Erection and Commissioning of Automation of Energy Saving Projects.
Drilling Fluids Engineer / Consultant with expertise in all drilling fluids including Silicates, Glycols and syntetics. Expertise in deep water, ERD and HPHT enviroments. Skills in operations, coordination, tendering, well site, marketing and presentation
Experience in Reservoir and Drilling Engineering. Some teaching and creative background. Technical and commercial skills.
Total Experience of 15 years, with aprx. 3 years Gulf Exp. The.work.area.includes.Quality-Assurance System. activities, Supporting, metrology, Inspections, Testing Exposure in API, ASME, ASTM stds & Qualified ISO Internal Auditor documentation.
HSE Manager in major energy, power generation, oil and gas sectors covering technical and commercial requirements. With professional experience in directing and mananing health, safety and the environment protection & sustainability development aspects as per OSHA framwork and guidelines. Strong abi
Mechanical engineer with over eight years experience in industrial construction projects
B.S in Petroleum Geology, 1 year expereince at well site with OGDC,Short course on Mudlogging & wirelinelogging, computer skills: MS word,Minpet,coral draw,Logpot 2003(Mudlogging).
INDUSTRIAL AUTOMATION, X-RAY SYATEMS AND ELECTRONICS.
Educational Qualifications: Master of Engineering in Mechanical Engineering specializing in Welding Engineering from Indian Institute of Technology, Roorkee, Uttar Pradesh, India in April 1996 with 74.40%, American Welding Society (AWS) Certified Welding Inspector (CWI) -AWS-CWI Certificate
A certified multi-disciplines (Welding, Painting, Mechanical) Quality Inspection Personnel
Diploma in elect. engg., working in offshore as rig electrician for 5 years
I am graduate of petroleum and natural gas engineering department from Middle East Technical University. I have worked for an independent natural gas exploration and production company for 2 years. I am interested in well testing, stimulation, reservoir engineering studies in an int. co.
Piping Supervisor
Mechanical engineer wih marine background, stuffed in maintenance, fabrication, commissioning of projects. have good experience in oil / gas industry.
With over twenty-four years of certified professional experience in Information Technology, I have successfully performed all manner of varied analysis, design, programming, and project management related activities.
6 years experienced electrical engineer in low voltage and high voltage
High energy Petroleum Engineer with a masters degree and experience in nodal analysis, production optimization, artificial lift design, pressure transient analysis, reservoir simulation, production forecasting, risk analysis, proven leadership and team building skills.
Planning, Monitoring and Scheduling of fabrication and erection of Steel Structure, Pressure Vessels, Tanks and Piping works by using Primavera Project Planner P3 Version 3.0 and 2.0b with 5+ years of experience.
Geophysics graduate with ~3years experience with wire line/TLC logging seeking for a full time position as a geophysicist.
I AM INTERESTED IN THE FIELD OF REFRIGERATION & AIRCONDITIONING
SKILL SET: MCSE Microsoft Accelerated Windows 2000. ( MCP + I ) CCNA CCNP CCIE Q R&S Availability : ASAP Current Location : Selangor, Malaysia
I am posting my resume for Instrumentation and control Technician
electrical / instrument engineer
I am a Degreed Petroleum Engineer with 6 years of international and domestic United States experience. Experience in drilling, workover, completions, and supervision for land and offshore operations.
More than 12 years of work experience maintenance field of Chemical, Petroleum and water treatment plants. Expert in utilisation of Computerised Maintenance Management System programme SAP PM Module and Reflection.Also expert in using Microsoft Project and Primavera Planning software’s.
„4 Years of Experience in Oil & Gas, Refinery, Petrochemical, and Power Plants.„«Involved in the Maintenance and Shutdown jobs.„Currently working in Qatar Chemical Company Ltd. (Qchem) Under Qcon as Senior Mechanical Technician.„« Breadth of experience covers in Rotating Equipment Maintenance field
EDUCATION & TRAINING
Tekla Modeler/Detailer , AutoCAD
Well Intervention, Well Services, Field Well Completion,
I am an environment engineer with 12 years of experience in managing the environmental/ pollution-related and regulatory issues of Refinery/ Petrochemical/ Chemical units. I am also a certified Lead Auditor for ISO 14001 & OSHAS 18001 and have been involved in the EMS certification of two refineries
14yrs oil and gas experience covering pipeline pigging operations, pipeline inspection activity, fpso production operations in crude oil plants, water reinjection plants, gas reinjection plants, gas dehydration plants, produced water handling and discharge, safety management and implementation
I have Higher National Diploma in electrical engineering,installation and maintenance and programming of PLC and DCS,also AUTOCAD and Microsoft word and excel
More than 30 years of experience in Control & Instrumentation field, out of which 28 years in a leading Engineering Consultancy organization MECON Ltd. (Govt. of India Undertaking) in Steel, Non-Ferrous, Chemical, Petrochemical & Power
PLANNING/SCHEDULING ENGINEER & BACHELOR OF ENGINEERING (CIVIL)
I have ”CSWIP-3.2 & CSWIP-3.1”, BGAS-Painting Inspector “Grade-2” and also over 10+ years experience working in the Inspection Field, and I am committed to pursuing achievement in this field.
HSE Specialist
A fresher but keen to learn and work hard for the organizational growth.
I have 12 years work experience in Civil Engineering Constructions and 4 years experience in Environmental Remediation project for Brunei Shell Petroleum. My Supervisor experience includes execution of structures as per drawings and specifications with skilled group of trade persons and subcontracto
I have 03 years of experience in the Oil Industry. I have applied my geological engineering and skills for delineation and development of reservoir. Applying sedimentologic and stratigraphic skills to identify best sand reservoir. Identification of structural and stratigraphic traps.
Qualified and well experienced Piping Engineer; availing in excess of 25 years of experience in the full spectrum of engineering, design, detailing, fabrication, erection, retrofitting, testing, QC, commissioning, maintenance and demolition of Process/Power Plant and Piping.
Journemtman welder
I'm a marine engineer working as QHSE Engineer in the base for 3 offshore rigs in saudi Arabia, I've got 5 years experience in the oil field starting as a mechanic then pollution control engineer then safety engineer on offshore rigs. V.Good Computer Skills& Excellent command of spoken English.
14 Years Of oilfield Experience
Land surveyor, Road, Stormwater, Sewer, Subdivision designer
First   Prev   51   52   53   54   55   56   57   58   59   60   61   62   63   64   65   66   67   68   69   70   71   72   73   74   [ 75 ]   76   77   78   79   80   81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100   Next   Last
Seach Parameters

Change search parameters...
CATEGORIES: Engineering/Technicians;
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com