Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #79622 next resume »»
CONTACT INFORMATION:
View contact information...

Electrical Engineer

I have more than 6 years experience in electrical engineering in oil and gas project (EPC). I was graduated from S2 Gadjah Mada University and my major is Electrical Power Engineering. I finished my study only 18 months, GPA 3.48.
I can operate computer (proficient in MS Office and Auto Cad), qualified in Electrical Power Engineering, familiar by using ETAP 5.5.6 and able to analyze manually. I can speak and write in English. I can work in team, creative and easy finding solution, strong analytical thinking, good interpersonal and communication skill. Work independently and highly motivated to achieve best performance.

Date of Birth: April, 14 1982
Nationality: Indonesian
Education: Electrical Power Engineering, Gadjah Mada University

Languages:
Language Speaking Writing Reading
Indonesia Excellent Excellent Excellent
English Excellent Excellent Excellent
Deutsch Basic Basic Basic
Mandarin Basic Basic Basic

Courses:

11/2007 Two Days Course Basic Well Log Interpretation Using Software: Introduction To Geographic Interpretation System at American Association of Petroleum Geologists Gadjah Mada University
11/06-12/06 Visual Programming (Delphi) at New Gama Indonesia
05/2006 Training of Microcontroller AVR 8535 at Gadjah Mada University Indonesia
02/2006 Training of ETAP/EDSA Technical 2000 at Gadjah Mada University Indonesia
11/2005 National Training of Freezer System Construction at Pusat Studi Jerman Indonesia
10/2005 Alternative Energy at Pusat Studi Jerman Indonesia
06/05-07/05 Mandarin Course at Smile Group Indonesia
10/05-12/05 Deutsch Course at Pusat Study Jerman Indonesia
09/02-03/03 Computer Engineering at LPK UNIGAMA Indonesia
09/01-03/03 English at ELTI Indonesia
03/02-06/02 Electrical Training at IST. Akprind Indonesia

Education:

2005 - 2007 Electrical Power Engineering at Gajah Mada University Master Program (finished only 18 months) GPA 3.48.
2000 - 2004 Electrical Engineering at Institut Sains & Technology Akprind GPA 3.47 / 4.0 (highest GPA in my Major)
1997 - 2000 Automotive Engineering High School at RK Cinta Rakyat Pematangsiantar (Used tobe ranking 1st in my classroom)

Honors and Awards:

2002-2004 BBBM Scholarship, every semester
1997-2000 Certificate of Ranking
2000 Certificate of Competency

Skill of using software:

ETAP 5.5.6, EDSA 2005, Luxicon, Auto Cad, SPR, EMTP, Web Design, Chalmite CGeographic software (Well Log Interpretation), Delphi, Microsoft Office, Video Editing, Power World, C Language.

Training:

1. DC Network Analysis by applying:
Ohm's Law, Kirchoff's Law, Delta-Star conversion, Matrix manipulation for solving simultaneous equations at PT.Aker Kvaerner
2. AC Single Phase Calculation without applying complex number:
Resistance, Impedance, Power Factor, Voltage Drop, Real Power, Apparent Power, Resonant Frequency, Transformer Impedance at PT.Aker Kvaerner
3. Three Phase calculation Without applying complex number:
Resistance, Impedance, Reactance, Power factor, Voltage Drop, Real Power, Apparent Power, reactive Power, Transformer, Impedance and Loss, Short Circuit at PT.Aker Kvaerner
4. Ac Network Analysis, Ac Bridge, Impedance, Reactance Power factor, Real Power, Apparent Power, reactive Power, Phasor Diagram at PT.Aker Kvaerner
5. Three Phase Unbalance circuit calculation applying symmetrical component:
Cable charging current, Ac network analysis, Application of symmetrical component, Micellanous unbalanced three phase circuit analysis at PT.Aker Kvaerner
6. Selecting Cable at PT.Aker Kvaerner
7. Generator (Isochronous and Droop) at PT.Aker Kvaerner
8. Motor Starting at PT.Aker Kvaerner
9. Relay Coordination PT.Aker Kvaerner
10. QHSE, EPC intoduction at PT JGC
11. Cable, Tray, Junction box, Hazardous area, Power Supply. At PT. JGC
12. Team building, Management time, presentation skill at PT. RAPP
13. Induction Safety at PT. Conoco Philips

Career Highlights:
Work Done at PT. JGC Indonesia

1. Period: September 2008- present (On-going)
Project: Donggi Senoro
Location: Sulawesi
Plant Owner: Pertamina
Position held: Electrical Engineer
Responsible:
Preparing data sheets MCC and Switchgear, AC-DC UPS, Bus Duct, Cable, Cathodic Protection, Heat Trace, Transformer.

2. Period: September 2007 – November 2008
Project: Engineering, Procurement & Construction of Tuban
Aromatics Facility Project
Location: Tuban, East Java, Indonesia.
Plant Owner: PT. Trans-Pasific Petrochemical Indotama.
Position held: Electrical Engineer
Responsible:

Making electrical design by using program ETAP 5.5.6 such as Load Flow Study, Short Circuit, Motor Starting, Relay Coordination, Transient, and also calculation manually as a proof of the software. Running Luxicon for lighting calculation, and drawing lay out by using Auto Cad.
Preparing motor list, preparing single line diagram, preparing load calculation. preparing cable calculation. Checking for detail design with other discipline. Preparing material take off. Providing electrical specification and requisition diesel engine generator, MCC, Power transformer, lighting panel, Junction Box, cable & wire, cable tray, lightning protection, grounding system, and electrical installation work, Package equipment, switch gear, load analysis, Voltage drop, Level illumination, Power and Control Lay out, cable trench, Hazardous Area, NGR, Bus Duct.

3. Periode: September 2007 – December 2007
Project: Hydrogen Peroxide Project (HL-P)
Location: Pakistan
Plant Owner: Mitsubishi Gas Chemical Company Inc., Japan.
Project Value: US $ 1.5 Billion (Approximately)
Position held: Electrical Engineer
Responsible:

Making electrical design by using program ETAP 5.5.6 such as Load Flow Study, Short Circuit, Motor Starting, Relay Coordination, Transient, and also calculation manually as a proof of the software.

Work Done at PT. Technip
:
1. Period: May 2007- September 2007
Project: Modification For Anoa New Well A 22
Location: Natuna Island
Plant Owner: Premier Oil
Position held: Electrical Engineer
Responsible:

Making electrical design by using program ETAP such as Load Flow Study, Short Circuit, Motor Starting, Relay Coordination, Transient, and also calculation manually as a proof of the software. Drawing lay out by using Auto Cad.
Preparing motor list, preparing single line diagram, preparing load calculation. preparing cable calculation. Checking for detail design with other discipline. Preparing material take off. Providing electrical specification and requisition diesel engine generator, MCC, Power transformer, lighting panel, Junction Box, cable & wire, cable tray, lightning protection, grounding system, and electrical installation work, Package equipment, switch gear, load analysis, Voltage drop, Level illumination, Power and Control Lay out, cable trench, Hazardous Area, NGR, Bus Duct.

2. Period: July 2005– May 2007
Project: Hydrocarbon in Khursaniyah
Location: Saudi Arabia
Plant Owner: Saudi Aramco
Project Value: 560 MMSCFD gas, 300.000 barrel/day and 1,800 metric
Ton / day of liquid sulfur
Position held: Electrical Engineer
Responsible:

Making electrical design by using program ETAP such as Load Flow Study, Short Circuit, Motor Starting, Relay Coordination, Transient, and also calculation manually as a proof of the software.
Preparing motor list, preparing single line diagram, preparing load calculation. preparing cable calculation. Checking for detail design with other discipline. Preparing material take off. Providing electrical specification and requisition diesel engine generator, MCC, Power transformer, lighting panel, Junction Box, cable & wire, cable tray, lightning protection, grounding system, and electrical installation work, Package equipment, switch gear, load analysis, Voltage drop, Level illumination, Power and Control Lay out, cable trench, Hazardous Area, NGR, Bus Duct.

3. Period: March 2005 - July 2005
Project: Matak Hangar Electrical Upgrading System Project
Location: Matak, Natuna Islands
Plant Owner: Conoco Philips
Project Value: US $ 15,000 (Approximately)
Position held: Electrical Engineer
Responsible:

Making electrical design by using program ETAP such as Load Flow Study, Short Circuit, Motor Starting, Relay Coordination, Transient, and also calculation manually as a proof of the software.
Preparing motor list, preparing single line diagram, preparing load calculation. preparing cable calculation. Checking for detail design with other discipline. Preparing material take off. Providing electrical specification and requisition diesel engine generator, MCC, Power transformer, lighting panel, Junction Box, cable & wire, cable tray, lightning protection, grounding system, and electrical installation work, Package equipment, switch gear, load analysis, Voltage drop, Level illumination, Power and Control Lay out, cable trench, Hazardous Area, NGR, Bus Duct.

Work Done at PT. AKER KVAERNER INDONESIA

1. Period: May 2004 - March 2005
Project: PECIKO Onshore Development Project (PCK4 /EPSC3)
Location: Senipah, East Kalimantan
Plant Owner: Totalfina elf E&P Indonesia
Project Value: US$ 120 Millions (Approximately)
Position held: Jr. Electrical Engineer
Responsible:

Making detail engineering design electrical system for Compressor
(Nuovo Pigone), Gas Turbine (Solar Turbine), Oily Water Treatment, Cathodic Protection, works for cabling system, load data, one line diagram by using ETAP, specification, data sheets, connection diagram, I/O list to DCS & EPDCS, grounding system, impress current cathodic Protection, layout drawing, etc.)

2. Period: February 2004 - May 2004
Project: Full well Stream Project..
Location: Aceh, North Sumatera.
Plant Owner: PT. ARUN LNG / Exxon Mobile Oil Indonesia.
Project Value: US$ 10 Millions (Approximately)
Position held: Jr. Electrical Engineer
Responsible:

Making Data sheet for lighting, preparing load calculation, analysis single line by using ETAP, preparing installation lighting system, lightning protection & grounding installation diagram, drawing lay out.

3. Period: October 2003 - February 2004
Project: FEED Engineering Phase B Field Development
Location: Jakarta
Plant Owner: PT. ARUN LNG / Exxon Mobil Oil Indonesia
Project Value: US$ 40 Millions (Approximately)
Position held: Jr. Electrical Engineer.
Responsible:

Making Data sheet for lighting, preparing load calculation, analysis single line by using ETAP, preparing installation lighting system, lightning protection & grounding installation diagram, drawing lay out.

4. Period: May 2003 - September 2003
Project: Tunu 8 Field Development Project.
Location: Balikpapan, East Kalimantan.
Plant Owner: TOTALFINAELF.
Project Value: US$ 60 Millions (Approximately)
Position held: Jr. Electrical Engineer
Responsible:

Making Data sheet for lighting, preparing load calculation, analysis single line by using ETAP, preparing installation lighting system, lightning protection & grounding installation diagram, drawing lay out.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 1751 to 1800 of 7050)Go to Search Parameters...
Brief Description
HND , ELECTRICAL/ ELECTRONICS ENGINEERING (Power and Machine Option)
I finish my contract in South Africa as Safety Advisor on “Polaris” Barge (Acergy) for his dry dock. I obtained my master's degree (Engineering and Chemical safety) in 2003. My career really started In 2005 in the off-shore, on the drillship “Pride Angola” where I sailed for 3 years.
I am an instrumentation and automation engineer with over 5 years experience in oil&gas, refinery and petrochemical fields, covering detail design and site installation/ precommissioning/ commissioning activities.
B-Tech in mech with 7.5 years of experience in plant design arena
Eletrical enginer for 8 yrs experince as chief enginer
Civil Structural Engineer
I have near eight years experience in field of piping design of refinery, oil and gas with position as piping lead engineer & assistant manager, furthermore I am fluent PDS, PDMS, Smart Plant Review, Plant Design Review, AutoCad, Microstation, Microsoft office, etc.
weldin inspection
Having a Diploma in Mech. Engg. with 18 years of Experience in Designer
Energetic and productive professional with broad-based experience in Maintenance Planning, Shutdown Planning and Project Management in Line with the Computerized Maintenance Management System.
I have total Twenty-one years hand on working experience in Electrical maint. and operation fields in various organization.
Control Electrical HV &LV equipment and Instrumentation Installation & Test, Cable wiring
Seeking a challenging career as a Reservoir/Petroleum/Production Engineer in an E&P Company
15 years of progressive experience and responsibility with documented success in the areas of drilling, workover, completions, engineering, operations and supervision at various organizational levels. I’m seeking a challenging position as a Drilling &/or Work-over Engineer / Superintendent.
18 years experience in process design of refinery and petrochemical units.
Over 14 Years in Maintenance planning, Shutdown/Turnaround Planning in petrochemical Industries. And also in Maintenance of various Rotating and Static Equipment ;Construction Planning including costing.
A consulting petroleum engineer / project management position in a challenging environment which requires significant technical expertise. Available for immediate travel, domestic or worldwide.
I am a Chemical Engineer having more than 18 years experience in various Oil Processing / Gas Treatment / Petrochemical Process Plants . I have 6 years of Onshore / Offshore Oil / Gas Plants Operational Experience as a Production Supervisor.
Job Title : Software Enginer Education : Ordinary Degree in Bachelor of Science Previous Employer: Motorola Australia Software Centre
Expert in understanding permeability of the carbonate reservoirs. With this help reservoir engineers can do their well level simulation rather easily. Fees are charged for every foot of well data studied. Work will be done at the place of the expert.
More than fourteen years hands-on and supervisory experience in Petroleum Refineries in Qatar, Saudi Arabia and Pakistan. Have been analyzing samples from all streams of different units. Have been acting as Lab. Group Leader during Group Leader's leave/absence.
A well rounded drilling personnel with a unique experience in drilling and completion / work over operations
Over twenty years in plants, and pipeline construction, Inspection and supervision, including several overseas assignments.
Quantity Surveyor/Estimator (Mechanical)
All descriptions of skillsand experiences are listed in resume. I am available to begin work immediately.
Instrumentation Engineer with 15 years of experience in maintenance, teaching and construction
Primavera , MS Project
A self-motivated mechanic with over twenty years worldwide experience, in mechanical/ maintenance engineering’s high-pressure environments; from marine engines, top drive, rotary tables, auxiliaries, hydraulics, and rig upgrades. I am hard working, resourceful and reliable.
Working as Geosteering engineer, meeting with client, collect data, model preparation, landing section, lateral section, steering while drilling, report. Communication to all participant while drilling execution.
i am graduate mechanical engineer having 7 years expereince in piping/structure fabrication and erection in the kingdom of bahrain.we were making the items like tanks , pressure vessels,pot shell,pipe stack , pipe racks for oil and gas sector, petrochemicals and off shore products.
I have extensive experience on Electrical Engineering studies , construction , Transmission & Distribution and Oil & Gas during my assignment on Total E&P Yemen and Petomar in Angola. Designing, modifying, and implementing electrical system my daily challenging job.
ASNT L III UT AND WELDING INSPECTOR AWS CWI QC1.
I am a Structural Designer with over 7 years experience in design of offshore and onshore oil facililities, building and other civil infrastructures
Seven (7) years experience in designing fire protection systems for petrochemical plants and similar industries. I am familiar with NFPA and other internationally accepted standards.
7 years experience in Mechanical maintenance
- Good at English and drilling software.
16 years of Piping & Pipelines Project Management/Project Execution experience in the Industries like Refineries, Hydrocarbon, Petrochemical and Oil&Gas(Cross Country Pipelines, Booster Pump stations, Oil Station, Gas Station, Up-Stream flow Lines).
GRADUATE MECHANICAL ENGINNER,CSWIP 3.1 WELDING INSPECTOR CERTIFIED BY TWI,UK,ASNT LEVEL II IN RT,UT,PT,MPT,IRCA UK APPROVED ISO 9001:2000 QMS LEAD AUDITOR COURSE PASSED. MORE THAN 8 YEARS EXPERIENCE IN QA/QC,WELDING INSPECTION IN EPC OIL&GAS
Making electrical design by using program ETAP such as Load Flow Study, Short Circuit, Motor Starting, Relay Coordination, Transient, and also calculation manually as a proof of the software.
Iam a Graduate Mechanical Engineer with MBA in Poduction Management and a PG. diploma in Materials Management with around 8 + Years of Experience in various MNC's (Oil & Gas, Process/Chemical, Metallurgical, Pharmaceutical.etc.).
An enthusiastic and self motivated Production and Process Engineer, with experience on production optimization and surface equipment designing and evaluation, focused on maximizing asset production capacity and productivity in the oil and gas industry.
HSE Manager, Experience in HSE studies of seismic exploration 2D and 3D since 2004 to the date
Oil and gas mechanical technician
I have diploma with 20 years experience in construction/maintenance. 10 years in oil industries maintenance, also witness commissioning and start up of new installations in the refinery. Hands on experience in 33/11/3.3kv/440v systems.Available in one month time notice period.
Specializing in ICT/SCADA planning Proven Technical & Management Expertise with 14 years Experience overseas-Kuwait and Japan.
See resume
Resume for Project engineer position
Expert INSTRUMENTATION , SCADA, TELECOM , DCS OR SAP / ERP , DESIGN , ENGINEERING , PROJECT MANAGEMENT , OPERATION AND MAINTENANCE , TECHNICAL SERVICES , ISO’S ETC
Industrial engineer, ample experience in catalytic cracking technology and liquefied natural gas, seeks position to apply knowledge acquired as researcher over past four years. Having lived in Latin America and Western Europe, have developed effective multi-cultural skills.
Chemical engineer with over eight years experience in an oil refinery. Utilize exemplary leadership, time-management, critical thinking/analysis, problem resolution, written/verbal communication and human resources management skills to plan and schedule operational, production and dispatch facility
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   [ 36 ]   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
CATEGORIES: Engineering/Technicians;
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com