Concurrent Loading & Cooling Project (Client:Woodside Energy Ltd)
1)Involved in Distributed Control System & IPS modification works.
2)Performed CO2 analyser package review.
Oct08–Dec08
LNG Train 5 Project (Client:Woodside Energy Ltd)
1)Involved in as-built documents close out.
Aug07–Oct08
RCU Revamp Project (BP Refinery Kwinana)
1)In charge of package Instrumentation review & incorporation.
2)In charge of Emergency Shutdown System replacement, modifications, bid evaluation & Factory Acceptance Test
3)In charge of Analyser systems relocation, replacement & bid evaluation.
4)Prepared field instruments engineering datasheets.
5)Performed field instruments sizing, selection, bid evaluation & inspection.
6)Involved in instrument & electrical design drawings review & generation.
7)Construction & commissioning support.
8)Involved in Distributed Control System modification works.
9)Prepared pre-TAR, TAR & Commissioning Work Instructions.

TECHNIP OCEANIA PTY LTD (PERTH)
Position: Senior Instrument Engineer/INtools System Administrator
July06–July07
Kupe Offshore Platform & Onshore Gas Plant Development Project (Client:Origin Energy Pty Ltd)
1)Performed IS Fieldbus engineering & design implementation.
2)In charge of package Instrumentation review & data incorporation.
3)Prepared Process Control, F&G and Safety Systems IO list.
4)Involved in project numbering procedures review & implementation.
5)Prepared engineering datasheets for field & analytical instruments.
6)In charge of Process Design Data Exchange
7)Involved in instrument & electrical design drawings review & generation.
8)In charge of INtools & Oracle database administration & software application support.
9)Performed remote connectivity set-up for work-sharing with Technip Malaysia.
10)In charge of MARIAN software application support & data exchange.
11)In charge of project templates & reports customisation.
12)Performed quality check & review on all instrument deliverables generated from INtools software.

INTERGRAPH PROCESS POWER & OFFSHORE SDN BHD MALAYSIA
Feb05–Jun06
Position: Consultant
As a Consultant for SmartPlant Instrumentation, Electrical & P&ID engineering systems in the South East Asia region.
1)Provide technical consultancies, training & system implementation for Oil & Gas & Petrochemical companies.
2)Provide project consultancy services for the Oil & Gas & Petrochemical companies.
3)Preparation of man-hour & price estimates for plant data conversion projects.
4)Preparation of execution plan for plant data conversion project.
5)In charge of Petronas Penapisan Melaka plant data conversion project.

TECHNIP MALAYSIA SDN BHD MALAYSIA
Duration: Feb91–Jan05
Positions: Senior Instrument & Lead Control System Engineer/INtools System Administrator/Expert Engineer
Mar01-Jan05
1)Developed INtools General Working & Coordination Procedure for Technip Malaysia.
2)In charge of software installation, database set up, training & administration support for offices in the Asia Pacific region.
3)As an Expert Engineer reporting to Engineering Vice President in the company.
May04-Dec04
BR-E CO2 Removal Facility Project (Client:Talisman Malaysia)
1)Involved in project numbering procedures review & implementation.
2)In charge of package Instrumentation review & data incorporation.
3)Prepared engineering datasheets for field & analytical instruments.
4)Prepared Control, F&G & Safety Systems IO list.
5)In charge of typical loops preparation for Control, F&G & Safety Systems.
6)Involved in instrument design drawings review & generation.
7)In charge of INtools & Oracle database administration & software application support.
8)In charge of project templates & reports customisation.
9)Performed quality check & review on all instrument deliverables generated from INtools software.
10)Prepared project Bill of Material.
Mar04-Jan05
Otway Onshore Gas Plant & Offshore Facilities Project (Client:Woodside Energy Ltd)
1)Involved in package Instrumentation review & data incorporation.
2)Prepared engineering datasheets for field & analytical instruments.
3)In charge of FISCO design implementation.
4)In charge of System IO list preparation & performed data exchange with Honeywell Australia.
5)In charge of Honeywell's typical loops review & clarifications.
6)Involved in instrument design drawings review & generation.
7)Performed in-line instrument dimensional data exchange with PDS system.
8)In charge of INtools & Oracle database administration & software application support.
9)Performed remote connectivity set-up for work-sharing with Technip Oceania PL & view access by Woodside Energy Limited (Perth, Western Australia).
10)Reviewed & raised clarifications on WEL's INtools Implemetation Guide.
11)In charge of project templates & reports customisation.
12)Performed quality check & review on all instrument deliverables generated from INtools software.
Jun03-Oct04
EPC1A East Area Project (Client:ExxonMobil Producing Nigeria Unlimited)
1)Involved in package Instrumentation review & data incorporation.
2)Prepared engineering datasheets for field & analytical instruments.
3)In charge of System I/O list preparation & performed data exchange with Emerson Calgary.
4)In charge of Process Control, F&G & safety systems typical loops generation.
5)Involved in instrument design drawings review & generation.
6)In charge of INtools & Oracle database administration & software application support.
7)Performed remote connectivity set-up for work-sharing with Emerson (Calgary, Canada) & Samsung Heavy Industries (South Korea).
8)Developed Work-sharing Coordination Procedure.
9)Reviewed & raised clarifications on MPN's INtools Implementation Guide.
10)In charge of project templates & reports customisation.
11)Prepared project Bill of Material.
12)Performed quality check & review on all instrument deliverables generated from INtools software.
13)Reviewed & raised clarifications on Emerson's change order claims.
Jun03-Nov03
Basic Engineering & Services for Maharajalela Compression (Client:TotalFinaElf E&P Borneo B.V.)
1)Involved in package Instrumentation review & data incorporation.
2)Prepared engineering datasheets for field & analytical instruments.
3)In charge of Process Control, F&G & safety systems I/O list generation.
4)Involved in instrument design drawings review & generation.
5)In charge of INtools & Oracle database administration & software application support.
6)In charge of project templates & reports customisation.
7)Prepared project Bill of Material.
8)Performed quality check & review on all instrument deliverables generated from INtools software.
Mar02–Sep04
Syngas Plant Project (Client: BASF Nanjing China)
1)Installed INtools, Oracle client & Oracle database server management software.
2)Performed Oracle & INtools database setup.
3)In charge of INtools & Oracle software & database administration support.
4)In charge of project templates & reports customisation.
5)Developed instrument specification sheets.
Oct02–Dec04
CSPC Nanhai Petrochemical Complex Project (Client:CNOOC-Shell Petrochemical Co. Ltd China)
1)Involved in package Instrumentation review & data incorporation.
2)Prepared engineering datasheets for field & analytical instruments.
3)In charge of non-IS Fieldbus design implementation.
4)In charge of loop generation for Process Control, F&G & safety systems.
5)In charge of cable drum schedule & drumming optimization.
6)Involved in instrument design drawings review & generation.
7)Prepared project Bill of Material.
8)In charge of INtools & Oracle database administration & software application support.
9)Performed remote connectivity set-up for work-sharing with CSPC's Plant Automation Group (Reading, UK).
10)In charge of project templates & reports customisation.
11)Performed quality check & review on all instrument deliverables generated from INtools software.
Jun02–Mar03
Polyolefins Front-end Loading Project (Client:Shanghai Ethylene Cracker Complex–BP/SECCO China)
1)Prepared engineering datasheets for field & analytical instruments.
2)In charge of non-IS Fieldbus design implementation.
3)In charge of typical loops generation for Process Control, F&G, Safety & Intelligent Motor Control Systems.
4)Involved in instrument design drawings review & generation.
5)Prepared project Bill of Material.
6)In charge of INtools & Oracle database administration & software application support.
7)In charge of project templates & reports customisation.
8)Performed quality check & review on all instrument deliverables generated from INtools software.
Feb02-Apr03
Egret Phase 1 Gas Development Project (Client:Brunei Shell Petroleum)
1)Involved in package Instrumentation review & data incorporation.
2)Prepared engineering datasheets for field & analytical instruments.
3)Involved in Process Control, F&G & safety systems I/O list generation.
4)In charge of non-IS Fieldbus design implementation.
5)Involved in instrument design drawings review & generation.
6)In charge of loop generation for Process Control, F&G & safety systems.
7)In charge of INtools & Oracle database administration & software application support.
8)Customised templates & reports for the project.
9)Prepared project Bill of Material.
10)Performed quality check & review on all instrument deliverables generated from INtools software.
Aug01-May03
PIC & Infrastructure Project (Client:Bayer China)
1)In charge of INtools & Oracle software & database administration support.
2)Performed profibus design implementation.
3)Prepared instrument specification sheets.
Feb2000-Mar2001
Cakerawala Gas Field Development Project (Client:Carigali Triton Operating Company Sdn Bhd Malaysia)
1)Performed engineering design of offshore plant SCADA, control & safety systems.
2)As INtools System Administrator with the following responsibilities:
-Customised project templates & reports.
-Performed quality review/check on all instrument deliverables generated from INtools software.
-Installed software & conducted user training for Samsung Heavy Industries (South Korea).
3)Developed control & safety system graphics & function descriptions.
4)Involved in Package Instrumentation review & data incorporation.
Jan2000-Feb2000
Titan Polyethylene 100 KTA HDPE Plant Project (Client:Titan Polyethylene Sdn Bhd Malaysia)
1)Performed factory acceptance tests on Yokogawa's Distributed Control System & Emergency Shutdown System.
Nov98-Jan2000
Kertih Poly Vinyl Chloride Plant Project (Client:Poly Vinyl Chloride Sdn Bhd Malaysia)
1)In charge of engineering design, selection, testing, installation & commissioning of Yokogawa's Distributed Control System, High Integrity Safety System & Fire & Gas System.
Dec97–Nov98
Champion 7 Offshore Complex Data Acquisition System Replacement Project (Client:Brunei Shell Petroleum)
1)Performed detailed design of Compression A platform.
2)Performed detailed design of the following for Compression B platform:
3)Developed Shutdown & Installation Strategies specification.
4)Developed instrumentation demolition & installation work scopes.
5)Developed work scopes for hot works.
6)Reviewed Basis of Design Document for Turbine/Compressor Control & Safety system (Triconex TMR PLC).
7)Reviewed Factory Acceptance Test Procedures for Turbine/Compressor Control & Safety Systems (Triconex TMR PLC).
8)Developed input/output database & functional loop diagrams for complex DCS (Foxboro IA system), IPS (Triconex TMR PLC), F&G System (Triconex TMR PLC) & Compression A platform Turbine/Compressor Control & Safety Systems (Triconex TMR PLC).
9)Developed database for instrument hook-ups, requisitions & commissioning.
10)Performed vendor data incorporation for DCS, IPS, F&G System & Turbine/Compressor Control & Safety Systems.
11)Reviewed F&G detection philosophy & detectors layout.
12)Revised F&G Cause & Effect matrices.
13)Performed site visit & as-built drawings retrieval.
Dec97–Feb98
Engineering Consultancy Services for the Installation of Automotive Diesel Additive Injection Facilities at Petronas Tank Truck Loading Rack (Client:Petronas Refinery Sdn Bhd Malaysia)
1)Reviewed & approved piping as-built, tie-ins & removal drawings.
2)Reviewed & approved piping scope of work document.
3)Reviewed & approved instrumentation tie-ins & removal document.
4)Prepared, reviewed & approved instrumentation scope of work document.
5)Reviewed & approved overall construction cost estimate.
6)Prepared & approved overall construction schedule.
Aug97-Nov97
Condensate Refinery Front-end Engineering Design Project (Client:PT Bhakti Mingasutama & Total Indonesia)
1)Developed Tank Gauging System & Motor Operated Valves Control System specifications.
2)Developed Instrumentation for Package Equipment & General Plant Instrumentation specifications.
3)Established local vendor contacts for the supply of field instrumentation.
May97–Sep97
Phase 2 PM3 Development Bunga Kekwa-C Central Processing & Export Facilities Project (Client: International Petroleum Company Malaysia)
1)Performed conceptual design of Fire & Gas System, Shutdown System, General Platform Alarm & Public Address (GPA/PA) System.
2)Performed sizing & selection of Control Valves & Flow instruments.
3)Prepared enquiry document for Distributed Control & Safety System, General Platform Alarm/Public Address System, Telecommunication System & Analyser Systems (Chlorine & Oxygen).
4)Performed technical bid evaluation & clarification of Distributed Control System & Safety system.
Mar97–May97
Maharajalela Jamalulalam Basic Engineering Studies (Client:Elf Petroleum B.V. Brunei)
1)Developed Instrument database for instrument index & system I/O schedules generation.
2)Performed basic engineering studies on Gas Chromatograph, Gas Metering System, Reid Vapour Pressure Analyser, Emergency Shutdown System, Emergency Shutdown Valves, Safety Relief Valves & Actuated Ball Valves.
3)Performed Onshore Gas Processing Plant power consumption studies & instrument cost estimates.
Feb96–Mar97
Merak Works Expansion Polyethylene Plant Project (Client:PT Petrokimia Nusantara Interindo-BP Indonesia)
1)Developed specifications, requisitions & performed bid evaluation, bid clarification & vendor data incorporation for Safety Relief Valves, Tuning Fork Level Instrument, Nuclear Level Instrument, Venturies (classical), Weighing System, Truck Weighing System, Electromagnetic Flow Meters, Orifice Plates, Restriction Orifices, Instrument cabinets, Ultrasonic Flow Meters, Electronic Field Transmitters, Rupture Discs, Mass Flow Meters for Particles & Control Valves.
2)Performed Package Instrumentation & Engineering Flow Diagrams review.
3)Conducted factory inspection on cable ladders, cable trays & truck weighing system in Indonesia.
Mar96–Apr96
Kuala Lumpur International Airport Project (Client:KL Aviation Fuelling System Sdn Bhd Malaysia)
1)Performed detailed design on Package Equipment Instrumentation, Safety Relief Valves & Fire Alarm & Detection System.
2)Prepared Motor Operated Valve Control System cost comparison studies.
3)Prepared Project Design Basis & performed bid clarification review.
Jun1995-Jan1996
Yadana Offshore Gas Facilities Project – Myanmar (Client:Total France)
1)Seconded to Paris head office to carry out basic engineering design of Distributed Control System, Fire & Gas System & Emergency Shutdown System.
Mar95–Jun95
Kuantan No. 1 PTA Unit–Outside & Inside Battery Limits Project (Client:Amoco Chemical Sdn Bhd Malaysia)
1)Performed factory acceptance tests on Honeywell's Distributed Control System & Programmable Logic Control System.
Aug93–Feb95
Project Management Consultancy Services for Petronas Lube Blending Plant (Client:Petronas Penapisan Melaka Sdn Bhd Malaysia)
1)Performed technical bid evaluation & vendor data review of Field Instrumentation, Automatic Tank Gauging System, Additive Injection Package, Automatic Tank Truck Loading & Metering System, Weight Control System & Air Compressor Package.
2)Performed technical bid evaluation, vendor data review & factory acceptance tests of Fire & Gas System & Water Treatment Package Control System.
3)Conducted factory inspection on actuated ball valves in Singapore.
4)Supervised site installation, pre-commissioned & commissioned Field Instruments, Automation Control Systems & Skid Package Instrumentation.
Aug94-Sep94
Klang Valley Distribution Terminal Project (Client:Petronas/Shell Sdn Bhd Malaysia)
1)Developed the following specifications for the project: Automatic Truck Loading System, Tank Gauging System, Flow Metering System, Motor Operated Valves, Control System & General Instrumentation Job specification.
Dec92–Jun94
Revision of Project Specification & Detailed Design of Bintulu Condensate Stabilisation Plant & MLNG-2 Feed Gas Inlet Facilities (Client:Sarawak Shell Berhad Malaysia)
1)Developed instrument database for Instrument Index, DCS Input/Output list, ESD System Input/Output schedule, F&G System Input/Output list generation.
2)Prepared F&G philosophy, Cause & Effect matrices, logic diagrams, layouts & detectors specification.
3)Prepared ESD System specification & logic diagrams.
4)Prepared Flare Flow Metering & Reid Vapour Analyser (RVP) specifications.
5)Performed sizing & selection of control valves & flow instruments.
6)Prepared field instrument specifications & engineering data sheets.
Apr94-May94
Fuel Gas Pipeline & Metering Facilities Project (Client: Petronas Gas Sdn Bhd Malaysia)
1)Developed Quality Assurance Plan & Project Co-ordination manual for the project.
Nov93
M1DR-A Platform Pneumatic Interlock System Review (Client:Sarawak Shell Berhad Malaysia)
1)Reviewed & performed modifications on the existing pneumatic interlock system & shutdown requirements for M1 DR-A platform.
Jul91-Nov93
Detailed Design of IDD EL Shargi North Dome (Client:Qatar General Petroleum Corporation)
1)Developed instrument database for the generation of Instrument Index, Distributed Control System (DCS) Input/Output list, Emergency Shutdown (ESD) System Input/Output list, Fire & Gas (F&G) System Input/Output list, DCS Configuration list, ESD System Configuration list & Instrument Cable schedule.
2)Prepared field instrument engineering datasheets & instrument air consumption estimates.
3)Performed sizing & selection of control valves & flow instruments.
Feb93
Debottlenecking of E-11 & F-23 Platforms Conceptual Design (Client:Sarawak Shell Berhad Malaysia)
1)Prepared electronic field instrument specifications.
2)Performed sizing, selection & requisition of control valves & flow instruments.
Mar91-Dec91
Bayan Gas Gathering Project (Client:Sarawak Shell Berhad Malaysia)
1)Developed instrument database for the generation of Instrument Index, Fire & Gas Input/Output list & Fire & Gas Alarm schedule.
2)Prepared field instrument engineering datasheets & instrument air consumption estimates.
Jun91
Baram Delta Field BAK-B1 Project (Client:Petronas Carigali–Kawasaki Heavy Industries Ltd)
1)Developed instrument database for the generation of Instrument Index, Fire & Gas Input/Output list & Instrument Cable schedule.
2)Prepared Instrument Control Loop diagrams.
Jun91-Jul91
PTG-02 & PTG-03 Project (Client:Esso Petroleum Malaysia Incorporated)
1)Developed instrument database for Instrument Index generation.

Registration:
1)Chartered Engineer (Engineering Council UK)
2)Member of Institution of Engineering & Technology UK

View contact information...
«« previous resume next resume »»
Search Results (Resumes 51 to 100 of 7039)Go to Search Parameters...
Brief Description
Degreed electrical engineer with many years of experience in instrument engineering for oil production and refining, government facilities, water and wastewater facilities and nuclear sites.
CORROSION SPECIALIST & CHEMISTRY LECTURER
Operations engineer for oil and gas, shallow wells: drilling and workovers, projects evaluations.
Summary21years practical working experience in engineering design including in offshore and onshore and oil project.I worked at refrigerator, trawler,tanker,scientific and container ships.My professional experience has given me an in-depth knowledge of the El.Engineering in Marine/Petroleum branch
Oil Gas and Chemicals
Pipe Stress Analysis planning and detail studies, static analysis of piping systems, including: refractory pipe, jacketed pipe, High / Medium Temperature and Cryogenic piping connected to pumps, compressors, turbines, fire heaters, storage tanks & pressure vessels; underground pipeline.
Highly Experienced Crane and Lifting Engineer
Controls Engineer
Licensed Professional Engineer, performance oriented, with 25 years of extensive broad-based experience in multidisciplinary projects in Instrumentation and Control Systems Engineering for Chemical and Oil & Gas Industries. Supervision of complex detailed Engineering, Procurement and Construction
Over 35 years of diversified experience as an instrumentation and control system /electrical power distribution engineer for petrochemical plants, refineries, synthetic rubber, carbon black plant and oil and gas fired power plants. Provided engineering expertise in the areas of project admin.
Free! I have over 35 years experience as an Instrument and Electrical Engineer in the Refining and Petrochemical Industries. I graduated in 1973 from the University of Louisville with a Master of Engineering with Specialization in Chemical Engineering degree.
Senior Cost Estimator with 20 years of progressive hands-on experience in petrochemical, oil and gas, and consulting engineering industries. Experienced in IPM Aspen Tech; Q-Estimate, Aspen Tech Kbase - ICARUS-2000, Exxon Estimating System, LULO Software - Venezuelan Commercial Cost Software, and SI
I am communicative, hard working. I easily integrate in new working and social environments as I have excellent communication skills and I am very open minded and flexible, I am responsible, ambitious and a real team player. I totally agreed and follow the HSE policy.
20 years experience with over 15 years of experience in design, engineering, and project management in the petroleum, and petrochemical industry. Successfully worked in different roles in oil industry in his 20 yrs career – engineering, project, and operation.
Professional Mechanical Engineer, Gas Pipeline Engineer, Metering Station Engineer, Project planning and Control Engineer, Project Engineer, Drilling Engineer, Project Manager
Principal Structural/Project Engineer with 16 years exp. in Oil & Gas Structures and Heavy Civils/Bridges. Worked in America, UK/Europe and Africa. Very diligent and precise but practical in appraoch. With a MSc in Engineering and PhD in Business providing excellent management and leadership skills.
Well site geologist or geologist operation
I have 20+ years of experience finding hydrocarbons in basins across the world; mainly through acquiring, processing and interpreting 2D and 3D seismic data and working together with geologists, engineers and landmen to put together economic drillable leads.
I wish to apply for the Full time post of Geologist, presently I am working as a Assistant Professor in Geology department of Poona College of Art’s, Science and Commerce, Camp, Pune ,Maharashtra affiliated to University of Pune, past 21 years at graduate level. During teaching Structu
I am 29 years experienced in HSE arena. It is Included in Oil and Gas, Petrochemical, Lamp Manufacturing and Gas Turbine Repair Shops.
Mechanical engineer with experience of the complete construction process of petrochemical plant from basic design to testing, commissioning, start up and final hand over. Having also a detailed knowledge and sound experience in the maintenance of petrochemical plants.
20 years experience in major integrated national oil company of India. Experience in production operations, process development, enhnaced oil recovery projects and research work related various operations of the company.
Instrument and Controls Engineer
Over 18 years total experience in design engineering, process systems, field engineering, project engineering. This includes design and specifications, chemical process analysis for Process Technology units, strong skilled in water treatment process. Proficient in the use of: AutoCAD, Microsoft Wind
Metallurgical Engineer, Metallurgsit
Economic and Reserve analysis, acquisitions, reservoir engineering in California heavy oil and Appalachian Basin natural gas
Process Engineer with 20 years of experience in EPC and operating companies
PROJECT ELECTRICAL ENGINEER
Structural Engineer • PROFILE • Demonstrated design experience in structural steel and concrete - Energy/Power and Oil/Gas industry. • Diverse heavy construction experience in buildings, pre-casting, bridges, highways, dams, estimation and bidding for construction projects. EDUCATION MS. Structur
Sr. Project Engineer/ Project Manager
3 years working in PAE as Main Drllg. Eng. in charge of vertical & horizontal wells (oil & gas). 9 years w/Total (Argentina) as Drllg. Sup. onshore & 2 years as Coman Senior offshore ( jack up).Several positions f/Drllg trainee to Drllg Manager in Drllg Contractors Companies.
More than 10 years of experience coordinating structural projects and technology development acquired during the Master and Doctor Courses in Civil Engineering and working as engineer in construction, aerospace, offshore/onshore and subsea industries.
Petroleum engineer with over 23 years of oil and gas industry experience, including over 14 years of drilling fluids engineering in Romania, Middle East (offshore and onshore), Canada offshore (Terra Nova project) and onshore (Western Canada), Alaska, India and 9 years with Romanian drilling
Experienced oil & gas geoscientist in exploration, production and business development
I am a seasoned, experienced geophysicist/geoscientist & explorationist, and am updated with the latest technology, with in-depth experience in geophysics, as well as geology. I seek a suitable position in oil & gas G & G.
Free Lancer Nace Certified Coating Inspector, SSPC Certified Protective Coating Inspector, AWS Certified Welding Inspector, ACA Certified Corrosion Technologist 24 years of exp. in Coating field. Third party experience in Petro Chemical Industry for last 12 years
Instrumentation and electrical , DCS , PLC
HYSYS/PROII/NGL/LPG/LNG/SYN GAS - CONCEPTUAL, FEED AND DETAIL - REFINERY, NATURAL GAS, CRYOGENIC PROCESS, SOUR GAS REMOVAL, ADVANCED PROCESS CONTROL (APC), GASFICATION (BtL, CtL and GtL). DISTILLATION AND REACTOR. HYSYS/PROII/ Distillation/Separation Sequence/Pinch Analysis.
22 years experience in maintenance , compressor , generator , pump , drilling equipment , machine shop service , manufacture , inspection service , production , wire line , fishing tools , welding work , commissioning.
Condition Monitoring, Reliability Engineer
Pipeline, Piping & Mechanical Equipement design and construction support
Worked in exploration, production and academia
Pressure vessel design engineer, Proficient with: SolidWorks, Inventor, Pro/E, AutoCAD, Algor, ANSYS, COSMOS, Matlab, Compress Codeware, Intuitive ERP; Proficient with ASME Code VIII, Div. 1 & ASME Code VIII Div. 2, B31.3; kill at using the knowledge in WRC107 & WRC279
Highly skills reservoir engineer with 18 years E&P experience and a Masters in Petroleum engineering Degree. Experience includes reservoir simulation, water flood design and management, EOR techniques, Heavy oil development, reserves evaluation, well test design and analysis & reservoir management
19 years experience in the Oil Industry with both service company & operators in UK, Oman, Australia, Brunei, Saudi, and Malaysia. Experience in Field Development Geology and geocellular modeling.
Position: Senior Instrument Engineer / Qualification: Master of Science (Electronics) - Queen’s University of Belfast
Professional Engineer with 19+ years of experience in engineering and project management, including design, sizing, and specification writing of various static and rotating equipments.
A seasoned completion/well intervention/well test professional with 18 years of experience with expertise in sand control, intelli.
the position of Chemist and subsequently to put my contribution for the growth and development of the company by utilizing my best efficiency and skills and to achieve my further career advancement opportunity.
Experienced Principal/Senior Control Systems Engineer who can contribute significantly to your company.
First   1   [ 2 ]   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
CATEGORIES: Engineering/Technicians;
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com