CONTACT INFORMATION:
View contact information...
To obtain a challenging position in a growing Electro-Mechanical Construction Company in the Electrical / Instrumentation Engineering Field where I can utilize my skills, experience and contribute to the development of the company in the respective position in recognition in exchange of dedication, maximum efforts and best performance.
* Self-starter and high energetic personnel with a desire to participate on a hands on basis
* Ability to present ideas clearly and concisely, coupled with excellent persuasive and interpersonal skills
* Ability to analyze situations and handle assignments under pressure
* Well matured, confident, well presented with excellent interpersonal and communication skills and able to work both independently and as a part of a team
* Proficient in Computer applications ¨C MS-Word, MS-Project
¡ñ Bachelor of Engineering (B.E) ¨C Electrical and Electronics (1996 to 2000), with 72% at
Bharathiyar University, Coimbatore, Tamil Nadu, India.
¡ñ Master of Business Administration(MBA) ¨C Annamalai University,Chidambaram,
Tamil Nadu, India.
Overview:
Eight (8) years of working experience in Electrical and Instrumentation Engineering with reputed companies such as Saudi Aramco in Saudi Arabia, Qatar Gas in Kentech Technical Services and gained experience and knowledge in the following areas:
* Power Distribution System
* Instrumentation System
* Electrical Generation (Gas Turbine, DG Sets), Transmission System (MV Cabling) and Distribution Systems
* Fuel handling system and Gas leak detection system.
* Fire Alarm System and Paging System
* HVAC system
Current Experience:
Presently I am working as an Electrical Engineer at Kentech, Qatar.
Company: Kentech Technical Services
Position: Field Electrical Engineer
Project: Common Sulphur Project
(Main Contractor ¨C Washington Group of International,USA)
Period: March 08 to till date
Presently, I am working as an Field Electrical Engineer at Qatar Gas II, Common Sulphur Project excuted at Qatar, Ras Laffan Industrial City. The Project includes Construction, Erection & Installation of 33.KV, 6.6KV Transformers, Generators, Liquid Sulphur Storages Tanks, Sulphur Storage Building, Granulators, Feed Pumps, Fire Water Pumps, 6.6KV Solid Type Bust Duct, Truck Unloading Area, 33KV Switchgears, 6.6KV Switchgears, LV Switchgears, 125V Battery Units and Battery Charger Units, Sub Stations 33KV & 6.6KV.
Previous Experience:
1) Company: Truba Arabia Limited (through Retco company)
Position: Electrical & Instrumentation Engineer
Project: Saudi Aramco Medina Bulk Plant ¨C BI-10-03509 & 03548
(Main Contractor ¨C Arabian BEMCO)
Period: December 2005 to May 2006(through Retco company I was
Working the below sites)
Truba Arabia Limited is a reputed Petrochemical & Power Plant Construction Company based in Jakarta, Indonesia and executing several Projects in Saudi Arabia in joint venture with ARABIAN BEMCO, a company based in Jeddah KSA. Truba Arabia is involved with Detailed Design, Project Management, Procurement, Construction Management and Project Services.
Medina Bulk Plant Project is a massive Project executed at Medina, KSA with total manpower strength of 800. The Project includes Construction, Erection & Installation of 03 Gasoline Storage Tanks, 03 Kerosene Storage Tanks, 03 Super Gasoline Storage Tanks, 02 Fire Water Tanks, Foam Skids, Loading Bays, Chemical Injection Skids, Fire Water Pumps & Diesel driven pump, Process Pumps & Drivers, Oily Water Sump and Separator, Filtration Equipment, 480V Bus Duct, 480V Switchboard, 125V Battery and Battery Chargers, 13.8 KV / Power Transformers and Building of Operations and Maintenance Building, Sales and Inspection Building, Electrical Switchgear Building, Remote Instrument Building, Dispensing Station, Vehicle Inspection Shelters, Truck Loading Shelter, Car Parking Sheds and Access Road.
Duties and Responsibilities:
* To co ordinate to the designer to clarify the site technical query, installation issues, revised drawing clarification.
* To cross check the material as per the IEEE, NEC, NFPA,NEMA,UL standards and requirements. To prepare the cable drum schedule and update the cable pulling report, update the total MHR's consumption for the cable pulling.
* Update the progress report coordinate the planning dept, check the scope of work and prepare the change of order, calculate the MHR's for the additional work.
* Supervision and Installation of Cathodic Protection System including self-sacrificing anode system, Impression current method for Storage Tank Bottom Cathodic Protection Installation, Fire Hydrant and Position Indicator Valves and Underground Piping Cathodic Protection System.
* Supervision and Installation of Power Distribution System ¨C Power Transformers (110KV/13.8 KV ¨C 220 MVA and 13.8 KV / 480 V ¨C 3 MVA) and Distribution Transformer Erection (480/220/120 ¨C 30 KVA, 15 KVA and erection of MCC, PCC, DCS, PLC Panels. Tank Stair-Case Lighting, PP, LP and LC Panel, HVAC Control panel Erection,.
* Supervision and Installation of Instrumentation System ¨C Tubing, Cable Loop testing, Level Switches, Differential Pressure Switch, MOV, FCV, Flow Switches, Level Transmitters, Radar Tank Gauging System (RTG), Float Switches, Flow Transmitter, Pressure Transmitter, Flow Meter. Fire Alarm System, Paging System.
2) Company: Saudi Aramco (through Retco company)
Position: Electrical Engineer
Project: Aramco Gas Separation Plant - Project
Period: May 2006 to November 2006
Duties and Responsibilities:
* Supervision and Installation of Fire Alarm System (Notifier.Net, USA)
* Installation of Smoke Detector (Photo Electrical and Ionization type)
* Supervision and Installation of Heat Detectors, Pressure Switches, Damper Switches, Manual Pull Station, Bell, Sounder Strobe and Flame Detectors).
* Supervision and Installation of Fuel Handling System (Siemens Control Panel ¨C S-7 version),Gas Leak Detection System (Crowcorn Panel ¨C UK), ESD, Duplex Filter, Condensate Tank, PRS Station (MOV, Pressure Transmitter, Differential Pressure Transmitters).
* Installation of Paging System (Gaitronics, USA)
3) Company: Al-Anwar Contracting Est (through Retco company)
Position: Electrical Engineer
Project: Saudi Customs (Saudi ¨C Kuwait Customs)
Period: December 2006 to August 2007
Duties and Responsibilities:
This was a Eight months Project at Saudi Customs Area executed by Al-Anwar Contracting, Jubail. Gained experience in Electrical Project Execution, Erection of New Power Paneling, Lighting Paneling. Also, possess experience in Coordination and Supervision of Electrical Commissioning and Installation activities.
* Erection, Testing and Commissioning of Control Panel, MCC, PCC Panels, Diesel Generator Synchronizing Panel(800KW-3Nos)
* Power Cabling from 1.5 Sq.mm to 300 Sq.mm, 2.5 Sq.mm sand Instrument cabling 1Pair to 40Pair ¨C Individual Shield, Over all shield, Twisted Pair cables and its termination.
5) Company: Trilinkers Company, Chennai, India
Position: Electrical Supervisor
Period: Sep 2004 to Oct 2005
Duties and Responsibilities:
Trilinker's is reputed Company involved in Designing, Erection and Installation of Panel Boards, PDB, LDB, Electrical System for commercial complexes, Banks, hotels, in Chennai
Erection, Testing and Commissioning of MCC, PCC Panel, Diesel Generator (up to 2.5 MVA), Various Resorts in Chennai
6) Company: B.P.Electricals,Chennai, India
Position: Site In charge
Period: From April 2000 to August 2004
Duties and Responsibilities:
B.P.Electricals is reputed Company involved in Designing, Supervising and Executing of Electrical System for commercial complexes, hotels, towers, resorts in various parts of Chennai.Gained experience in Electrical Project Execution, Occupational Health and Safety. Also, possess experience in Coordination and Supervision of Electrical Commissioning and Installation activities.
* Erection, Testing and Commissioning of Control Panel, MCC, PCC Panels, Diesel Generator (2 MW)
* Power Cabling from 1.5 Sq.mm to 300 Sq.mm, Control Cabling from 7C to 40C, 2.5 Sq.mm sand Instrument cabling 1Pair to 40Pair ¨C Individual Shield, Over all shield, Twisted Pair cables and its termination.
* Erection, Testing of Rockwell Automation Control Panel
* Installation of Variable Frequency Drivers (Allen Bradley, Siemens, Danfosco)
* Instrumentation works such as RTD, Thermocouple, Thermistor, Pressure Transmitters, Differential Pressure Transmitters, Flow Meters, Temperature Controllers and Proximity Sensor Switches.
1. Neyveli Lignite Corporation Ltd. Neyveli, Tamil Nadu (Central Government of India)
Plant: NLC Ltd. Thermal Power Station
Plant Capacity: 200 MW
Training Period: 15 Days
Nature of Training: Power Generation System, Transmission & Distribution, Fault Analysis, Different Types of Breakers and Control, Power System Protection, Boiler, Turbine, Electrostatic Precipitator, Fuel Handling system, Different Types of Relay and its protections, Radial System and Ring Main System.
PERSONNEL DETAILS
Date of Birth: May 30, 1979
Marital Status: Single
Language Proficiency: Tamil, English ¨C Read, Write, Speak
Hindi, Malayalam and Arabic - Speak
Nationality: Indian
View contact information... |