ELECTRICAL AND INSTRUMENTATION ENGINEER.

City: Jinja
Country: Uganda
Willing to
Work Overseas: Yes
Current Work
Status: Current Working and Permanent.
Joining Period: Minimum One Month

PERSONNEL INFORMATION: -
Date of Birth: 23 Mar 1980
Gender: Male
Nationality: Indian

PROFESSIONAL INFORMATION: -
Work Experience: 8 years 7 months.
Skills: Electrical, Instrumentation, Project, Maintenance, Engineering.
Industry: Consumer Goods/FMCG/Oil/Gas/EPC/Power
Category: Maintenance/Engineering/R&D/Projects
Current Employer: M/S BIDCO UGANDA LTD, JINJA, UGANDA, www.bidco-oil.com
Previous Employer: M/S ISGEC JOHN THOMPSON, NOIDA, INDIA, www.isgec.com
Highest Degree: Diploma, Engineering, Board of Technical Education, India.
Current Monthly
Salary: USD 1850 per Month.
Expected Monthly
Salary: USD 30% Minimum Increment.
Job Prefer Location: Anywhere.
WORK HISTORY: -
Around 8.50 years experience in Electrical/Instrumentation Engineering and Maintenance in the Industrial sector, extensive experience in end-to-end execution of EPC Projects including supervision of Installation, Calibration, Testing, Pre-commissioning, Operation and Maintenance of Plant Instrumentation/Electrical systems. Some of the other responsibilities include guidance, close vigilance and site inspection during shop testing, and functional checking of instruments and Electrical Panels. Simulation, during pre commissioning and start up of the plant. Co-ordination with other engineering disciplines during loop checking. Experience in the testing, erection, commissioning and maintenance of various kinds of process control equipments like DCS, PLC, and SCADA. A team player with excellent co-ordination skills and the ability to work under pressure and target well versed with all environment, quality, and safety management standards.
Working Experience:- A. M/S Hind Lamps Ltd. (http://www.hindlamps.com/) (Unit-II), Koshi Kalan (Mathura, U.P.). A Unit of Bajaj group of company. Manufacturing of GLS Lamps of 100watt, 60watt, 40watt. Worked as an Electrical maintenance supervisor from Nov. 1999 to Dec. 2002. Independently handle the machine break downs, handle the man power team. The machine having Relay logic control through OMRON H8PR Rotary Positioner and pneumatic based, Also look after the utility area like Oxygen and LPG Plant, Generators, Compressors.
B. M/S Hindustan Syringes and Medical Devices Ltd. (http://www.hmd.com/) Sector-25, Faridabad. A Unit of HMD group of company. This is an ISO-9001, EN-13485 and CE Mark Company. HMD founded in 1957 as well known name in the Indian Medical Devices Industry. It produces Glass Van, Dispo Van, Surgical Blades, Needles, IV cannualas, etc. Worked as a Junior Electrical Engineer from Dec-2002 to Feb-2005. Worked with PLC based Injection Machines, PLC based Syringes packing machines, and Maintenance of AHU, AIR Compressors, Chillers in Utility section. Worked as a Shift In charge and independently handle the break downs in Shift.
C. M/S ISGEC John Thompson, (http://www.isgec.com/) Sector- 24, Noida. A Unit of Saraswati Industrial Syndicate Limited. I am working in EPC division (Boiler Erecting and Commissioning). Worked as an Engineer Commissioning from March-2005 to August-2007..
a> Independently handle the Electrical/Instrumentation Erection and Commissioning for Boilers.
b> Preparation of work schedule.
c> Handle the man power and contractor team.
d> Installation of MCC/Instrument/PLC panel and its cabling.
e> Installation of Field Instruments and Drives.
f> Loop checking and calibrating of Instruments g> Trial Run and load Trial taking of drives and Instruments.
h> Pre-commissioning & commissioning of Plant.
The Following Projects has been completed in INDIA: - a> Oil and Gas fired Boiler of 22TPH for 4MW Power project at M/S TATA METALIKS LIMITED, KHARAGPUR (W.B.) It is a Tata Group of Company.(From March-2005 to June-2005) b> Traveling Grate Buggass fired Boiler of 110TPH for CO-GENERATION Power Plant at M/S NIZAM DECCAN SUGARS LTD, BODHAN (A.P.). (From June-2005 to October-2005) c> AFBC Boiler of 75TPH 100% Coal fired Boiler at M/S GRASIM INDUSTRIES LTD, NAGDA (M.P.) It a unit of Aditya Birla group.(From October-2005 to January-2006) d> Dumping grate Buggasse fired Boiler of 2 nos. 90TPH Boiler at M/S BAJAJ HINDUSTAN LTD, Lakhimpur. (From December-2006 to January-2007) e>Dumping Grate Buggass fired Boiler of 2 nos. 90TPH at M/S AKABARPUR CHINNI MILLS LTD, AKABARPUR.(From January-2007 to February-2007) f> Traveling Grate Buggasse fired Boiler of 120TPH at M/S RAMGARH CHINNI MILLS LTD, Sitapur(U.P.) (From February-2007 to May-2007)
The following Projects have been completed in Overseas. g> M/S Partex Energy limited (Bangladesh) of 70TPH of 100% Natural Gas Fired Boiler for its 6MW Power plant for Sugar Process Plant. It is a Partex Group of Company. (From January-2006 to April-2006) h> M/S Unique Power ltd (Meghna Group of Industries) of 60TPH Natural Gas fired Boiler for 6MW Power plant for Sugar Process Plant. (From April-2006 to September-2006) i> M/S CITY Sugar Plant Ltd (A City Group of Industries), of 90TPH Natural Gas fired Boiler for 12MW Power Plant. (From September-2006 to December-2006). j> M/S KAKIRA SUGAR WORKS (1985) LTD, UGANDA, East Africa. From May-2007 to August-2007.
D. Presently working as an Engineer Electrical/Instrumentation from September-2007 to continue in M/S BIDCO UGANDA LTD, UGANDA, East Africa. (www.bidco-oil.com) BIDCO Uganda Limited is a highly progressive, rapid-growth-oriented and professionally managed company. The investment is a fully integrated edible oil business in Uganda, which is the first of its kind in the country. With a drive for innovation and market driven approach it has readily embraced cutting edge technology in its processes and systems. The company is one of the fastest growing customer oriented organizations in Uganda with a wide range of FMCG products in Edible Oil industry.
Bidco Uganda Limited has invested in a state-of-the-Art technology, single largest edible oil plant at Jinja, Uganda. It is also developing Oil Palm plantations in Uganda, on a very large-scale, covering thousands of hectares. Total investment in Uganda is to a tune of U.S. $ 135 million. The investment is driven by the philosophy of "Soil to Pan", meaning – from plantations stage up to finished consumer products in the market.
Investment in Uganda is a large joint venture by internationally reputed & leading agri-business group in Asia, Wilmar & Josovina with Bidco group of Kenya. The company in Uganda is the single largest Foreign Direct Investment (FDI) and the company won the 1st position Gold award for the same last year.
Technical Knowledge:- 1. Electrical distribution system with protection devices such as MCB, MCCB, OCB, ACB, ELCB, RCCB and Change over Switches. 2. Maintenance of Induction motors Up to 400KW and also DC Motors. And its control through DOL and STAR DELTA starters. 3. Installation and commissioning of Industrial automation system of Variable Frequency Drive (ABB, Siemens and Telemechanique), soft starters and servo motor control systems. 4. Temperature control with PID system and thermocouples/RTD. 5. Automation control through Relay logics, Limit Switches, Micro Switches, Contactors, Proximity Switches, and Photo Electric Switches, for PLC based automation machines. 6. Maintenance of Hydraulic machines, Injection Maudling Machines and pneumatic machines having PLC based controls. 7. Power Factor Improvement system through p.f. Controller. 8. Calibration of field Instruments like, DP Transmitters, Pressure Transmitters, I/P converters, Control Valves and Power cylinders involves in Process plants. 9. Installation of MCC Panel and its commissioning for Power and Process plant. 10. Preparation of Cable schedule/ JB details for MCC and Instrumentation Panel. 11. Building PLC logics for control the drives through DCS/PLC system. 12. Interconnection system for control the drives of MCC panel from PLC/DCS. 13. Burner management system and its automation control through PLC. 14. Test troubleshoots and maintains plant such as input/output modules and relay interlock circuitry. Solenoid valves, digital input and output switches, power supplier, temperature monitoring system, thermocouple detector module, and RTD detector module.
Responsibilities: - The Job involves as Superintendent in charge for the total Electrical/instrumentation works involving, erection, installation and commissioning. The job involved the, erection of DCS panels/MCC Panel and Cabinets, tray and conduit works, cabling works, termination, loop checking, pre-commissioning and commissioning. The work included the installation and commissioning for Package units such as air compressors, water treatment, wastewater treatment, water injection plant, Firewater pumps, DM Water plant, etc.
Reporting to the Project Manager and responsible for the following: -
1. Compilation of QA/QC documents for handover of equipment.
2. Ensuring installation inspection and testing reports are signed-off by the clients.
3. Co-ordination with the project engineers regarding the design problems encountered in the field.
4. Capable of reading drawings such as P&ID and Logic drawings.
Carrier Objective: - 1. To work in an Organization where my hard work and dedication will take me to the pinnacle of success there by contributing to the growth of organization. 2. A responsible position in professional organization where my skill could be effectively utilized in contributing towards the organization and of course there should be an opportunity of growth. 3. Excellent Designing skills, willingness to learn, excellent communication skill, comprehensive problem solving ability, team facilitator.
Academic Qualification: - Passed Matriculation in year of 1996 from Board of Secondary Education, Orissa. With 1st Division (76.13%).
Technical qualification: - Passed three-years Diploma in Electrical Engineering in the year of 1999 from State Council of Technical Education & Vocational Training, Orissa, India with 1st Division (60.50%).

Computer Skill: - Good knowledge in MS-Office,MS-Projects, Internet Explorer,

View contact information...
«« previous resume next resume »»
Search Results (Resumes 1301 to 1350 of 6411)Go to Search Parameters...
Brief Description
* Membership in ASET and with work experience in instrumentation and control systems field. * Familiar with field instrumentation and industrial control system. * Experience in multiple loop control systems, PLC, DCS, SCADA systems * Fluent in computer and AutoCAD drawing skills.
A professionally qualified and technically competent Data Management Analyst, with 14 years experience in Well log Data Processing and Petrophysical Data Management.
To receive a laboratory, Technical, Analysis or Research position working in the Petroleum and/or Oil Field.
I am having Bachelor Degree of Mechanical Engineering certificate. I have 7 years experience in Qa/Qc field and 10 years experience in production field. And also I have completed the AWS-CWI,NDE Level II.
Piping design, pipe supports, project coordination. 25 years experience in petrochem industry. Autocad, word, excel, office. Motivated and available.
Over 25 years of experience in the oil and gas industry in: Quality Control and Inspection of Materials, Weld Inspection, Blasting and Coating .Management of personnel and administrative staff. Certification and condition assessment activities of both new and in-service equipment.
HSE specialist with chemical/process engineering background seeking environmental or HSE role within the oil/ gas and construction industries.
Please find below my details of experience for Estimation Engineer Position. I am a diploma mechanical engineer and keen in excelling in my career with hard work and accepting higher responsibilities.
Senior Pipelines Engineer with 16 years experience with International Consultancies.
vibration foreman
Experience in reservoir engineering and other petroleum related activities. Experience in reservoir performance / simulation, secondary recovery methods, and field developments, Production Forecast and in place volume estimation.
Electrical and Instrumentation Engineer having 9 years of experience in construction, Maintenance, Projects, oil, Industries.
Analyzer commissioning and maintenance in oil and gas industries
I have experience on Project & system engineering with testing and commissioning. I have visited various places in India & aboard for commissioning of the systems. I have undergone 3 Months on Job training at Invensys India Pvt Ltd., Chennai for Foxboro DCS. I was affiliated with Yokogawa India
OIL AND GAS, PETROLEUM RELATED EPC PROJECTS - ESTIMATION AND PLANNING USING P3 AND MS-PROJECT SOFTWARES
A 10 years experience Control & Automation engineer serving the oil and gas industries with skillful experience in metering, instrumentations and control & automation system. Solid experiences and confidence in Site Erection and Commissioning, Design and Project Execution.
Worked during plant major Shutdown/ Turnaround held in November 2007 and carried out maintenance and calibration of various types of field instruments
Engineering Manager - Petrochemical
Horizontal directional drilling
Determining the direction of the organization by establishing objectives and by designing and implementing the strategies necessary to achieve those objectives or identifying and analyzing the things that may help or hiders accomplishment of objectives.
Engineering, Design, Installation, Commissioning, Programming, Management, Consultancy & Upgrades etc., for all types of Instrumentation & Communication Projects for Oil & gas Industry, Paints, Refinery, Petrochemical and Glass. Preparation of Design Basis Scoping, Functional Specifications Document
Procurement Engineer with 14year Exp. in Oil/Gas/Engineering Industry, Qualification Diploma in Fabriction Engineering
Oil & Gas Production Chemistry, Chemical Engineering, Corrosion Engineer, Process Optimisation, Production Chemicals Optimisation, Corrosion/Scale Prevention/Inspection, Process and Environment Monitoring, Well testing/completion design, Process design/waste water management, Extensive field experie
I am an innovative thinker with a demonstrated ability to improve production and decrease down time. I am very adaptable to changing projects and work schedules and have a proven ability to quickly train on different facilities. I have excellent planning and organizational skills
19 years experience in Jet Aircraft and Engine Maintenance
A Logging Analyst in the Syrian Petroleum Company. A Petrophysicist in Al Furat Petroleum Company, responsible for many fields for all petrophysical operations and formation evaluations. Petrophysics section head, Wireline logging, perforation and core analysis contract holder.
I possess hands on experience in developing EMS (ISO 14001) and OHSMS (OHSAS 18001) procedures in line with International best practices, performing HSE audits, leading EIA and Risk Assessment study teams, assisting in development of emergency response / contingency plans e.t.c,
Vast experience of planning, Management reporting, Refinery Economics,Vast experience in Petroleum Refining. Confident and result-oriented, Able to analyze and apply problem solving and decision-making techniques to achieve desired objectives within target deadlines.
Thirteen (13) years of extensive and diversified experience in managing and leading variety of upstream Oil & Gas handling, Chemical & Petrochemical Projects.
About 16 yrs of experience in the field of Civil Engineering Design, Construction & Inspection and Document Control for turn over (Piping Test Packages, Punch list & etc) & dbase management using MS Access program.
Electrical Intrument & Control System
Welding , QC, Engineering - Inspection
Power system design and Analysis:
Wireline supervisor or wireline consultant
Geoscientist with experience of working in a multidisciplinary team in a major E and P company. Experienced in Seismic modelling and Interpretation, and reservoir modelling. Holds an M.Sc in Petroleum Geoscience.
Process Engineer with over 11 years oil and gas engineering background. Design experience of Liquefied Natural Gas import terminals and process simulation experience of base load liquefaction trains.
Structural engineer with over 14 years experience in EPC projects (grass root and revamp) in refineries, petrochemical plants, spinning mill, cement plant & other industrial units.
OBJECTIVE: To utilize my experience in manufacturing and construction. Using various software programs, and engineering disciplines, (24,000hrs) Of AUTOCAD experience.
More than 14 years process & project engineer experience in Oil & Gas and Oil Refinery.
CAREER OBJECTIVE A suitable, challenging, and rewarding position in Petroleum Engineering.
Working Experiences as Senior Process Engineer from 1992 - 2003 in LNG/ LPG Plant of PT. Badak NGL in Bontang East Kalimantan Indonesia. I have been working for PT. Badak NGL over 20 years. Previous Job experienced in PT. Badak as Senior Production Planning Engineer from 1983 - 1991.
ERP Consultant (functional and technical) : MFG-PRO and Progress, Axapta, Movex, SAP Software Development Project Manager : Visual Basic, Oracle, Access, SQL-Server
To pursue challenging career where I can utilize my intellect technical skills so as to enhance competence of an organization and myself.
Geologist with nine years of experience both in the field and office. Have managed field operations, core retrieval and interpreted field samples throughought Alberta, BC, Saskatchewan, New Brunswick and in Colorado USA.
I have multilingual skills and am fluent at Russian, Turkish and good atdrilling
Product Support for Hydraulic Drilling Rigs and Screw Compressors
Process Engineer
Proactive and skilled professional with a solid supervisory background and experience developed on projects in Venezuela
Japanese and English Speaking Mechanical Engineer
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   [ 27 ]   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
CATEGORIES: Engineering/Technicians;
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com