CONTROL & INSTRUMENT COMMISSIONING / MAINTENANCE ENGINEER 16.05.2008

Romanian, born 16.09.1954
Married: two children
Romanian Passport, expires October 2008
Romania/International driving license

PROFILE:
Construction/Commissioning Instrumentation & Control Superintendent, or Project Management (PMC-role), or I & C Field Engineer/Supervisor, or I & C Maintenance Engineer with extensive (>25 years) experience: in Romania & overseas (>12 years) – in the:
Power Generation, Power & Desalination, Wastewater Treatment, Petrochemical, Gas Processing Projects with experience in:
* Turn key & customized data acquisition systems, calibration, measurement & interpretation, design & research, mounting, erection, field installation, pre-commissioning, commissioning, inspections, witness, operation, maintenance for: control loops of flow, temperature, level, pressure, vibration, alarm & interlocks, function groups, photometers, analytical analyzers, control valves, DCS, DDC, PLC, MCC, ESD,LMS/DMS, power & gas plants, fire fighting & gas systems, oil production, steam, oil & gas turbines, combined cycles, water treatment, desalination, chlorination, boiler, water & oil storage, distribution & transfer, instrument & service air compressors, EDG systems, H2, O2, CO2 plants, TCA coolers, stack flue gas, Hart Communicator.
* Supervisory skills of multi-national workforces for the duration of construction &commissioning phases.
* Specialized in the "Plant handover system", coordinating the activity of Mechanical Completion and Pre &Commissioning works.
* Reviewing /inspection of Test-Packages compliance against the: Project specifications, Quality & Test/Procedure.
* Experience in "Project Management"-PMC role, practiced in reporting processes.
* Familiar on reading/using P&ID's, logic diagrams, catalogs, tuning.
* A sound knowledge of international standards and codes (BS EN 60801,ISO 900X, IEEE,NFPA, IEC, API RP551, ANSI)
* Administrative aptitude and computer literacy (Microsoft Office Project, Lotus, TinnyCad, Orcad, AutoCAD, Internet)
* Safety awareness (Courses as: Safety Leadership Workshop, HSES Supervision & Leadership Program, Permit to Work).

ISTRUMENTATION/SYSTEMS/PLANTS:
Honeywell, Yokogawa, W.D.P.F.Foxboro, ITT Barton, Fisher Rosemount, Masoneillan, Auma, EMG, Rotork valves, Daniel box, Siemens-Sipart, Fisher-Porter, Endress-Hauser, Sor, Magnetrol, Varec, Petrol, Aschroft, Sakura Enders, Duragauge, Sespi, Zellweger Analytics, Parametrics, Maihak Multor, Land, Hartmann & Braun, Raychem, Allen-Bradley, Rockwell Automation Software Logix 500/Linx5/ActiveX – 6200 Series SLC 500 PLC's, Mark 5, Cuttler Hammer, Omron CXP Programmer, Siemens Simatic PCS 5/7, Diasys 4, Contronic3, ABB Advant 160/450 & Siemens-Teleperm XP DCS, Ingersoll Rand, Compair, Sullair, Deltech-Flair, Donaldson, Bently Nevada 7200, Homar-Notifier 5000, Minimax FMZ-4100,Fizia-Italimpianti, Technos, Termomecanica, Tormene, Aquatech, Fantuzzi Regiane, Eurosistemi, De Nora Impianti, Raimondi, Texas Instruments Systems.

QUALIFICATION:
* "M.Sc". Engineer in Electronics(Components and Devices),1974-1979, Politechnica University Bucharest Romania

LANGUAGES:
* Romanian (mother tongue), English (speaking, reading and writing), French (basic)

EMPLOYER (Country)-PROJECT PERIOD/LOCATION/VALUE-POSITION HELD:
* Mott MacDonald –October 07- Present, Independent Water Steam & Power Project, KSA, 960 Million $ - Sr.Owners I&C Engineer
* ABB SP&P (Italy) –January 07- April 07, Power Generation EPF Block D, Malta, 200 Million $ - I&C Commissioning Engineer
* HANSWORTH Ltd (UK/UAE) -June.05-Aug.06 - 6X25MW Power Plant Project – Nigeria- 550 Million $ - I&C Superintendent
* LLOYD's REGISTER IS (UK) – July 04-Oct 04 - ENI WLGP-Mellitah Coastal Plants-Libya- 3,0 Billion $ - Lloyd's Site Representative
* ZUEITINA Oil ( Libya) - June. 03-June. 04 - Concession 103 D – Gas Plant & Oil Production –LIBYA- Instrument Maintenance Engineer
* ALSTOM Power ( Italy)- August. 02-May. 03 Jebel Ali Power & Desalination Plant –UAE-0.8 Billion $ - Senior I & C Commissioning Engineer
* ALSTOM Power ( Italy)- Dec. 00-Dec. 01- Shoaiba Power Plant Stage 1 -SAUDI ARABIA- 2 Billion $ - Senior I & C Commissioning Engineer
* MITSUBISHI HEAVY IND (JP)- Oct. 98-June. 99- Bursa Combined Cycle-1400MW Power Plant- Turkey-1.8 Billion $ – I&C Sys Engineer
* MITSUBISHI CONSORTIUM (JP) -Jan.97-July. 98 -Al Aweer Gas Turbine PP "H" Project--U.A.E-2.2 Billion $ - I&C Systems Coordinator
* ABB SAE SADELMI ( It) - March 95-Dec. 96- Al Taweelah Power&Desalination Plant "B", -U.A.E-1.8 Billion $- I & C Commissioning Engineer
* NATIONAL INSTITUTE FOR THERMAL ENGINES (RO)-Sept 79-March. 95 Bucharest- Romania- Electronic Laboratory – Deputy Manager
OVERSEAS POSTING (Chronological): KSA, Malta, Nigeria, Libya, Libya, UAE, Saudi Arabia, Turkey, UAE, UAE
CAREER HISTORY on the next Pages

October.07- Present (x month), Independent Water Steam & Power Project (IWSPP) 5x 120MW Steam Turbines + 9x Boilers+ 2x8 Reverse Osmosis banks - Rabigh Arabian Water and Electricity Company(RAWEC) - KSA
Owners(RAWEC)Engineer, Senior Instrumentation & Control Engineer, Mott MacDonald - consultancy
* Provided oversight of installation, commissioning, and start-up processes for the IWSPP and auxiliaries.
* Performed system walkdown and inspections during all phases.
* Assist initial startup, checkout, and calibration including control and process instrumentation, MHI's Protection and Control systems.
* Pre-identified all potential expansion issues.
* Provide extensive interface with Engineering corrections and field implement design deficiencies.
* Monitored STG performance during steam blows and full load operation
* Monitored STG performance during no load, load and full load operation, established final system setpoints.
* Interfaced with overseas vendors for problem resolution of I&C systems
January.07- April 07 (4 month) Power Generation EPF Block D, 4x35MW, Barge 8 Offshore Facilities, Malta Shipyards, for Kashagan Field Development Experimental Programme Project - Kazakhstan,
Instrumentation & Control Commissioning Engineer, ABB SP & S,- PMC & EPC contractor
* LMS/DMS ( Load Management Sys/ Distribution Management Sys) - commissioning and set up Involved in the functional tests, loop tests, calibration of the field instruments, interfaces Server / RTU s – Allen Bradley to Switchgears, interlocks according to the process requirements
* review/ preparation of instrumentation and control design documents, conceptual and detailed electrical and/or instrument designs and layouts, control schematics, instrumentation wiring diagram, PLC Control Panels Design, instrumentation and control, instrument loop diagrams.
* maintain close liaison with other teams to support and monitor the instrumentation activities in order to ensure effective sharing of information,
* in final coordinate the plant preservation and barge preparation for the travel to the final location – Caspic Sea.
June.05-Aug.06 (14 months) - 6X25MW Independent Power Plant Project-Omoku - Nigeria
Instrument & Control Construction/Commissioning Superintendent- Hansworth Ltd - Rockson Eng Ltd - PMC & EPC
* performed managerial duties at the division level including preparation and the verification (at site) of the existing drawings, including the interface with various engineering disciplines during design/construction/commissioning development,
* review/ preparation of instrumentation and control design documents, P&IDs, conceptual and detailed electrical and/or instrument designs and layouts, equipment designs and packages (process control system and emergency shutdown systems, control panels-Mark V-frame 5 and. instrument tubing, electrical and instrument material selections, control schematics, instrumentation wiring diagram, PLC Control Panels Design, instrumentation and control, cable lists, instrument loop diagrams).Provide appropriate settings for major instrument and control parameters to allow safe operation of plant and equipment.
* ensure equipment erection & commissioning for safety critical items meets acceptable standards. Undertake installation and commissioning of pneumatic /electronic instrumentation on-BOP, power generation equipment, ESDV systems, gas/oil metering kit, temperature/flow/level/pressure controllers.
* resolved unusual problems, made decisions under emergency commissioning conditions to solve problems and protect the teams and the plant, conduct meetings and makes frequent inspections to assure operations confirms to plans and are being carried out safely, efficiently and economically.
* directed preparation of and reviews/approves forecasts for manpower, materials and supplies required, order tools, supplies and supporting service and initiates action to assure stocks are maintained at minimum adequate levels. Prepared work schedules; directs the work of subcontractors involved in various activities and monitors the commissioning costs to enhance the overall efficiency within budgeting constraints.
* reviewed and approved the comments report when appropriate and maintains accurate records of all activities carried out..
July.04-Sep.04 (4 months) - ENI Gas BV – WLGP-Wafa Plants-Coastal Oil & Gas Processing Plant Mellitah)-LIBYA
Lloyd's Register Site Representative( E&I )– Third party representative - Lloyd's Register Inspection Services
* provide independent verification on the onshore plants forming the Western Libya Gas Project (WLGP), the physical progress of work, the quality required level, safety condition and witness in accordance with the Site Work Instructions, the commissioning of a certain equipment. (by the means of Verification Work Instructions (VWIs), following the corresponding Verification Matrix as an index, in order to show the relationship between Safety Critical Elements (SCE) and the appropriate performance standard (PS).
* attend and act as a third party representative to all relevant Company's-ENI /Technip- meetings, monitor the EPC Contractor (Tecnimont)
* review/verify theTest-Packages compliance against the Project specifications, the Quality Plans, the Procedures and Inspection &Test Plans.
* reviewed at sample level the documentation provided to ensure that the Inspection and Test Plan Intervention points have been implemented by the main manufacturers QA/QC team and that Change Control, Site Query and Non Compliance Systems have operated to a satisfactory level.
June. 03-June. 04 (13 months))- Zueitina Oil Company -Concession 103 D – Gas Plant & Oil Production -LIBYA
Instrument Maintenance Engineer - Craddock Engineering UK – Zueitina Oil Company Libya
*. involved in the functional tests, loop tests, calibration of the field instruments including water analysers, interfaces with PLCs – Allen Bradley Logix 500 / Switchgear, interlocks, controller tuning according to the process requirements, Foxboro, Fisher & ITT Barton, instruments overhauls, vibration system- Bently Nevada 7200, air intake filters for gas turbines, water & gas injection systems
* contribution to P&I development, Instrument Summary, production, maintenance and the specification /purchase of Process Control equipment such as: Fisher/Masoneillan Control Valves, Relief Valves, Flow Measuring Systems, Emergency Shutdown Systems, PLC control systems.
* duties also include proposal estimating, planning of project Process Control activities and reporting / forecasting performance
August. 02-May. 03 (10 months))- Jebel Ali Power & Desalination Plant Station " K" Phase II –DUBAI-UAE
Senior I & C Commissioning Engineer –- ALSTOM POWER Italia / ENEL POWER Italia –main contractor
*. involved in the witness, to the consultant-Fichtner/client-DEWA of the functional tests, loop tests, calibration of the field instruments including analyser systems, interfaces with DCS-Teleperm-XP / Switchgear, communication PLC – DCS, interlocks, controller tuning according to the process requirements of the combined cycle power plant, as wel as for TOP-Turn Over Package.
* witness of the various systems i.e. Aux. Boilers & Recovery Boilers (Alstom Power Boilers), GPRS-(Tormene).
* Coordinate subcontractors –Minimax, for the Fire fighting FMZ 4100 System and hand over it to the consultant
Dec. 00-Dec. 01 (13 months))- Shoaiba Power Plant Stage 1 phase 1&2 -SAUDI ARABIA
Senior I & C Commissioning Engineer - ALSTOM POWER Italia / ABB SAE SADELMI Italia –BOP main contractor
* working in the BOP Commissioning Instrumentation & Control Department, for Shoaiba (3+2)x390MW Steam Power
* involved in functional group tests, loop tests, calibration of the field instruments including all gas and water analyzer systems (i.e. analytical, dust, photometers, TOC, pH, concentration, conductivity), interface with DCS / Switchgear, communication PLC (Advant 160)-DCS (Advant450), interlocks, controller tuning according to the process requirements, witness and hand over of the various systems i.e.Water Island-Fantuzzi Regiane (Desalination), De Nora (Chlorination) and Eurosystemi (Demineralisation), Aux. Boiler (Combustion Engineering), H2 (Sespi), to the consultant/client, as well as for TOP's
* assigned as I & C Commissioning Manager, my duties include planning individual works, schedule jobs i.e. time to complete activities, technical support during commissioning, inspections, witness for consultant engineers and client, review Project Schedule and develop Project Execution Method for Instrument and Control Scope of work. Maintain overall schedule and communication to client, technical department, subcontractors and vendors, keeping in touch with the planning department for progress, shortfalls and with the QA/QC Department for standards and site procedures..
* involved in organising the maintenance team, schedule, activities, involved in Factory Performance Test
* attended daily progress/commissioning meetings, reporting on current situations, monitoring changes in forward planning and restrictions to progress.
* collected and recorded the data for use in Performance Measurement, as build drawing and set point and alarm list.
July. 99-Nov. 00 (17 months))- Electronic Laboratory—Bucharest- Romania
Technical Consultant- Electronic Products - TRADIEL srl.-Bucharest
* assigned as Technical Consultant, I was involved in the design, commissioning and service for various computer - controlled systems, turn key systems and customised projects as system integrator
Oct. 98-June. 99 (9 months))- Bursa Combined Cycle-1400MW Power Plant- Turkey
Control System Engineer / Instrument & Control Engineer- MITSUBISHI HEAVY INDUSTRIES – main contractor
* involved in Factory Acceptance Test for Diasys 4 DDC and the integration FAT with other systems.
* provided technical support as a I & C Commissioning Engineer for commissioning of Fire Fighting System - Notifier 5000, TCA Coolers, Air Intake Filters- Donaldson, Gas Station- Homar.
* in charge for the coordination of the instrument technicians, instrument laboratory setup and also responsible for the new technicians training.
* involved in the Water Treatment Plant –Aquatech commissioning and the interface with DDC-Diasys 4
* involved in the daily technical commissioning meetings and in monitoring the relation contractor -client.
Jan.97-July. 98 (19 months))- Al Aweer 600 MW Gas Turbine Power Plant "H" Project phase 1 - Dubai, -U.A.E
I&C System Coordinator Engineer - MITSUBISHI CONSORTIUM - main contractor
* involved since the beginning in construction supervision, calibration, preparation of the as built drawings and revision of construction loop packages for the final inspection and witness
* review the vendors instrument criteria to suit plant scope and conditions and procedures for various systems like Instrument and Service Air Compressors-Ingersoll Rand (Cuttler Hammer –PLC), Air Intake Filters - Donaldson, EDG.
* commissioned the above systems and also Fire Fighting MiniMax FMZ 4100.as I & C Commissioning Engineer.
* provided the technical connection between designer, vendor, client/consultant – DEWA/Kenedy & Donkin, subcontractor / main contractor.
March 95-Dec. 96 (21 months))- Al Taweelah Power and Desalination Plant "B" Project-Abu Dhabi, -U.A.E.
I&C Commissioning Engineer - ABB SAE SADELMI Italia – main contractor
* involved in instrument commissioning for Control System Hartmann & Braun- Contronic 3, including the switchgear interface to the Information System
* worked at Desalination-6 units and Remineralisation Plants, O2, CO2 and Town Water Plants.
* performed open and closed loops, motorised valve MOV-Auma actuator control valves, function groups.
Sept 79-March. 95 (> 15 years)- Methods and Specific Ways for Measurement Laboratory Bucharest- Romania
Electronic Laboratory- Deputy Manager/ Scientific Research Engineer / Electronic Engineer - MASTER S.A./ THE
NATIONAL INSTITUTE FOR THERMAL ENGINES - Bucharest, Romania
* involved in the design of computer - controlled systems, turn key systems and customised projects as system integrator
* performed special measurements like noise- Bruel & Kjaer, tensometry and spectral analysis - Nicolette.
* in charge for the delivery terms, quality and improvement of the results.
* designed differential amplifiers, multiplexes (MMC 4067}, high resolution A/D converters, precision voltage references and interfaces PLC's-process.
* involved in the installation / commissioning of the electronic equipment for the heat engines test stands-Froude, Schenck, Hoffman, coordinate the lab research and design activity using all my technical knowledge, experience and interpersonal skills for getting the best results and relations with ours partners.

PROFESIONAL BODIES
* published "Microprocessor based supervision control and measure system for test stands of the heat engines".
* author of the an invention "Electronic device for force measurement" -brevet no: RO-94898/14.03.1988, and innovations certificates: Pressure capacitor transducer -1986, Cycles programmed device for heat engines tests -1988, Multi channel system for high-speed transient response recording –1986

COURSES ATTENDED
* Thensometric Measurement in Industry, DBase 4, Microprocessors: Architecture and Microprogramming Language

View contact information...
«« previous resume next resume »»
Search Results (Resumes 751 to 800 of 6520)Go to Search Parameters...
Brief Description
13 years exp electrical engineer in T&D of Power sector
Skilled drilling engineer with more than 12 years experience for offshore drilling operation - Immediate available
Instrumentation and control Engineer with following Skills: Honeywell TDC 3000,ABB AC800x,Allen Bradely Panel View,Siemens S5 & S7,Various Field Devices
a very energetic, dynamic and analytical minded person. work with less supervision, written and spoken english are very good. i am trustworthy and dependable person and possess interpersonal relationship ability. have good working relationship with colleagues and superdinates. can handle stress
Free! Drilling Engineer, 10 years experience, hpht experience, Casing design, advanced well design, drilling fluids, directional drilling, drilling software,
I have 17 years of experience and presently working with Saudi International Petrochemical Co (Sipchem). I have got specialized Skills in maintenance planning and scheduling work process control, CMMS SAP R/3 PM module, Primavera P3 / MS project, RCM, Development and implementation of maintenance
Surveyro
Electrical engineering design, B.E(Electrical & Electronics)
Seeking A Challenging Overseas Position in a professional org MSProj & Premevira
I have 15 plus years oilfield experience working in refinery in Bahrain. This experience excludes time with Shell Todd Oil Services in New Zealand as Production Technician and as a Senior Mechanical Technician at Transalta Power Station – GT26 (Alstom). I am very adaptable to work schedule and have
Wellsite Drilling Supervisor
A dynamic professional with more than 24 years of rich experience in Marketing, Sales, Business Development, Planning, Procurement, Process improvement, Manufacturing and Man Management.
A highly experienced and versatile project management and professional engineer with over 15 years of engineering and project management experience in the Oil and Gas industries. Extensive experience in various types of oil and gas projects.
B. Tech in Metallurgical Engg, 27 years experience in Corrosion & Inspection function in refineries
Senior Piping Designer with experience through both contract and direct work assignments, with major emphasis in the areas of Specialty Chemicals, Pharmaceuticals, Petrochemicals, Sulfur Recovery, Heavy Industry, Gas Turbine & Power Generation.
B.sc Petroleum Engineering, Model 204, SAS, Oracle, Oil and Gas Database Conversion, Production Engineering, Reservoir Engineering, Supported Petroleum Engineering application (Pipeflow, Pipesim)
Senior Petroleum Engineer with long experience in Oil & Gas Industry
Experienced LNG & Petrochemical plant commissioning and maintenance activities in Electrical field. Petrochemical and Utility plants instrumentation experience is an additional experience
14 years of project experience including as Sr. pipeline engineer and piping engineer as well have experience as senior pipeline designer and piping designer including 4 years of experience in supervising a team of designers and draftsmen. Design and drafting experience in various field.
Instrumentation Engineer, Detailed Engineering for offshore, FPSO, oil/gas,steel plants
Mech Engr with 22 yrs exp in power plant projects, working with Thermax Babcock & Wilcox Ltd.
Expert in Industrial Gas & oil separation plants (GOSP), Gas Terminals and Stations.
MANAGEMENT Able to make sound prompt decisions encompasing a diversity of areas: From design and implementation through to resources and progress strategies.
Experience in reliabilty centered maintenance and Mechanical Integrity. Extensive experience with Project engineering.
I introduce myself, i am an Electrical Engineer worked in IRAN under Hyundai Engineerung & construction co. for South pars Field Developement Phase 4 & 5 and before Phase 2 & 3 also.
Mechanical engineer Having Experience in Installation,Inspection and commissioning Rotating equipment and various static and package equipments.Having total 10 years of project experience including 5+ years of experience in Oil & Gas projects
Application for the position as QA/QC personal in Oil/Gas/Petrochemical industries
Experiences: Oil / Gas Field Facilities, Pipeline and Production Plant Operations, Commissioning and start up
Professional Drilling Consultant
13 years of experience in Engineering Projects & Maintenance, design engineering, construction and commissioning of instrumentation in petrochemical and chemical industries involving detailed engineering including, project estimation, preparation of instrument specification, comparison statement ,pr
HIGH LEVEL ENGINEER EXCELLENT EXPERIENCE IN THE PETROLEUM/OIL INDUSTRY, MULTI-TASK WORKER, TRILINGUAL, SKILL TO CREATE GOOD ENVIROMENT AT WORK, COMPROMISE TO EXECUTE PROJECTS ON TIME AND BUDGET, HAPPY TO LEARN NEW EXPERIENCE AT WORK EVERY DAY.
Petroleum_ maintenance planning engineer in Qatar Petroleum
Degree in Mechanical Engineer with distinction , Certified Vibration Specialiest from Vibration Institute, USA .Having 13 years of experience in Reliablity Enhancement , troubleshooting & Maintenance support of Rotating Equipments
Graduate Mechanical Engineer with over 12 years experience ( presently working as ¡§Senior Mechanical Engineer (Reliability)¡¨ and additional responsibility as ¡§Shutdown Project Leader¡¨ for Gas-To-Liquids:GTL plant in Qatar ) in an operating environment with hands on experience in RELIABILITY
• More than twelve years of experience in planning and scheduling and project control which have mostly been achieved during the course of execution of multimillions dollars project in Oil, Gas and petrochemical fields inside the country Iran and Turkmenistan (In all type of projects: E, EP, EPC, MC
Experienced in power plant, utilities and offsites plant operation and commissioning
In The field of HSE
An internationally experienced more than 13 years as Professional Inspector / Inspection Engineer involved in Inspection of In-service – Baseline / corrosion monitoring, Turnaround, Shop fabrication / Erection of Vessels, Tanks, Piping, valve components,
18 years petrochemical experience, senior engineer
RESERVOIR ENGINEER; WELLTESTING; FORMATION EVALUATION; SIMULATION
A senior professional with 22+ years of rich experience in Project Management, Inventory Management, Operations Management, Documentation Management; presently associated with Voltas Ltd, Qatar; seeks senior level opportunity preferably in on shore - off-shore oil/gas projects.
This is to express my keen interest in pursuing an opportunity at your organization. At present I am pursuing in ADITYA BIRLA GROUP VIKRAM CEMENT.
Experienced distribution center in-charge, materials planning and control handler, and warehouseman (total 14 years) and mechanical engineer in practice as power plant maintenance and engine tender. Computer literate, resourceful, constructive decision maker. Easily adapts to any working environment
Construction/Commissioning Instrumentation & Control Superintendent, or Project Management (PMC-role), or I & C Field Engineer/Supervisor, or I & C Maintenance Engineer
16 Years of Experience; Experience in managing the Quality control & Quality assurance activities for large integrated engineering projects. Exposure in vendor documents, correspondences with client, vendor, carrying on stage & final inspection with client. Exposure to International code
Planning & Scheduling by Primavera P3; Structural Design by STAAD-PRO 2004
Over 20 years (5-1/2 years in India and 15 years in Gulf) of experience in the field of Pipelines in reputed Engineering Consultancy firms. Worked as a Lead Pipeline Engineer for various PDO (Oman) and Saudi Aramco Oil/Gas cross country pipelines and in-plant pipeline tie-in projects.
Metallurgical/Materials Engineering, failure analysis of gas turbines components, remaining life assessment, gamma prime growth morphology in nickel-base superalloys, high temperature coating degradation and failure mechanism, creep behavior of the alloy, fatigue crack initiation and growth
Corrosion control, cathodic protection
Electrical and electronics engineer with 24 year experience in a major fertilizer, chemical and petrochemical industry. Also have a strong back ground in communication field
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   [ 16 ]   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
CATEGORIES: Engineering/Technicians;
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2008 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com