Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #78318
next resume »»
CONTACT INFORMATION:
View contact information...
PERSONAL INFORMATION:
Date of Birth: June 28, 1954
Place of Birth: Silay City, Negros Occidental, Philippines
Civil Status: Married
Citizenship: Filipino
Height: 5ft 10inches
Weight: 180 lbs.
Gender: Male
BENEFICIARY: Eruce Lee B. Paez
EDUCATIONAL BACKGROUND:
Tertiary:
West Negros College
Bacolod City, Negros Occidental, Philippines
B.S. Mechanical Engineer
Date Graduated: 1974
Secondary:
Silay Institute
Silay City Negros Occidental, Philippines
Date Graduated: 1970
Primary:
BO. Tanza Elementary School
E.B. Magalona Negros Occidental, Philippines
Date Graduated: 1970
EMPLOYMENT RECORD:
POSITION HELD: Piping Supervisor/Field Engineer
INCLUSIVE DATE: November 9, 2007 to September 27, 2008
LINE OF WORK:
Conducting a piping training program from zero skill up to a skill trainees supervising the assigned work from planning, organizing, leading and controlling.
Performed piping work activities from designing and drawing the piping tie-in to existing pipelines, drawing various structural platform such as: valves operator platform, workshop structure, pipe racks, pipe supports, pipe shoes and guides.
Conducted the technical methods in piping erection, installation, fabrication and hydro testing.
Checking and correcting the pipelines for punch list and unknown repairs.
EMPLOYER:
Consolidated Contractors Company Co. W.L.L. Khursaniyah Gas plant Project Al-Khobar, Kingdom of Saudi Arabia
WORK PERFORMED:
Procurement of materials for sulfur process lines such as: pipes, pipe fitting and I-beams for pipe racks and pipe support for superheated water pipe lines and compressed air pipe lines at train #1 and train #2 sulfur process plant.
Designed, drawing and rectify pipe support for sulfur foam pipe lines.
Checking and correcting pipe lines from sulfur loading to sulfur process plant at train #1, #2, and #3.
POSITION HELD: Piping Supervisor/Field Engineer
INCLUSIVE DATE: July 24, 2006 to July 25, 2007
EMPLOYER:
Contracting and Trading Co. (C.A.T.) Abu Dhabi Branch, P.O. Box 250
Email: catnt@enirates.net.ae
Telephone: 6721626
WORK PERFORMED:
Procurement of materials for Fujairah oil tank farm project such as: pipes, pipe fittings and I-beams (for pipe racks and support).
Designed, drawing for valves operator platform and pipe support for Mussafah Ghq. District cooling scheme project.
Designed, drawing for piping tie-in to existing pipelines for black oil pipelines manifold #3 at Fujairah oil tank farm project.
Conducting the fabrication, installation and hydro testing for 32"Ǿ suction and 20"Ǿ discharge header pipelines at Fujairah terminal phase-V expansion (oil tank farm project).
POSITION HELD: Workshop Supervisor and Compaction Foreman
INCLUSIVE DATE: July 30, 2005 to May 30, 2006
LINE OF WORK:
Supervising of work such as: fabrication and erection of ten tons overhead crane, pipe support, ducting and diesel tank.
Supervision of soil compaction for Doha New Airport Reclamation Area.
EMPLOYER:
International Engineering and General Contracting (I.E.G.) P.O. box 40111 Block #3, 4th Floor Al Jaber Towers Opp. Museum Doha,
WORK PERFORMED:
Compaction of new airport reclamation area.
Fabrication and erection of ten tons overhead crane, pipe support, ducting and oil tanker.
POSITION HELD: Mechanical Piping Foreman
INCLUSIVE DATE: February 18, 2004 to September 27, 2004
LINE OF WORK:
Supervision of piping such as: piping erection, installation and hydrostatic testing.
EMPLOYER:
Hyundai Engineering and Construction Co. Ltd. P.O. Box 753991-111 Assaluyeh, Islamic Republic of Iran
WORK PERFORMED:
Erection and installation of mechanical pipelines at on sure gas plant facilities.
Hydrostatic testing and re-instatement of mechanical pipelines at offshore oil rig platform south pars development phases (SPD) #6 and #5
POSITION HELD: Mechanical Piping Gen. Foreman
INCLUSIVE DATE: July 15, 2002 to August 12, 2003
LINE OF WORK:
Supervision of piping activities in all areas of responsibilities.
EMPLOYER:
Mohammad Al-Mojil Group (MMG) P.O. Box 11, Dammam, K.S.A. 31411
Telephone: 8421111
WORK PERFORMED:
Fabrication/installation, hydrostatic testing of pipelines for Khuff condensate oil refinery at Rastanyra, K.S.A. and Jueg EO/EG plant (petro chemical plant) at Jubail, K.S.A.
POSITION HELD: Mechanical Piping Supervisor
INCLUSIVE DATE: September 21, 2001 to November 28, 2001
LINE OF WORK:
Supervision of mechanical piping activities at:
Kapeo Phils. Co.
Dong Won Ahe Co. Ltd.
Dong Won Engineering Co.
Kephilco Thermal power plant
EMPLOYER:
Flour Daniel Pacific Inc.
WORK PERFORMED:
Dismantling of element ¡V re-cladding, removal of insulation, casing removal and removal of elements
Replacement of element¡XElement installation,casing insulation, full welding and re-cladding, pro testing was performed as per specifications.
Fabrication and installation of 40,000 gallons crude tank vessel. Fabrication/installation of accessories pipe lines
POSITION HELD: Piping Foreman
INCLUSIVE DATE: Jan. 08, 1996 to July 19, 1996
LINE OF WORK:
Offshore Constructions of Mechanical pipelines/Structural Platforms for Oil Wells Oil Control Platforms.
EMPLOYER:
ARAMCO¡XSponsored by: AGAP ARABIA, LTD.
WORK PERFORMED:
Monitoring Meiscor (Sub-contractor) daily activities for Sendet Bar Plant pipeline installation and equipment tie-in.
Rectifying all failures due to faulty material and/or workmanship as per piping spec/piping general requirements.
Tracking down installed quantity/punch list materials.
Assisting Meiscor (Sub-contractor) in performing hydrostatic testing for acceptance
POSITION HELD: Piping Foreman
INCLUSIVE DATE: Dec. 6, 1992¡XDecember 14, 1993
LINE OF WORK:
Lekhwair Oil and Gas Facilities.
EMPLOYER:
BROWN and ROOT MID EAST, L.L.C
WORK PERFORMED:
Supervising the constructions of mechanical pipelines, Pipe,support,instrument tubing, hydro-testing and Functional test from oil well heads to riser for oil well Platforms.
Supervising the construction and modifications of elevated access platform for well heads.
Supervising the installation of electrical equipments such as: transformers, fiber optic box, cable trays and brackets for oil control platform.
POSITION HELD: Mechanical Piping Foreman / Supervisor
INCLUSIVE DATE: October 16, 1991¡XApril 30, 1992
LINE OF WORK:
Erection of 350 Megawatts/Unit Steam Power Plant.
EMPLOYER:
MITSUBISHI HEAVY INDUSTRIES, LTD. Az-Zour, Kuwait
WORK PERFORMED:
Fabrication/Installation of small and large bore stainless steel pipe as per Dwg. Spec. for Sulferox Chemical Plant.
Erection of large bore carbon steel pipe from bulk separator vessel trim to pipe racks (tree units).
POSITION HELD: Piping Foreman
INCLUSIVE DATE: Dec. 13, 1984 to Aug 8, 1985
LINE OF WORK:
Coal Mine Conveyor System.
EMPLOYER:
ENGINEERING EQUIPMENT, INC. (EEI)
WORK PERFORMED:
Scheduling/distribution of activities to my subordinates
Report any deviation from the constructions dwg.
Report progress of work in terms of installed quantity and no. of men utilized.
Controls materials, tools and equipment being used for the accomplishment of work.
Enforces company rules and regulations and safety.
POSITION HELD: Piping Foreman
INCLUSIVE DATE: April 23, 1983 to Feb. 14, 1984
LINE OF WORK:
MWSS ¡V Pump Lift Sta. Rehabilitation.
EMPLOYER:
ENGINEERING EQUIPMENT, INC. (EEI)
WORK PERFORMED:
Structural erection and installation of BSPI transfer tower.
Assembly/installation and alignment of BSPI transfer transfer mechanical accessories.
Structural/mechanical installation and alignment of four Drive Sta. Unit
Belt frames and conveyor tail Sta. Installation/alignment.
Belt frames roofing installation/alignment.
Functional testing. Service and maintenance.
POSITION HELD: Piping Foreman
INCLUSIVE DATE: Feb 14, 1984 to June 9, 1984
LINE OF WORK:
Oil Rig Platform.
EMPLOYER:
BROWN and ROOT INTERNATIONAL, LTD. Abu-Dhabi, U.A.E.
WORK PERFORMED:
Demolition, lay outing, sheet pile installation, rebars fabrication/installation.
Forms fabrication/installation.
Dewatering, conc. pouring, structural roofing installation.
Installed sanitary service pipelines and 6" „w D.I.P. exhaust pipeline.
POSITION HELD: Pipe fitting Trainer/Interviewer
INCLUSIVE DATE: July 8, 1981 to March 18, 1982
LINE OF WORK:
Manpower Development Program.
EMPLOYER:
ASIA INTERNATIONAL BUILDERS CORP. (AIBC)
WORK PERFORMED:
Designed/fabricated/assembled self-invented pipe bender machine.
Installed/fabricated spools/pipe support at offshore.
Hydro-statis testing of pipe lines.
Fabrication of as per Dwg. Specs.
POSITION HELD: Training Supervisor
INCLUSIVE DATE: Jan. 15, 1981 to July 7, 1981
LINE OF WORK:
Manpower Development Program.
EMPLOYER:
CONSTRUCTION DEVELOPMENT CORP. OF THE PHILS. (CDCP)
WORK PERFORMED:
Teaching theoretical and practical method of pipe fittings.
Fabrication and piping system importance to industrial plant. It includes the usage and functions of pipe fittings.
Basic hand tools, equipments and job safety.
POSITION HELD: Piping Foreman
INCLUSIVE DATE: Aug. 18, 1980 to Jan. 14, 1981
LINE OF WORK:
Water filtration Plant MWSS-Balara.
EMPLOYER:
CONSTRUCTION DEVELOPMENT CORP. OF THE PHILS.
WORK PERFORMED:
Teaching piping system/fabrication of pipe fittings, trade mathematics and advance techniques of piping fabrications/installation.
Develop zero skill trainees to become full skilled workers.
POSITION HELD: Piping Leadman
INCLUSIVE DATE: June 14, 1980 to Aug 18, 1980
LINE OF WORK:
Sugar Refinery Construction ¡V BUSCO.
EMPLOYER:
CONSTRUCTION DEVELOPMENT CORP. OF THE PHILS.
WORK PERFORMED:
Fabrication/installation of polyvinyl chloride plastic(PVC) pipe line at chlorination house.
Replacement of damaged 24" „w and 36" „w D.I.P. bell and spigot type.
Replacement and repair stirring paddle exhaust mud.
POSITION HELD: Piping Leadman
INCLUSIVE DATE: May 4, 1979 to April 5, 1980
LINE OF WORK:
Thermal Power Plant Bo. Malaya (M-2 Project).
EMPLOYER:
ENGINEERING CORPORATION OF ASIA (ECCO-ASIA)
WORK PERFORMED:
Fabrication/installation of 24" „w carbon steel pipe.
Line/pipe support from screen house up to condenser.
Installation of pipe line from vacuum pan, crystallizer to centrifugal basket.
Erection of syrup tank as per DWG spec.
Hydro static testing/functional test.
POSITION HELD: Piping leadman
INCLUSIVE DATE: July 2, 1977 to April 20, 1979
LINE OF WORK:
ATLAS MINING CORPORATION ¡V CICG SUPPLIED.
EMPLOYER:
Copper Mining Plant Construction Cebu City
WORK PERFORMED:
Installed 8 feet „w circulating water pipe line from screen house up to condenser.
Installed large and small bore pipes/support from dearator, boiler feed pump sailing water, high pressure heat, economizer inlet header, turbine and condenser.
Installed large and small bore pipes/support from gland condenser to low pressure heater (four units).
POSITION HELD: Tinsmith/Welder
INCLUSIVE DATE: May 15, 1977 to June 27, 1977
LINE OF WORK:
Car plant.
EMPLOYER:
DELTA MOTORS South Super Highway
WORK PERFORMED:
Installed large bore pipes/support from cell units to ball Filter.
Installed large bore carbon steel underground pipe line from thickener No. 5 up to disposal area.
POSITION HELD: Pipe Welder
INCLUSIVE DATE: Nov. 22, 1976 to May 12, 1977
LINE OF WORK:
Raw Sugar Mill Construction ¡V BUSCO.
EMPLOYER:
CONSTRUCTION DEVELOPMENT CORP. OF THE PHILS.
WORK PERFORMED:
Assembled chassis of basic utility vehicle (Toyota Tamaraw) using riveting machine, Jigs and Arc welding machine.
POSITION HELD: Welder
INCLUSIVE DATE: Jan. 13, 1976 to July 28, 1976
LINE OF WORK:
Shipyard and Repair.
EMPLOYER:
EL'NOR SHIPYARD Mandaue City, Cebu
WORK PERFORMED:
Fit-up/full weld of pipe line fro vacuum pan up to crystallizer.
Production welds of pressure vessel (dearator).
Production welds of chimney (smoke stack).
Erection/fit-up and full weld pipeline from ball mill up to pump house.
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 251 to 300 of 7054)
Go to Search Parameters...
Brief Description
Industrial Eng. with master degree in HSE. Title obtained: HSE eng. Specialist
A production/well completion engineer with over 20 years experience in Canada and overseas
I have Very good Experience in the Petrophysical Operation, Studies and Well reservoir Survillance. Have experience in QC/QA of integrated studies. Have leadership experience
Geoscientist
Honor degree in Mechanical Engineering form UK and have gained more than twenty five years experience in the fields of major sub-sea assets management, assets integrity, offshore operations, projects and contracts management, inspection, maintenance and marine related projects.
Multi skilled engineer, Technical Advisor, Mud Engineer
15 years Mechanical Engineer within Oil / Gas & refinery industry, inclusive 5 years maintenance experience; 5 years for nuclear power project; P.Eng of APEGGA, Canada
Can perform both technical work and sales work involving oil/gas industry more specifically as an advisor, planner, support or salesperson.
Drilling Engineer – DCWO planning, programming, engineering, operations evaluation, performance analysis; deep HPHT gas wells, high deviated, ERD and horizontal oil wells, sidetrack wells; land operations; harsh desert (Middle Asia) and arctic (Siberia) environment; English-Russian-Slovak
Senior Mechanical Engineer experienced in detailed mechanical / thermal / process and E&I design of Fired Heaters, Reaction Furnaces, Reformers, SCR’s WHRU’s, Boilers, Incinerators, Flares and associated ancillary equipment. Very strong E&I, DCS / PLC & BMS skills.
By working 17 years in the field of petrochemical field, I experienced all kinds of key projects like FCCU, Hydro-cracking unit, Hydro-treating unit and have expert ability to do piping static and dynamic stress analysis. Also I have five years working experience as a mechanical engineer in refinery
35 years of experience in the process industry working for engineering firms, equipment manufacturers, chemical company
Conducting a piping training program from zero skill up to a skill trainees supervising the assigned work from planning, organizing, leading and controlling. Performed piping work activities from designing and drawing the piping tie-in to existing pipelines, drawing various structural platform
Twenty years of professional experience in, design, consultancy, construction and maintenance, covering a broad range.
25 years of experience in construction, installation, commissioning, testing and maintenance of Electrical, Electronics and Instrumentation equipments and controls in Petrochemical Industry
Have more than 20 years experience in Piping Design and Engineering including Stress Analysis and Piping Materials Control for various projects in petrochemical plants, refineries and commercial chemical plants. Presently working in Worley Parsons (Colt Engineering Corporation), Calgary, Canada
Overview: Thirty (30) years of engineering management experience, 25 years of which were in the oil, gas and shipping industry and EPC projects that include the following: Project management, conceptual, feasibility studies, detailed design engineering, procurement, constr. and commissioning
Over 18 years experience in 2D and 3D seismic data processing. Processing land desert and mountain data. Processing experience gained in Geofizyka Krakow Ltd, WesternGeco and CGGVeritas. User knowledge of Unix, Linux , excellent Omega SPS and Tango, basic ProMAX. Good MS Office skills.
Advanced Process Controls, RealTime Process Information Systems, LIMS
PROJECT MANAGEMENT, CORROSION & MATERIALS,INSPECTION & INTEGRITY ENGINEER/MANAGER
More than eighteen years of experience in premium International Oil and Gas Engineering Consultancy Companies within the field of Process Safety, Technical Safety and Loss Prevention.
well services, production technology, safety, beam pump
Licensed Professional Engineer, performance oriented, with extensive broad-based experience in multidisciplinary projects. Particular expertise in Instrumentation and Control Systems Engineering for Chemical and Oil & Gas Industries. Supervision of complex detailed Engineering and Procurement.
Reservoir Geologist  To perform characterization Reservoir integrated Studies and reservoir Modeling. Generation and evaluation Geological Prospects and development opportunities. Elaborate Exploitation Plans. Planning (targets) and monitor of Special Wells. Volumetric reserve estimations.
Primavera, MS Project, MS Office, EVMS, Planning
Versatile technology professional with expertise as a Senior Reservoir Engineer and Operations Business Manager. Resourceful problem solver who performs well under pressure. Outstanding leadership, organizational, and communication skills. Granted Top Secret Security Clearance. Analytical.
More than 13 years of multi-international reservoir engineering experiences in gas and oil developments from sandstone and carbonate in land fields and offshore,including different stages of appraisal and development planning & management, well test, reservoir characterization & simulation, economic
SmartPlant 3D/P&ID Application support
I wish to apply for suitable position in the highly motivated & challenging environment. I am having 21 year of experience in different fields of Gas, Petroleum and Chemical industries. Also involved actively involved as an engineering material coordinator. I am having experience in identifying
More than 20 years experienced in project design services which involved mechanical and piping design preparation of conceptual design packages and detailed design packages, specification of pipes, fittings, valves and other specialties. Developed specifications for pumps, steam turbines, tanks, pre
A total of 15 years of professional work experience, (9) years in the Gulf region, of which seven years Were in the oil/gas, petrochemical, power/desalination plant and building construction projects. A Computer literate and proficient in oral and writing English communication skills.
Geophysicist position in a oil-field services company. I have more than 18 years of seismic data processing and data management experiences.
Welding Inspector, CSWIP 3.2, ASNT-II Certified, 18 Years working experience in Oil and Gas Industries in various countries.
Has 20 Years Expeierence in various aspect of Control and Automation and last 7 years in Middle East with ABB /Invensys. Has done large projects and several latest DCS/ESD systems such as Triconex,ABB infi90 , Foxboro I/A , Honeywell TDC3000 etc
I am qualified Degree chemical Engineer from the reputed Maharaja Sayaji Rao Uni, Vadodara
I’ve total of Eighteen (18) years experience in the area of Pipeline design and Piping design for oil & gas and petrochemical projects.
Over 30 years and broad range of experience in oil and gas exploration. Bachelor degree Geophysics/ Geology and MSc degree in Geophysics. Worked in most aspects of exploration, such as seismic survey planning, acquisition, data processing, interpretation, AVO, seismic attributesand seismic inversion
Expertise in gas sweetening, gas compression, gasification process, and U&O facilities.
Over 16 years experience as Electrical Engineer
I have been a Process Engineer for 16 years. My experience includes process design of oil, gas and petrochemical plants and steam and power generation units, expertise in conceptual design, basic design, FEED and detailed engineering, experienced also in optimization and troubleshooting projects.
Over 20 years experience in chemical, petrochemical and oil&gas industry.
Presently working as Sr APC & Opt Engineer in Qatar Petroleum Refinery. A total of 20 years experience in Petroleum Refinery industry (8 years in APC & Opt, 5 years in Technical Services and 7 years in Operations).
I have extensive experience in Oil&Gas industry and EPC, I have extensive experiencey in Rotating Equipments Design and I worked in a refinery in Egypt as the Head of the Rotating equipments for 14 years.
Having achieved many goals in my long career how MECHANICAL ENGINEER, I am interested in continuing my professional horizons by working as a FLEXURAL STRESS AND MECHANICAL PIPING DESIGN AND LEADING MECHANICAL ENGINEERING PROJECT for your respectable company.
Have about 25 years of experience in logging operations (Open hole, Cased hole and Production Logging Services) and interpretation of well logs (Open hole, cased hole and Production Logging)
To provide technical expertise of piping, mechanical engineering for Oil & Gas, Petrochemical, Power plant. Support to projects management, Supply division and projects controls through all phases of major and minor projects
Process Design Engineer with experience o fEPC contracts in Saudi Arabia. I also have expereince in operating plants, providing plant support. I am currently working as Technical Manager of 20 process engineers, doing small projects execution for Sasol Infrachem Utilities.
Seismic interpreter and reservoir geophyscist with experience in reservoir modeling, geostatistics and rock physics
An experienced Control & Instrumentation Engineer with extensive achievements in leading, designing, executing, and organizing project activities for process industries, e.g. oil/gas refineries, chemical/petrochemical complexes, Power plants, steel and copper industries.
Accomplished PLC, HMI, automation, programmable controls specialist
First
1
2
3
4
5
[ 6 ]
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
CATEGORIES:
Engineering/Technicians;
INDUSTRIES:
Petroleum/Oil/Gas;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com