Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #78769
next resume »»
CONTACT INFORMATION:
View contact information...
Mechanical Engineer with over 12 years experience in oil and gas industries in Venezuela. Specialist in Construction Supervisor - Mechanical Superintendent and Contract Administrator for medium and grand projects, including Construction, Pre-commissioning, Commissioning, and Start Up for PDVSA - ExxonMobil in Venezuela and Berry YV Industrial Contracting in Canada.
Strong communication and effective problem solving skills in both Spanish and English. Ability and capacity to work under pressure and with different cultures, focused in safety and projects objectives.
AVAILABILITY
Immediate
TECHNICAL HIGHLIGHTS
Excellent Balance of Technical and Communication Skills.
Integrity and Honesty towards all Work.
Driven, Focused and Consistent in Following Through on Goals, Safety and Environment.
Teamwork and excellent human relations.
Development of project scheduling, cost control and manage of change.
Development and Management of key indicators in Cost, Performance and Safety.
Supervising all activities related with piping inspection, installation, reinstatement and testing which includes welding, cleaning & painting/coating, hydro testing & flushing.
Supervising all activities related with tank erection and testing which includes welding, cleaning & painting/coating, hydro testing & flushing.
Supervising all activities related with pump inspection and installation.
Supervising all activities related with hot tapping, cut and connection.
Preparing and reviewing project construction specifications.
Preparing Site Instructions.
Leading weekly meeting with the Contractors.
SIMOPS Coordination with the Contractors to ensure the safety in the Projects.
Reviewing contractor's executed quantities in order to verify the bill of payment.
Preparing with the contractor the final pending list and taking action to complete all the pending activities.
Reviewing and releasing all the "As built drawings" from the contractors.
Plants and facilities commissioning and start-ups.
Preparing and reviewing materials take-off and cost estimates of pump stations, tanks, plants and pipelines.
Performing request for materials and equipments.
Preparing technical analysis for material's request.
Knowledge of norms and regulations such as NFPA, ANSI, API, ASME, ASTM and others.
Knowledge of Exxon Mobil Standards and Procedures.
Languages: Spanish (Native), English: Reading and Speaking: Advanced level, Writing: Intermediate level.
Computer Applications: Management of computers under Windows environment (Word, Excel, Power Point, Project, Lotus Notes & Others).
PROFESSIONAL EXPERIENCE
Berry YV Industrial Contracting – Canada (In a Project for Canada Natural Resources Ltd, CNRL).
MECHANICAL SUPERINTENDENT (06/2008 - 09/2008)
Mechanical Superintendent for the mechanical completion and coordination of the hydro tests in the Secundary Upgrader Unit 42 & Unit 43. Special Target reached: Nobody got Hurts during this activity and the job was completed on schedule.
OCN A Subsidiary of Exxon Mobil In Venezuela.
CONTRACT ADMINISTRATOR (12/2005 - 04/2007)
Contract Administrator at the Centre Production Facilities "CPF" for the Contracts of the Maintenance Department for:
Proper handling of proprietary / confidential information / data related to the contracts.
Proper documentation and timely advice to management of deviations to any of the control standards.
Adequate handling of communications (verbal and written) with Company staff and contractor personnel.
Ability to lead negotiations and maintain control even in adverse situations.
CONSTRUCTION SUPERVISOR (7/2004 - 12/2005)
Construction Supervisor at the Centre Production Facilities "CPF" for the construction, commissioning and start-up of the infrastructures for:
IPC Rental Compressor. A brief scope of work for this project included: Fabrication and installation of a new pipe and system arrangement for the new facilities of the gas compression of the Plant, to minimize the gas emission and reach with the environment regulations. Included the installation of 3 gas compressors with 5 mcfpd of capacity, 1 TEG dehydrator, 1 air compressor and other facilities. Special Target reached: Nobody got Hurts during this activity and the job was completed on schedule.
Improvement of the pipe line Cathodic Protection. A brief scope of work for this project included: The installation of the new rectificators, anode bed and measure points, to improve the cathodic protection system of the diluent and DCO pipeline. Special Target reached: Nobody got Hurts during this activity and the job was completed on schedule.
Gas Facilities Modification Short Term Well Pad 6 & 5. A brief scope of work for this project included: The construction and installation of a new system to flare the excessive production of gas of the well pads. Included a KO Drum separator, pipes arrangement and flare installation. Special Target reached: Nobody got Hurts during this activity and the job was completed on schedule.
CONSTRUCTION SUPERVISOR (12/2003 - 7/2004)
Construction Coordinator at the Upgrader for the construction, commissioning and start-up of the infrastructures for:
Diluent Project. A brief scope of work for this project included: The construction of a new System to pump Diluent from OCN Jose to OCN CPF. Fabrication and installation of: 20" to 3/4" of pipe, valves and equipment installation, in welding service and Hot Tap of Ø 20" and Ø 10" nozzles on the tank TK-5303, in welding service and Hot Tap of the 20" X 16" split tee on the Ø 20" Naphtha line, installation and start up of the 2 new pumps of 600 HP, all the civil, electrical and instrumentation installation needed to operate the system. Special Target reached: Nobody got Hurts during this activity and the job was completed on schedule.
Turnaround 2004 (SQUAT) for the modification of the Air Fan Coolers AF-1101. A brief scope of work for this project included: Coordination and Supervision of all the activities for the fabrication and installation, of the Inlet and Outlet System (Ø 8" and 4") for the Air Fan Coolers AF-1101 A to H, (Including spools / pipe welding, spools / valves installation and hydrostatic testing) during the 2004 Turnaround in the night shift (1 Week). Special Target reached: Nobody got Hurts during this activity and the job was completed on schedule.
Construction of the Drain System modification for the Tank TK-1301. A brief scope of work for this project included: The construction of a extension line of Ø 8" for the Drain System of the Tank Tk-1301. Special Target reached: Nobody got Hurts during this activity and the job was completed on schedule.
PDVSA
CONSTRUCTION SUPERVISOR (9/2001 - 2/2003)
Construction Coordinator for the construction, commissioning and start-up of the infrastructures for:
Fuel System Improvement for the Marine Terminal Of Guaraguao. A brief scope of work for this project included: The construction of a new pipeline for intermediate fuel oil (IFO) between the berth 1,2,3,4 and the exchange of static mixer by dynamics to improvement the flow rate loading to the ships. Special Target reached: Nobody got Hurts during this activity and the job was completed on schedule.
Construction of Water Treatment Plant for Effluents (ATRAE). A brief scope of work for this project included: Construction of foundations, heavy equipments installation, field-testing, start up, stabilization and plant operation. Special Target reached: Nobody got Hurts during this activity and the job was completed on schedule.
Construction of a 5,000 BBS Jet A-1 Storage Tank. A brief scope of work for this project included: A new tank Construction to increase the plant capacity and adequate the fire water system to the international norms. Special Target reached: Nobody got Hurts during this activity and the job was completed on schedule.
PROJECT LEADER ENGINEER (5/2000 - 9/2001)
Project Leader Engineer for the detailed design in the followings projects:
Asphalt Plant Improvement El Chaure. A brief scope of work for this project included: Exchange the specification for 5 atmospheric tanks for hot and cool asphalt, substitute the electrical tracing system and replace 2 Kilometers of thermo insulation for a 16" pipe.
Fire Water System Improvement for the Distribution Plant El Guamache. A brief scope of work for this project included: Adequate the fire water system of the plant to new requirements, specifically to protect the LPG tanks area, create the specification and purchase order for 4 mains fire water pumps.
SLOP System Improvement for the Loading Platform of the Distribution Plant El Guamache. A brief scope of work for this project included: The design of 2 storage tanks (6000 liters), pipe line and pump, to collect the SLOP of the platform to prevent environment pollution.
Internal Floating Roof Design for Atmospheric Tanks for The Fuel Distributions Plants of Maturín / San Tomé. A brief scope of work for this project included: Create the specification, purchase order and make the technical analysis selection to incorporate internal floating roof in atmospheric tanks, with the proposal to storage gasoline.
FIELD LEADER ENGINEER (3/1995 - 5/2000)
Field Leader Engineer for the construction, commissioning and start-up of the infrastructures for:
TAEJ Phase II Project Crude Oil Storage and Loading Facilities in JOSE area. A brief scope of work for this project included: Installation & testing of more than 60 km of 60", 48", 36", 30", 24", 20", 12", 10" piping, the construction of several manifolds that included the installation of more than 600 motorized valves with a Ø of 48", 36", 30", 24" and 20", the construction of a new loading pumps station which has 8 (10,000 BPH) and 5 (5,000 BPH) vertical centrifugal pumps and the completion of the fire water system for these tanks, manifolds, and pumps station. Finally, all the activities required to commissioning and starting up these facilities. Special Target reached: Nobody got Hurts during this activity and the job was completed on schedule.
Water Treatment Plant for Liquids Effluents in JOSE area. A brief scope of work for this project included: Construction of foundations, buildings, heavy equipment installation, field-testing and start up of the plant for the stabilization and operation. Special Target reached: Nobody got Hurts during this activity and the job was completed on schedule.
TRAINING AND INDUCTION COURSES
Design & Selection Pumps (32 hrs)
Layout of Process equipment's (32 hrs)
Design & Construction of atmospheric Storage Tank API 650 (32hrs
Piping Design ANSI B.31.3 (32 hrs)
Mechanical Design (80 hrs)
Safety, health and environment "SHE" (40 hrs)
Dangerous atmosphere (16 hrs)
Work Permission (16 hrs)
English Level III (120 hrs)
English Level IV (120 hrs)
Supervision Level I (40 hrs)
94th Chinese Export Commodities Fair Autumn 2003 Guangzhou City – China (40 hrs)
Basic Training SHE ExxonMobil OCN (40 hrs)
EMFOS 2005 "ExxonMobil Fundamentals of Safety" (24 hrs)
BOMB Threat Response Training Seminar
Microsoft Project 2003
English Level IV (120 hrs) 2006
English Level V (100 hrs) High Intermediate Listening and Speaking 2006-2007
OSSA Regional Orientation Program (Canada)
Construction Safety Training System Version 3.2 "Alberta Construction Safety Association" (Canada)
ASSOCIATE
Engineer college of Venezuela CIV 103.489
EDUCATION
Degree: The Metropolitan University (UNIMET), Caracas - Venezuela
Degree Title: Mechanical Engineer
Graduation Year: 1994
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 1001 to 1050 of 6997)
Go to Search Parameters...
Brief Description
QUALIFICATION :- DIPLOMA IN ELECTRICAL ENGINEERING WITH FIRST CLASS
MSc in Petroleum Engineering from the University of Oklahoma, USA with over 11 years of experience in both Industry and Academia to offer.conduct reservoir management activities and participate in interdisciplinary reservoir study teams. Bring a focus on performance of complex tasks.
Extensive experience in the petroleum, chemical, pharmaceutical, nuclear and environmental fields. Directed engineering, manufacturing, and construction efforts, including startup and commissioning for owners and contractors alike.
Control Systems (SIS/DCS/PLC) Engineer with >25 years of experience on various process, gas, refining, chemical and petrochemical plants/EPCM in Canada, Saudi Arabia, India & USA. „« Currently doing Detailed Engineering to SAT of Shell¡¦s Upgrader Expansion Project at Bechtel Canada Ltd.
All I&C design aspects. IN-Tools, Microstation, Autocad, MS Office suite software.
Over twenty-eight years in various assignments throughout the oil and gas industry, I have had twenty one years within the production side of the field, including work off the Gulf of Mexico and Venezuela. I have been in charge of multimillion dollar production platforms, responsible for monthly we
Vastly experienced electrical engineer, manager, superintendent, supervisor
Over 25 years of Diverse Design and Drafting Experience
instrument Engineer in OIL& GAS field
Write-up pre-commissioning, commissioning procedures, start-up schedules and reviewing. Provide necessary technical information for procurement in compliance with tender specifications/data sheets and within budgeted man-hour and project schedules.
A piping designer that has multiple experience in piping industry. Holder of BS Mechanical Engineering with piping design experience over 7 years and more than 5 years of field assignments. A designer that has proficiency in 3D CADWorx, Microstation, AutoCAD, Navis Works, Laser Scan, & PDS trained.
12+ years of project and design engineering with subsea oil and gas installation contractors and consultants working on package management, site management, installation engineering, FEED and Detailed Design with a strong focus on Subsea Pipelines
Doctor of Philosophy in Science in Exploration Geophysics, IIT, Kharagpur, Calcutta, India (1977-82).• Master of Science, Technology in Exploration Geophysics, Osmania Univ., Hyderabad, India (1974-77).• Master of Information Technology, Curtin University of Technology, Perth, WA, Australia
Mechanical Engineer - Rotating Machinery & Packages
Sound knowledge of all aspects of Oil and Gas Field Process Engineering including Process Simulation, Pipeline Simulation, Preparing PFDs and P&IDs, Vessel Sizing and Specifications, Pump Hydraulics, Line Sizing, PSV Sizing and Flare Header Sizing, Depressurization and Blow down Calculation.
I am having 10 years experience in Oil & gas industry (Offshore & Onshore) in the field of Inspection, QA/QC & NDT. Certified CSWIP 3.2, API 570 & ASNT Level II-RT, UT, MT & PT
Areas of Expertise: Design of offshore structures performing Global and Local analysis of Floating Production Systems, Jack up Platforms, Semi Submersible Platforms & Jackets,
QA/QC-INSPECTOR/ENGINEER- E&I
9+ years of work experience in Content management & Data Cataloguing
Mechanical Engineer with 10 years of professional experience mostly in ESP and HPS designed worked for Schlumberger REDA and Woodgroup ESP. in artificial lift.
Groupement Berkine (Sonatrach-Anadarko Corporation) currently base in Hassi Messaoud, Algeria
Field Engineer in Middle East
I am a Petroleum Engineer of 14 years of oil and gas experience I have broad based skill that spread into financial and management and Reservoir modeling,seismic interpretation,seismic inversion ,great marketing skill.I have created a niche for myself in directional surveying in Nigeria.
Condition monitoring Engineer with 10 years experience in oil and gas industry(Vibraton Analysis,Thermography)
Oil & Gas Offshore Architect: Living Quarters / FPSO Accommodation Design
An Inspection / Static Equipment Integrity Engineer with 14 years experience in oil and gas industry.
Motivated drilling/completion engineer, with considerable hands-on experience and excellent credentials, seeks opportunity to perform at peak potential for an aggressive company. Has achieved a solid reputation for managing challenging technical operations efficiently and economically.
A motivated, team player possessing outstanding problem solving skills related to internal/external offshore operations, along with excellent communication and computer skills. Over 20 years of hands on engineering and operations experience in offshore drilling, subsea control systems, installation
8 Years Experience in NDT field. Performing NDT Inspection on Vessels, Columns, Cross Country Pipe Lines and Oil Field, Offshore Plat form, Petroleum Refineries, Fertilizers, Tanks and Fabrication Yards.
APPLY IN TECHNICIAN TURBOMACHINERY AND PLANT OPERATORS KNOWLEDGE
Piping design for PetroChemical,Refinery,Offshore,Marine,Mining,Pipeline,Power, Pulp and Paper fields. 15 years PDS experience. Field and fabrication shop experience. Capable of orienting towers and platforms. I pride myself with working with other disciplines. Willing to travel.
Senior/Principal Piping Designer/Checker
Structural Design, Stress Analysis, FE Analysis (Nastran / Patran, ANSYS 11.0) and Structural Calculations in MathCAD (Ref: Roark’s, API, ASME B31.3 and DNV)
24 years experienced Sr. Piping designer, well skilled in PDS, PDMS and microstation
Wide experience leading project engineer assignments working with design/engineering teams in the supervision, development and preparation of engineering and construction documents and drawings.
Mechanical Engineer - Project Engineer- Construction Supervisor – Mechanical/Construction Superintendent and Contract Administrator for Oil & Gas Industries.
Highly skilled in Electrical and Instrumentation field engineering and technical Advisor on GE control systems
Compounding & QA enginer
Mechanical Engineer
Please accept this cover letter and enclosed resume as my application for the position of Instrument Technologist with your organization.
More than 6 years work experience as a Project Engineer and successful in running 40 gas station projects.
Many years of work and academic experinces with the AutoCAD software and some classes in the ESRI -GIS software.
NAME:JOHN GOODDY
Master Electrician \ Instrument Tech \ PLC Programmer
Responsible for implementing and execution of water well drilling/work over programs given by Clients. Ordering materials required for Well Construction. Organizing and controlling the rig crew. Monitoring the daily drilling activity. Communicating with Client and Company.
MEng is a Staff Petrophysicist with 14 years experience specialising in petrophysical evaluation and 4 years in wireline/LWD operations. Career history includes working currently as a petrophysicist to support logging and coring operations, and performing petrophysical evaluations
Currently working as Senior Corrosion Engineer. Experienced in routine and non-routine corrosion mitigation and control activities, Topside inspection.
I am a postgratuate with 15 years experience in Oil/Gas - design of HV and LV from 132kV, 66kV, 33kV, 22kV, 11kV, 6.6kV & 440V level
Static Equipment Mechanical Engineer
Simulation studies, preparation of detail feasibility reports, FEED package, detail engineering, HAZOP, licensor selection, debottlenecking of existing units etc.
First
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
[ 21 ]
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
CATEGORIES:
Engineering/Technicians;
INDUSTRIES:
Petroleum/Oil/Gas;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com