Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #80125 next resume »»
CONTACT INFORMATION:
View contact information...

EDUCATION

Graduated from SD Negeri Ketilang Cirebon 1988.
Graduated from SMP Negeri 7 Cirebon 1991.
Graduated from STM Negeri Cirebon 1994.
Graduated from Profesional Management Komputer Indonesia Bandung 1995.

COURSES & TRAINING

Training in PT. (Persero) PLN Unit Distribusi Jawa Barat, Bandung from June ~ Sept' 95.
Training Fire Fighting at PT. Gunanusa Utama Fabricators, Cilegon from 28 ~ 29 March 2001.
Training Document Control at PT. Gunanusa Utama Fabricators, Cilegon 15 July 2002.
Training Survival Craft and Rescue Boats at FOCUS Jakarta from 11 ~ 13 July 2002.
Training Primavera at EDP Media Jakarta from 24 ~ 27 January 2003.
Training Survival Craft and Rescue Boats at BSTS Miri Malaysia from 21 October ~ 23 October 2008.
Training H2S at BSTS Miri Malaysia from 24 October ~ 25 October 2008.

WORK EXPERIENCE

I.Oct '08 at Present
EJ Joint Venture SDN.SHD Malaysia as Site Planning Engineer.
Project:
B11IQ OFFSHORE HOOK UP & COMMISSIONING PROJECT
B11P-A Platform
B11DR-A Platform
Responsibility:
Make Daily Report for General Discipline.
Make Actual Schedule refer to Actual Hook Up works
Make Actual Manpower & Man hours Report
Make Change Order

II. October '06 ~ Sept '08
PT. Gunanusa Utama Fabricators as Scheduler.
Project:
TUNU FIELD DEVELOPMENT PROJECT PHASE 11
South Compression Platform with 4.100,00 Ton Weight
South Manifold Platform with 2.300,00 Ton Weight
Client Total E & P Indonesie
Responsibility:
- Make Schedule for General Discipline.
- Make Weekly and Monthly Progress Report.
- Make Two Week & Two Month A head Schedule.
- Make Delay Status for Controlling Project.
- Make Change Order Report
- Make Manpower Plan, Man hours Plan& S-Curve

III. June '05 ~ October' 06
PT. Gunanusa Utama Fabricators as Scheduler.
Project:
SISI NUBI PROJECT – SN1 EPSC1 Project
Deck & Pile with 5.475,24 Ton Weight
Client Total E & P Indonesie
Responsibility:
- Make Schedule Level 0, Level 1, Level 2, Level 3.
- Make Weekly and Monthly Progress Report.
- Make Schedule Onshore at East Kalimantan.
- Make Schedule & Progress Report for Vessel.
- Make Schedule & Progress Report for Sub Contractor.
- Make Delay Status for Controlling Project.
- Make Change Order Report.
- Make Manpower Plan, Man hours Plan & S-Curve.

IV. Sept '04 ~ May '05
PT. Gunanusa Utama Fabricators as Scheduler
Project:
HRSG ASTORIA ENERGY PROJECT
With 4.676,68 Ton Weight
Client Alstom Power Indonesia Responsibility:
Make Schedule Level 3.
Make Weekly and Monthly Progress Report.
Make Delay Status for Controlling Project.
Make Change Order Report.
Make Manpower Plan, Man hours Plan & S-Curve.

V. May '03 ~ August '04
PT. Gunanusa Utama Fabricators as Scheduler
Project:
A. Peciko Offshore Phase 4 / EPSC.2 Project
SWP K – TDD with 108,63 Ton Weight
SWP K – Jacket with 2.494,00 Ton Weight
SWP E – Jacket with 2.775,95 Ton Weight
SWP K – Deck with 1.611,38 Ton Weight
SWP E – Deck with 1.611,38 Ton Weight
Modification MWP with 1.404,57 Ton Weight
Client Total E & P Indonesie
Responsibility:
- Make Schedule Level – 3.
- Make Weekly & Monthly Progress Report.
- Make Change Order Report for Offshore Works.
- Make Schedule & Progress Report for Vessel Works.
- Make Manpower Plan, Man hours Plan & S-Curve.

B. Manifolds & Pig Launcher Matra Section Project
With 104,65 Ton Weight
Client Fedsin / Exspan
Responsibility:
- Make Schedule Level – 3.
- Make Weekly & Monthly Progress Report.
- Make Manpower Plan, Man hours Plan & S-Curve.

VI. March '02 ~ March '03
PT. Gunanusa Utama Fabricators as Scheduler
Project:
A. Peciko Offshore Phase 3 / EPSC.1 Project
SWP G – Jacket with 2.396,72 Ton Weight
SWP G – Deck with 1.567,73 Ton Weight
MWP A Modification with 62,60 Ton Weight
SWP G – Pressure Vessel & Tank with 48,48 Ton weight
Client Total E & P Indonesie Responsibility:
- Make Schedule Level – 3.
- Make Weekly & Monthly Progress Report.
- Make Change Order Report for Offshore Works.
- Make Manpower Plan, Man hours Plan 7 S-Curve.

B. Attaka South Dev. Project
Attaka 'O' Platform – Jacket with 696,89 Ton Weight
Attaka 'O' Platform – Deck with 375,15 Ton Weight
Client Unocal Indonesia Responsibility:
- Make Schedule Level – 3.
- Make Weekly & Monthly Progress Report.
- Make Change Order Report for Offshore Works.
- Make Manpower Plan, Man hours Plan & S-Curve.

C. TN Oily Water Treatment / EPSC.1
OWT Deck with 1.473,28 Ton Weight
Client Total E & P Indonesie
Responsibility:
Make Schedule Level – 3
Make Weekly & Monthly Progress Report.
Make Manpower Plan, Man hours Plan & S-Curve.

D. Tunu Field Dev. Phase 8 / EPSC.1
Tunu 8 / EPSC.1 – Deck & Pile with 6.446,00 Ton Weight
Pressure Vessel Tank with 41,75 Ton Weight
Responsibility:
Make Schedule Level – 3.
Make Weekly & Monthly Progress Report.
Make Change Order Report for Onshore Works.
Make Schedule Level – 3 and Weekly Progress Report for Vessel Works.
Make Manpower Plan, Man hours Plan & S-Curve.

VII.Nov '98 ~ March '02
PT. Gunanusa Utama Fabricators as Scheduler.
Project:
A.GTS Modification Project.
GTS Modification MWP A/B/C/D/E with 1.968,29 Ton Weight.
Responsibility:
Make Schedule Level 3 & Level 4.
Make Weekly and Monthly Progress Report.
Make Schedule Onshore at East Kalimantan.
Make Delay Status for Controlling Project.
Make Change Order Report.
Make Manpower Plan, Man hours Plan & S-Curve.

B.Tunu Field Dev. Phase 7 / EPSC.1 Project.
TCP Platform with 6.220,49 Ton Weight.
Responsibility:
Make Schedule Level 3 & Level 4.
Make Weekly and Monthly Progress Report.
Make Schedule Onshore at East Kalimantan.
Make Delay Status for Controlling Report.
Make Change Order Report.
Make Manpower Plan, Man hours Plan & S-Curve.

VIII.Sept '97 ~ Nov '98
PT. Gunanusa Utama Fabricators as Quantity Surveyor.
Project:
A.Mal & Jam Field Development Project.
Central Platform
Jacket (Incl. Pile & Boat Landing ) with 4.191,12 Ton Weight.
Tender Drilling Deck with 321,47 Ton Weight.
Deck with 1.130,98 Ton Weight.
Satellite Well Platform.
Jacket (Incl. Pile & Boat Landing) with 2.5410,97 Ton Weight.
Deck with 823,86 Ton Weight.
Client Elf Petroleum Asia.
Responsibility:
Make Report for Weekly & Monthly Progress Report.
B.TNOR / EPSC. 1 NPU & Associated Project.
NPU Deck with 3.615,89 Ton Weight.
Technical Building with 130,00 Ton Weight.
Offsite Facilities with 1.702,81 Ton Weight.
Camp Jetties with 538,28 Ton Weight.
Pressure Vessel with 29,85 Ton Weight.
Client Total E & P Indonesie.
Responsibility:
Make Report for Weekly & Monthly Progress Report.
IX.June '96 ~ Sept' 97.
PT. Linggarjati Sakti as Stevadore Foreman.
Responsibility:
Coordination Loading and Unloading at Cirebon Port.

X.Oct '95 ~ June '96.
PT. Indojaya Pan Pratama as Draftsman.
Responsibility:
Make Shop Drawing for Mountoya Fabrication & Taman Rajawali Estate.
Make RAB for Taman Rajawali Estate

View contact information...
«« previous resume next resume »»
Search Results (Resumes 2351 to 2400 of 7055)Go to Search Parameters...
Brief Description
Solid knowledge of Microsoft Office Suite, CoralDraw, Foltran, Qbasic, Visual Fox Pro and Mathcad, Autocad, Staad Pro, Sap 2000, Advanced knowledge of VISUAL BASIC applications for EXCEL, ACCES, WORD, POWER POINT, AutoCAD and STAAD PRO, electronic mail and Internet.
Fifteen years of experience in piping construction and piping engineering activities related to projects for oil production facilities, oil refining and industrial plants.
B.Eng in Chemical Engineering; Diploma in Mud (Drilling Fluids) Engineering.
Diploma in Mechanical Engineering, Diploma in Industrial Safety from Central Labour Institute- Mumbai, H2S Awareness & Rescue Operation, Safe Journey Management, Road Safety Management, Job Hazard Analysis, Permit to Work System, Gas Testing, Incident investigation & Accident reporting.
I have worked for multinational and International companies in the Middle East like General Dynamics, Babcock & Wilcox, and Delta Corporation. I look for a job as QA/QC Engineer/Specialist or Plant Manager.
I have 15+ years experience as an Instrumentation & Control Systems Design Engineer along with seven years I&C construction and commissioning experience at locations throughout the globe.
I have varied experience earned through honest means in Chemical, Oil & Gas, Petrochemical , Water treatment and other related areas by hard work, sincerity, dedication, team spirit and conviction.
A Mechanical Engineering PhD graduate seeking engineering and research work as a Mechanical Engineer.
•Ability to solve petroleum production problems involving design of petroleum production facilities •Engineering and project management experience in the oil industry •Strong planning, communication and presentation software skills
15 years experienced Mud engineer. Drilling fluids design, testing and well site engineering. Solids control equipment management
Drilling Engineer with 12 years of experience in drilling and workover supervision, including 2 years of well construction planning. Also 1 year of work as a Safety Engineer.
Electric Technical Officer (ETO)
I have over 11-year field exploitation and G&G Modeling and reservoir simulation experince and extensive competency in reservoir management, economic evaluation, reserve estimating and booking, risk analysis, welltest interpretation, well perfomance analysis and stimulations.
Slick Line Expert.
Ability to design & detail automation for DCS systems and other interfaces.
Mechanical Engineer,University Politehnica Bucharest
Technical and Application Engineering Support for the new concepts being introduced and promoted.
Having +10 years of Gas Processing, Fertilizer & Petrochemical Plants operational and supervisory experience.
Over 8 years experience as a piping team member and leader involved in oil, gas and petrochemical plants. Participated with famous European companies (Foster wheeler, Lurgi, Davy Process Technology, AKPG Kvaerner) as the main contractor, sub contractor or consortium member
Having a good experience in Export Business, Purchasing, Design, Material Planning, and Scheduling. An executive with experience in Business Development, Negotiations, Operations, Planning and Scheduling with a solid perspective of organizational priorities, potential and limitations.
Mechanical Engineer with 4.5 yrs experience in Oil & Gas Industry
Masters in Industrial Chemistry , Master¡¦s Thesis -Oil well Cementing and Fluid loss admixtures for better fluid loss control and zonal isolation in oil wells. High Temperature High Pressure Filtration Cell, Consistometer, DLS, Zeta potential, TOC, GC, HPLC, Rheology, Spectrophotometers.
Wonderware Integration Expert & also In Sap xMII
Petroleum Engineer with experience in ESP & PCP installation, Well testing, Workover & Completion
My skills among others include good use of tools and ability to troubleshoot
Piping Design Stress Analysis Engineer
Calibration of Instruments,online routine and corrective maintenance,troubleshooting, field calibration, calibration in workshop, commissioning, precommissioning
Planner with primavera 3.1
Instrument engineer
Sr Rotating Equipment Engineer
Structural PDMS Designer
20 years experience in Production/Operations onshore and offshore. Ex Marine Engineer officer.
Process Engineer (Chemical Engineering)
I HAVE +10 YRS EXP IN A PETROLEUM LABORATORY OF OIL REFINERY IN INDIA,HAVE KNOWLEDGE OF TESTING ALL PETROLEUM PRODUCTS.
To seek holistic and enriching exposure in the field of technology and management with an organisation that is dedicated to say in the forefort of excellence.
I have over twenty years of experience, comprising of mechanical, piping and HVAC design, project management, construction supervision, mechanical systems startup and commissioning and board /computer drafting including PDMS, Intergraph ISDP 3D, AutoCAD and FLEX CAD on various marine, offshore pet
Pursue a career in the, Chillers Systems, Refrigeration, Air conditioning,
Proven professional experience in Manufacturing Processes in Ethylene, Ethylene Oxide, EthyleneGlycol and Ethylene Benzene, Process Design and Optimization. Experience with process control objectives to optimize unit operations.
I have degree in Civil engineering and 6 years experience with Oil & Gas Industry(Kuwait,Qatar,U.A.E,Georgia).I have valid driving licence of Qatar/U.A.E/Oman.Execution of Pipe rack foundations,Static/Rotary euipment foundations,Turbine,Boiler,Flare foundations, Control bldg and Sub station bldg.
• Over 15 years of experience in Petrophysics (Exploitation and Reservoir characterization)in clastic and complex carbonate reservoirs. • Detailed experience of acquisition, quality control, interpretation and evaluation of petrophysical (wireline, LWD and core) data.
Seeking a challenging and rewarding Chemical Engineering position with a progressive company.
handle the Project Independently, Installation Instruments* Loop Checking* Site Design *F&G System *Pre Commissioning Activities Erection of DCS,PLC *Knowledge of Analyzer System *Experienced in Senior levels *Good Leadership quality *Good interpersonal relationship
Electrical Engineer with experience in system design and maintenance planning of electrical facilities including motors, motor starters, switchgears, power distribution, and cabling.
pipelines engineer, mechanical engineer
I am presently working as a field service representative for Ecolochem International,Inc. Presently assign in an Onshore Gas Plant for Shell Exploration Philippines. I work also as a assistant driller for Sedco Forex Sclumberger.
I am a Mechanical Engineer with Master degree in Mechanical Engineering,
Objective Secure employment in the petroleum industry working in reservoir exploitation, well planning, and/or completion operations.
German R. Leal Mechanical engineer with 15 years industrial experience in Petrochemical and Oil Plants. HRSG Boiler/Plant. Piping Engineering and Design (PI&D), Flow Sheet, Plot Plan. ASME B31.1;3, 5,8, 11 ASME BPV Sect VIII. Stress Analysis CAEPIPE, Auto Pipe.
Extensively experienced with the specification, bid evaluation and purchasing of mechanical equipment and pipelines.
I am smart Lithuanian male, strong wide profile IT specialist with more than 15 years related experience and searching for the position in IT sector, where my experience and strong background in computer science can be best utilized. My main personal qualities is: calm, disciplined, communicable.
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   [ 48 ]   49   50   Next   Last
Seach Parameters

Change search parameters...
CATEGORIES: Engineering/Technicians;
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com