OBJECTIVE: Instrumentation
* Experience in installation and commissioning of manufacturing and utility machinery
* Experience in Water and Effluent Treatment Plant operation and maintenance, set reset control panel, maintained daily log book, pH reading, BOD5 percentage
* Skilled in Boiler and Compressor maintenance, pneumatic and hydraulic control valve servicing, thermocouple installation, electronic soldering, pipe threading, pressure gauge calibration, transmitter, recorder, valve positioner, relays, regulator assembling and calibration
* Performed preventive maintenance work, trouble shooting and overhauling of manufacturing & utility machinery
* Expert in parameter setting for Injection molding machine, hydraulic press, dying, dryer machine, PVC blending, auto packaging machinery
* Designed machine lay out, PFD, P& ID
* Participated in occupational health and safety and other technological courses
* Computer skills: AutoCAD, VISIO, MS Office, MS Project
WORK EXPERIENCE:
Instrument Technician 2007~2008
Peterson Instruments, Calgary, Alberta (http://www.petersoninst.com)
(Peterson Instruments is the manufacturer and product agent for serving the oil and gas industry)
* Assembled and calibrated flow recorder (model Dri Flo 11 and Barton), liquid accumulator (sampler, model SA-77) and differential bellows
* Set parameter for high and low pressure switch (HLR)
* Participated in technical meetings intended for product development and reviewed customer requirements and complaints
Maintenance Engineer 2004 ~2006
KDS Group, Chittagong, Bangladesh (http://www.kdsgroup.net)
(KDS group is pioneer in the linkage industries and offering the widest range of products in Bangladesh. It produces carton boxes, poly bags, plastic hangers, sewing threads, off–set printing, ticketing, screen printing and labels)
* Installed Generator sets (Gusscor, 804 KW) as per design and drawing of supplier in collaboration with the engineering team, assembled all accessories, checked safety, set parameter and started the generator sets synchronize with the others
* Installed Boiler (Shelmex, 4ton) as per design and drawing with the cooperation of engineering team, connected blower, feed water tank, water softeners plant, level gauge, set safety valve, parameter and operated the boiler at maximum load requirement
* Performed preventive maintenance work with maintenance team, issued parts, checked parts quality, replaced parts and recorded maintenance history
* Participated trouble shooting of existing plant machinery
* Estimated mechanical and electromechanical spare parts required for maintenance and operation of the plant
Plant Engineer 1996 ~2004
Bata Shoe Co. (Bangladesh) Ltd (htt://www.bata.com)
(Bata Shoe Co. (Bangladesh) Ltd. is the largest manufacturer and number one retailer of footwear in the world. It has a significant product line, which includes PVC, super expanded PVC, rubber, canvas leather and sports footwear)
* Planed and organized preventive maintenance work, distributed maintenance cards and check sheets, recorded maintenance history, ensured machine performance was at optimum levels
* Installed Boiler (Loose, 2.3 ton) as per instruction of manufacturer in cooperation with engineering team, assembled gas connection, feed water tank, water softener plant, HP pump, adjusted safety switch, set parameter and operated the boiler to its optimum level of performance
* Installed plant machinery such as hydraulic press, heavy duty injection molding machine, air compressor, water pumps, chiller, cooling tower including relevant piping and insulation
* Carried out modification work for central HVAC including re-routing ducts, re-arrangements of diffusers to cope with the load requirements. Modified the pipe layout for steam, condensate and chilled water line in the existing plant for simplifying and increasing performance
Maintenance Engineer 1992~1996
Jordache Limited, Dhaka, Bangladesh (http://www.themerchantsltd.com)
(Jordache Limited is one of the leading Tissue paper manufacturers of Bangladesh)
* Installed toilet tissue paper, printing and packing machinery, added new product to the existing product line and increased business by approximately 15 %
* Planned and estimated raw materials consumption and calculated the minimum and maximum demands for materials inventory control
EDUCATION:
B.Sc. in Mechanical 1985~1992
Rajshahi University of Engineering and Technology, Bangladesh
Second year Instrumentation, SAIT, Calgary, AB, Canada 2008
PROFESSIONAL AFFILIATION:
Member of Institution of Engineers (IEB), Bangladesh, Membership No.: M/ 15130
TRAINING:
* Management of Industrial Safety & Compliance by SEDF with IMF 2005
* Bearing Technology by SKF South East Asia & Specific Pvt. Ltd 1998