CONTACT INFORMATION:
View contact information...
Electrical Engineer
I have more than 6 years experience in electrical engineering in oil and gas project (EPC). I was graduated from S2 Gadjah Mada University and my major is Electrical Power Engineering. I finished my study only 18 months, GPA 3.48.
I can operate computer (proficient in MS Office and Auto Cad), qualified in Electrical Power Engineering, familiar by using ETAP 5.5.6 and able to analyze manually. I can speak and write in English. I can work in team, creative and easy finding solution, strong analytical thinking, good interpersonal and communication skill. Work independently and highly motivated to achieve best performance.
Date of Birth: April, 14 1982
Nationality: Indonesian
Education: Electrical Power Engineering, Gadjah Mada University
Languages:
Language Speaking Writing Reading
Indonesia Excellent Excellent Excellent
English Excellent Excellent Excellent
Deutsch Basic Basic Basic
Mandarin Basic Basic Basic
Courses:
11/2007 Two Days Course Basic Well Log Interpretation Using Software: Introduction To Geographic Interpretation System at American Association of Petroleum Geologists Gadjah Mada University
11/06-12/06 Visual Programming (Delphi) at New Gama Indonesia
05/2006 Training of Microcontroller AVR 8535 at Gadjah Mada University Indonesia
02/2006 Training of ETAP/EDSA Technical 2000 at Gadjah Mada University Indonesia
11/2005 National Training of Freezer System Construction at Pusat Studi Jerman Indonesia
10/2005 Alternative Energy at Pusat Studi Jerman Indonesia
06/05-07/05 Mandarin Course at Smile Group Indonesia
10/05-12/05 Deutsch Course at Pusat Study Jerman Indonesia
09/02-03/03 Computer Engineering at LPK UNIGAMA Indonesia
09/01-03/03 English at ELTI Indonesia
03/02-06/02 Electrical Training at IST. Akprind Indonesia
Education:
2005 - 2007 Electrical Power Engineering at Gajah Mada University Master Program (finished only 18 months) GPA 3.48.
2000 - 2004 Electrical Engineering at Institut Sains & Technology Akprind GPA 3.47 / 4.0 (highest GPA in my Major)
1997 - 2000 Automotive Engineering High School at RK Cinta Rakyat Pematangsiantar (Used tobe ranking 1st in my classroom)
Honors and Awards:
2002-2004 BBBM Scholarship, every semester
1997-2000 Certificate of Ranking
2000 Certificate of Competency
Skill of using software:
ETAP 5.5.6, EDSA 2005, Luxicon, Auto Cad, SPR, EMTP, Web Design, Chalmite CGeographic software (Well Log Interpretation), Delphi, Microsoft Office, Video Editing, Power World, C Language.
Training:
1. DC Network Analysis by applying:
Ohm's Law, Kirchoff's Law, Delta-Star conversion, Matrix manipulation for solving simultaneous equations at PT.Aker Kvaerner
2. AC Single Phase Calculation without applying complex number:
Resistance, Impedance, Power Factor, Voltage Drop, Real Power, Apparent Power, Resonant Frequency, Transformer Impedance at PT.Aker Kvaerner
3. Three Phase calculation Without applying complex number:
Resistance, Impedance, Reactance, Power factor, Voltage Drop, Real Power, Apparent Power, reactive Power, Transformer, Impedance and Loss, Short Circuit at PT.Aker Kvaerner
4. Ac Network Analysis, Ac Bridge, Impedance, Reactance Power factor, Real Power, Apparent Power, reactive Power, Phasor Diagram at PT.Aker Kvaerner
5. Three Phase Unbalance circuit calculation applying symmetrical component:
Cable charging current, Ac network analysis, Application of symmetrical component, Micellanous unbalanced three phase circuit analysis at PT.Aker Kvaerner
6. Selecting Cable at PT.Aker Kvaerner
7. Generator (Isochronous and Droop) at PT.Aker Kvaerner
8. Motor Starting at PT.Aker Kvaerner
9. Relay Coordination PT.Aker Kvaerner
10. QHSE, EPC intoduction at PT JGC
11. Cable, Tray, Junction box, Hazardous area, Power Supply. At PT. JGC
12. Team building, Management time, presentation skill at PT. RAPP
13. Induction Safety at PT. Conoco Philips
Career Highlights:
Work Done at PT. JGC Indonesia
1. Period: September 2008- present (On-going)
Project: Donggi Senoro
Location: Sulawesi
Plant Owner: Pertamina
Position held: Electrical Engineer
Responsible:
Preparing data sheets MCC and Switchgear, AC-DC UPS, Bus Duct, Cable, Cathodic Protection, Heat Trace, Transformer.
2. Period: September 2007 – November 2008
Project: Engineering, Procurement & Construction of Tuban
Aromatics Facility Project
Location: Tuban, East Java, Indonesia.
Plant Owner: PT. Trans-Pasific Petrochemical Indotama.
Position held: Electrical Engineer
Responsible:
Making electrical design by using program ETAP 5.5.6 such as Load Flow Study, Short Circuit, Motor Starting, Relay Coordination, Transient, and also calculation manually as a proof of the software. Running Luxicon for lighting calculation, and drawing lay out by using Auto Cad.
Preparing motor list, preparing single line diagram, preparing load calculation. preparing cable calculation. Checking for detail design with other discipline. Preparing material take off. Providing electrical specification and requisition diesel engine generator, MCC, Power transformer, lighting panel, Junction Box, cable & wire, cable tray, lightning protection, grounding system, and electrical installation work, Package equipment, switch gear, load analysis, Voltage drop, Level illumination, Power and Control Lay out, cable trench, Hazardous Area, NGR, Bus Duct.
3. Periode: September 2007 – December 2007
Project: Hydrogen Peroxide Project (HL-P)
Location: Pakistan
Plant Owner: Mitsubishi Gas Chemical Company Inc., Japan.
Project Value: US $ 1.5 Billion (Approximately)
Position held: Electrical Engineer
Responsible:
Making electrical design by using program ETAP 5.5.6 such as Load Flow Study, Short Circuit, Motor Starting, Relay Coordination, Transient, and also calculation manually as a proof of the software.
Work Done at PT. Technip
:
1. Period: May 2007- September 2007
Project: Modification For Anoa New Well A 22
Location: Natuna Island
Plant Owner: Premier Oil
Position held: Electrical Engineer
Responsible:
Making electrical design by using program ETAP such as Load Flow Study, Short Circuit, Motor Starting, Relay Coordination, Transient, and also calculation manually as a proof of the software. Drawing lay out by using Auto Cad.
Preparing motor list, preparing single line diagram, preparing load calculation. preparing cable calculation. Checking for detail design with other discipline. Preparing material take off. Providing electrical specification and requisition diesel engine generator, MCC, Power transformer, lighting panel, Junction Box, cable & wire, cable tray, lightning protection, grounding system, and electrical installation work, Package equipment, switch gear, load analysis, Voltage drop, Level illumination, Power and Control Lay out, cable trench, Hazardous Area, NGR, Bus Duct.
2. Period: July 2005– May 2007
Project: Hydrocarbon in Khursaniyah
Location: Saudi Arabia
Plant Owner: Saudi Aramco
Project Value: 560 MMSCFD gas, 300.000 barrel/day and 1,800 metric
Ton / day of liquid sulfur
Position held: Electrical Engineer
Responsible:
Making electrical design by using program ETAP such as Load Flow Study, Short Circuit, Motor Starting, Relay Coordination, Transient, and also calculation manually as a proof of the software.
Preparing motor list, preparing single line diagram, preparing load calculation. preparing cable calculation. Checking for detail design with other discipline. Preparing material take off. Providing electrical specification and requisition diesel engine generator, MCC, Power transformer, lighting panel, Junction Box, cable & wire, cable tray, lightning protection, grounding system, and electrical installation work, Package equipment, switch gear, load analysis, Voltage drop, Level illumination, Power and Control Lay out, cable trench, Hazardous Area, NGR, Bus Duct.
3. Period: March 2005 - July 2005
Project: Matak Hangar Electrical Upgrading System Project
Location: Matak, Natuna Islands
Plant Owner: Conoco Philips
Project Value: US $ 15,000 (Approximately)
Position held: Electrical Engineer
Responsible:
Making electrical design by using program ETAP such as Load Flow Study, Short Circuit, Motor Starting, Relay Coordination, Transient, and also calculation manually as a proof of the software.
Preparing motor list, preparing single line diagram, preparing load calculation. preparing cable calculation. Checking for detail design with other discipline. Preparing material take off. Providing electrical specification and requisition diesel engine generator, MCC, Power transformer, lighting panel, Junction Box, cable & wire, cable tray, lightning protection, grounding system, and electrical installation work, Package equipment, switch gear, load analysis, Voltage drop, Level illumination, Power and Control Lay out, cable trench, Hazardous Area, NGR, Bus Duct.
Work Done at PT. AKER KVAERNER INDONESIA
1. Period: May 2004 - March 2005
Project: PECIKO Onshore Development Project (PCK4 /EPSC3)
Location: Senipah, East Kalimantan
Plant Owner: Totalfina elf E&P Indonesia
Project Value: US$ 120 Millions (Approximately)
Position held: Jr. Electrical Engineer
Responsible:
Making detail engineering design electrical system for Compressor
(Nuovo Pigone), Gas Turbine (Solar Turbine), Oily Water Treatment, Cathodic Protection, works for cabling system, load data, one line diagram by using ETAP, specification, data sheets, connection diagram, I/O list to DCS & EPDCS, grounding system, impress current cathodic Protection, layout drawing, etc.)
2. Period: February 2004 - May 2004
Project: Full well Stream Project..
Location: Aceh, North Sumatera.
Plant Owner: PT. ARUN LNG / Exxon Mobile Oil Indonesia.
Project Value: US$ 10 Millions (Approximately)
Position held: Jr. Electrical Engineer
Responsible:
Making Data sheet for lighting, preparing load calculation, analysis single line by using ETAP, preparing installation lighting system, lightning protection & grounding installation diagram, drawing lay out.
3. Period: October 2003 - February 2004
Project: FEED Engineering Phase B Field Development
Location: Jakarta
Plant Owner: PT. ARUN LNG / Exxon Mobil Oil Indonesia
Project Value: US$ 40 Millions (Approximately)
Position held: Jr. Electrical Engineer.
Responsible:
Making Data sheet for lighting, preparing load calculation, analysis single line by using ETAP, preparing installation lighting system, lightning protection & grounding installation diagram, drawing lay out.
4. Period: May 2003 - September 2003
Project: Tunu 8 Field Development Project.
Location: Balikpapan, East Kalimantan.
Plant Owner: TOTALFINAELF.
Project Value: US$ 60 Millions (Approximately)
Position held: Jr. Electrical Engineer
Responsible:
Making Data sheet for lighting, preparing load calculation, analysis single line by using ETAP, preparing installation lighting system, lightning protection & grounding installation diagram, drawing lay out.
View contact information... |