CONTACT INFORMATION:
View contact information...
AREA OF EXPERTISE
* Plant and Equipment layouts; Engineering Conceptual sketches, area plates and vender cut sheets to 2D/3D Cad intelligent format.
* Piping GA plans; from New Design phase through Engineering Specifications, P&ID's and Connections from vender cut sheets or new designed. Field sketches of existing layouts of interconnections through existing drawing and surveying Facilities existing configuration.
* Equipment Design: Vessel, Pumps, Compressors, Chillers, Cells, Cat -walks, ladder and stairs from conceptual, detailing, renovating and restoration, full constructible design packages.
* Isometrics; readable Field sketches, design cad intelligent production through the aid of Isogen batch files.
* Walk downs of P&ID's, for tie in operation, and design upgrades putting together full functional work packages together for implementing of new designs and maintenance upgrades.
* Layout of Piping Racks & Supports; from industrial Standard practices and procedures new design concept to spicing and renovating existing pipe racks.
* Coordinate and provide assistance in putting together project specifications manifest, from vender cuts sheets, specifications to design to, specialty item cut sheets, valve tagging ID and customer preferred valve cut sheets and warehouse supplied.
* Understand and Apply Industrial Standards code references: ASME, API, ANSI, ISA, NEC, and UBC.
SOFTWARE TRAINING
* 2D/3D AutoCAD currently 2007
* 3D Auto plant Rebus 2004 addition
* 3D Cadworx's Plant, 2005 & 2008
* 3D Cadworx's P&ID, 2005 & 2008
* 3D Cadworx's Equipment, 2005 & 2008
* 3D Navies works Jet stream 5
* 3D Muti-Structual Steel
* 2D Micro station
* 2D/3D Mechanical Desk top
* Cad-overlay/Raster imagining
* Designer
* Microsoft office suite 2003
* Microsoft Projects task management
* Rebus Pro-piping Series
* 3D Studio max
* PDS
EDUCATION
A.A.S. Degree-Computer Aided Design Drafting Technology December- 1989
ITT Technical Institute, S. L.C., UT
Hands on experience and Technical training through forming an Alliance with Local Businesses for small projects according to the quarters outlined manifest.
Management Certificate of Completion September 1993
Magcorporation, Rowley, UT
Safety practices and procedures for Construction process activates; Safety Reporting to control room and outlining the work to be preformed, the area outline of possible hazards to look for. Safety and how it affects all of us.
3D-Studio Certification of Completion February 1996
Autodesk Training Center, S.L.C., UT
PROFESSIONAL EXPERENCE
Anvil, Bellingham Washington June 2008 to Current
Senior Piping Designer
Working in partnership with in house Engineers and Constructors to design and implement small cap projects and implementing new design of Petrochemical refineries.
Jacobs Engineering/Constructor, Golden Colorado June 2007 to June 2008
Lead/Senior Piping Designer
Acting Liaison for a multi-project engineering construction firm. Senior Designer Drafter/Checker for a 2000 btu. Uranium process facility, 1000 BTU Facility, Suncor= Cononco/Phillips upgrades to the FCC unit added new purge system, constructible work packages for maintenance turn around, Shell new process facility in Wyoming, Questar, new compressor station, new storage facility for LPG. Program and Setup intelligent configuration, specification (spec writer), and build intelligent piping, off spec., components for the Isogen specification files for the individual client's preferences for the Bill of material layout.
Brinderson/Jacobs, Bakersfield California January 2006 to June 2007
Senior Piping Designer
Project Design was to design and install New Clean fuels projects. Duties included as senior piping designer, Design New gasoline blender, including skid mounted 9 pump station and all the interconnecting pipe and new pipe raceway, supports. Designs locate of pumps and new interconnect piping for in-plant isobutene system to supply new Merox unit to remove the mercaptans sulfurs in the LPG. Other duties was to support engineering for all other piping interconnection for; New FCC Unit, Hydrogen Unit, Heat exchangers, for the Big West/Flying J Petrol Chemical downstream facility. Upstream Construction Design for a New Temporary Storage Facility, and to maintain process equipment fabrication drawings for, ICL skid manifolds, Well head mounting supports.
CCI Mechanical/Kennecott, Salt Lake City, Utah March 2005 to January 2006
Senior Piping/HVAC Designer
Project to design and install industrial Chiller system for all electrical rooms and control rooms at Kennecott, Retrofit of all existing HVAC systems, fabrication drawing of interconnect of old and new duct. Detailed Equipment placement drawing installations and ongoing update O&M for refrigerate systems and fire systems.
Redd Engineering/Constructor, Salt Lake City, Utah/ Green River,Wyoming March 2004 to March 2005
Lead/Senior Piping/Mechanical Designer February 1999 to March 2000
Multi-disciplined engineering construction firm. Worked in partnership with in house Engineers and Constructors, on Petrochemical companies as BP, Amoco, Chevron/Texaco, Exxon Mobil and Flying J. Gas transmission, William Bros, Questar, Sinclair, Fina, and Shell. Mining was Kennecott.
Booth and Associates, Pocatello, Idaho/ Anniston, Alabama February 2003 to March 2004
Senior Piping/Mechanical Designer Drafter March 2000 to September 2001
Chemical Demilitarization for munitions stockpile piping plans of system configurations. Familiar with Federal Sop's. RFI, Wads and ECP procedures. Work order packages consisting of walk down of P&ID's piping plans and Iso's packages of existing system configurations for a change in the sops. Small Projects as consulting, for Automation forklift company (Dafukie), Chevron, Gas transmission, William Bros, Questar and nuclear waste.
Bryan A Stir rat & Associates, West Covina, California September 2001 to February 2003
Senior Piping Designer
Landfill Gas Extraction piping drawing including system plans and details with direct interface interconnection to; well locations, Headers, storage tanks,. Calculate slopes of header and Sub-Header piping. Flare Station Assemblies. Plans, Details, and Bill of Materials. Field walk down and site verification. Corrections and modifications to P&ID's and Electrical Schematic drawings.
in the sops.
C.E. Entry/Layton Construction, Salt Lake City, Utah/ Rawlins, Wyoming February 1998 to February 1999
Senior Piping Designer Drafter
Multi-disciplined engineering construction firm. Worked in partnership with in house Engineers and Constructors, on Petrochemical companies as BP, Amoco, Chevron/Texaco, Exxon Mobil and Flying J. Gas transmission, William Bros, Questar, Sinclair, and Shell. Mining was Kennecott.
TEC-Thomas Engineering/Peterson Fabrication, Bountiful, Utah January 1997 to February 1998
Senior Mechanical Designer Drafter
Project to design new waste compactor 3 piece unit (Baler, Helirap, and Tilt conveyor), responsibilities included design up new concepts as per engineering specifications and project meetings. Track all equipment data sheets per piece of equipment, and create equipment operation manuals
View contact information... |