CONTACT INFORMATION:
View contact information...
Place / date of birth: Surabaya, 8 October 1971
Education/ Degree: Bachelor degree in Mechanical Engineering, from Sepuluh Nopember Institute of Technology, of Surabaya,INdonesia 1994.
Summary of Qualifications: SR. STATIC EQUIPMENT ENGINEER
Having more than 12 years experiences in Mechanical Engineering.
As Mechanical Engineer and Team Leader for engineering work for Front-End Engineering Design (FEED), Bidding stage, Detailed Engineering, shop fabrication supervision, construction and pre-commissioning work.
Specialty in Static Equipment Engineering for Heat Exchangers (Air Coolers, Shell & Tubes, Plate & Frame, Brazed Aluminium, etc), Pressure Vessels (Drums, Reactor, Columns, Sphere, etc.) and Tanks.
Registered professional engineer in PII (Persatuan Insinyur Indonesia; an association of professional engineer of Indonesia). KTA No. 0905-09-015709
Work
Experiences: JUN '2007 - PRESENT FOSTER WHEELER E&C MALAYSIA SDN. BHD
Sr. STATIC EQUIPMENT ENGINEER Jun. '2007 – Present
PSR-2 REVAMP PROJECT, MALAYSIAN REFINING COMPANY, MALACCA, MALAYSIA
* Review contract documents & technical clarification to Company (client)
* Preparation of specification and equipment datasheets
* Re-rating, design verification and recommendation
* Preparing Technical Requisition package.
* Technical Bid Evaluation and Risk Analysis
* Vendor document review
* Fabrication work monitoring
* Coordination with other disciplines, supplier and client
FEB. '1996 – JUN, 2007 PT. INTI KARYA PERSADA TEHNIK, JAKARTA
STATIC EQUIPMENT ENGINEER - LEADER Feb. '2007 – Present
SINGA GAS DEVELOPMENT PROJECT PROPOSAL, MEDCO E&P INDONESIA (LEMATANG)
* Review ITB documents & technical clarification to Company
* Work plan and scheduling
* Work volume, man-hour, manning estimation and material cost assesment.
* Preparing Technical Requisition package.
* Technical Bid Evaluation and Risk Analysis
* Coordination with other disciplines
STATIC EQUIPMENT ENGINEER Feb. '2007 – Present
RCC OFF GAS TO PROPYLENE PROJECT PROPOSAL, PT. PERTAMINA (PERSERO)
* Review technical documents
* Preparing Technical Requisition package.
* Technical Bid Evaluation and Risk Analysis
* Coordination with other disciplines
STATIC EQUIPMENT ENGINEER - LEADER Sep. '2006 –Jan.'2007
JAMBI MERANG DEVELOPMENT PROJECT PROPOSAL, PERTAMINA – AMERADA HESS JOB
* Review ITB documents & technical clarification to Company
* Work plan and scheduling
* Work volume, man-hour, manning estimation and material cost assesment.
* Preparing Technical Requisition package.
* Technical Bid Evaluation and Risk Analysis
* Coordination with other disciplines
STATIC EQUIPMENT ENGINEER - LEADER Jul. '2006 –Sep.'2006
NEW REFINERY PROJECT PROPOSAL, KUWAIT NATIONAL PETROLEUM COMPANY
* Review ITB documents & technical clarification to Company
* Work plan and scheduling
* Work volume, man-hour, manning estimation and material cost assesment.
* Preparing Technical Requisition package.
* Technical Bid Evaluation and Risk Analysis
* Coordination with other disciplines
STATIC EQUIPMENT ENGINEER Mar. '2005 – May. '2006
QATARGAS II DEVELOPMENT PROJECT, YOKOHAMA, JAPAN
* Supervising of detail engineering work, bidder selection and monitoring fabrication work of pressure vessel.
* Handled Equipment: Columns, Drums, Filters, Air Coolers and Brazed Aluminium Heat Exchangers.
STATIC EQUIPMENT ENGINEER – UNIT LEADER Sep. '2004 – Mar. '2005
PENGEMBANGAN GAS SUMBAGSEL PROJECT, SUMBAGSEL
* Coordinating and supervising of detail engineering, bidder selection, fabrication and construction activities.
* Handled Equipment: Columns, Drums, Tanks, Filters & Pig Launchers/Receivers
STATIC EQUIPMENT ENGINEER – UNIT LEADER Dec. '2002 – Aug.'2004
BETARA COMPLEX DEVELOPMENT PROJECT, JAMBI
* Coordinating and supervising of detail engineering, bidder selection, fabrication and construction activities.
* Handled Equipment: Pressure Vessels (Columns and Drums); Filters and Pig Launchers Receivers
STATIC EQUIPMENT ENGINEER - LEADER Nov. '2002 – Dec. '2002
KONDUR FUEL GAS NETWORK PROJECT, MALLACA STRAIT, RIAU
* Generating equipment data sheet for existing equipment.
* Handled equipment: Pressure Vessels, Tanks, Heat Exchangers & Filters
STATIC EQUIPMENT ENGINEER - LEADER Jul. '2001 – Sept. '2002
BETARA COMPLEX DEVELOPMENT PROJECT PROPOSAL, JAMBI
* Review ITB documents & technical clarification to Company
* Work plan and scheduling
* Work volume, man-hour, manning estimation and material cost assesment.
* Preparing Technical Requisition package.
* Technical Bid Evaluation and Risk Analysis
* Coordination with other disciplines.
* Handled equipment: Columns, Drums, Tanks, Shell & Tube HE, Air Cooled HE, Plate & Frame HE, Braced Aluminum HE & Filters
STATIC EQUIPMENT ENGINEER - LEADER Nov. '2000 – Jul. '2001
PLATFORMING UNIT RESTORATION PROJECT, BALIKPAPAN
* Coordinating and supervising of bidder selection, detail engineering, fabrication and construction activities.
* Handled Equipment: Air Cooler, Shell & Tube H.E, Vessels and Columns.
STATIC EQUIPMENT ENGINEER - LEADER Aug. '2000 – Oct. '2000
PROPOSAL PROJECT FOR PLATFORMING UNIT RESORATION PROJECT, BALIKPAPAN AND HVU MODIFICATION PROJECT, BALIKPAPAN.
* Review ITB documents & technical clarification to Company
* Work plan and scheduling
* Work volume, man-hour, manning estimation and material cost assesment.
* Preparing Technical Requisition package.
* Technical Bid Evaluation and Risk Analysis
* Coordination with other disciplines
MECHANICAL ENGINEER May. '2000 – Jul. '2000
LNG EXPANSION TRAIN H PROJECT (WARRANTY PERIOD), BONTANG
* Checking and repairing static & rotating equipments during plant shutdown.
* Review equipment performance during operation.
BOILER ENGINEER Jul. '1999 – Apr. '2000
LNG EXPANSION TRAIN H PROJECT (PRECOMMISSIONING, COMMISSIONING AND START-UP), BONTANG
* Coordinating and supervising of precommissioning, commissioning and start up activities for boiler package equipment.
* Boiler modification for reducing vibration problem.
* Boiler performance test.
STATIC EQUIPMENT ENGINEER Apr. '1999 – Jun. '1999
CENTRAL GATHERING STATION AREA 10 PROJECT
* Responsible to Preparing Requisition Package
* Preparing Equipment Data Sheets
* Technical Bid Analysis
* Reviewing Technical Documents & Drawings
* Handled Equipments: Air Coolers, Shell & Tube H.E and Tanks.
STATIC EQUIPMENT ENGINEER Nov. '1998 –Mar. '1999
LNG EXPANSION TRAIN H PROJECT (CONSTRUCTION PHASE), BONTANG
* Supervising repair work for pressure vessels at PT. Puspetindo, Gresik.
ROTATING MACHINERY ENGINEER Nov. '1997 – Nov. '1998
ON The Job Training at M.W. Kellogg Co. Houston TX.USA
* Preparing Requisition Package
* Preparing Equipment Data Sheets
* Technical Bid Analysis
* Reviewing Technical Documents & Drawings
* Handled Equipments; Strainers & Filters, Filter Press, Chemical Injection Packages, Vortoil Hydrocyclone, Vacuum Ejector, Pumps, Compressor Package, Air Dryer Package, Deaerator.
STATIC EQUIPMENT ENGINEER Mar. '1997 – Oct. '1997
LNG EXPANSION TRAIN H PROJECT (DETAIL ENGINEERING), BONTANG
* Responsible to Preparing Requisition Package for Towers & Trays
* Preparing Engineering Drawing for Towers
* Preparing Data Sheet & Setting Plan for Exchangers
* Technical Bid Analysis & Clarification with Vendors
* Platforms, Ladders, Brackets & Clips Design
* Reviewing Technical Documents & Drawings
* Preparing Loading Data & Plot Space for Civil Group.
STATIC EQUIPMENT ENGINEER Jan '1997 – Feb' 1997
VCM PLANT PROJECT, MERAK
* Responsible to Vessel & Exchanger Mechanical Design
* Platform, Ladders, Brackets, & Clips Design.
STATIC EQUIPMENT ENGINEER Jul '1996 – Dec '1996
LNG EXPANSION PROJECT TRAIN-H (PROPOSAL) BONTANG
* Responsible for Vessel & Exchanger Estimating
* Preparing Requisition Package for Vessels & Exchanger
* Technical Bid Analysis
STATIC EQUIPMENT ENGINEER Apr. '1996 – Jul '1996
LNG EXPANSION PROJECT TRAIN-H (FEED) BONTANG
* Responsible for Vessel & Exchanger Mechanical Design
* Preparing Engineering Drawing for Vessels
* Preparing Data Sheet & Setting Plan for Exchangers
* Preparing Loading Data & Plot Space for Civil Group.
Feb '1994 – Feb '1996 PT. DJAJANTI UNIVERSAL
A join Venture Company (Indonesia-USA)
In Wood Working Industry
CHIEF INDUSTRIAL ENGINEERING Feb. 1995 – Feb 1996
* Responsible for Production Planning and Inventory Control.
* Product Development
MANAGEMENT TRAINEE Feb. 1994 – Feb. 1995
* Rolling from department to department: Kiln Dry, Rough Mill, Shaping, Assembling, Finishing, Side Product and Industrial Engineering.
Languages: Indonesia, English - Fluent
Computer
Skill: Pressure Vessel Design Program: AutoVesl, PV Elite, Compress, Disasu, B-Jac, E-Tank, Coade, WRC 107, etc.
All most all Windows application, such as Words, Excel, Power Point, MS Project etc.
AutoCAD 2000
Trainings
/ Courses: 1. ASME Boiler and Pressure Vessel Code Section VIII, Division 1, Design and Fabrication of Pressure Vessels with Repair and Alteration, Jakarta, October 6-10, 1997.
2. ASME Boiler and Pressure Vessel, Spring Seminar 1998, Houston, Texas, USA.
3. Jump Start Training at MW. Kellogg Co, Houston, Texas, USA, November 1997.
4. In house weekly training for machinery and pressure vessel in MW. Kellogg Company, Houston, Texas, USA. 1997-1998.
5. Composite Material Training by PT. Induro, Cikupa, Jabar, July 2000.
6. Plant Safety Training at Pertamina UP-V Balikpapan, January 2001.
7. Safety Training Obsevation Program (STOP); by HCJV (Kellogg-IKPT Joint Venture), at Badak NGL.Co, Bontang, Kaltim, July 1999.
8. Engineering Material, Material Selection Design and Corrosion Assessment, Departement of Metalurgy & Materials, Universitas Indonesia, January 2005.
9. NIOSH course for Petronas Safety Passport, July 2007.
10. Induction on H2S Gas Safety at Petronas, July 2007.
View contact information... |