CONTACT INFORMATION:
View contact information...
PROFESSIONAL EXPERIENCE
May '08 – Dec '08 ConocoPhillips, Sembawang Shipyard
Instrument Technician Bohai Bay FPSO Phase II
Scope of Works: Responsible for calibration, testing & commissioning of Instruments for Crude Oil Emulsion Centrifuge System, Co-ordination with vendors for the communication signals (Modbus & TCP/IP) between Unit Control Panel and the Process Control in Central Control Room.
Mar '05 – May '08 ABB Industry Pte Ltd, Singapore.
Application Engineer.
Projects: 350MW Thermal Power Plant, Uong Bi, Vietnam, Excitation System for Seraya Power Plant, Singapore, Multistory Commercial Building, Singapore & Changi Water Treatment Plant, Singapore.
-Design & Co-ordination for Input / Output List for Control System in Thermal Power Plant.
-Responsible for the coordination submission of shop drawings for Multistory Building.
-Commissioning of Process Control System involves 3MVA Transformers, 1800KW Motors and Variable Frequency Drives.
Aug '03 – Dec '04 Kumagai–Skanska-HCC-Itochu JV, Senior Electrical Engineer.
Delhi Metro Rail Project, India.
Scope of Works: Electrical & Mechanical Installation includes Electrical, Environmental Controls, Fire, Hydraulic & Building Management systems for Underground metro project for 4 stations including 4.2 km cut & cover tunnel works.
-Checking of drawings submitted by the sub contractors for the services against the tender drawing and contract specifications.
-Co-ordination of E&M services with respect to structural openings during construction.
-Co-ordination with various system wide contractors like Signal & Telecom, HT & Traction power, AFC gates, Lift & Escalator contractors for their service installation.
Dec '02 – Jul '03 Jurong Shipyard, Electrical & Instrumentation Inspector.
HALLI BURTON in FPSO Conversion Project.
Scope of Works: Responsible for quality checking and ITP inspections in accommodation blocks office main deck, operation deck Lower & Upper Platform in Jurong shipyard. Pre-commissioning checks & commissioning of Fire & Gas Instruments, Electrical Installations, Ventilation and AC units. Preparation of ITP and clearing of punch list.
Aug '02 – Oct '02 Equator Engineering Sdn Bhd, Electrical Engineer
350 MW Combined Cycle Power Plant, Penang, Malaysia.
Scope of Works: Testing & Commissioning of Analog & Digital Instruments like Pressure, Temperature, Flow & Level Transmitters
May '00 – May '02 AMEC Group Singapore Pte Ltd,
Electrical Construction Engineer.
North East Line MRT Project, Singapore.
Scope of Works: Electrical Installation includes Main LV Switchboards, Distribution Boards, Cables, Bus Bar, Lighting, Power and Lightning Protection.
-Responsible for Co-ordination with Civil contractors and other System wide Contractors for the requirement of power supplies to their equipments.
-Supervision & Control over the installation of works by Subcontractor.
-Progress monitoring using work packs, attending co-ordination meeting, liaise with Design department, attending clients meeting, and following up material deliveries.
Feb '00 – May '00 Montgomery Watson Asia, Electrical Technical Officer.
Kim Chuan Sewage Treatment Works Project, Singapore.
Scope of Works: Consulting service to the refurbishment and extension of the above project.
-Review contract documents & specifications.
-Review drawings by the Contractors.
-Attending Inspections and witness tests.
Dec '98 – Feb '00 HTE Engineering Pte Ltd, Project Engineer.
HDB Flatted Factory, Bukit Batok, Singapore.
Scope of Works: Installation of LV Switchboard, Distribution boards, Bus bar, Cables, Lighting, Power and Lightning Protection.
-Supervision & Control over the installation of works by subcontractor.
-Prepare Shop drawing from the contract drawings by considering the possible implementation and comply with design requirement.
-Liaise with consultant on any design discrepancies, with the suppliers for the catalogue and sample submission, with purchase department for the material requirements.
-Attend co-ordination meeting with main contractor and other domestic contractors.
Jun '98 – Oct '98 Babcock –Hitachi K. K, Assistant Commissioning Engineer.
2 x 600 MW Steam Turbine Power Project, Tuas, Singapore.
-Responsible for the Energisation of MCC's and Motorized Valves
-Responsible for the Sequence & Functional checks for the Motorized Valves.
Jul '97 – May '98 The General Electric Company (S) Pte Ltd, Project Engineer.
New Nanyang Polytechnic, Ang Mo Kio, Singapore.
Scope of Works: Installation of LV Switchboard, Distribution boards, Cables, Lighting, Power and Lightning Protection.
-Supervision & Control over the installation of works by subcontractor.
-Liaise with Consultants on design requirements.
-Co-ordination with Main Contractor & Sub- Contractor to ensure that works progress meet Master Project Schedule and project milestones.
-Led a team of supervisors, foreman & electricians to ensure the completion of critical activities.
-Sourced materials and liased with vendors on delivery requirements.
May '94 – Jan '97 Equator Engineering Sdn Bhd, Electrical Engineer.
Project: 4 x 150 MW Hydroelectric Power Project, Kota Bahru, Malaysia.
Client: GEC (M) Sdn Bhd Period: Mar '95 – Jan '97
Scope of Works: Erection of Generator, Transformers, Auxiliary Transformers, Isolated Phase Bus Bars, Generator Circuit Breakers, 6.6 KV Switchgears, LV Bus Ducting, Switchboards and Control panels, MV & LV Cabling and Termination and Earthing Installations.
-Supervision & Control over the installation of works by subcontractor.
-Led a team of direct supervisor and skilled worker to meet the critical deadlines.
-Liaise with clients regarding technical queries and design criteria.
-Maintaining the progress records using Computer Based Project Management System (CBPMS).
Project: 3 x 110 MW Gas Turbine Power Project, Johor, Malaysia.
Client: John Brown (M) Sdn Bhd. Period: May '94 – Mar '95
Scope of Works: Erection of 33 KV Auxiliary Equipments, Landing Gantries in Switchyards, and Installation of Switchboards, Charger Panel, and Control Panels. Installation of Power, Control and Instrumentation Cables, Lighting and Small Power in Control Building
-Supervision & Control over the installation of works by subcontractor.
-Prepared weekly schedules, prepared daily and weekly progress reports.
-Submit claims for variations works.
Aug '92 – Dec '93 Meeco Graphics, Service Engineer.
10/1, Queen's Road, Bangalore, India.
-Troubleshooting of photocopier PCB Boards.
EDUCATIONAL QUALIFICATIONS
Bachelor of Engineering (Electrical & Electronics Engineering)
University of Madras, INDIA. Year of Graduation: 1992
TECHNICAL QUALIFICATION
Post Graduate Diploma in Microprocessor & Computer Hardware (PGDMH)
National Center for Computing Techniques, Bangalore, INDIA.
COMPUTER SKILLS AutoCAD, MS Office & Microsoft Project
PERSONAL PARTICULARS
Date of Birth 18th April 1970
Nationality Singapore Citizen
Sex Male
Marital Status Married
Driving License 2A/3
Language Spoken English, Tamil & Malay
Language Written English & Tamil
View contact information... |