2006¡VPresent Project Manager, Babcock & Wilcox Canada (Nuclear Services)
Cambridge, Ontario
Overall lead for below projects from proposal to execution phase.
„X Darlington NGS Primary Heat Transport System, Feeder tube replacement (3 Campaign)
„X Pickering NGS Primary Heat Transport System, Feeder tube replacement (2 Campaign)
Responsibilities includes
„X Prepare proposal, coordinating activities for specific scope and conduct Price Approval process
„X Primary Single Point Of Contact with customers and conducts customer presentations
„X Technical and commercial interfaces with customer and contractors from proposal to close out phase of the projects
„X Manages the review and interpretation of customer's specifications and bidding documents
„X Manages project using financial information and develops cost control strategies for successful financial returns
„X Develops the Project Execution Plan, schedule coordination, job planning
„X Identifies technical, commercial, and financial issues and negotiates favourable project changes
„X Develops alternate technical and commercial strategies to solve project problems and manage risks
„X Act as site manager and execute the service projects
„X Establish and maintain effective communications and relationships with the members of the teams in order to ensure satisfaction in the execution of the project
„X Lead responsibility for procurement and manufacturing of any required tools
„X Develop, coordinate and conduct specific training programs for site execution

Significant Achievements
Manage the first feeder tube replacement project at Darlington Nuclear station, using developed specialty tools for the first time in nuclear industries.

2001¡V2006 Field/Project Engineer, Babcock & Wilcox Canada (Nuclear Services)
Cambridge, Ontario
Technical Lead for a variety of both field service and tooling design projects serving the Nuclear industry, including:
* Pickering A NGS Steam Generator Divider Plate Installation
* Pickering A NGS Steam Generator Replacement Thermal Sleeve Installation
* Point Lepreau NGS Steam Generator Inspection
* Darlington NGS Steam Generator Anti-Vibration Bar Installation (4 Campaigns)
* Feeder Replacement Tooling Project (in partnership with Atomic Energy Canada Limited)
Responsibilities include:
„X Conduct the service projects from proposal thru the execution phase
„X Supervision/mentoring of junior Engineering staff
„X Lead Technical customer interface
„X Schedule coordination, job planning, and conduct of regular meetings
„X Lead responsibility for procurement and manufacturing of any required tools
„X Lead responsibility for procedure, route sheet, and QA planning documentation, including:

„X Field Procedures
„X Field Execution Inspection & Test Plans
„X Shop Fabrication Inspection & Test Plans
„X Training Documentation
„X Job Safety Analyses
„X Dose Estimates
„X Final Reports
„X History Dockets

„X Develop, coordinate and conduct of specific training programs as required for different field execution programs, including specification and design of mocked-up field environment where required. (Programs typically required for both technical and QC staff, and for trades training).

Significant Achievements
Successfully complete the design and fabrication of Feeder Tooling Replacement to use in Nuclear industries.
The third Darlington AVB Installation was conducted in four steam generators in parallel, necessitating a very large crew to meet the short schedule and extra coordination and planning. This campaign was completed under schedule and budget, and was "event-free" of quality or safety issues and resulted in the best report card in the history of BWC's Nuclear Services, issued by OPG.
1999¡V2001 Manufacturing Engineer, Mobile Climate Control Inc.
York, Ontario
„X Developed and optimized the fabrication process to achieve higher product quality at lower cost
„X Reviewed manufacturing time study and resolved technical problems.
„X Modified CNC programs to optimize the product cost.
1996¡V1999 Project Manager, Centigrade Industries Inc. (Oil/Gas/Petrochemical)
Shiraz, Iran
Overall project lead for design, manufacture and installation of major heat exchangers & pressure vessels in the field of Oil/Gas/Petrochemical industries. Responsibilities included:
„X Review and analysis of project specifications and requirements.
„X Lead for preparation of the technical proposal including preparation of detailed project cost estimates.
„X Interfaced with customers to address all the technical issues and deviations prior to contract.
„X Prepared project execution plan and indoctrinated the project team with the project requirements.
„X Supervision of all aspects of project from design to installation, ensuring all project requirements was met.
„X Conducted project meetings to review the project status and resolve the outstanding issues.
„X Liaison with engineering, production, planning and QC to ensure product quality and schedule requirements were met. Provided technical problem solving.
„X Evaluated the products supplied by the vendors from quality and schedule basis.
„X Prepared final report of the project, and reviewed customer feedback and lesson learned.
„X Member of Process Improvement, Root Causes Analysis and ISO committees.

Significant Achievements
After completing the plant upgrades for power plant air cooler manufacture I was promoted to Project Manager to manage the first sale of this equipment. Although this was a first-of-a-kind project for Centigrade, the project was brought-in on schedule and under budget and we were successful at achieving further sales.
1993¡V1996 Manufacturing Engineer/Manager, Centigrade Industries. Inc. (Oil/Gas/Petrochemical)
Shiraz, Iran
Supervision and administration of the production department of a major heat exchanger manufacture. Tasks included:
„X Optimized product manufacturing by utilizing the new manufacturing technology. Capital investment required the necessary justification to management including presentation to senior staff.
„X Periodic evaluation of the personnel qualification and continuous improvement by utilizing relevant training.
„X Production problem solving, including review of non-conforming conditions and determining best corrective action. Conducted Root Causes Analysis of significant problems and prepared correction actions to prevent/reduce the potential of similar problems.
„X Generated BOM for the projects and coordinated with procurement, including evaluation of vendors' bids against technical requirements
„X Reviewed customer feedback and lesson learned.
„X Developed/Optimized shop route sheets.
„X Oversaw work place safety requirements.

Significant Achievements
I expanded the manufacturing facility for power plant air coolers. The company had previously not expanded into this market. I was also recognized for manufacturing improvements resulting in increased product quality and cost reductions. These efforts earned me rapid promotions.

1987¡V1993 Design/Project Engineer, Petrochemical Industries Design & Eng. Co.
Shiraz, Iran
Detailed mechanical engineering design of pressure vessels & heat exchangers in accordance with ASME, ASTM, API Codes & Standards.
„X Reviewed customer Technical Specification in accordance with code requirements.
„X Reviewed P&ID's and PFD's and coordinated with other work groups.
„X Prepared manufacturing drawing and data sheet, technical MR to procurement and Bid Table Analysis
„X Reviewed vendors technical proposal and negotiated vendor deviations
„X Stress analysis of the pressure parts

EDUCATION

Isfahan Engineering University
B.Sc., Mechanical Engineering
P. Eng, Ontario Professional Engineering
In process to register with PMI as PMP

OTHER TRAINING

* Pressure Vessel & Heat Exchanger Design, Lumas Company, Holland
* Air Cooler Mfg & Welding Technology, GEA, Germany
* Shell & Tube Manufacturing Technology, Kroup, Germany
„X Problem Solving & Decision Making, Kepner-Tregoe, Canada

View contact information...
«« previous resume next resume »»
Search Results (Resumes 1251 to 1300 of 6635)Go to Search Parameters...
Brief Description
Instrument Engineer with MBA having 10 years Expeience in Refinery & Chemical Industries Project & Maintenance.
Stractural/ Mechanical Engineering
I am a Diploma holder in Electrical Engineering. I worked 8 years in Indian Engineering Companies as Engineer. Later i started my career in Oil and Gas Industry. I am capable of serving the position as Electrical Maintenance Supervisor / Foreman. Now i am working in Sudan.
More than 30 years experience in corrosion protection
Surveyor working with Lloyd's Register Asia
Exprience in Honeywell Systems,Zyton,Qualitronics,Syris,Diginet. Skilled in all fire systems and BMS.
Having Over 10 years of experience in Documentation in Oil & Gas Industry using EDMS
I am a Mechanical Project Executives around 7-1/2 years of experience in the field of Project management, Construction of Offshore structures & pipelines, Oil & Gas, and mechanical structures
A keen analyst with 11 years of experience in QMS Implementation, Testing & Inspection, Inspection Co-ordination, Welding Operations, Audits etc.
NDE Project Manager, III Ultrasonics ASNT/ACCP/EN473, Phased Array, TOFD, API 510 (lapsed), CWI (lapsed)
Results-oriented Petroleum Engineer with 17 years experience in the International Oil Industry with an in-depth technical appreciation of production practices.
Canadian Citizenship, twenty-year work experience in the oil/gas and mining industry with very strong skills in geology and geophysics, reservoir management, Development and Production and production engineering. Very proficient in computer software applications for resources estimation, project eva
Piping &pressure vessel design
Core business is scaffolding; Consulting, controlling, supports, execution business. in Oil & Gas industry and construction industry
I am M.Tech and got 13 years of experience in the field of process automation & controls
Mechanical Field Service Technician
Coil Tubing Supervisor. An extensive Knowledge of onshore, Desert, swamp and offshore Well service techniques have been gained on a variety of completions, including Oil & Gas producers, water & gas injectors and Deep-Sea wells which are outlined as follows.
Extensive experience processing marine and land seismic data. Familiar with data worldwide including Geometry QC, Refraction Statics Solution, Tidal Statics, Velocity Analysis, Multiple Attenuation, DMO, Coherence Filters and Migration.
I am interested to fulfill one of the geologist position in your company, here in I apply for that slot. I have been working on the several oil companies for more than 15 year experiences to look at some hydrocarbon basin studies throughout Indonesia
Diverse experience as a petroleum, mechanical and environmental engineer. Areas of specialized knowledge extend from personal management, completion, operations and production engineering to project engineering and project management.
Instrument Electrical. Real polyvalent-Electronics: Fire detection/gas detection/communication system and hydraulic systems(crane, wellhead control)
14 year-experience(6 years in Arabic World) in Oil&Gas and Petrochemical Industries as C&I Engineer(Technician).Involved in design, construction, commissioning, startup, shutdown and maintenance of some plants.I worked with great companies – ANSALDO, BROWN & ROOT, SHELL, LUKOIL.
5 Years of Digital DCS Control systems erection ,testing and commissioning experience.
NACE certified corrosion technologist with over 25 years experience in all aspects of the Corrosion Protection field. Extensive field experience. Willing to travel. Interested in contract work.
Free! M.Sc Petroleum Engineering, 28 years experience as Drilling Fluids/Mud Engineer and Reservoir Engineer
Presently I am working Bunduq oil company at offshore Abudhabi as a techanicianmechaical
Rotating Equipment Supervisor
IT/PC Technician
Seimec mechanic
Offshore design and project management
Safety Technician offshore/oil and gas.
I am well conversant with ANSI/ASME codes and standards as well as software packages CAESAR-II, SPR. I am well versed in conceptual engineering, detail engineering, Piping Stress analysis, Team leading, project planning, Project managements, Project execution techniques and pre-commissioning. I am w
Mud Engineer/Consultant 18yrs experience with all kinds of muds and locations. Hard working
Oil & Gas production optimization, Artificial Lifting, Workover, Completion, Nodal Analysis, Stimulation, Simulations.
More than 10 year’s progressive experiences in the Inspection sector at various International & national Company. Employment within the Oil & Gas, Power Plant, Structural Steel, Pipe Mill, Pipeline Coating, Pipelines Installation (Offshore) Platform Modification (Offshore) Refinery and Pressure Vess
i am a chemical engineer and i have a diploma in petroleum industrilization engineering.my expeierence concerning in oil and gas services such as well-testing, wellhead maintenance, pressure vessels inspection, tanks desludge and cleaning operations, well testing equipments modifications...
Material Controller
Over 17 Years of professional experience in Piping, Basic & Detail engineering of Offshore(FPSO, FPU & Wellheads), Onshore Refineries, Petrochemical plants, Oil field developments, Fertilizers, Chamical, Process and industrial plants of various types with excellent knowledge in Industry standards
Working as Sr. Electrical Engineer (Project Co-ordination) in SEG Middle East LLC. Abudhabi, UAE, at Aug.2006 onwards.
Operation, Maintenance, and troubleshooting of Reciprocating, Flotronic, Screw & Scroll Chillers.
Awarded degree with M.Sc. in Polymer Chemistry with basic degree in Chemistry background, aspiring for a suitable position which offers professional contribution and self development with my area of interest in Research and Development and Quality Control department.
Design, maintenance of process Instrumentation
Expert to work with ORCAFLEX ,ORCALAY,OFFPIPE,AGA Software - Able to work with CAESAR II,SAGE Profile,MOSES,AUTOPIPE,MATHCAD - Worked with DNV 1981,DNV 1996,DNV 1998 (Guideline No. 14),DNV 2000 (OS F101),DNV RP B401,DNV PR F103,DNV RP E305,DNV RP F105,DNV RP F107,BS 8010, BS 7910, API 5L, ASME B31.8
I worked for construction of grid sub stations, designing of house wiring, panels designing etc
Dedicated, reliable professional with over 14 years of experience in all aspects of oil / Gas HSSE Offshore and Onshore.• High ability to deal with multicultural environments in position where communication is important and teamwork is essential.•
Judicious leader with 11 years’ experience in the areas of Production Planning, Maintenance Operations, Quality Inspection and 10 years in Hydraulics.
Mud Engineer (senior) experienced motivated ready to relocate works anywhere
Seeking challenging job in power/Gas/Oil and desalination plant to utilize more than 23 years of experience as senior commissioning engineer, operation engineer, shift operations superintendent, and equipment conditioning & performance engineer of Rotating and Static equipment of thermal power plant
Extensive experience in managing complex construction and service projects with the knowledge to balance the requirements for functionality, quality, timeliness, and safety.
Over 25 years of international oil/gas industry experience as a professional Geologist, I worked on Africa, Middle East, Canada, UK, India, Kazakhstan, Trinidad & others. Proven track record in geological exploration venues: prospect generation & new ventures evaluation
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   [ 26 ]   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
CATEGORIES: Engineering/Technicians;
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2008 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com