Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #72779 next resume »»
CONTACT INFORMATION:
View contact information...

Date of Birth: 4th June 1961
Birthplace: Daet, Camarines Norte
Citizenship: Filipino
Civil Status: Married
Height: 5¡¦11¡¨
Weight: 82 kls.

Degree Obtained

Bachelor of Science in Electronics & Communication Engineering (BSECE)
FEATI University
Sta. Cruz, Manila, Philippines
1978-1985

Career Profile

Over 15 years extensive experience in the field of Instrumentation Inspection, Engineering, Construction, Hook-up and Commissioning of various kind of plant, exposure in Oil & Gas Production & Processing facilities, Petrochemical plant. These units include steam reformer, boiler, compressor, process, offsite & utilities. In-charge of the field inspection through final acceptance prior to mechanical completion certificate instrument accordingly as per Quality Control inspection, Test plant & specification of instrumentation, construction installation procedure. They are consists of instrument, bench calibration and functional check various type of instrument such as flow, level, pressure, control valve, PRV, analytical instrument, process switches, receiving instrument and miscellaneous instrument. Confirm instrument, impulse line installation prior to blowing & leak test. Confirm field installation of instrument, local control panel, junction box, marshalling panel, DCS console as per approve location plan, diligence, being efficient, responsible to the assigned task & good communication skills.

Employment History

CONSOLIDATED CONTRACTORS INTERNATIONAL COMPANY (CCIC)
P.O. Box 60784
Doha - State of Qatar

CCC Work Experience

Period: 13th September 2002 to present
Project: Ras Laffan Onshore Expansion Project
Position: QC Instrument Inspector
Contractor: Chiyoda Mitsui and Snamprogetti JV

Period: 6th July 2001 to 12 September 2002
Project: Q-Chem Polyethylene & Hexene/Offsite Project
Position: QC Instrument Inspector
Contractor: Kellogg Brown & Root / Technip JV

Period: 29th January 2000 to 30th November 2000
Project: Onshore Gas Development Project - Phase 2
Position: QC Instrument Inspector
Contractor: Bechtel-Technip Joint Venture - UAE

Period: 8th February 1998 to 5th December 1999
Project: Saudi Chevron Petrochemical Project
Position: QC Instrument Inspector
Contractor: Chiyoda Petrostar Limited

Period: 16th September 1996 to 28th October 1997
Project: Ras Tanura Refinery Upgrade Project
Position: QC Instrument Inspector
Contractor: Aramco - Kingdom of Saudi Arabia

Period: 22nd April 1995 to May 1996
Project: Onshore Gas Development Project 545
Position: QC Instrument Inspector
Contractor: Bechtel - Technip Joint Venture - UAE

Non-CCC Work Experience

AGAP Arabian Limited

Period: 1992 February to December 1994
Project: Safaniyah Gas Oil Separator Plant
Position: Instrument Field Engineer
Contractor: Saudi Belleli Company

Work Performed

Prepare daily inspection activities and document for final acceptance prior to project completion. Maintain close working relationship with the contractor personnel and with the customer representative. Identify quality problems with the Contractor customer sanctions / approval through designed channel. Review plan and drawings in accordance with project specification, codes & standards, conduct activities & inspection in accordance to project quality assurance manual & quality control inspection plan. Inspection of field instrument shall be installed in accordance with individual project specification.

„« Instrument trench prior to cable pulling
„« Cable laying, tagging and dressing prior to backfilling of trench
„« Instrument tiles installation prior to final backfilling of trench
„« Cable meggering & continuity test prior to backfilling of trench
„« Primary & secondary cable tray installation
„« Mounting of junction box prior to glanding & termination
„« Junction box inspection primary & secondary cable after termination
„« Inspection of all field mounted instrument & valves installation
„« Tubing installation & pressure testing
„« Control room inspection
„« MCT inspection prior to cable pulling from trench to Control Room
„« Cable tray inspection inside the Control room
„« Mounting of panel prior for termination of cable
„« Meggering of cable after glanding & termination from junction box to panel
„« Earthing inspection, plant earth, reference earth, clean earth from bus bar to panel prior to energization of panel
„« Panel inspection after termination prior to energization of panel
„« MCT installation
„« In-charge of field inspection through final acceptance prior to mechanical completion certificate
„« Supervision of loop checking activities in accordance with project specification & standard
„« Review loop dossiers submitted by construction & confirm that all documentation included therein is acceptance & compliance with loop scoop
„« Released of loop folder in accordance with project schedule
„« All installation of activities shall be checked to confirm that location, mounting, accessibility, protection, maintenance provision & installation workmanship is in accordance with the requirement of the project specification, standards, schedules & approved construction drawing.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 451 to 500 of 6558)Go to Search Parameters...
Brief Description
SAS and COBOL Programmer with DB2 and SQL experience
My experiences have included not only involvement in reservoir engineering , but also having a broad field experiences with an understanding of operations and proficiency in computer reservoir applications.
OBJECTIVE Seeking a challenging position at senior management level in R&D and Manufacturing / Technical Services / Applications Development / Technology Strategy Planning./Project Implementation
Offering MBA Leadership, insightful, analytical, and creative engineering leader successful in conceptualizing and implementing cost-effective solutions and leveraging key advantages in complex environments. Resourceful team builder and project manager adept at building and leading teams.
Over 20 years of Oil and Gas experience using/supporting technical applications for oil companies & vendors (Landmark, Geoquest, and Paradigm). The past 8 years, my focus is on project management, building/leading application support team, workflows, database, data management and GIS solutions.
PDMS Desgn,Draft, Isodraft and Catalogue Creation and MDS supports
OFFSHORE STRUCTURAL ENGINEER, JACKET ,TOPSIDE, FPSO STRUTURE DESIGN EXPERIANCE
Worked for Offshore / Onshore for Installation, Construction of Offshore facility , Pipeline , Degree in Metallurgy, Piping Engg, ISO 9000, CSWIP 3.2, Painting Insp, API , ASNT Level II
Well evaluation,formation evaluation,basin evaluation and static reservoir 3D-model
More than Fifteen (15) years in Piping (Onshore and Offshore) & Pipeline Design experienced (Onshore) relating to oil & gas projects, petro¬chemical and cross-country pipelines.
Instrument Engineer with15 Years of experience
ELCTRICAL ENGINEERE
Level 4 scheduling in oil&gas with Primavera
Electrical & Instrumentation Inspector - Broad experience in E&I installation in Fabrication of Offshore Production Platform, FPSO, D.P Cable Laying Vessel and Oil & Gas Refinery Plant. (Knowledgeable in industry standard recommended practice: NEC 500, IEC/NEC 505, API RP14C, 14F.
Instrument engineer
Having 13 years experience Inspection activities on oil & gas, Pipe Line, Petrochemical and Off shore module structures. Have served with multinational Companies in Gulf. Familiar with ISO – 9000 Quality Management System requirement, International Codes and Standards. .
Ph, D. in Chemistry. Ten years experience as an oilfield corrosion engineer. Specialized in cathodic protection diagnostic surveys (CIPS, DCVG). Comprehensive computer knowledge (programming, database design). Internal corrosion protection experience (corrosion and scale inhibitors, biocides).
Basin Modelling, Geochemistry, Petroleum Geology, Prospect Generator, Charge Evaluation, Charge Risk Assessment, Seismic Interpretation
I have experience in all phases of both electrical and petroulem experience.
Mechanical Rotating Machinery and Static Equipments
Started carrier with Operations and later switched over to projects. For the last 17 years employed as a safety professional mainly in the Petroleum/ Petrochemical field. Expert in carrying out Safety audits/ HAZOP studies and QRA.
Geoscience expertise from progressively increasing career responsibilities. Management expertise from progressively increasing career responsibilities. Please see resume for details.
Masters in automotive engineering
Senior Hydrogeologist
Production Geologist 25+ years experience. Expertise in Field Development, mature field integration, locating additional infill drilling targets.
Over 25 Years of Extensive Oil Industry Experience in Contracts Administration, Purchasing and Materials Controls. Presently working for the last two years as a CONTRACTS ENGINEER with RasGas LNG Company, Qatar. Seeking advancement and higher opportunities.
Over twenty years experience in oil and gas construction industries
Senior Reservoir Engineer
Total 24 years in various capacities in Oil refinery, Gas processing including Gas Cracker&Petrochemicals with Technical services & commissioning background that covers Process Design, Equipment rating, Troubleshooting, Plant change orders management, Capacity enhancement.
SUMMARY Professional Production Geo-Scientist with 24+ years experience in Geological and Geophysical interpretations. Technical expertise in Oil & Gas Field Development & Exploration, with the use of well logs, core descriptions, sequence stratigraphic & seismic stratigraphic concepts.
+15 years Experience in Engg & Design of Rotating Equipment , abilities to contribute at all stages of the Life Cycles of Large Projects, analyzing viability to assisting in preparing data for client presentation to preliminary engineering, on to detailed engineering, installation & commissioning
B.Sc. in Chemical Engineering (Gas and Petrochemical); 19 years experience in process facilities (more than 17 years in oil and gas industry). The summary of major duty is design, optimization, installation and operation of process equipment.
Overall 20 years experience in Design, Engineering, Project Coordination, Project management, Maintenance of Instrumentation, Analyzers & Control Systems of Major/DBN Hydrocarbon(Olefins) and Polymer(PVC/VCM) projects. Upgrades of DCS, PLC, SCADA, GC, Process Gas & Liquid Analyzers, CEMS A
32 years of work experience and present position senior most lead inst. engineer
Petroleum Engineer, twenty-two years experience, strong analytical Reservoir Engineering on implementing exploitation strategies for petroleum and gas reservoirs, and secondary recoveries techniques. Reservoir description and simulation. Reserves Assessment. Performance production evaluation. Econom
17+ yrs. experience in petroleum engineering from onshore/deepwater offshore (large) oil & (multi TCF) gas fields. Delivering reservoir/production engineering solutions for maximizing asset value by boosting production, well potential & technical integrity and improving overall business performance.
Production Technology and Operations
Complete Crude oil Analysis, Mud Analysis, Water Analysis, Special Core analysis, Procurement of Consumables and Instruments, Calibration and Maintenance of Petroleum & Analytical Instruments.
I have More than 35 years in the marine, oil and gas related industries,
A Sr. exploration Geologist, with extensive experience( 25 years) in oil and gas exploration: G&G and geochemical studies, play assessment, prospect identification and generation, team leader, project management, research of new exploration opportunities, JV , Bid round Data rooms ,etc.
20 Years Total Experience In Drilling As Drilling Engineer/ Drilling Supervisor/Well Planning, Well Control, IWCF Supervisor Passed
I have been working in the field of industrial automation and Control since 1995 and my professional experience is Inspection and supervision of Field Instrument Installation , loop checking Pre-Commissioning and Commissioning of the following DCS, ESD and Fire alarm system including the field and
Drilling, Completion, Fluids Engineering, Directional Drlg Supervisor/Consultant
20 yrs experience Oil/Gas from Ground Up. Objective supported by: INTERNATIONAL PM MBA Ceng INSTRUMENTATION AND CONTROL HNC PROCESS CONTROL CONSTRUCTION SUPERVISION COMMISSIONING / AUDITING FISCAL MEASUREMENT SYSTEMS ENGLISH / SPANISH
Knowing Reservoir Simulation from inside (numerical modeling and coding) out (running commercial software). Seeking a Reservoir Engineering related position at Houston, TX to utilize my diversified engineering and business experience and 7 years of education in Petroleum Engineering.
A highly experienced operations geologist(12 years)based in UK with varied international experience in exploration(11 years)and development geology(7 years). Seeks a supervisory or team position in operations geology worldwide. Expertise includes deep water and high pressure wells.
TO HELP WITH MY EXPERIENCE,KNOWLEDGE LIKE SPECIALIST IN ARTIFICIAL LIFTING OIL PRODUCTION AND ENVIRONMENT, QUALITY OF ADMINISTRATION, SECURITY AND OCCUPATIONAL HEALTH Applying the knowledge acquired in the Masters of Management of Company and The Master of Finances and Business.
Petroleum Geologist with background in Exploration/Development/ Operations/ Wellsite geology with Major and independent operator. G&G interpretation using GeoQuest workstation: IESX, CPS-3, Wellpicks, Wellcomposite. Geological support to expl./Deve./Horizontal well drilling.
Having a strong background in Geology and three & a half years of International Oil Field experience, I wish to join a reputed company within the Oil Industry and build a career as a Geologist, Petrophysicist (Log Analyst) or Seismic Interpreter.
Xiao Ming Jiang A senior civil/structural engineer with experience in power station, SCR and FGD project design and project management.
First   1   2   3   4   5   6   7   8   9   [ 10 ]   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
CATEGORIES: Engineering/Technicians;
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2008 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com