CONTACT INFORMATION:
View contact information...
SUMMARY:
--35+ years as Drilling Engineer, Drilling Supervisor, and Drilling Superintendent
--Exploratory and development drilling, workover, completion and testing
--Preparation of drilling, completion and well service AFE's and programs
--Deep, HTHP, H2S, CO2, directional, short-radius horizontal and underbalanced wells
PERSONAL:
Married - weight 165 lbs (75kg), height 5'-11" (1.80m) - excellent health - US citizen, Argentine and Brazilian permanent residence visas.
EDUCATION / QUALIFICATION:
Bachelor of Science degree in Petroleum Engineering, Universidad Industrial de Santander, Bucaramanga Colombia, 1963. - Completion of Exxon Drilling Engineering School, Tulsa Oklahoma, 1980.
Completion of many drilling-industry-related schools and seminars, including Well Control, Floating Drilling, Drilling Fluids, Stuck Pipe, Technical Limits, and Extended-reach Drilling.
Current IADC Well Control certification - current H2S certification.
Languages: English (native), Spanish (good), Portuguese (good), Indonesian (some).
Working proficiency in Windows 'Microsoft Office' and in use of Munro Garrett 'DIMS' and Landmark 'Open Wells' drilling operations reporting software.
EXPERIENCE:
Feb. 2007 - Present:
DOW CHEMICAL DO BRASIL LTDA., BAHIA, BRAZIL
DRILLING ENGINEER/CONSULTANT
Well planning and operations support for the drilling of +/-1,300m (4,300ft) directional brine wells on Matarandiba Island, Bahia, Brazil. Contract negotiation with the drilling contractor for the rig; and with service companies for drilling fluids, cementing, logging, directional drilling and all other drilling support services.
2006 – 2007:
HALLIBURTON PROJECT MANAGEMENT - FALCON OIL & GAS, MAKO, HUNGARY
DRILLING CONSULTANT
Operations supervision for the drilling of deep (6,000m - 20,000ft), high pressured (2.23sg - 18.5ppg), high temperature (230° C - 450° F) exploratory land wells employing a Crosco 3,000 hp rig. "Underbalanced" and "Managed Pressure" drilling techniques, utilizing high pressure rotating heads and strictly controlled fluid densities and rheologies, were employed to maintain bottom hole hydrostatic and circulating pressures at approximate balance with formation pressures.
2004 – 2006: HALLIBURTON INTEGRATED PROJECTS, VILLAHERMOSA, MEXICO
DRILLING CONSULTANT
Operations supervision for 14,500ft (4400m) directional wells drilled and completed on turnkey contract for Pemex, onshore Mexico. Managed Pressure drilling techniques were employed while drilling the production intervals of the wells by use of high pressure rotating heads and nitrified foam or "two phase" (water/N2) drilling fluids. Bottom-hole hydrostatic and circulating pressures were maintained near balance with producing formation pressures at 4 to 6 ppg (.5 to. 7 sg). Production liners were cemented using nitrogen-lightened lead slurries.
2000 – 2003:
COASTAL OIL & GAS CORPORATION / EL PASO PRODUCTION, PARANÁ, BRAZIL
DRILLING CONSULTANT - OPERATIONS SUPPORT MANAGER
(2000 – 2001): Supervision of Queros Galvão rig No I, drilling and testing 11,000 to 16,000ft (3350-4900m) exploratory land wells in Paraná, Brazil. Employment of mist and foam drilling fluids to reduce bottom hole pressures, and down-hole hammers to improve rate of penetration through long sections of igneous rock. Nitrified drilling fluid and a high pressure rotating head were employed to maintain bottom-hole hydrostatic and circulating pressures slightly less than estimated formation pressures while drilling potential hydrocarbon-bearing formations.
(2002 – 2003): Logistics management responsibility for the two-rig drilling project; ordering and scheduling of all required materials, tools and services. Engineering support and constant monitoring of rig activities. Liaison with the drilling contractor and service companies; management of drilling location and access road construction.
1998 –2000:
MAXUS VENEZUELA, LTD., MATURIN, VENEZUELA
DRILLING CONSULTANT
Operations supervision for the drilling and completion of 11,000 to15,000ft (3350-4550m) development and exploratory wells near Quiriquire, Eastern Venezuela.
1997 - 1998:
COASTAL OIL AND GAS CORP., HOUSTON, TEXAS
DRILLING SUPERINTENDENT
Operations responsibility for the drilling of two exploratory wells in the Ucayalli basin, Eastern Peru. 8,500ft and 13,500ft (2230 & 4000m) wells, utilizing a Parker Drilling Co. heli-transportable rig, and helicopter transport for all logistical support.
1995 - 1997:
OCCIDENTAL PETROLEUM CORPORATION, MARACAIBO, VENEZUELA
FIELD DRILLING ENGINEER - CONSULTANT
Field engineering support for one 3,000hp drilling rig and one completion/workover rig working in the Alturitas field, Western Venezuela. Short-radius horizontal 11,500ft (3500m) TVD wells with 1,500ft (460m) to 2,000ft (610m) lateral displacement.
MAXUS VENEZUELA, LTD., MATURIN, VENEZUELA
DRILLING ENGINEER - CONSULTANT
Drilling AFE's and programs preparation and engineering support for exploratory wells in and near Quiriquire field, Eastern Venezuela. Drilling supervision for the first of these wells.
1993 - 1995:
PEREZ COMPANC S.A., RIO GALLEGOS, ARGENTINA
DRILLING CONSULTANT
Operational responsibility for the drilling of an 11,500ft (3500m) high-risk exploratory well in Southern Patagonia, Argentina.
PETROLEUM ENGINEERS, INC., LAFAYETTE, LOUISIANA
DRILLING ENGINEER - CONSULTANT
Monitoring and engineering support of current drilling, completion and well-service projects. Preparation of turnkey bids and drilling/workover AFE's, programs, and procedures. Well planning, operations support and supervision for the drilling of 10,000+ft wells in Texas coastal waters for Ashland Exploration, Inc., Houston, Texas. Drilling supervision for a 10,000ft turnkey directional well in Plaquemines Parish, Louisiana for Aran Energy Corp.
MEXPETROL S.A., BUENOS AIRES, ARGENTINA
DRILLING ENGINEER - CONSULTANT
Investigation of a blowout near Neuquen, Argentina, and subsequent preparation of a report identifying the reasons for the blowout and recommending procedures to be implemented in order to minimize possibilities of future similar occurrences.
1991 - 1993:
TRITON ENGINEERING SERVICES COMPANY, HOUSTON, TEXAS
DRILLING SUPERVISOR
Supervision of land exploration drilling operations for Lagoven in Eastern Venezuela, and exploration and development wells for Maraven in Lake Maracaibo, Venezuela.
1990:
KUWAIT OIL COMPANY, KUWAIT
DRILLING SUPERVISOR
Supervision of land drilling and completion projects in Kuwait. Political hostage – August to December, 1990.
1984 - 1990:
CORPOVEN, ANACO, VENEZUELA
DRILLING CONSULTANT - ENGINEER
Assignments as Drilling Supervisor and Wellsite Engineer for land drilling, workover and completion projects near Anaco, Venezuela, including one 16,000ft relief well (El Tejero II).
1981 - 1984:
TROPIC DRILLING COMPANY, MACAE, BRAZIL
OPERATIONS SUPERINTENDENT
Management and operational responsibility for the drillship "Tainaron", working under turnkey contract to Petrobras in Campos Basin, Brazil. Preparation of drilling programs and procedures, management of rig operations and shore-based catering, materials, personnel, and transportation departments. Close liaison with Petrobras engineers with regard to current and planned operations.
1980 - 1981:
ROY M. HUFFINGTON, INC., BALIKPAPAN, INDONESIA
LEAD DRILLING ENGINEER
Engineering planning and support responsibility for five drilling and two workover rigs operating in Kalimantan Timor, Borneo. Preparation of drilling, completion, and workover AFE's, programs, and procedures. Supervised a staff of three engineers and four technicians.
1979 - 1980:
ESSO EXPLORATION INC., SINGAPORE
DRILLING SUPERVISOR
Operations supervision for the drillships "Neddrill I" and "Wodeco VII" drilling 8,000 to 12,000ft exploratory wells in Malaysian waters, South China Sea. Onboard Drilling Supervisor during the drilling and testing of the discovery well "Irong Barat I".
1977 – 1979:
OASIS OIL COMPANY, WAHA, LIBYA
DRILLING CONSULTANT
Supervision of drilling and well service operations in Southern Libya. 7,000 to 11,000ft. wells, difficult desert conditions.
1975 – 1977 (Two one-year contracts):
ARAMCO, DAHRAN, SAUDI ARABIA
DRILLING SUPERVISOR
Wellsite supervision for development and water-flood well drilling, and completion / workover projects near Abquaq, Eastern Province, Saudi Arabia.
1968 - 1975:
TRIANGLE DRILLING COMPANY, BEAUMONT, TEXAS
STAFF ENGINEER - DRILLING ENGINEER
Engineering support for four drilling/workover rigs working on day-rate and footage contracts. Preparation of drilling and well service programs and engineering support, provided as a services to small operating companies in East Texas and Louisiana.
1964 – 1968:
DOW BADISCHE CORP., WILLIAMSBURG, VIRGINIA
MECHANICAL DESIGN ENGINEER
Design of process machinery for use in the manufacture of synthetic (Acrylic) fiber.
1963 - 1964:
CITIES SERVICE OIL COMPANY, BUCARAMANGA, COLOMBIA
WELLSITE ENGINEER
Provided wellsite engineering support for exploratory and development drilling projects in Santander Department, Colombia.
View contact information... |