Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #81019 next resume »»
CONTACT INFORMATION:
View contact information...

EDUCATION:
B. Eng, Elect. /Electronics Engineering
Enugu State University of Science and Tech. 2002

SUMMARY OF EXPERIENCE:
* Over 9 years working experience in the oil and gas industry
* Preparation of instrument specification and datasheet
* Instrument cable schedule and cable routing
* Instrument data sheets and material take-off (MTO)
* A productive team member, who approaches new challenges positively and with genuine enthusiasm
* Conversant with ISA, API, and companies project engineering specifications
* Instrument loop drawings and instrument installation details.
* Instrument index and instrument list.
* Instrument location layouts.
* Use of AutoCAD Software.

TECHNICAL SKILLS:
Software: Microsoft Office (Word, Excel, PowerPoint, CorelDraw)
AUTOCAD
MATLAB
Instrucalc

SPECIFIC EXPERIENCE:

Instrument Engineer, Cakasa (Nigeria) Company Limited Nov 2008 – Date

Project: DOMESTIC GAS SUPPLY PROJECT
Position: Senior Instrument Engineer
Client: Mobil Producing Nigeria Unlimited (MPN).
Job responsibilities include:
* Preparation of instructions, calculations, specifications, data sheets, drawings and other documents required to complete the final detailed design of all field instruments and control systems for the scope of work.
* Create MTO list for this scope of work.
* Create data sheets for all required field instrumentation.
* Update the SAFE CHARTS to reflect the new installation.
* Design and prepare installation drawings for fire and gas detection system in the analyzer shelter.
* Make provision for new Junction Box at the inlet Area and prepare JB termination drawing.
* Design real time monitoring of Pressure, Temperature, Flow rate and gas composition for transmission to the NLNG Plant Control Room (approximately 3 km distance).
* Provide means for the shutdown valve to receive additional shutdown signal from the NLNG plant CR.
* Verify existing, update (if applicable) or create new instrument location plans for scope of work.
* Written description of Construction Contractor's Instrumentation and Controls Scope of Work (for IFC package).

Project: OSO AS-BUILT PROJECT
Client: Mobil Producing Nigeria Unlimited (MPN).
Job responsibilities include: Field survey of the platforms (3-D laser scanning of entire platforms), platform walkthrough to capture non-dimensional details on the facilities, post-processing of the raw data, preparation of desired drawing deliverables (drafting and engineering), QAQC of deliverables and the delivery of final As-Built Deliverables which shall include datasheets and drawings at the minimum.

Instrument Engineer, Point Engineering Limited 2005 – October 2008

PROJECT EXECUTED:

Project: Swamp area gas gathering project for NLNG trains T4, T5 &T6 project. Detailed design
Client: Nigeria Agip Oil Company Limited (NAOC)
Job responsibilities include: The purpose of Swamp area gas gathering for N-NLG Trains T4/T5 project is to increase the sales gas export capacity by up to 500 MMSCFD. New processing equipment and vessels will be added to implement additional gas production. An extension of the existing integrated control system (DCS & ESD/PSD integrated system) shall be provided for the Swamp gas gathering development. This extension shall function in conjunction with the existing facilities.
* Site/facility visit activities
* Preparation of As-built
* Development of instrument & control philosophy
* Preparation of instrument data sheet
* Preparation of hook-ups/installation details
* Preparation of Modbus list
* Preparation of instrument/F&G/PAGA layouts
* Preparing junction box wiring diagram and cable schedule
* Preparation of instrument index I-O list
* Design of cable tray network
* Preparation of cables & coils list.
* Preparation of instrument loop diagrams
* Preparation of cause and effects charts.
* Preparation of RFQ/RDDS
* Preparation of technical/inspection data sheets
* Preparation of supply specification/material requisitions.

Project: Early oil development phase (SPDC) FEED and detailed design.
Client: SPDC
Job responsibilities include: The purpose of this project is to embark on the Early oil phase of the Santa Barbara further oil development project which basically entails the tie-back of 5 EOD wells to the existing facilities via a new manifold extension. This phase is projected to improve the facility uptime from an estimated value of 65% to above 85%. Based on the requirements of the project, SIF classification was done to determine safety integrity levels of instrument, HAZOP was also done as well as constructability review before the final IFC package was submitted.
The following were the tasks for the project after site visits.
* Preparation of logic flow diagram of the independent sequence logic
* Preparation of instrument hook-up drawings
* Preparation of instrumentation design report
* Preparation of loop/wiring drawings
* Preparation of F & G protection system drawings
* Preparation of control panel layout and wiring
* Preparation of instrument location and conduit plan
* Preparation of data sheets, loop diagrams and installation detail drawings
* Preparation of bill of materials
* Brief summary of report
* Construction scope of work
* Issue for comments/approval
* Comment implementation and "issue for construction"

Project: Alternative export of Ekulama 2 flow station production via GPHSL FEED and detailed design.
Client: SPDC
Job responsibilities include: The purpose of this project is to install and replace a number of pipelines relating to the project together with associated facilities. In 2004, management approved the derating of the NCTL from 69 Bar to 39 Bar (operating), a major trunk line exporting crude oil from a number flow stations connected to the NCTL (including Ekulama 2 Flow Station) to Bonny terminal. This derating was necessitated by unresolved integrity issues, thus prompting development of alternative routes to evacuate crude to Bonny terminal. The "Alternative export of Ekulama 2 flow station production via GPHSL" project is one of such developments to export crude from Ekulama 2 flow station to Bonny terminal. Based on the requirements of the project, SIF classification was done to determine safety integrity levels of instrument, HAZOP was also done as well as Constructability review before the final IFC package was submitted. The relevant DEP's, specifications and standards were used for the accomplishment of this project

Project: the Remote Field Manifold (RFM) installation SPDC.
Client: SPDC
Job responsibilities include: The Remote Field Manifold will be installed on a platform close to the inlet manifold of Nembe II flow station. The Remote Field Manifold (RFM) installation was necessitated by ullage constraints and in order to balance production across the district flow stations, three of the wells to be drilled, are to be produced to Nembe IV flow station. Of these three wells, 2 which are located in Nembe Central and require a river crossing to flow to Nembe IV will be routed via a Remote Field Manifold. However, the remote field manifold is to gather crude oil from two wells to be drilled as part of Phase 1 in Q1, 2007 and more wells to be drilled as part of the Phase 2 project. Phase 1 & 2 are to be executed back to back. The concept involves the installation of oil gathering manifolds at Nembe II flow station and laying short lengths of flowlines from the wellheads to the RFM.
The RFM will commingle production from wells of similar pressure regimes and evacuate the flow through bulk lines installed between the RFM and Nembe IV flowstation.Based on the requirements of the project, SIF classification was done to determine Safety Integrity Levels of instrument, HAZOP was also done as well as Constructability review before the final IFC package was submitted. The relevant DEP's, specifications and standards were used for the accomplishment of this project.

Project: UBIT 'B' Internal Slot Addition Project
Client: Mobil Producing Nigeria Unlimited (MPN).
Job responsibilities include: The overall purpose of the project is to increase production at Ubit B by the addition of a new internal slot to accommodate one more wellhead. The project involved instrumentation modifications for the additional wellhead.

Project: UBIT 'GH' field redevelopment project
Client: Mobil Producing Nigeria Unlimited (MPN).
Job responsibilities include: The primary scope of the project includes the following:
* Installation of a new 9-slot Wellhead control panel (WHCP-3) and 6-Slot Pressure pilots, extension of existing fusible loop to the new Wellheads and gas Lift manifolds area, tubing tray extensions /Tie-ins, instrument gas Header supply / tie-ins.
As Part of the Engineering design activities, a Site Survey was undertaken to identify the followings:
* The optimum location for a 9-Slot Wellhead Control Panel (WHCP-3) and Tie-ins.
* Project scope tubing tray extension /Tie-ins.
* Status of the existing ESD/fusible loop system.
* Confirmation of the fire detection system available on site.
* Location of possible Tie-ins for instrument gas.

Project: Addax Adanga complex engineering studies and detailed design project.
Client: Addax
Job responsibilities include: The purpose of these studies (de-bottlenecking and platform modification) is to provide data for company to use the existing ADPP and sister MOPU to handle the increase in production and gas compression interface.
The required engineering studies and detail design for:
* The removal of certain equipment and bulk material
* The refurbishment of certain facilities on ADPP
* The addition of certain facilities on ADPP.
* The transfer of control of ADPP to the TPU (Borgen Dolphin)
* The evaluation of the TPU for a classification change to a fixed structure and to evaluate the cathodic protection requirements for the Adanga Production Platform (ADPP).
* Adanga Complex SIMOPS & HAZOP.

Project: UNAM A Phase II and ASABO C Slot Addition Project
Client: Mobil Producing Nigeria Unlimited (MPN).
Job responsibilities include: The overall purpose of the project is to increase production at Unam A and Asabo C by the addition of a new slots to accommodate more wellheads. The project involved instrumentation modifications for the additional wellhead.

Project: Foster Wheeler: NLNG 7+ Project
Client: Foster Wheeler
Job responsibilities include: The project involves FEED studies for the proposed construction of Train 7 & 8 (expansion project) for the possibilities of tying-in into the existing trains facilities including the various sections of the plant, substations, field auxiliary rooms, electrical and instrument cable trenches, control rooms and telecoms buildings.

Instrument Engineer, SUDELETTRA NIGERIA LIMITED 2003 - 2005

PROJECT EXECUTED:

Project: QIT Fire Water Project
Client: Mobil Producing Nigeria Unlimited (MPN).
Job responsibilities include:
* Preparation of instrument data sheet
* Review of P&ID
* Preparing of SAFE CHARTS
* Preparation of instrument list

Project: Ebocha Plant revamping
Client: Nigeria Agip Oil Company Limited (NAOC)
Job responsibilities include:
* Preparation of instrument data sheet
* Preparation of P&ID
* Preparing Junction box wiring diagram and cable schedule
* Preparation of instrument list
* Design of cable tray network
* Preparation of RFQ
* Preparation of technical and inspection data sheets
* Equipment sizing and selection (control valves, shutdown valves, relief valves, orifices, ETC).

Maintenance Trainee, Anadrill Schlumberger Nigeria Limited 2000-2001

Responsibilities Include:
* Determination of service level on tools
* Servicing of IWOB carriers
* Servicing and calibration of resistively tools
* Tool scope check

Maintenance Trainee, Datamatics Nigeria Limited 1996-1997

Responsibilities Include:
* Repair and servicing of Copiers
* Sales and maintenance of office tools

REFEREES:
To be provided on request.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 1551 to 1600 of 7050)Go to Search Parameters...
Brief Description
Piping Designer with PDS, Rebis Autoplant, Plantspace, Microstation, AutoCad and ProCad experience.
E & I Technician
i am an fabrication enginner working with saudi aramco gas oil seperation project as a approved qa qc mechanical supervisor since june 2007
Automation, Instrument and Control Engineer Manager
I have B.S in Mechanical Engineering from Bushehr University in IRAN and I have more than 8 years of experience in Oil&Gas field and Power Plant companies, especially in piping division.
B.Sc.(Engineering) Metallurgy and Materials Science.
Certified Cost Engineer. Graduate Mechanical Engineer with over Eighteen Years experience in preparing Project Cost Proposals / Tendering including Estimation / Quantity Survey, Costing and all related activities. Completed Eleven Years in Gulf (Bahrain).
Fifteen years experience in the area of Seismic Data Processing including 2D and 3D land, transition zone, marine and OBC processing. Specialized areas including demultiple applications, imaging techniques, and Amplitude versus offset.
7-year offshore structural engineer with M.S degree
power system protection engineer with avery good experiance in protective relays testing control scheme troublshooting
Instrument Supervisor
Project Planner/Scheduler (Primavera P3 & MS Project Planning Software, MS Word / Excel). Vast experience in Steel Works Business - Planning, Fabrication / Erection (Storage Tanks & Steel Structures), Gas Plant / Pipelines. Completed Structural Engineering and 4 years in BS Mech'l Engineering.
Maintenance supervisor / Reliability specialist / Project Management
Broad base of experience within the Pulp/Paper, Pharmaceutical/Chemical and Bio-Technology industries involving design, engineering, construction, and commissioning. Management of projects (automation, instrumentation and electrical/instrumentation systems), quality, personnel and resources.
Developing & producing plot plans using PDMS 11.2 (CLS), pipe modelling (PDMS-PMS), Equipment modelling (PDMS-EMS), producing Piping Study & General Arrangement Drawings(PDMS-CAST), Producing Isometrics(Isodraft) & used Review Reality station for reviewing the plant model.
Certified ( Project Controls, AACE, #1366), published Engineer (BSPE and MBA) with over 15 years of direct field experience in Operations, budget design, Inventory control, Drilling Engineering, Oil Well Fire Control, Well design and Turnkey Bid estimates.
Education: Master in Chemistry Various certifications on Drilling Technology and Oil and Gas operations. Worked as Mud Engineer with MI Overseas. BakerHughes INREQ and IDF schlumberger in middle east. Worked as lab chemist with QGPC Qater, Mud Engineer with ADC Saudi Arabia ETC
Pr. Management-Estimating man hours, developing WBS CBS, Progress measurement techniques, monitoring by Primavera, project control, invoicing. Engineering-Prep. basic Instr data sheet, detailed ENGINEERING of DCS, FGS, SDS, control logic, SAFE. Commissioning -Elect system of process platforms
I am experienced in long & short range mine planning, scheduling, budgeting, design of safety procedures & standards, production & destress blasting, mine backfill, ventilation, ground control, geomechanics modeling & design of stable openings (using the bifurcation theory in mechanics).
Senior controls and Scada Systems Analyst
Mechanical Engineer Bsc. Hons. Project Engineer. Commissioning Engineer
Directional Driller with horizontal experience in shale and lime. Also have workover and completion experience,
Piping Stress Engineer
Registered civil engineer with Master’s degrees and 5 years of work experience primarily in structural design
Experience on process design of oil and gas industry units, engineering and tender documents preparation. Well familiar with process codes and standards and design requirements
Piping Engineer
Programming/maintenance of PLC/DCS controllers and SCADA systems. Maintenance of electrical/electronic and pneumatic/hydraulic instrument equipment. Maintenance of fire/gas detection systems (turbines, oil/gas production facilities). Excellent communication and management skills.
I am experienced in Air separation Units (Oxygen plants, Nitrogen plants, Argon plants) and Carbon dioxide plants. I am a plant manager and looking after all the activities involving in mafucturing and selling
I am Diploma Engineer in electrical and post diploma holder in Instrumentataion & control having 28 years experience in petro chemical, Heavy chemical , Oil & gas industries in a diffr\erent position in project, maintenance of instrumentation.
Instrumentation Automation Engineer 9+ Yrs Exp
Seeking very challengeable, risky and more responsible jobs to acquire a technical/management position where engineering experience and managerial skills will significantly contribute to product and process development
Control room operator, commissioning, precommissioning, plant start up, normal shut down, fire and gas, process, production, turbine.
Technical and sound Instrument engineer
15 years in the oil and gas industry including WesternGeco and Halliburton – Landmark Graphics Corporation. Areas of expertise include seismic data management, seismic and well data loading and conversion.
I am a Senior Instrumentation Technologist with 15+ years experience in the Instrumentation Engineering field; and I am well versed in project execution from FEED through to commission and start-up with a strong emphasis on efficiency and safety.
IT , Hysys,English language
Duties and Responsibilities:
Senior coatings/painting inspector
I am an Instrumentation and Control Engineer with a Doctorate Degree. I am experienced in designing and developing advanced controllers
Rotating equipment Engineer
QA/QC Inspection Engineer
Over Eight (8) years of total experience in Process Engineering which includes Basic Engineering, Detailed Engineering for Oil & Gas Offshore (fixed platform) & Onshore Processing Unit, Underground Gas Storage Facilities, Hydrogen Generation Unit, Naphtha Splitter Unit and Flow Assurance Study fo
Electrical commissioning technician / completions
I have spent 12 Years working as a DC Surveyor / Piping Designer in an onshore/offshore environment. Two of the main construction projects that I have been involved in was the BP Holstein and the Chevron Tahiti Spars. I have also spent a substantial amount of time working in petrochemical refineries
Considerable expertise in dealing with corrosion control of oil and gas installations, resulting from over twenty years of relevant experience in upstream, midstream and downstream activities in oil and gas industry.
Control System professional with 18 years experience and PMP and Six Sigma Green belt certified
Acting as QA/QC Manager/Cordinator (Welding, Inspection & NDT), with more 15 years of experience in the Middle East and European Union in the field of Oil & Gas and power piping projects. Experienced in work with multinational engineering companies (ALSTOM. TOTAL, KAVAERNOR¡K)
Experienced Instrumentation & Control system Engineer, interest in Projects, Proposals and Commissioning
Surface and Interfecial Sciences, Condensed Matter Physics, materials Sciences, UHV Techniques, Analytical Chemistry.
I have 12 years experience in drilling oil wells(development and exploration) and operation monitering. I have a bachelors degree in mechanical engineering.
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   [ 32 ]   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
CATEGORIES: Engineering/Technicians;
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com