Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #78628 next resume »»
CONTACT INFORMATION:
View contact information...

Career Objective: " Contributing to the Progressive Organization with long term Commitment, therby enhancing personal skills and leading to a Successful Career".

Educational Qualifications:

* B.E.( Mechanical Engineering) passed in 2nd class (CPI: 4.74)
From B.V.M Engineering College-"Sardar Patel University", V.V.nagar.(Gujarat-India) In May-2006.
* Diploma in electrical Engineering¡VD.L.MODE passed in 1st class (60.17%) from Technical Education Board,Gandhinagar. Government Polytechnic,Ahmedabad.(Gujarat-India) In April-2005.
* Diploma in Mechanical Engg passed in 1st class (60.20%) from Technical Education Board,Gandhinagar. B & B Polytechnic,V.V.nagar.(Gujarat-India)in May-1999
Summary:

ƒæ Bachelor of Engineering-(Mechanical) + D.M.E + D.E.E + 7 years of experience as Project Engineer/Construction Engineer/Shutdown Engineer/Maintenance Engg ¡VAs an Execution in Oil and Gas,Refinery, Petrochemicals plants and Projects.
ľ Projects Construction and Shutdowns Execution, Financial Management,MTO-(Material Take off ),Planning and Organization of the Projects and Shutdowns Execution and Management. Execution of Commissioning and Start up Phase.
ľ Execute the work as per the company's ITP and with knowledge of ASME,ASTM,NACE,API,ANSI and IBR codes & Standards for Piping Fabrication,Erection,loop Clearance,Structure fabrication and erection,Blasting and painting, Punch list clearance etc.
ľ Construction Work Volume Calculation (Piping,Structure,Insulation & Painting)
ľ Review of Vendor data for Piping material

ľ Preparation of Daily,weekely and Monthly Report for updating the progress.
ľ Execute the Shutdown and Maintenance of static Equipments-(Columns,Vessels Exchangers,evaporators, Distillation,reactors,Valves,LP Boilers etc). and Rotating Equipments -(Turbines-frame6,frame7,Compressors,pumps etc)installation,commissioning and Start up as a shutdown engg.
ľ Technical skill: Support The Project Management Team(PMT) during detail Engineering,Construction and Commissioning Phase of the Projects.
ľ Coordinate and Execute all SIMPOS related activities within SIMOPS area.
ľ Coordinate and Execute all of the engineering support activities and deliverables Require by ESU.
ľ Proficient in reading & review of Isometric Drawings, LDT-line Designation table, P & ID,PDMS,process layout,flow diagram,Structural drawing for
Fabrication,Erection,Commissioning and Start up.
ľ Installation,Commissioning, Maintenance and Start up of projects, plant shutdown and maintenance.
ľ Gas Turbines frame 6 & 7's DLN Conversion modification,Commissioning and Start up.
ľ Proficient in Autocad 2000,2005, C,C++.
ľ Working knowledge of Microsoft Office & projects.ERP and Telly.
ľ Working knowledge of SAP Programming and its Application.

Professional Strengths:

* Proficient Knowledge of Projects construction- Fabrication, Erection, Commissioning, Start up and Shutdowns Execution(LNG ), organization and management.
* Knowledge of Project Engineering,Process and Procedure.
* Proficient in that Mechanical works meet the Project safety,Environment,Operational,Quality,Cost,Design and Schedule Objectives.
* Support the Engineering Manager tin Coordinating/Communicating various issues that effects the Mechanical Engineering Design,Safety and Regulatory compliance of the work.
* Responsible for insuring that Management of Change(MOC) on project design is Performed according to established Procedures and work with the Business unit to ensure MOC adequately documents Rotational.
* Facilitate and Coordinate in all Mechanical Engineering technical work product,is responsibal for technical input on facilities sharing/allocation issues,Evaluate/comment on work performed by contractors and sub-contractors to insure that that the work is being executed in accordance with projects specification and company standards, and regulatory requirements.
* Review of Mechanical design Drawings,Documents and Specifications.
* Identify and access deviation to contract Technical specification and regulatory requirements also,ensure that such deviations will be processed according to project procedure and maintains deviation control log.
* Effective Projects and shutdowns monitoring, ensuring High level of Customer Satisfaction.
* Assist in Tracking RCA finding and Completing action items in a timely manner.

* Working Knowledge of Projects and shutdowns Control System and Cost estimation Procedure.
* Knowledge of project construction ¡VPiping fabrication & erection,Structure fabrication & erection,Equipment erection.follow up company ITP for the piping Fit up procedure, wps procedure,Blasting and Painting procedure, hydrotest & pneumatic test procedure,loop clearance procedure,punch clearance procedure etc.
* Knowledge of Workpack and JSA Preparation for the each and every job of the shutdown.
* Knowledge of Preparing, Managing and Handling of Logistics and Facilities management Plan for the LNG plants Shutdown.
* Strong in Organizing and Managing Complex Engineering Activity.
* Experience in Billing with Vendor, Suppliers and Contractors.
* To Plan and Effectively Execute LNG and Petrochemical Plant Shtudwon.
* Knowledge of to Prepare Shutdown Access Control plan,Shutdown Traffic control Plan, Shutdown EHS Plans,Shutdown waste management plan and Shutdown Layout Plan for LNG Plants Shutdown.
* Ability to Complete the Task with Safety, Schedule and Quality.

Work Experience:

(A) Present Company: Ras Gas Company Limited, Qatar.
From: 08 january,2008 to till date.

ľ Presently Working in Ras Gas ( One of the Biggest Global LNG company ) on Contract through ACEC, Qatar as a Shutdown Engineer since 08 January,2008.
ľ We have Successfully completed AKG( Al Khaleej Gas) shutdown in Feb,2008.
3 days Ahead of the Schedule.
ľ GTG-52,GTG-01 (GTG-Gas Turbine Generator)Shutdown Completed with DLN Conversion in March,April-2008.
ľ LNG Train 1 & 2 ( May 08 ) & Train 5 ( June 08 ) Shutdown Successfully completed well ahead of the schedule with qualitative work with the highest standard of the safety.
ľ GTG-02 Shutdown Completed with DLN Conversion in July,2008.
ľ Helium Plant Shutdown Recently Completed Ahead of schedule with Higher Safety Performance 98% in November,2008.

Responsibility:
* Making detail work pack for each job with all activities to be performed during SD Execution with time duration and manpower requirement,support needed from various departments and various contractors.
* Making torquing,Inspection check list,Planning all resources including cranes requirement,Scaffolding requirement,forklifts,boomtrucks,lifting gears,tools tackles etc.
* Prepare,Manage and Handle the Logistics and Facilities requirements for the Shutdown Support with Contractor,Safety,Operation,maintenance and EMS.

* Prepare the Shutdown Access control Plan, Shutdown Plot Plan, Shutdown Traffic Management plan and Shutdown EHS plan and Take Approval from Asset, Safety and EMS.
* Coordination with operation for shutdown Planning,Scheduling & Review from operation / Process angle.
* Coordination with operation for approval of Blind list,isolation list,Purging list.for Shutdown Execution. Coordination with OPS for Shutdown Planning,Scheduling and Review from operation/process angle(decommissioning & recommissioning activities).
* Coordination with other departments-Field Maintenance,Integrity,Process
Operation,EMS,HSE & Contract for various issues related to shutdown from planning to actual execution.
* Make the Lesson Learn report during the shutdown and implement those points in next coming shutdown to improve the work ability and safety
* Job Safety Analysis preparation,review & approval for each job with operation & EHS based on workpack.
* Workpack preparation/Review/Clash Analysis/Lifting plan approval etc for the shutdown jobs.
* Coordination with Mechanical/Instrumentation/Electrical Department & with GE/CMSA/COP/PMT for executing shutdown jobs.
* Ensuring that all approved papers/Documents are in place for Successful execution of the Jobs & necessary communication to all concern are in place.
* Working as a unit/area coordinator for Ras Gas LNG train shutdown during actual Execution.(This includes coordinating all the activities beginning from Applying permit up to the completion of the job,QA-QC,permit sign off).
* Reporting shutdown actual progress to head of shutdown execution shift wise.

(B)Previous Company: Reliance Industrial Limited,Jamnagar.
From: February,2007 to January,2008.

ľ I had been worked in Reliance Industries Limited,Jamnagar-JERP(World Largest Grass Root Refinery).On Contract Through the'Parikh Agency' As a construction engineer(Execution-Piping, structure & Equipments)
ľ I had been worked on hydrogen manufacturing unit Project and Hydrogen Compression unit Project for the new Jamnagar Export Refinery Project-JERP.
ľ Projects Details:
„Ï Hydrogen Manufacturing Units: Capacity: 181 TPD x 5
„Ï Hydrogen Compression Unit: Capacity: 114 Bar @ 110 Degree
Centigrade
Responsibility:
* Work As per the ASTM,ASME,IBR,API and NACE procedure.
* Execute the Work as per ITP.(Inspection and test plans)
* Made a scope for the fabrication and erection of the piping spools and structures details parts for the AG and PR.(C.S,S.S,IBR,Alloy Steel,LTCS etc )

* Made the lifting plan for light,Medium and medium weight equipments,piping spools and structures.
* Operation of PDS and PDS Viewer.
* Material take off & Summary for the Construction Units.
* Installation,Fabrication and Erection of the pipes supports.
* Manpower allocation Planning and executing for the erection of spools,structures and equipments.
* Prepared the Work Pack and JSA for the Each and every task Activity.
* Execute the WPS,PWHT, S.R with Contractors as per the ITP.
* Execute the erection work as per the Isometrics,Layouts, P & ID and LDT.
* Execute the Loop Clearance Approval Procedure with Contractors, operation and inspection and Clear out the punch list as per their points with ITP procedure.
* Logistic and Facilities Planning and Arrangement for the Projects.
* Updates the Progress to the Managements in Daily and Weekly meeting.
* Planning and Execute the work as per the schedual,safety and Quality to Achieve the higher Target.
* Held Daily Safety tool box Talks with workers and Supervisors.
* Coordinate with inspection,Operation and Maintenance Department regarding any activity started.
* Make Coordination with workers,Supervisors,management,inspection,safety and operation.
* Make Scope and Summary of the Erectable Spools,Straight Spools,small spools,drains,vents etc for the better Progress in work.
* Execute the Blasting and Painting jobs as per the specification for Piping and Structures.

(C) Sopariwala Exports Pvt.Ltd.
Borsad Tobacco Company Pvt. Ltd.
From: April,2003 to January,2007.

ľ I had worked in Borsad Tobacco Company Pvt. Ltd. The Domestic Firm of the Sopariwala Exports Pvt.Ltd. Which is the Major Exporters of the Processing Tobacco, Perfumes and many more see on WWW.SOPARIWALA EXPORTS.COM.
I have worked In this company As a Project Execution.
ľ Projects Details:

A Sopariwala Exports Pvt. Ltd, Borsad.(Gujarat).
„Ï Blending and Flavoring plant. Capacity: 1.5 TPH
„Ï Rava Blending Plant: Capacity: 2.0 TPH
„Ï Threshing Plant: Capacity: 1.7 TPH

B Nutan Tobacco Ltd, Nadiad.(Gujarat).1.5 TPH
„Ï Stem Flattening plant: Capacity: 1.5 TPH.

C Borsad Tobacco Company Pvt. Ltd,Borsad.(Gujarat)
„Ï Threshing and Rosting Plant: Capacity: 2.0 TPH

ľ This company are mainly engaged in Construction of most innovation and sophisticated equipments. Company is handling custom build project for the chemical applications. it is mainly in Material Handling,Product range includes Pneumatic Conveying Systems,Automatic Weighing and filling systems,liquid filling systems,Air pollution control systems,Dryers,Heaters,Exchangers Cutters,Hydrulic Press etc. for the Automation system for the Process Plant.All Plants are PLC and GOT base Centralized Control.

Responsibility:
* Execute the Construction,Fabrication,Erection and Commissioning of the plants.
* Execute the Piping,Structure and Equipments erections works.
* Material Take off of whole the Plants Construction.Dealing with Vendor and Suppliers for the materials.
* Estalblish projects Execution plans,Budgets,Quantities,Scope reviews,Quality plans and Schedule
* Help the Marketing Department for costing of Ongoing and Forth-coming Projects
* Executing also, electrical works cable and cable tray's cost estimation, laying layout,LT Panel's installation work,Generators cooling tower's and exhaust's piping and insulation work.
* Execute the switch gear installation work,Earthing estimation works, APFC, DB,C.T & P.T etc.
* I also involved in design of the Belt conveyar,Gravity Classifier, Pneumatic conveying system, cutters,Vibratory trays feeders, Seperators etc.
* After Completation of the all above projects I was responsible for overall plants operation and maintenance.
* Manage the Plants shutdown with higher progress rate at minimum Maintenance and Budgets.

(D) Amin Steels Products, Vaso.
From: July,1999 to February,2003.

ľ I Worked in this Small scale company As an Asst.Engineer From July,1999 to February,2003.
ľ Amin steel Products is the Manufacturing of the Switch Gear Mechanism,Busbar Box,Metering,L.T & H.T. Panels,APFC Panels,D.B. Panels, And Also Take Job Works of the Sheet metals as per the Clients Design and Requirements.

Responsibility:

* Interpret, organize and Coordinate engineering activities.
* Guide the Worker About the manufacturing process with safety point of view.mostly, hand safety.
* Make the planning and manufacturing plan of the products.
* Make the product and process layout of the product.

* Make the Man Machine charts for the Process time Calculation and Manpower Calculation for the product cost interpretation.
* Planning, indenting and procurement of Bought-outs and sub-contact items.
* Work closely with all Departments for the Requirements,Planning and Deliveries.
* Under Taking cost estimation & achieving billing targets,submittimg billing schedule to the clients as well as checking costing and profitability.
* Involved in site management,correspondence with client and work with assured Quality & time Limit.

Reference:
Will be provided

View contact information...
«« previous resume next resume »»
Search Results (Resumes 1801 to 1850 of 7055)Go to Search Parameters...
Brief Description
Sr. Drilling & Completion Consultant
Chemical Engineer with 15+ years experience in upstream oil/ gas exploration & production industry. Experienced in equipment sizing, hazards and effects process tools application (i.e. HAZID, HAZOP, JHA etc.), process simulations, process optimization, feasibility studies, concept identification,etc
Diploma In Instrumentation Engineering + AMIE Eqvt to B.E
I have dedicated 14 years in the corrosion protection, corrosion monitoring, material selection and material upgradation in Oil and gas based industries. For the last two years I have been associated with the Inspection Management System and Risk Based Inspection programme being developed.
Expert in alignment, maintenence, troublrshooting, overhouling with nice computer knowledge
Fourteen years of experience in Estimation & Proposal preparation of Co - Generation Boilers, Refineries & Oil, Gas and Petrochemical Plants. Well versed in all aspects of Estimation and commercial terms & conditions of contract.
Excellent working knowledge in Piping stress analysis using caesar II
I am interested in exploring the possibility of employment through your Organization. My background includes experience of over two years as a Trainee Mud Engineer on offshore platform in Petrobaltic S.A.
GIS Specialist
I am a Mechanical Engineer with over 20 years of oilfield experience in Drilling, Well Intervention, Cementing and downhole tools
B.E. Mechanical engineer with 6 years experience
Coating Inspector
Seeking assignments in Quality Assurance, Quality Control & Inspection for Pressure Vessels, Piping, Pipeline, Structures, Test Pack, Plant Construction and project execution with a reputed organisation in Oil&Gas.
Sulphuric plant operator ITI (AOCP NCTVT)
I am having 6 years of experience in PDMS I have done B.Tech in Mech Engg . •Experience i
Instrument Engineer with MBA having 10 years Expeience in Refinery & Chemical Industries Project & Maintenance.
Stractural/ Mechanical Engineering
API 650 & AP1 620, ASME SEC VIII Div. 1&2, ASME B31.1 & 31.3 ,ASTM & NFPA'S
Highly motivated and articulate petroleum engineer. Driven to succeed in all projects Supervised and undertaken, leaving no detail to chance. Engineering is a passion, this is displayed in unwavering ability to be hands-on with every Project.
PDMS Pipe Design using 11.6; 2D Design using Microstation; Able to communicate and work directly with client;
Piping engineer with good knowladge of asme,astm,api code
Mech.Eng.with 4+yrs Exp.in Petrochemical and Fabrication industry
Process Chemical Engineer
Having Over 10 years of experience in Documentation in Oil & Gas Industry using EDMS
A keen analyst with 11 years of experience in QMS Implementation, Testing & Inspection, Inspection Co-ordination, Welding Operations, Audits etc.
Piping &pressure vessel design
Research and Development of Oilfield Equipment
Instrumentation Engineer. EPC experiencied.
I am Mechanical Engineer . Working in Ras Gas Industries Limited,Qatar on Contract basis.i am looking for the long term job with my skill,experience & hard work.
Roustabout,mud/pumpman,floorman and presently as a derrickman.
API 510 Inspector
*Licensed Electronic Engineer *Certified CompTIA Security+ *Certified CompTIA Network+ *Microsoft Certified Professional
knowledge in CHEMICAL ENGINEERING field and to be seen my self as a successful Engineer of (I.I.Ch.E) and wish to have good knowledge application, continual growth and learning prospectus with a reputed organization in near future.
SCADA, DCS, CCMS, BMS, DDC, power, lighting, grounding, ...
I am M.Tech and got 13 years of experience in the field of process automation & controls
Mechanical Field Service Technician
Coil Tubing Supervisor. An extensive Knowledge of onshore, Desert, swamp and offshore Well service techniques have been gained on a variety of completions, including Oil & Gas producers, water & gas injectors and Deep-Sea wells which are outlined as follows.
Extensive experience processing marine and land seismic data. Familiar with data worldwide including Geometry QC, Refraction Statics Solution, Tidal Statics, Velocity Analysis, Multiple Attenuation, DMO, Coherence Filters and Migration.
I am interested to fulfill one of the geologist position in your company, here in I apply for that slot. I have been working on the several oil companies for more than 15 year experiences to look at some hydrocarbon basin studies throughout Indonesia
Diverse experience as a petroleum, mechanical and environmental engineer. Areas of specialized knowledge extend from personal management, completion, operations and production engineering to project engineering and project management.
Instrument Electrical. Real polyvalent-Electronics: Fire detection/gas detection/communication system and hydraulic systems(crane, wellhead control)
14 year-experience(6 years in Arabic World) in Oil&Gas and Petrochemical Industries as C&I Engineer(Technician).Involved in design, construction, commissioning, startup, shutdown and maintenance of some plants.I worked with great companies – ANSALDO, BROWN & ROOT, SHELL, LUKOIL.
5 Years of Digital DCS Control systems erection ,testing and commissioning experience.
NACE certified corrosion technologist with over 25 years experience in all aspects of the Corrosion Protection field. Extensive field experience. Willing to travel. Interested in contract work.
Presently I am working Bunduq oil company at offshore Abudhabi as a techanicianmechaical
I am well conversant with ANSI/ASME codes and standards as well as software packages CAESAR-II, SPR. I am well versed in conceptual engineering, detail engineering, Piping Stress analysis, Team leading, project planning, Project managements, Project execution techniques and pre-commissioning. I am w
Mud Engineer/Consultant 18yrs experience with all kinds of muds and locations. Hard working
Senior Structural Designer Wide range of experience in Civil/Structural engineering with 10+ years solid background of Structural Design in the Oil Gas industry.Experience from FEED, FEL, to detailed engineering covering offshore and onshore.
DCS DELTA V (Emerson 7.3, 8.3 versions)
Offshore Rig Safety & Training Coordinator.
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   [ 37 ]   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
CATEGORIES: Engineering/Technicians;
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com