Subject.: PROJECT ENGINEER //SENIOR ENGINEER /ELECTRICAL --
ENGG./(DESIGNS)/PROC./CONSTRUCTION/SUPN./O & M
OIL/GAS/PETROCHEMICAL INDUSTRIES ETC.

B I O - D A T A
DMS ( MIE, C. ENGG, P.E. )

NOMINATED POSITION PROJECT ENGR./(ELECTRICAL) /SENIOR ENGR.
ENGG./(DESIGNS)/PROC./CONSTRUCTION/SUP.O& M
POSITION OIL/GAS /PETROCHEMICAL INDUSRRIES
BORN: 1953
NATIONALITY: Indian
LANGUAGES: English, Hindi, Gujarati, Marathi

QUALIFICATIONS: B.E.(Electrical) 1st Class (Hons), University of Bombay, 1976, Diploma in Management Studies D.M.S. 1st Class (Hons) University of Bombay, 1983.

TRAINING: M/s. MULTIWELD CO. (P) LTD., Intensive training
01/04/77 to 01/09/77 in Plant Maintenance and production in their weld mesh wire fabric / manufacturing unit.
06/09/77 to 31/01/78 M/s. REMEX ENGINEERING (P) LTD.,
Preparation of specification. Cost estimation. Planning procurement and erection schedule. Design and layout for electrical equipment for Bombay Dyeing Loom Shed renovation project.
10/12/80 to 28/02/81: M/s. TATA ELECTRIC COMPANIES,
General Orientation in generation, transmission, distribution and testing divisions.
MEMBERSHIP: 1) Member – Society of Power Engineers, India
2) Member – Computer Society of India
3) VJTI Alumni Association, Bombay
4)\Institution of Engineers (India) & IEIBC
COMPUTER
LITERATE KNOWLEDGE OF MS WORD, EXCEL, POWER POINT ETC, ETAP,PROGRAMS
CAREER/ SUMMARY AND PRINCIPAL ACCOUNTIBILITIES
Since completing training in 1977 has obtained 21 years of specialist experience in electrical engineering.
Particular activities have included the following.
.Electrical System Design for main and auxiliary power distribution systems,/Analysis including fault levels, volt drop,.etc.which includes the following Electrical Equipment.
* a)Switchyard equipment like lightning arrestors, current transformers, potential transformers, power & distribution transformers, isolaters, etc./ GIS equipment,(220 KV, 145 KV,)
* b)33KV/22 KV/11KV HV & MV Switchgear with SF6/VCB Panels, HV & MV power cables, LV Motor control centres, MCCs / Power control centres PCCs, HV / LV Motors, battery, battery chargers, UPS / DCS Systems, Emergency power supplies, DG Sets, Variable speed drives VSDS, AC / DC Distribution boards, Fire alarm / detection system, etc.
* c)Control room eqpts. like relay & protection panels for line, transformer and cable protection, 33kV, 22kV & 11kV system.,fault recording eqpt.relay co-ordination, of elctrical system etc.etc.
* Hazardeous Area Clssification based on Area classification/temperature/Gas groups etc as per API /NFPA/NEC Standards. FOR ON -SHORE/OFF SHORE PLATFORMS TANK FARMS/OIL WELLS etc.
* d) Area classification /Selection of Electrical equipment in Hazardous areas like flame-proof motors, pushbutton stations, FRLS/special cables, etc.
* f) Electrical installation work viz. Cabling, underground/above ground, cable trays, lighting systems indoor/outdoor, grounding and lightening protection system, etc.
* g) Also associated with electrical systems associated with cranes/hoists, boilers, compressers, DG sets, etc.
* Cost estimates, project proposals/buget approvals etc.
* Engineering specifications. All electrical equipment specification in accordance with international codes / standards including essential and start up spares for equipments, as stated above.
* Engineering specifications/ for electrical equipment in hazardous areas. like flame – proof motors, push button stations, FRLS/ special Cables
* Familiarization with Industry codes like IEC/ BS/ ANSI/ IEE /NEC/ API/ NFPA standards for Petrochemicals / Petroleum refineries.
* Associated in preparation of specifications pertaining to mechanical equipment viz. Boilers, compressors, pumps, D.G. sets etc. Evaluation of bids/offers, technical and commercial clarifications /confirmations from vendors / subvendors.
* Preparation of turnkey contracts Project specification for LSTK/ EPC contracts including preparation of relevant project drawings,
* Procurement of Electrical /Electro-mechanical Equipment
Activities includes the following:
a.Preparation of Tender Specifications b Bid evaluations/Vendor's technical clarifications & confirmations.
c.Analysis of Technical & Commercial & financial particulars.
d. Purchase recommendation for equipment.
e. Purchase recommendation for LSTKcontracts.
f Preparation of Draft LO1/PO & Contract documents g. Material requisition for purchase/procurement.
k. Follow up for regular bidding, assurance of timely material supplies,at right time,/price/quantity/quality.
* Inspection of materials/equipment at manufacturers shop floor/ vendor/sub-vendors premises.
* Vendor Appraisal / Selection of right vendor.
* Vendor Drawing review / approval.
* Expediting with manufacturer for timely deliveries/supplies.
* Quality Assurance and Quality Control including ISO-9000 certification.
* Review of materials/equipment test certificates submitted by vendor/suppliers for final acceptance.
* Construction, supervision,work/systems viz.of EPC Contractor w.r.t.Quality,of work,schedule, & safety requirements.
* Site inspection of equipment and adherence of QA/QC procedures.
* Erection supervision to ensure quality of erection is according to manufacturer's recommendations.
* Checking Installation/Construction Work of EPCM -Contractor and compliance as per approved drawings/specification.
* Supervision of EPC Contractor's performance w.r.t. QUALITY,/schedules, safety requirements.
* Timely implementation of Project to specified requirements/Project schedules /milestones.
* Project Management planning and control,Project progress monitoring for timely completion as per technical requirements /schedules//milestones.
Client liason. Acting as a primary interface between client and contractors.
Feasibility studies for major expansion, modification and upgrade of existing systems. Participation in meetings, workshops and evaluation committees..etc.
* Responsible for managing the overall process and delivery of projects of various sizes and complexity levels.
Involved from the commencement/strategy through to design, procurement, construction administration and close-out of the project.
* Coordination with vendors/ sub-vendors / statutory authorities like electrical supply authorities/ electrical/inspectorate, day to day interfacing/co-ordination with EPC contractor, technical, O & M/ commercial departments.
* Review of electrical contractors installation work with reference to approved drawings and preparation of "As-Builts".
* Settlement of claims/certification of additional scope of work./Contractual issues.
* Adherence to site safety rules & regulations.
* Testing /Pre-commisioning/ Commissioning assistance.
* Over see Testing/commissioning by plant EPC contractor and assistance,to ensure Minimum shut down time and least disturbance with other utilities
* QHSE Awareness.
* Mechanical completion/handing over,/SAP systems /maintenance systems support.
* Mechanical completion/handing over,/SAP systems /maintenance systems support.
Preventive & breakdown Maintenance of all electrical equipment like motors,
HV.LV Switchgears, etc
FIELDS OF: Petroleum Refineries, Power Plants,Chemical Plants; Fertilizer
EXPERIENCE. Plants; Industrial Plants; High Voltage Substations;
Petrochemicals; Commercial buildings and,Power plants,
Mfg. Plants,Pulp & Paper & Aluminium. /OIL/GAS Industries.
EMPLOYMENT –HISTORY
AS a FREE LANCER CONSULTANT working ON THE FOLLOWING PROJECTS
SEPT 00- TODATE PRESENTLY With GASCO on ERM PROJECT IN ABU DHABI
1. With JACOBS ENGG ON RELIANCE PETROLEUM PROJECTS (on retails outlets).
SAINT GOBAIN GLASS LINE-2 EXPANSION PROJECT.
2. AS ELECTRICAL PROJ. / ENGINEER worked on projects OF METHANOL /BDO
plants OF Saudi International Petrochemical Co. KSA
3. OIL & NATURAL GAS COMMISSION LTD. NORTH KADI MEHSANA, INDIA
4. AS ELECTRICAL ENGINEER /SYSTEMS SUPPORT ENGINEER
a)Ras Laffan liquified Natural GAS CO. LTD. ON EPC PLANT MODIFICATIONS/UPGRADES.
b)ENEL POWER STATION. 750 MW. P.S IN QATAR
OTHER PROJECTS LISTED AS FOLLOWS
5. Indian OiL Corpn. IOCL REFINERY.PARADEEP ORISSA STATE
For DODSAL/L.G CORPORATION. FOR EPCC-1, EPCC-2, EPCC-3, EPCC-4 packages.
6. National Aluminium Co. Ltd. NALCO DAMANJODI, ORISSA STATE
For ACC/BAKER HUGHES. (Process collaborater Australia)
7. MANDKE HEART RESEARCH CENTRE. MUMBAI (600 BED HOSPITAL BUILDING FOR SIEMENS LTD.
8 MADRAS ALUMINIUM CO. LIMITED SALEM DISTRICT
9 BHARAT ALUMINIUN CO. LTD. (BALCO)/220 KV/11 KV S/ S.
EXPERIENCE With M/s. Mobil Producing Nigeria Ultd Nigeria as Senior
JAN 00- to Aug. 00 Electrical Engineer E& I department, working at QIT TERMINAL on existing 11 KV Substation upgrade & retrofitting works.. & HV/ L.V. DistributIon systems. 11KV/380 VOLTS Infrastructure Projects, New Office Bldg, MHE estates, etc.
EXPERIENCE:With M/s. Aluminium Baharin B.S. C. Baharin as Senior
June 98- to Oct. 1999 Electrical Engineer working on Coke Calciner and Sea Water Desalinations project( 66KV GIS S/S.) and also on In-House projects/ Modifications on existing H.V. & L.V. Distribution Systems.(11KV/380 V.)

EXPERIENCE With M/s. Humphreys & Glasgow Consultants Ltd.,
Jan 98- May 1998 As Manager Electrical/Project Superintendent working on Cochin Refineries - DHDS Project.

EXPERIENCE With M/s. P.T.Riau Andalan Pulp & Paper as Lead Engineer
FEB-1997-DEC1997 (Electrical)/Project Superintendent for their 3000 TPD Pulp Plant & 1200 TPD of Paper Plant at Kerinci. Indonesia.
As area engineer responsible for Fibre Line -2 & priority projects.

EXPERIENCE With M/s. TECHNIP GEOPRODUCTION, ABU-DHABI, U.A.E., on 1995 -Mar 1995: a short assignment.

Worked on Projects of M/s.ADNOC viz.BU-HASA, SAHIL & FF areas, water injection and water treatment plants for cluster areas 53/54/55. Work includes of the following: (11 KV S/S & Distribution)
Duties / responsibilities include:

* Electrical system design, for main & auxiliary power distribution.
* Detail design including materials specification, requisition of Emergency generator
* Preparation of LSTK CONTRACT specifications, which included the following,Transformers,.HV/LV switch gear HV/LV power cables,Battery / Battery charger UPS systems,AC/DC distribution board.Fire alarm & detection systems.
* DG sets & associated electrical equipment
* Electrical Installation Works viz,Cabling, Lighting, grounding & lightening protection,etc.
* Review of specification vis-à-vis contractors offer, Clarifications/confirmations, etc.
* Evaluation of bids/offers, of turnkey tender specifications for electrical installation work on LSTK basis / project proposal drawings. material requisition for electrical equipment for purchase / procurement.
* Preparation of LOI / PO, for procurement.
* Preparation of contarct documents/
* Contract administration.
* Client liason

* Coordination with vendors/ sub-vendors, for clarifications/confirmations, vendor drawing review of bids package.
* Review of Contracotr's drawing for construction and preparation of as-builts.
* Coordination among client/contractor/supply authorities/ electrical contractor.
* Testing and Commissioning assistance.

BECHTEL WORK HISTORY: Joined Bechtel in August 1993 as Electrical
14/08/93 to 13/08/94 Engineer & has worked on the following projects: -

* Saudi Aramco's Safaniyah Bulk Plant.

* Riyadh Refinery, Upgrading of Control Rooms and Substations

* Al-Hada Compound Redevelopment and Stemco Compound Expansion (11kv substation & distribution)
Duties / responsibilities include:
Electrical system design, for main & auxiliary power distribution.
* Detail design including materials specification, requisition of emergency generator.
* Preparation of LSTK CONTRACT specifications, which included the following,Transformers. HV/LV switch gear HV/LV power cables Battery / Battery charger,UPS systems AC/DC distribution board.
* Fire alarm & detection systems
* DG sets & associated electrical equipment
* Electrical Installation Works viz,Cabling, Lighting, grounding & lightening protection,etc.
* Bid evaluations, Review of specification vis-à-vis contractors offer, Clarifications/confirmations, etc.
* Preparation of LOI / PO, for procurement.
* Preparation of contarct documents/
* Contract administration.
* Client liason
* Construction /Supervision.
* Review of Contractor's drawing for construction and preparation of as-builts.
* Coordination among client/contractor/supply authorities/ electrical contractor.
* Testing and Commissioning assistance.

PREVIOUS WORK: M/s.TATA CONSULTING ENGINEERS (T.C.E.),
HISTORY BOMBAY.
01/02/78 to 13/08/93
Has worked 15 years with T.C.E., started the career in 1978, progressively promoted to Electrical Engineer, Project Engineer and Project Coordinator/Project Superintendent. Has worked on many projects. The following are some of the more interesting ones:
A) Bharat Petroleum Corporation LTD, BPCL Refinery( Primary power receipt distribution system) ( 66KV switchyard, 11KV switchgear expansion/distribution).
B) Substation Projects M/S TATA ELECTRIC. COS.BOMBAYTransmission & subtransmission Projects (220 KV, 132 KV,GIS, SWITCHYARD, 132/110KV Subsations etc.)
(33 KV, 22KV,11KV. H.V. SWITCHGEAR & DISTRIBUTION))
C) Rural Electrication projects Laos and Sri Lanka (Financed by M/s. Asian Development Bank, Manila, Philippines) (132 KV Swich yard with / distribution at 11KV, 380 VOLTS.)
D) Tata Electric Cos. ( Jetty expansion project) (11KV S/ S and distribution)
E) Garden Reach shipbuilders &Engineers(Augumentation of ship fitting out facilities)
( 33 KV S/S & distribution)

Activities asd listed in Career S ummary & accountibilities were performed for OTHER PROJECTS are as follows.

1. PT. Abbott Indonesia Pharmaceutical Expansion Project. ( 33 KV S/ S and distribution)
2. Volhro Ltd., Secundrabad Organo Phosphatic Pesticides Project at Patencheru Secundrabad, India. ( 33 KV S/S & distribution)
3. Polymers Corporation of Gujarat Ltd., Baroda PMMA Project Production Plant for ACH Monomer Sheets and pellets Plant) ( 33 KV S/ S and distribution)
4. Radiation Technologies (India) Pvt. Ltd., (A division of Raychem) Cost evaluation of sheetline/implementation.
5. National Centre for Performing Arts, Tata Theatre, Bombay. (1000 Seat Theatre)
( 11KV S/ S and distribution)
6. Hindustan Development Corporation Ltd., H.T. Insulator Project. (Manufacturer of HV/EHV Insulators at Mandideep, Bhopal) ( 33 KV S/ S and distribution)
7. CBS Gramophone Records and Tapes (India) Ltd., Projection Plant for manufacture of gramophone Records at Aurangabad. ( 11 KV S/S and distribution)
8. DSIDC-Delhi State Industrial Corporation Narela Complex Solid Waste Management.
9. Gujarat Narmada Valley Fertilizers Co. Ltd., Bharuch Fertilizer Project (132 KV Swich yard with 2 x 50 MVA transformars / distribution at 11KV, 6.6 KV,415 VOLTS.).
10. Bajaj Auto Ltd., Aurangabad. Two /Three Wheeler Plant. Review and augmentation of D.G. System. ( 11KV, 4 MW.)
11. Larsen & Turbo's Awarpur Cement preparation of Report on Electrical Systems.
12. Associated Building Co. Ltd. Bombay House, Review and Implementation of proposed Fire Fighting and Electrical systems.

F) DUBAI ELECTRICITY & WATER AUTHORITY (DEWA), DUBAI, U.A.E.

Represents DEWA to carry out /expediting and witness testing of 44 units of dual ratio (33 KV-11/6.6 KV 10 and 15 MVA rated) at manufacturers factory (M/s. Zaporosh Transformator Corporation in Ukraine including:
* Stagewise QA/QC checks during manufacturing.
ISO-9000 checks
Review of materials/equipments test certificates for final acceptance.
Order value (US$5,864,064)

G) HITACHI LIMITED, JAPAN.
Seconded to Hitachi Japan office in the Kokubu Substation Projects, Depts. Part of engineering services team supporting high voltage substation turnkey projects. Substations include 66 KVGIS Switchgears, associated transformers 13.8 KV and low voltage distrubution equipment. Work includes preparation of lumpsum turnkey project proposals/offers including drawings and contract documents for various international clients line PUB Singapore, Qatar, Saudi Arabia, Cairo-Egypt, Kuwait etc. (Assignment duration January 1990 to July 1990.)

H) ANPARA "B" THERMAL POWER STATION PROJECT, UTTARPRADESH STATE ELECTRICITY BOARD.
Represents Hitachi Plant Engienering and Construction Co. Ltd., Mitsui and Co. Ltd., for inspection, expediting witness testing and review of materials/equipments test certificates for final acceptance of Indian supplied material and equipment includng:
400 KV Aluminium Tubular Bus
A.C.S.R. Conductors
AC & DC Distribution panels.
Low Voltage Cables.

I) Inspection and expediting materials control including review of test certificates for final acceptance like power transformers, current transformers, voltage transformers, isolators, lightening arrestors, HV & LV switchgear, HV & LV motor's, HV & LV power cables, control panels, lighting fixtures, lighting poles, cranes, etc., for various projects handled by TCE since 1979.

J) Development and Standardization.
Upgrading/revision and preparation of new standard specifications and development schemes for lighting and cable installations. Business Development work preparation of various project proposals, etc.

Vendor Development, vendor appraisal, selection of right vendor and preparation of vendor data systesm and records for reference.

PUBLICATIONS: Presented a paper to M/s. GLAXO (I) LTD., on "Reliance of Electronic Industry on Quality Chemicals"

View contact information...
«« previous resume next resume »»
Search Results (Resumes 2351 to 2400 of 6411)Go to Search Parameters...
Brief Description
I would like to announce my availability to any professional company in need of a Senior HSE Officer with an Engineering and Medical Degree. My vast experience and capabilities and the ability to get along with people will prove to be an asset to the company, client and workers. As a professional,
Well-experienced instrument senior technician seeking a motivating position related to Construction, Commissioning and Maintenance applicable to industrial and OIL&GAS installations.
Offering Extensive Experience in Industrial Electrical/Instrument Equipment
Pursue a career in the, Chillers Systems, Refrigeration, Air conditioning,
QUALIFICATIONS : M.Sc. (Geology), Skill : Geologist, Mudlogger, Geotechnical Engineer
28 years experience in drilling fluids onshore and offshore across 4 continents. Fully experienced in both field engineering and office supervisory/management posts. IWCF Combined Surface/Subsea Supervisor well control certificate.
Working experience in Chemical plants with private sector and foreign organizations. Worked at ¡§Honeywell DCS TDC 3000¡¨ controlled Urea & Ammonia plants, FFC and ¡§Foxboro DCS¡¨ controlled Urea plant, Indonesia.
I know I would be the correct candidate because; I have never met a challenge that I could not solve, resolve, or find a solution to in an accurate and timely manner. I am a quality engineer with over 15 years experience in the automotive field alone.
13 years of Experience in DCS System, PLC & ESD system as well as field instrumentation.
Ph.D. in materials science and engineering, four year experience in teaching, five year experience in working in various industries. Fields of specialty; corrosion, coating, materials selection
* Over 11 years of experience in areas of Process Automation Engineering & Instrumentation.* Hands-on experience in Automation Engineering, estimation, design, installation & maintenance of equipments in India & Abroad.Expertise in advanced PLC, systems & providing technical support on Instruments.
DEsign Engg., PLC, SCADA, I&C work Experience
Skills include Petroleum Engineering,reservoir Engineering,Petroelum Geoscience,Geochemist,Mud Logging
I have recently completed M. Sc. in Petroleum Technology, from University of Karachi.
Pipe rack design, routing of pipes on rack, Preparation of Tank farm Layout in detail and piping layout for the same from the process point of view. Preparation of detailed piping layout, Equipment layout, General Arrangement drawings, Isometric checking.Isometric drawing preparation
Cogeneration, gas engines
• Results-driven, logical and methodical approach to achieving tasks and objectives
Free! I am a geology masters student at Baylor University (May 2009 graduation). My training has included all of the basic geological branches with focus on sequence stratigraphy, depositional systems (both carbonate and clastic), and isotope geochemistry.
2.6 year of experience in Detailed Engineering work of the refinery units helped me understand the profile and the responsibilities of a mechanical engineer (Static) and to realize how important this field is to the oil refining business and I have learned how important it is to be flexible.
Highly personable Drilling Fluids Engineer with over three years of experience in laboratory work, project supervision, logistic services both air and land logistics and mud engineering.• Proficient with Microsoft Office System (including Microsoft Word, Microsoft Excel, Microsoft PowerPoint®, Micro
Project Planning & Control Engineer / Scheduler / Earned Value System Designing and Development/Primavera Group Software Developer/I have been working in Engineering and Construction phases of EPC oil, gas and petrochemical projects/PMP (Project Management Professional)/Project Planning & Control
Senior Mechanical / Piping / Materials Handling / Pneumatic Design Specialist, Checker, Design Supervisor & Project Manager
A chemical process engineer with 12 years experience in oil refining and petrochemical industries
Has served as Supervisor (Mechanical) during shutdown in KNPC, Kuwait and FERTIL, Abu Dhabi. Has experience in the maintenance of Rotary Machinery like pumps, compressors, turbines, etc. and stationery equipments like heat exchangers, columns, vessels and piping. Has computer knowledge.
Skilled in all planning shutdown, shutdown supervision, servicing, modifications design and total project cost control, mainly in power stations and refineries
Pipeline, Pipe Stress, Piping or MEchanical Engineer
Process Design & Review , Review P & ID’s , Computer Programs (Excel, Word, PowerPoint), Training The Junior Process Engineers & Process Technicians
Over 18 years of experience with reputed international companies with Sadaf , Ibn Zahr , Flour Daniel ,Deutsche Babcock, in important positions like Mechanical Engineer, Principal Engineer, Mechanical Superintendentposition in Engineering, Project and Construction Management.
OBJECTIVE A challenging position in managerial level QUALIFICATION FOR THE JOB Good education and fully experienced with engineering and management duties,, have initiative and willing to accept engineering responsibilities.
: PROJECT ENGINEER //SENIOR ENGINEER /ELECTRICAL -- ENGG./(DESIGNS)/PROC./CONSTRUCTION/SUPN./O & M OIL/GAS/PETROCHEMICAL INDUSTRIES ETC.
cnc turn mill machinist setter
JR. PDS DESIGNER PIPING WORKING FOR WELLCOMPANY IN MUMBAI ON PDS FOR PIPING. GOOD EXPERIANCE OF PIPING.REFER DETAIL BIODATA.
This is the Drafts man C.V for Zueitina Oil Company, Libia.
PROCESS ENGINEERING OF OIL AND GAS PROJECTS
OBJECTIVE To secure a position with a corporation wherein I can apply the skills, knowledge and expertise obtained during my 18 years in the Health & Safety and Emergency Response fields.
I’m a civil engineer with studies in HSEQ, I have worked at Cusiana and Cupiagua Oil and Gas CPFs, I have been working for the past 6 years in HSEQ areas an I´m free to go wherever the job is. I speak Spanish as a mother tongue and have good English skills.
Application for the post of Control & Instrumentation Engineer. post graduate in Instrumentation engineering having more than 9 years of experience in automation Oil & Gas, Petrochemical and Fertilizers projects.
Senior Structural Designer in the Oil and Gas industry with experience of PDMS, Micro station and AutoCAD
• Drilling Engineer - Oil and Gas Drilling Wells Planning; • Rig operations experience; • GPS units, GIS’s methods and procedures; • Manage/coordinate teams of 15+; • Software programming knowledge and experience.
I am a Mechanical engineering diploma holder, over 15 years of experience with CSWIP Plant Inspector, CSWIP 3.2, AWS CWI and ASNT LEVEL II in RT, UT & MT, with valid UAE driving license.
Setup PDMS, customize PDMS program in PML I and II to greatly reduce man-hours. Piping designer, draftsmen, produce drawings, model pipe support and routed piping systems. Train others on PDMS software.
Process engineer, Sharif Institute of Technology, B.Sc. Degree, Tehran University, Equipment design, Takestan Industrial Systems Company, Well Engineer, Integrated Project Management, Schlumberger Company, Heriot Watt University, Student of Petroleum Engineering, Voluntary work in Indonesia and Iran
Looking for position of Lead Engineer of Rotating equipment in Design, Engineering and Construction organisations.
Total Eight and half years of Engineering, Commissioning and Maintenance experience of DCS/PLC in a petrochemical industry
Discipline leadership and management. Ten years experience in Oil, Gas, and Industrial Instrumentation and Control. Client based engineering experience. Major Projects include FEED, detailed design, construction, testing, commissioning of onshore and offshore facilities. Capital works projects.
look at next resume
Assembles and installing conduit wire, power cables. Install control and distribution apparatus. Read labels manuals and schematic diagrams. Install electrical motors (0.25-850 kW). Work with power tools and measuring instruments.
INTOOLS, Instrument Data Sheets,Sizing Calculations,Wiring,Hook-ups,Loop Drawings,I/O list,Bid Evaluation,Review of Vendor Documents/Drwgs,FAT Inspection,
Result driven professional with over 4 years of experience in Project Management, Programming, Instrumentation, Software Development and MES / PLC / SCADA Implementation.
Chemical Engineer
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   [ 48 ]   49   50   Next   Last
Seach Parameters

Change search parameters...
CATEGORIES: Engineering/Technicians;
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com