Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #80134 next resume »»
CONTACT INFORMATION:
View contact information...

Date of Birth: 19 September 1978
Marital status: Married
Sex: Male
Nationality: Vietnamese

Language: English, a little Chinese
Position: Mechanical Engineer
(Job Leader at CIMAS office / CTCI office)
(Jun -2001 ~ Aug 2007)
Piping Assistant Manager (at SAMSUNG office)
(Sep 2007 ~ Present)

EDUCATION & QUALIFICATION:
Petrochemical Engineer - Hanoi University of Technology (1996-2001)
Diploma:
- The 1st prize for science research student awarded by Hanoi University of Technology
- The 2nd prize for science research student awarded by Ministry of Education & Training
- The 2nd prize for science research student awarded by VIFOTECH technique - science creation

TRAINING PROGRAM IN CIMAS COMPANY
- Word, Excel, PowerPoint, Network configuration (02 weeks)
- Auto CAD (02 weeks)
- English course (48 hours)
- Piping Introduction (01 month)
- Auto PLANT 97 ¡* installed and develop model¡¨ (03 weeks) / Auto Plant2004 ¡* How to installed server, workstations and develop model¡¨ (4 weeks)
- PES/ Piping 2D drawing draft (03 weeks). This is in-house software with CAD environment which created by CTCI's mother company. It could draft layout drawing & ISO drawing
- Special Support software with CAD environment which created by CTCI's mother company. This software designed special support.
- MICROSTATION (SE, J, V8) / Piping 2D drawing draft (02 weeks)
- PDS ¡* 6.4, 7.1, 7.3¡¨ Training (06 weeks) ¡* How to install PDS software for workstation and server, install PDS project in the server, key in 3D, work 2D and revise some customizations¡¨
- Professional Knowledge for piping knowledge (08 weeks)
- EDA software and piping professional overseas training in Taipei in Taiwan (12 weeks)
- Process knowledge basic (2 weeks)
- Training PDMS ¡* 11.3, 11.5, 11.6¡¨ software for server, workstation and develop piping, equipment and civil model (06 weeks)
- Training Plant Design Review (02 weeks)
- Training Smart Plant Review (02 weeks)
- Training Walkinside 5.3 ¡* VR context¡¨ (02 weeks)

PROFESSIONAL EXPERIENCE:

SAMSUNG Engineering Co., Ltd
Dec 2008- Present: Proposal for JER & SEP project
- JER Project ¡* Jubail Export Refinery¡¨ with catalytic reformer unit, benzene extraction unit & paraxylene unit in Arabia with my responsibility for estimating piping arrangement and providing loading to structure
SEP Project ¡* S-oil Onsan Refinery Expansion¡¨ in Korea with my responsibility for checking proposal piping of detail ISO
SNDC -1 Project ¡* Saih Nihayda Depletion Compression Phase -1¡¨ for Petroleum Development Oman LLC
Sep 2007 - Dec 2008: ESP & GSP Project ¡* Ethylene Separated project & Gas Separated project¡¨ at Maptaphut - Rayong in Thailand. I am assistant manager for this project. My duty is control line list following P&ID, BM Valve take off, instrument valve take off, sampling cooler, equipment drawing, plot plan, piping underground, piping layout, after that I check 3D modeling from Subcontract if have got any misunderstand or mistake to compare standard note project request, client request, P&ID note, design note, hazard, clash check etc¡K It will be coordinate with civil, equipment, instrument, electrical and I will change by route send it to piping subcontract for revising. Final I am responsible for the 1st, 2nd, 3rd model review Tag with PTT client and I clear directly Tag with PTT client. I review by PDMS11.5 & Plant Design Review 6.3

CIMAS / CTCI Engineering Co., Ltd
I had many experiments about piping work, because I had already been work six years in CIMAS consultant after that I bore responsibility for job leader of some projects. So that I could view overall project about design piping layout for many equipment and design support with Smart Plant Review & Plant Review Design and also I could key in them by PDMS and PDS. For these projects, I had been familiar with many types of equipment as: pump, drum, tower, tank, exchanger, filter, dryer, silo, reactor, compressor, heater, etc. Therefore in new project ¡* EO - EG Project¡¨, I started layout for reactor area with reactor, pump, exchanger, drum, filter and tower. Hereinafter I described detail for every project.

With software, I can install by myself PES, special support, PDS server, created project in PDS server and workstation, PDMS server and workstation

I was taught of PDS, PDMS, Smart Plant Review and Plant Design Review in CIMAS's Engineer. I am very fluently these softwares
Dec 2006 - Aug 2007: EO - EG KAYAN Project ¡* 700Ktpy - Ethylene oxide and ethylene glycol products¡¨ in Dubai (piping job leader for CIMAS Engineers). I could check equipment drawing, nozzle orientation; detail ISO according to P&ID, piping layout, check material, support and instrument before ISO issue. I designed piping layout, key in 3D model and design support for this area, work with PDS 7.3 at CTCI's office in Taipei. I designed reactor area and after that leader area would be check and commented my design. I used to Smart Plant Review for review and clash check 3D model and modified direct my design. I had joined the 1st & the 2nd model review with client
Nov 2006 LONDER Project worked tracing line by hand at CIMAS
Oct 2006 Checked ISO drawings (MTO & QTO) and designed support for CAMAU Power Plant in Vietnam at CIMAS office. I operated Smart Plant Review for checking and designing
Mar 2006 - Sep 2006 LONDER Project (300.000 MTA - IPA project) at CTCI's in Taipei (Piping Job leader). Here in I was responsibility for the project: I could check equipment drawing, orientation nozzle, detail ISO according to P&ID, piping layout, check material, support and instrument before ISO issued by Plant Design Review 5.3 which was clash check. I checked all of ISO for CIMAS's engineers. I keyed in piping, equipment, fire fighting & U/G in 3D model and sometime I designed layout, I checked 3D model interferences, I could either update / revise directly 3D model or coordinated with civil, instrument, electrical. But sometime I should inform supervises of designing these areas. I designed for small line and utility line. I controlled 3D model progress, issued ISO according to project schedule, manpower (10 engineers) & man-hours (22000 hours) for the project. The project operated with PDMS 11.3 & Plant Design Review 6.2
Oct 2005 - Mar 2006 LONDER Project at CIMAS office (Piping Job leader) with the same duty.
Oct 2004 SAR II Project, I designed piping layout.
Feb 2005 - Aug 2005 OCT Project (250.000 MTA Propylene Plant) - at CTCI's in Taipei (Piping Job leader) ¡* I could check equipment drawing, orientation nozzle, detail ISO according to P&ID, piping layout, check material, support, instrument before ISO issue, I checked all of ISO for CIMAS's engineer. I keyed in piping, equipment, fire fighting in 3D model and created 2D arrangement, I checked 3D model interferences I could either update/revise directly 3D model or confirm with civil, etc., but sometime I need confirm super vise's design these areas. I design and key in for small line and utility line. I control 3D model progress, issue ISO follow project schedule, manpower (10 engineers) & man-hours (26000 man hours) for the project. The project operated by PDMS 11.5¡¨. I used Plant Design Review 6.2 for review design and clash check this project.
Jun 2004 - Feb 2005: OCT Project in CIMAS (Piping Job leader) I was responsibility the same TNK project
8th ~ 14th Jul 2004 Go to Taipei received OCT Project
Apr 2004 - Jul 2004 TNK Project (540.,000 BPSD - Tank Yard project) at CIMAS (Piping Job leader) ¡* I only keyed in piping 3D model who controlled 3D model progress according to project schedule, manpower (6 engineers) & man-hours (11000 man hours) for this project. The project operated by PDMS 11.5¡¨. After that I transferred from this project to OCT project with Job leader.
Mar 2004 CAD Engineer of PDS server for OLE 3 (olefin products), Aroma 3 (Aromatics products) ¡* I installed PDS 7.1 server and workstations, established these projects at server. I could update some error from database, customization and solve some troubles for server and workstations
Jan 2004 Revised AS BUILT arrangement by PDS 7.1 software for Normal Profin Plant project
Sep 2003 - Sep 2004 AF Project (50.000 MTA - Methyl Acrylic Fiber Plant) at CIMAS (Piping Job leader) ¡* I only keyed in 3D model who controlled 3D model progress according to project schedule, manpower (6 engineers) & man-hours (3600 man hours) for this project. The project operated with PDS 7.1¡¨
Aug 2003 - Sep 2003 CAD Engineer of PDS server for AF project with PDS7.1, PETRON refinery Project with PDS 7.1, power plant DAHTARN project with PDS 6.4. I installed PDS 7.1 & PDS 6.4 server and workstations, established these projects at server. I could update some error from database, customization and solve some troubles for server and workstations
May 2003 - Aug 2003 Created ISO drawing by AutoCAD for EBARA Project in Thang Long industry in Vietnam
Mar 2003 - May 2003: I learned how to drafted and designed Piping layout, I was be training on job in Taipei with Receiving Terminal Expansion Project after that I had transferred other project how to created above ground piping standard for MRC Acrylic Fiber Plant Project
Feb 2003 - Mar 2003: Created ISO drawings for CAPCO Project by AutoCAD and take off MTO for CPCK project
Dec 2002 - Feb 2003: Piping 3D modeling with PDS 7.1 for DungQuat No 2&3 Project in Vietnam after that It was be relay by Vietnam government.
Nov 2001 - Dec 2001: From 2D layout, I was drafted ISO drawing by CAD and taken off MTO by hand for Co-Tech Copper Foil Project
Jul 2001 - Sep 2001: Probation time in CIMAS

View contact information...
«« previous resume next resume »»
Search Results (Resumes 1701 to 1750 of 6999)Go to Search Parameters...
Brief Description
Piping Design Engineer, 4 yrs. exp
Geophysical Engineer
17 years experience as a Piping/Mechanical Draftsman/Designer in the Oil & Gas industries (Offshore and Onshore facilities). Proficient use of design software include AutoCAD 2008i, PDMS to model and generate 2D drafting and also MDS design software to design and model pipe support.
NACE certified Cathodic Protection Technologist # 8789
Senior Mechanical Engr. with a vast amount of process in engineering, operation, optimization of oil and gas production facilities (Well completions, artificial lift and gathering systems) Harnesses best-practice project management methodologies
Senior Geologist
13 years post qualification experience in FEED, detailed Engineering and Engineering Management for Chemicals/ Fertilizer, Petrochemicals(Ethylene, Poly Ethylene,Poly Propylene etc), Refinery, Oil and Gas industry (Onshore & Offshore, Upstream & Downstream) and detailed engineering in Pressure vesse
I am a Mechanical Engineer with 16 Years of experience as "Piping Engineer" in engineering of Offshore plants i.e Fixed platforms, FPSO, FPU and Onshore plants ex. Refineries, Petrochemicals, Polyester Plant etc. I am having vast experience of working with Leading International Clients.
Project Engineering
Senior Piping Designer with experience in piping design in Petrochemical and Refining Industries. Working knowledge of Bentley Rebis, PDS, Cadworx 3D, AutoCAD 2006, Flex CAD, Propipe, and MS Office
Fatigue Fracture FEA Vibrations Engineer
I am Instrument-Electrician technician specialist, I have 17 years of experience five years like supervisor in installation, calibration and operation of industrial instruments of measurement and control.
Experienced Piping Engineer onshore and refineries
Oil gas tankage [farm tank-speherical - double wall] fabrication/construction management. QAQC mangement - construction safety management
Associate myself with an organization, which has potential for both organizational and individual development and scope for learning and to enhance my skills team output and competent professional.
A Marine Maintenance engineer with International exposure and managerial experience. Last post as Technical superintendent at Tokyo, shipping related.
Corrosion Engineer with extensive knowlede in the area of materials selection for chemical and water processing industries.
Experience in O&M of gas turbine &steam turbine
15 years experience of planning, design and implementation of Networks, Telecommunications, Systems implementation and integration, with IT teams around world using my expertise and Multi-language skills: English, Russian, Portuguese, Spanish.
Over twenty years experience spent in the oil and petrochemical industry. Experienced in all aspects of electrical commissioning operations and maintenance. With design reviews and Vendor site visits through to fats. with the ability to liase with other disciplines on gas turbine and diesel generato
MAINTENNACE PLANNING / MAINTENANCE /PROJECT/CONSTRUCTION
Piping Designing / Mechanical Draughtsman including development of Layouts, Details, Isometrics, P&IDs etc. as per piping specifications for Onshore, Offshore, Refineries, Process Industries, Chemical, Power and Desalination Plant.
BE. Professional with 15 + Years of Sound Exposure in Project management, Engineering services, utility Operations, Erection, commissioning & Management
Mechanical and Marine Engineering. - Experience in Diesel Engines, Generators, Gas Turbines and Steam Turbines. - Experiences in Computerised Maintenance Management System (CMMS) and PMS - Electronic Maintenance Management System.
Geoscience Technician / Technical Writer
B.E mechanical engineer with 5 years experience & auto cadd piping engineer
4.5 years job experience in Reliance Industries Ltd ,RIL ,(INDIA) in LLDPE/HDPE plant. Presently doing MS in Natural Gas Engineering.
Piping engineer and designer
Expertise in reservoir modeling, gained experience in providing technical consultancy works to major oil and gas companies in the world including Aramco, KOC, ADNOC, BG and DPE. Expert user of RMS. Provided trainings to various clients around the globe.
Working in PM/MM-SAP implementation, Roll out and support projects. Having 5 years experince in Utilities/Power plant maintenance and Projects
Extensive experience on stationary equipments of oil, gas and petrochemical industries units, detail design and vendor document review.
Piping Designer, making Lay-put of piping general arrangement , isometrics and pipe support details,materials take-offs
PDMS Piping Designer
Piping Designer PDS administra
I have done 3 years apprenticeship in well-established organisation in Mumbai in naval dockyard
Sixteen years of experience in Design and Analysis of offshore and onshore structures. Varied Experience in design of structures from Fixed offshore platforms, FPSO, Refineries to concrete structures. Working experience in various multinational engineering firms and various working locations.
Chemical Engineer having 15 years of experience in Refinery. Skills possesed include in depth knowledge of process design using simulation software and knowledge of various international codes.
Design Engineer ( Static Equipment )
HND , ELECTRICAL/ ELECTRONICS ENGINEERING (Power and Machine Option)
I finish my contract in South Africa as Safety Advisor on “Polaris” Barge (Acergy) for his dry dock. I obtained my master's degree (Engineering and Chemical safety) in 2003. My career really started In 2005 in the off-shore, on the drillship “Pride Angola” where I sailed for 3 years.
I am an instrumentation and automation engineer with over 5 years experience in oil&gas, refinery and petrochemical fields, covering detail design and site installation/ precommissioning/ commissioning activities.
B-Tech in mech with 7.5 years of experience in plant design arena
Eletrical enginer for 8 yrs experince as chief enginer
Civil Structural Engineer
I have near eight years experience in field of piping design of refinery, oil and gas with position as piping lead engineer & assistant manager, furthermore I am fluent PDS, PDMS, Smart Plant Review, Plant Design Review, AutoCad, Microstation, Microsoft office, etc.
weldin inspection
Having a Diploma in Mech. Engg. with 18 years of Experience in Designer
Energetic and productive professional with broad-based experience in Maintenance Planning, Shutdown Planning and Project Management in Line with the Computerized Maintenance Management System.
I have total Twenty-one years hand on working experience in Electrical maint. and operation fields in various organization.
Control Electrical HV &LV equipment and Instrumentation Installation & Test, Cable wiring
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   [ 35 ]   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
CATEGORIES: Engineering/Technicians;
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com