CONTACT INFORMATION:
View contact information...
Date & Place of Birth: 11 January 1966 – Suez, Egypt
Citizenship: Egyptian
Marital status: Married, 4 children (12 years, 12 years, 7 years, and 1 year)
Current Location: Malaysia
QUALIFICATIONS
2006 PhD Production Engineering, Faculty of Petroleum & Mining Engineering, Suez
Canal University, Egypt (Title of PH. D.: Production Data Analysis for
Artificial Lift Oil Wells).
1999 MSc Reservoir Engineering, Faculty of Petroleum & Mining Engineering, Suez
Canal University, Egypt (Title of MSc: A comparative study between reservoir mathematical models for enhanced oil recovery (EOR) by polymer/surfactant flooding).
1989 BSc Petroleum Engineering, Faculty of Petroleum & Mining Engineering, Suez
Canal University, Egypt.
KEY COMPETENCIES
* More than 16 years of experience in petroleum engineering.
* Extensive experience in subsurface operations and production technology.
* Good skills in artificial lift methods (ESP, Gas Lift, SRP & JP) and production optimisation.
* Good background in reservoirs engineering, production facilities, and rig activities.
* Multilingual: English and Arabic.
* Computer: Good operating on software computer programs such as MS office, OFM, Finder,
Prosper, GAP, WellFlo.
WORK HISTORY
FEBRUARY,2007 – PRESENT
PETRONAS CARIGALI SDN BHD
MALAYSIA
SENIOR PRODUCTION TECHNOLOGIST
Reporting To: Head of Subsurface Integrity
Work Location: Town
Responsibilities include:
1. Gas Fields team leader.
Lead a team included Production Technologists, Reservoir Engineers, and Geologist for the following:
* Monitor well performance and sharing with production operation for solving any problem.
* Preparing rig and rigless workover programs.
* Preparing surveillance programs.
* Preparing work program budget (WPB), short term production forecast (STPFC), and long term production forecast (LTPFC).
* Try to use new technology in our gas fields such as chemical water shut off and gas jet pump.
* Lead/participate in multi-disciplinary teams, provide technical advice and guidance.
* Monitor and troubleshoot producing operations and well integrity.
2. Production Technology Advisor
* Subsurface integrity value assurance committee (SVAC) member.
* Lead/participate in multi-disciplinary teams, provide technical advice and guidance.
* Sharing as a production technologist advisor for solving some PETRONAS Overseas problems.
3. Artificial Lift advisor.
* Work with a team for using new artificial lift methods in PETRONAS such as ESP & PCP.
FEBRUARY,2006 – FEBRUARY,2007 (1 YEAR)
KUWAIT OIL COMPANY
KUWAIT
PETROLEUM ENGINEER
Reporting To: Field development Team Leader
Work Location: Town
Responsibilities include:
* ESP coordinator.
* Preparing rig and rigless programs such as perforation, and water shut-off.
* Preparing surveillance programs such as PBU, BHFP, SBHP, PLT, and TDT.
* Work with our team for preparing and implementation well completion.
* Validating some measured data.
* Increase production, and decrease operating costs.
* Work with team to successfully implement production enhancing projects and initiatives.
* Follow-up well tests, well operations, field activities, etc. where appropriate.
OCTOBER,1999 – FEBRUARY,2006 (6.5 YEARS)
KHALDA PETROLEUM COMPANY
EGYPT
DISTRICT ENGINEERING DEPARTMENT HEAD
Reporting To: District Engineering Sector Manager
Work Location: Onshore field
Responsibilities include:
* Provide technical advice on production and processes to enhance production and utilities systems.
* Monitor well performance with aim of optimizing day to day production and identifying problem areas.
* Monitoring water flood operations.
* Supervision of some rig operations such as DST, RFT, perforation, stimulation &
fracturing.
* Supervision of some rig-less operations such as acid stimulation, perforation, PLT, fracturing, TBG cleaning, ESP backwash, and unloading by CT&N2.
* Initiation of some work-over & re-completion recommendations.
* Create and maintain a well performance database such as production & injection history, pressure history, work-over history, Artificial Lift (ESP, GL, SRP & JP) database and using these database for production optimization.
* Supervision of production and injection allocation reports.
* Follow-up of artificial lift (ESP, GL, SRP & JP) operations and identification of problematic wells.
* Follow-up wire line operations.
* Review well data to find suitable candidates for increasing production by stimulation, perforating or artificial lift.
* Supervision and mentoring of some junior engineers.
JUNE,1991 – OCTOBER,1999 (8 YEARS)
GULF OF SUEZ PETROLEUM COMPANY
EGYPT
PETROLEUM ENGINEER
Reporting To: District Engineering Division Manager
Work Location: Onshore field
Responsibilities included:
* Preparing and implementation well completion for gas & oil wells.
* Preparing well survey programs such as pressure build-up survey & gas lift survey.
* Analyze and interpret a variety of well monitoring surveys such as pressure build-up survey, static pressure survey & gas lift survey.
* Perform, analyze and interpret an ECHOMETER survey.
* Preparing troubleshooting programs for artificial lift wells such as ESP, gas lift &
hydraulic system.
* Preparing and witness of work-over & re-completion programs for oil & gas wells.
* Preparing tubing cleaning programs utilizing chemical or mechanically by wire line.
* Design the oil & gas flow lines using computer programs such as SNAP.
* Design of artificial lifting system (ESP, gas lift, jet pump).
* Monitoring of field production and injection data for evaluation of its performance.
INSTRUCTOR
MARCH, 2005 – NOVEMBER, 2005
INTEX, EGYPT
From March, 2005 To November, 2005, I worked as an instructor (part time) in INTEX (www.intexeg.org), Egypt.
I instructed the following courses:
* Well Completion & Productivity {advanced} (November, 2005).
* Beam Pumps (June, 2005).
* Electrical Submersible Pumps (April, 2005).
* Gas Lift & Gas Pumping (March, 2005).
PAPERS
2005 Osman et al,: "Prediction of Down-hole Pumping Problems for Electric Submersible
Pumping (ESP) Wells" The Sixth Syrian Egyptian Conference in Chemical and
Petroleum Engineering, November 08-10, 2005, Hims, Syria.
2005 Osman et al,: "Production Data Analysis for Electric Submersible Pumping (ESP)
Wells" 7th Offshore Mediterranean Conference and Exhibition (OMC2005), March 16-
18, 2005, Ravenna, Italy.
2005 Osman et al,: "Accurate Determination of Pump Intake Pressure and Bottom Hole
Flowing Pressure for Sucker-Rod Pumping (SRP) Wells" 9th International Mining,
Petroleum, and Metallurgical (MPM) Engineering Conference, Feb 21-24, 2005,
Cairo, Egypt.
1998 Shedid, A.S., and Osman. F.M.,: "Accurate Determination of Pump intake Pressure and Bottom Hole Flowing Pressure Using Hydraulic Jet Pump Performance Data"
Journal of Petroleum and Mining Engineering (JPME), Vol. 1, No, 1, June 1998, pp. 33-45.
TRAINING
2006 Defensive Driving Theory, Kuwait Petroleum Corporation, Kuwait.
2005 Problem Solving & Decision Making, GESCO group, Egypt
2004 Wireline operations, AASTMT, Egypt
2002 Principles of Sucker rod pumping, LUFKIN, Egypt.
2001 Basic Well Log Interpretation, OGCI, Canada.
2001 Gas Production Engineering, OGCI, Canada.
1998 Conformance Technology Workshop, HALLIBURTON, Egypt.
1997 Reservoir Simulation, ICEMEC, Egypt.
1995 Hydraulic Jet Pump Operation, TRICO, U.S.A.
1995 Work-over & Re-completion, AMOCO, U.S.A.
1994 Advanced Formation Evaluation, IPR, Egypt.
1994 DST & RFT Interpretation, IPR, Egypt.
1994 Pipe Line Design, ICEMEC, Egypt.
REFEREES
Will be provided
View contact information... |