Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #83829 next resume »»
CONTACT INFORMATION:
View contact information...

QUALIFICATION:
Bachelor of Mechanical Engineering, 1991,
1st Class, D.Y.Patil College of Engineering
& Technology, Shivaji University, Kolhapur

TOTAL YEARS OF EXPERIENCE: 17+ Years

SUMMARY OF EXPERIENCE:

Lead Mechanical Engineer in PMC engineering team for Ma'aden Phosphate Project having more than 17 years of working experience in preparation of Specification/ Material Requisition/ Proposal/ Scope of Work; Preparation & Review of Design Basis and calculations, Technical & Cost Evaluation; Vendor Drawing Review, Interfacing coordination with Client / EPC Contractor / Vendor; Establishes work plan, Review project status for various Static, Rotating and Material Handling Equipment and Mechanical Packages in LNG, Petrochemical, Refinery/ Fertilizer /Chemical Plants in PMC consulting, EPC, Oil & Gas Companies. Have varied experience and worked in all phases of projects from conceptual, FEED and detailed design engineering.

INTERNATIONAL ASSIGNMENTS:
* WorleyParsons, Al-Khobar, Saudi Arabia from Sep-06 till present as PMC Lead Mechanical Engineer on Ma'aden Phosphate Project.
* Technip, Abu Dhabi UAE from Feb-05 to Sep-06 as Senior Static Equipment Design engineer on various projects listed below in detail.
* Bechtel, Houston USA from 1-March-04 to 26-May-04 and from 12-July to 28-Sep-04 for Marathon LNG project.
* UOP Des Plaines, USA from Dec-01 to June-02 for on the job training for design of Vessels and columns for Schedule A projects.
* Daelim Engineering, Seoul, South Korea from Aug-97 to Feb-98 for HDPE and PP plant for Haldia Petrochemicals projects.

CODES FAMILIARITY:
ASME, ASTM, ANSI, AWS, BS, TEMA, API, NFPA, ISO

COMPUTER ABILITY:
Having varied experience of design software Programs like Compress, PV-elite, Caesar II and B-Jac. Worked on various EDMS like Smart Plant Foundation, Info-Works, and Lotus Notes.

WORKING EXPERIENCE:

1. September 2006 - Till date: Worley Parsons, Al-Khobar, KSA

I have Joined WorleyParsons as Lead Mechanical Engineer in September 2006 and working for PMC engineering team for Ma'aden Phosphate Project in various phases of the project.

Projects handled:

A) MA'ADEN Phosphate Project from Sep-2006 till present: Lead Mechanical Engineer in PMC engineering team of the project. The Phosphate Chemical Complex is being developed by a Ma'aden subsidiary - the Ma'aden Phosphate Company (MPC) and consists of four Chemical Plants including a Phosphoric Acid Plant, a Sulfuric Acid Plant, Ammonia Plant, a Diamonium Phosphate Plant, and associated infrastructure facilities. The Phosphate Complex will be supplied with phosphate concentrate shipped by rail from a MPC Phosphate ore beneficiation plant situated at Al Jalamid approximately 1,400km North West of the complex location.

Responsibilities include preparation of Ma'aden Mechanical specifications and ISBL conceptual design, data sheets, Requisitions, TBE, and cost estimation during FEED phase of the contract. During FEED phase, technically reviewed EPC contractor's open book estimates and provided input to EPC contract scope of work. After award of EPC contracts, during detailed engineering phase responsible for review of EPC's standards, specifications, datasheets, requisitions, vendor proposals, TBE and vendor detail drawings providing PMC review comments. Also reviewing and responding to EPC contractors technical queries on behalf on client. Responsible for finalizing railway loop layout for Acid loading and phosphate unloading at Ras Az Zawr site, also coordinating and meeting with Saudi Railway Authority in Riyadh for design issues related with Acid loading and phosphate unloading facilities. Participate in 3-D model review prepared by EPC contractors. Responsible for attending and providing PMC inputs in technical matters related with Pressure Vessels, Heat Exchangers, Waste Heat Boilers, Process Columns, Storage Tanks, material handling equipment etc.

WP is also responsible for detailed design of ISBL facilities which includes Sea Water Supply System, Natural Gas System, Gypsum Mobile Conveyors and Radial Stackers and various other package equipments. I am responsible for detailed design activities for Gypsum Mobile Conveyors and Radial Stackers, pH Adjustment unit, Safety Showers and providing support to other packages on need basis.

B) MA'ADEN Phosphate Project "Material Handling MH1 Contract" from December-2007 till July-2008: In the absence of regular material handling project manager filled in role of material handling manager and performed responsibilities like evaluation of EPC bids, coordinating with inter departments, Client and bidders; issuing post tender clarifications, technical negotiation with tenderers, preparation of technical recommendation report for contract award and updating the scope of work for contract award. Material Handling MH1 contract includes a facility for rail/road unloading of raw materials like Phosphate Concentrate, Kaolin and Reactive Silica. After the unloading material is conveyed to intermediate storage which includes a phosphate concentrate storage building and storage silo for Kaolin and Reactive Silica. From intermediate storage material is reclaimed and sent to battery limit of Phosphoric Acid Plants to meet operational needs of the plants. Also actively involved in finalizing layout for the facility.
WP project management recognized my work and awarded me Employee of the Year for 2007-2008.

2. February 2005 – September 2006: TECHNIP, Abu-Dhabi, UAE

During this period worked in Technip Abu-Dhabi as Senior Design Engineer in Static Equipment group and worked in various types/phases of the projects like FEED, EPC for Petrochemical, Refinery and LNG plants.

Projects handled:

A) QATARGAS II LNG Project (Chiyoda Technip Joint Venture Project for Qatargas) From July-2005 till Sep-2006: As part of this project Chiyoda (Japan) Technip (France) joint venture (CTJV) was constructing the world's 2 largest LNG (Liquefied Natural Gas) trains for the Qatar Liquefied Gas Company Limited (II) ("Qatargas II"). Under this project, the joint venture partners were engineering and building Trains 4 and 5 at the Qatargas plant in Ras Laffan. Each train of 7.8 million tons per annum of LNG.

Worked as Deputy Lead Static Equipment engineer, responsible for Preparation of Mechanical data sheets and Material Requisitions for P.O., Vendor Print Checking, Co-ordination with inter department as well as with vendor for Site Fabricated Storage Tanks, Pig receivers and Slug catcher. Also responsible for engineering expediting of Storage tank subcontractor Belleli Energy S.p.A., situated in Dubai/Sharjah for engineering and shop prefabrication activities of 25 nos. storage tanks for the project.

B) HP FEED GAS CONDITIONING SYSTEM (EPCM project for ADGAS, Abu-Dhabi) From Feb-2005 – July 2005: The Project consisted of existing 3-trains of LNG Plant and associated utilities at Das Island. Plant products are LNG, LPG, Pentane and molten sulphur. To overcome the foaming problem in the HP Feed Gas system, ADGAS provided two new vessels Gas Scrubber and Feed Gas Liquid Knock Out Drum and added demisters in existing Slug Receiver vessels based on the recommendation by Technip.
Worked as a Senior Discipline engineer for two new vessels Gas Scrubber and Feed Gas Liquid Knock Out Drum and providing demisters in existing Slug Receiver vessels. Responsible for preparation of Material requisitions, Specifications, Mechanical datasheets for Enquiry and Purchase. Reviewed vendor's offers and Prepared TQs and Technical Bid Tabulation, replies to Client comments, Co-ordination of vendor meetings. Review of vendor's drawings, Design calculations, Procedures, Data books etc. and co-ordination with all related disciplines for Technical matters.

C) CSP DEBOTTLENECKING PROJECT (FEED project for ADMA-OPCO, Abu-Dhabi) From March-2005 – July 2005: ADMA-OPCO operates the offshore oil and gas producing facility at Zakum West Super Complex (ZWSC). The crude produced from the offshore field of Lower Zakum and processed at ZWSC. As a result of ADMA-OPCO's increased future production target and also increasing Gas-Oil ratio, Collector Separator Platform at ZWSC required to handle increased throughput in the coming years over its original design capacity. As part of CSP Debottlenecking FEED project, existing four Separator internals and two Gas Scrubber internals needed to be replaced.

Worked as a Senior Discipline engineer for replacement of internals of existing Separator and Gas Scrubber Vessels. Responsible for preparation of Specifications, Mechanical Datasheet for Modified Separator and Modified Gas Scrubbers. Review of Vessel inspection reports and adequacy check of existing vessels. Co-ordination with Client and inter-disciplines for Technical matters.

3. October 2001 – February 2005: BECHTEL, New Delhi, INDIA

During this period worked as a Pressure Vessel Design Engineer in various types/phases of projects like FEED, LSTK for Petrochemical, Refinery and LNG plants.

Projects handled:

A) LNG project (Marathon, EG LNG Train 1 Project) From December-2003 till February 2005: Worked as vessel engineer in EPC phase for EG LNG Train 1 project (Marathon LNG). Responsible for Preparation of Mechanical data sheets, Material Requisitions, Technical Bid Evaluation, cost estimation, Vendor Print Checking, Co-ordination with inter department as well as with vendor for Pressure Vessels, Tray Internals, Storage Tanks, Filters and Gas Separators. Worked on assignment to Houston office from 1-March-04 till 28-Sep-04 for bid evaluation, finalization of vendors and vendor print review of static equipment.

B) UOP Schedule A Project (From Oct-01 to March-03, Aug-03 till Feb-04): Worked as Vessel Design Lead Engineer for the preparation of Pressure Vessel specifications of Basic Engineering Design Schedule A Packages for Technology Licensor UOP. Responsible for preparation of project specifications for Pressure Vessels, Column Internals, Mesh Blankets, Tower Packing, Inert Ceramic Balls and Material Handling Equipment. Job activity includes vessel sizing calculation, specifying support type, design code, mechanical check, sizing calculations for various internals, vendor print checking for compliance of Licensor's requirements. Ensuring adherence of all specifications to technical and standard requirements of Licensor. Also underwent 6 months (December 2001 to June 2002) of on the job training at Technology Licensor's office in USA.

C) LNG feed (Marathon, Alba Phase 3 Project) From April-2003 to July-03: Worked as Lead vessel engineer during feed and estimation phase for Alba Phase 3 project (Marathon LNG). Responsible for Preparation of Mechanical data sheets, Requisitions, Technical Bid Evaluation, cost estimation, Co-ordination with inter department as well as with vendor for Pressure Vessels, Storage Tanks, Filters and Gas Separators.

D) Darwin LNG Project (from July-2003 to Aug-03): Responsible for vendor drawing and calculation review/approval for Pressure Vessels. Also reviewed weld procedures, weld maps, paint procedures, NDE procedures.

4. APRIL1999 - Sep 2001: M/s SIMON INDIA LIMITED, New Delhi,
(A subsidiary of Simon-Carves of UK)

Worked as Assistant Manager Design supervising team of two engineers and one designer for Mechanical Design, Preparation of Mechanical data sheets / detail design drawings, Requisitions, Technical Bid Evaluation, Vendor drawing review, cost estimation, Co-ordination with inter department as well as with client and vendor for Pressure Vessels, Heat Exchangers, Process Columns, Storage Tanks, FRP equipment.

Frequently visited Vendor shops for FRP equipments and Third party agency for expediting of project being jointly engineered, procured and constructed by Simon India and Simon-Carves UK.

Trained in pipe stress analysis software Caesar-II and assisted piping lead in Pipe stress analysis for Chlor alkali project.

Projects handled:

* Chlor-Alkali and Titanium di Oxide project for Arabian Chlorine Company
(CRISTAL), Saudi Arabia
* Supply of Pressure Vessels to Simon Carves, U.K. for Zeneca project.

5. JULY ' 97 - MARCH ' 99: DAELIM E & C INDIA LTD., Delhi.
( South Korean MNC )
Worked as Senior Engineer Design and deputed to Seoul, South Korea in their parent organization from Aug-97 to Feb-98 to work on HDPE and PP Projects for the front end and detail engineering work. Responsible for dealing directly with International Bidders/Vendors, Organizing technical clarification meetings with client / consultant and Vendors, Preparation of requisition, Technical Evaluation, Assisting procurement for cost evaluation and selection of vendor, Inter department coordination, Vendor drawing review, Extensive expediting with vendors, Frequent vendor shop visit to monitor manufacturing progress, Assisting project manager for progress of project. Equipment handled include Process Reactors, Pressure Vessels, Heat Exchangers, Air Fin Coolers, Filters, Silos & Blenders, Trays & Tower Internals, Waste Heat Boiler, Acid Gas Flare System, Site Fabricated Tanks etc.

Projects handled:

* High Density Poly Ethylene (HDPE) and Poly Propylene (PP) project for M/s
Haldia Petrochemicals, West Bengal.
* Hydrogen Generation Unit, M/s IOCL, Mathura.
* Diesel Hydro Desulpherisation Unit ( DHDS unit ) for M/s IOCL, Baroda.

6. APRIL' 95 - JULY ' 97: Kinetics Technology India Limited,
New Delhi (Now taken over by Technip)

Worked as senior design engineer responsible for Mechanical Design, Preparation of Mechanical data sheets / detail design drawings, Requisitions, Technical Bid Evaluation, Vendor drawing review, Preparation of B.O.M., cost estimation, Co-ordination with inter department as well as with client and vendor for Pressure Vessels, Heat Exchangers, Process Columns, Storage Tanks, Air Coolers, FRP equipment, Fire fighting system. I was also associated with preparation of many proposals.

Projects handled:

P.S.A. H2 Plant for M/s. GAIL, Auraiya
MS Maximization project for M/s. HPCL, Bombay
H.V.U. revamp project for M/s. BPCL, Bombay
Ammonia Plant revamp project for M/s. SPIC, Tuticorin
Ferric Oxide Plant for M/s. NMDC, Vishakhapatnam
P.S.A. N2 Plant for NRL, Numaligarh
Caustic Soda Plant for M/s. NIRMA, Baroda

7. APRIL' 92 - APRIL ' 95: ATV Projects India Ltd., Mathura

ATV Projects India Ltd, was an ASME "U" Stamp fabrication organization. Worked as Design Engineer responsible for mechanical detailed Design of Pressure Vessels, Heat Exchangers, Process Columns, Storage Tanks, LPG Bullets, Horton Spheres; Preparation of fabrication detail drawings & design calculations ; Technical scrutiny of tenders; inquiry preparation ; preparation of B.O.M. ; cost estimation ; co-ordination with client and shop etc. Shop and site inspection of Pressure vessels and heat exchangers for a period of one and a half years.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 1901 to 1950 of 7054)Go to Search Parameters...
Brief Description
B.Tech from IITK, 6 yr exp. in piping stress on CAESAR II, Triflex. Review of lines on PDMS & Smart review. worked with bechtel, chemtex, Citec(Finland)
A Logging Analyst in the Syrian Petroleum Company. A Petrophysicist in Al Furat Petroleum Company, responsible for many fields for all petrophysical operations and formation evaluations. Petrophysics section head, Wireline logging, perforation and core analysis contract holder.
Extensive Wonderware software experience including Industrial Application Server and System Platform products. Expert industrial PC skills. Extensive experience with Microsoft Virtual Server and Terminal Server products.
I have involved in petrochemical, oil/gas, and heavy industrial projects. I have strong academic achievements, excellent interpersonal skills, and positive attitude, Commitment and desire to perform engineering design. I am also exceptionally well organized and highly motivated and able to pull toge
To obtain a challenging position in your organization where my technical and management skills can be effectively honed and utilized and to gain practical experience in the realm of Civil/Structural Engineering.
Over Eight years of multidisciplinary Civil Engineering experience
Instrumentation & Maintenance industrial Engineer
Substation primary design engineer for high voltage substation
DEEE with 4 years Triconex Knowledge
I had passed bachelors degree in safety and fire engineering.Passed NEBOSH international certificate in occupational Safety and health.
I have 13 years in piping design and drafting field for Oil and gas industry
I possess hands on experience in developing EMS (ISO 14001) and OHSMS (OHSAS 18001) procedures in line with International best practices, performing HSE audits, leading EIA and Risk Assessment study teams, assisting in development of emergency response / contingency plans e.t.c,
Vast experience of planning, Management reporting, Refinery Economics,Vast experience in Petroleum Refining. Confident and result-oriented, Able to analyze and apply problem solving and decision-making techniques to achieve desired objectives within target deadlines.
16+ years experience HVAC Engineer with intension to work in Oil and Gas field
Sr. Projejct Document Controller-Exp of 12 years in Oil & Gas/Power Project Industry
Thirteen (13) years of extensive and diversified experience in managing and leading variety of upstream Oil & Gas handling, Chemical & Petrochemical Projects.
About 16 yrs of experience in the field of Civil Engineering Design, Construction & Inspection and Document Control for turn over (Piping Test Packages, Punch list & etc) & dbase management using MS Access program.
Electrical Intrument & Control System
Lead Mechanical Engineer, 17 years of experience in preparation of Specification/ Material Requisition/ Proposal/ Scope of Work; Design Basis and calculations, Technical & Cost Evaluation; Vendor Drawing Review, Static, Rotating and Material Handling Equipment and Mechanical Packages
Senior Piping Designer with 20+ years experience. AutoCAD, AutoPlant, Excel, Access, Word, Outlook.
Wireline supervisor or wireline consultant
Geoscientist with experience of working in a multidisciplinary team in a major E and P company. Experienced in Seismic modelling and Interpretation, and reservoir modelling. Holds an M.Sc in Petroleum Geoscience.
Process Engineer with over 11 years oil and gas engineering background. Design experience of Liquefied Natural Gas import terminals and process simulation experience of base load liquefaction trains.
Structural engineer with over 14 years experience in EPC projects (grass root and revamp) in refineries, petrochemical plants, spinning mill, cement plant & other industrial units.
OBJECTIVE: To utilize my experience in manufacturing and construction. Using various software programs, and engineering disciplines, (24,000hrs) Of AUTOCAD experience.
More than 14 years process & project engineer experience in Oil & Gas and Oil Refinery.
CAREER OBJECTIVE A suitable, challenging, and rewarding position in Petroleum Engineering.
Working Experiences as Senior Process Engineer from 1992 - 2003 in LNG/ LPG Plant of PT. Badak NGL in Bontang East Kalimantan Indonesia. I have been working for PT. Badak NGL over 20 years. Previous Job experienced in PT. Badak as Senior Production Planning Engineer from 1983 - 1991.
ERP Consultant (functional and technical) : MFG-PRO and Progress, Axapta, Movex, SAP Software Development Project Manager : Visual Basic, Oracle, Access, SQL-Server
I have multilingual skills and am fluent at Russian, Turkish and good atdrilling
Proactive and skilled professional with a solid supervisory background and experience developed on projects in Venezuela
Good Capability and ability to get goal the project with safety, quality, planning and costing
Using FEM packages (COSMOS, ALGOR) to analyze structures and components (Stress, Stiffness, Fatigue, etc). Document drafting and review (Calculations, P&IDs, MITPs, etc.).
More than 23 years experience as Sr. rotating techn/foreman in the refinery, responsible for the repair, troubleshooting, modification, preventive and predictive maint. of all rotating equipt.; ensure safety, planning, scheduling of personnels, preparations of tools and spare parts.
Stress Analysis of critical lines connected to static as well as rotating equipments like exchangers, columns, reactors, pumps, compressors. Super high pressure steam lines, lines connected to ‘cold box’ (Cryogenic lines), and expansion loop sizing for rack lines, analysis of pressure safety valves
A highly experienced MBA professional with exceptional interpersonal and communication skills and an external extensive background in the following broad-based competencies: Procurement/Supply Chain Management Strategic Planning; Contract Negotiation; Business Development
Wire line logging: done a special six months course on wire line loggingIn which I Have studied all the logs their specifications, uses, tools, interpretation etc, like gamma ray, sp log sonic log, neutron porosity logResistivity & conductivity log, density &photo electric factor log etc.
Crude oil storage tank construction experience as per API 650/653
i am looking for dimensional survey engineer job. i have complite Diploma in Marine & Offshore Technology.i have been work for Keppel fels Shipyard 3yers. Dyna-Mac shipyard 1.5years. now working for Norce offshore in Indonesia for DLB Projct.
I Mr. Noel C. Atienza 12 almost 12 years experience in oil and gas as a senior mechanical technician, including as a machinery supervisor. I'm permanent residence in singapore
a great job seeker of electrical field
Pipeline Integrity Engineer / Project Engineer / Design Engineer
Technical Assistant to Reservoir/Production/Petroleum Engineering.
BSc Chemical Engineer Having Six Year experience in Petrochemical Industry
Currently working in SNC LAVALIN ENGG INDIA LTD. Mumbai and deputed to SNC LAVALIN EUROPE B.V. BRANCH to Shaybah, saudi arabia as a PDS ADMINISTRATOR. My job profile is related to Piping Engineering and PDS(PLANT DESIGN SOFTWARE),RIS (Relational Interface
Controls and Instrumentation Engineer / ESD-Triconex & DeltaV SIS/ 6+year Exp
Provide structural engineering, construction management, real estate due diligence and expert witness services.
Innovative Professional with 26 years of progressive experience in engineering design, maintenance planning and management, including 16 years in the Oil/Gas industry.
Over 18 years experience in construction, installation and mechanical assemblies, heavy
My background has 15 years of Heavy chemicals, Dyes, Petrochemicals process safety and Refinery Construction HSE experience in India as well as foreign countries Recently acquired NEBOSH Qualification
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   [ 39 ]   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
CATEGORIES: Engineering/Technicians;
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com