CONTACT INFORMATION:
View contact information...
SUMMARY:
I have 8 Years 6 months of technical experience out of which I have 8 years 6 months experience in Detail Engineering, Basic Engineering, Concept Study and Estimation for Onshore and Offshore platform design, Living Quarters, FPSO, Well Head Platforms, Process Platforms, RMS and Production Station - On plot Piping, Steam, Utility, Water and Compressed air pipelines, Preparation of Plot Plans, Key Plans, GA drawings, Isometrics and Broad MTO, Site survey, Preparation of Routing Drawings, Developing pipe routing drawings using P& ID¡¦s, Developing P&ID¡¦s, Preparation of Stress Analysis Reports, Preparation of Layout Drawings for equipments (Compressor House, Pump House etc), Preparation of Technical Specifications for Boilers, Compressors and Control Valves. Project Planning and technical coordination with client as part of Annual Maintenance Contract, Preparation of Foundation Drawings for Power Plants, Preparation of Plot Plans, Compressed Air Stations, D.G Sets, Pumps, Calculating Load data and, Preparation of Detailed Project Reports & Feasibility Reports for Power Plants, Compressed Air Stations etc. Handled the following Utility Package: Generator, Chillers, Air Handling Units, Fire Water, Potable water, Irrigation Water, Lift Station, Diesel Transfer Pumps, Expansion Tank & Air Separator, Diesel Storage Tanks, Pipes& Fittings ( Cast Iron, Ductile Iron, HDPE, Copper Pipes, Pre-insulated & Carbon steel Pipes), Valves ( Manual Valves, MOV¡¦s, Control Valves, Pressure Relief Valves, Balancing Valves, Choke Valves, Ball Valves etc)Duct and Accessories ( Louvers, Grilles, Acoustic Silencer, Dampers etc.), Fire Protection System ( Fire Extinguishers, FM 200 System etc) & Waste Water Treatment Plant.
APPROVALS:
Petroleum Development of Oman/ Shell approved Piping Engineer.
Bechtel approved Piping Engineer.
Have conducted Campus Interviews and interviews in piping design campuses in India.
Certified ISO-9001 2008 Internal quality Auditor.
Experience Details:
1. Larsen and Turbo-Valdel Limited
(September 2008 till date)
Designation: Assistant Consultant- Piping
Client -1 Oil Natural Gas corporation of India
Project: B-193 Development - Offshore Platform
Pre-bid Engineering and estimation for 5 Well Head Offshore Platforms, One Process cum Well Platform, Living Quarters, Modification Job on Existing Platform
- Involved in Estimation for the project.
- Preparation of Equipment layouts, Basic Piping studies, Preliminary MTO
- Preparation of Piping Specs and data sheets for specialty items.
Project: RS-12 and RS-14 Well Platform Project:
Pre-bid Engineering and estimation for 2 Well Head Offshore Platforms, Modification Job on Existing Platform
- Involved in Estimation for the project.
- Preparation of Equipment layouts, Basic Piping studies, Preliminary MTO
- Preparation of Piping Specs and data sheets for specialty items.
Project: Deatil Engineering for MHN Process Platform
Activities Performed:
1. Preparation and Finalisation of Equipment Layouts.
2. Piping MTO and Valve MTO.
Client -2 MODEC, Singapore
Involved in 2 modules of FPSO project (Layouts).
Activities Performed:
1. Model Review
2. Clash solving
3. Checking of Isometrics.
4. Checking of MTO¡¦s
5. Preparation of data sheets for specialty items.
2. Tebodin and Partners LLC, Muscat, Sultanate of Oman
( From April 2007 till September 2008)
Designation: Lead Piping Engineer
Client 1 - Petroleum Development of Oman/ Shell
Project Name - DD for SNGP Booster Compressor Station
Project Consisted of Nine Gas Wells, Remote Manifold Station, New Booster Compressor, it's utilities (H.P Flare, L.P Flare, Compressed Air, Main Gas Line, Seal Gas Line, Condensate line, Drain Line etc). All the lines where tied-in to the existing plant. Standard followed for the project was Shell Standard (MESC system, SAP System, SP¡¦s).
Activities Performed:
1. Site Visit.
3. Discipline Check of PEFS ( P&ID¡¦s)
4. Specifications for Specialty items like (X-mas tree interconnecting flange, Casasco fittings, Specification for big size pipes and fittings).
5. Preparation of Plot Plans and getting approval from the client.
6. Preparation of GA drawings and Key Plan.
7. Coordination with other departments for developing their deliverables
8. Preparation of Isometrics.
9. Preparation of stress analysis report using CEASAR -II for the above lines
10. Preparation of Preliminary, Intermediate and Final MTO for the project.
11. Handling Site Queries
12. Final As-built Drawing.
13. Execution ( Construction Support)
Project Name - DD for RMS-11 and GRE Pipe Lines
Project Consisted of 28 Oil Wells, Remote Manifold Station, it's utilities (H.P Flare, L.P Flare, Compressed Air, Gas Lift Line and drain Line). Bulk Oil line and Flare line where tied-in to the existing plant. Standard followed for the project was Shell Standard (MESC system, SAP System, SP¡¦s).
Activities Performed:
1. Site Visit.
2. Discipline Check of PEFS ( P&ID¡¦s)
3. Specifications for Specialty items like (Multiport Selector Valve, Gas Lift Manifold, Specification for big size pipes and fittings).
4. Preparation of Plot Plans and getting approval from the client.
5. Preparation of GA drawings and Key Plan.
6. Coordination with other departments for developing their deliverables
7. Preparation of Isometrics.
8. Preparation of stress analysis report using CEASAR -II for the above lines
9. Preparation of Preliminary, Intermediate and Final MTO for the project.
10. Handling Site Queries
11. Final As-built Drawing.
12. Execution ( Construction Support)
Project Name - DD for LEK-C Manifold to LPS Production Station
Project Consisted of interconnecting piping from LEK-C Manifold to LPS production Station, Bulk Oil line and Flare line where tied-in to the existing plant. Standard followed for the project was Shell Standard (MESC system, SAP System, SP¡¦s).
Activities Performed:
1. Site Visit.
2. Discipline Check of PEFS ( P&ID¡¦s)
3. Specifications for Specialty items like (Multiport Selector Valve, Gas Lift Manifold, Specification for big size pipes and fittings).
4. Preparation of Plot Plans and getting approval from the client.
5. Preparation of GA drawings and Key Plan.
6. Coordination with other departments for developing their deliverables
7. Preparation of Isometrics.
8. Preparation of stress analysis report using CEASAR -II for the above lines
9. Preparation of Preliminary, Intermediate and Final MTO for the project.
10. Handling Site Queries
11. Final As-built Drawing.
12. Execution ( Construction Support)
Other projects handled where Concept Study for Fahud and Qarn Alam Fire Water System Upgrade, BFD for Sayyala and Sadad Booster Pumps, DD for Oil and Gas Wells, DD for Burhan West Development, Alhuwaisah Water Injection Facility etc and preparation of estimations for projects.
Client 2- Occidental, Oman
Project consisted of interconnecting piping from Bulk Manifold Station to production Station. It was a pipeline project. The pipeline was almost 5 kms. Bulk Oil line was tied-in to the existing plant.
Activities Performed:
1. Site Visit.
2. Discipline Check of PEFS ( P&ID¡¦s)
3. Preparation of Plot Plans and getting approval from the client.
4. Preparation of GA drawings and Key Plan.
5. Coordination with other departments for developing their deliverables
6. Preparation of Isometrics.
7. Preparation of stress analysis report using CEASAR -II for the above lines
8. Preparation of Preliminary, Intermediate and Final MTO for the project.
9. Handling Site Queries
10. Final As-built Drawing.
3. Saudi Arabian Kent Co. Limited, Saudi Arabia (From Jan-2006 till April 2007)
Designation: Piping Engineer
Client-1 Eastern Petro Chemical Company ( SHARQ)- SABIC / Foster Wheeler, UK.
(Jan-2006 till Sep-2006)
„« Designing of utility pipelines like Ethylene, Oxygen, Nitrogen, Caustic Soda, Ethane, Natural Gas, Butane, Instrument Air, Portable water from metering skid to different utility locations.
„« Preparation of Plot Plans and Isometrics for utility lines.
„« Preparation of tie - in packages for the above lines.
„« Preparation of Piping Layout drawings for E/W and N/S Pipe rack
„« Preparation of Piping layout and Isometric drawings for Royal Commission.
„« Preparation of stress analysis report using CEASAR -II for the above lines.
„« Preparation of Layout Drawings and Isometrics for RC Corridor.
Client - 2 Jubail Chevron Philips Petro Chemical Company (Jan-2006 till Sep-2006)
„« Preparation of Plot Plans and Isometrics for utility lines.
„« Preparation of stress analysis report using CEASAR -II for the above lines.
„« Preparation of Plot Plans and Isometrics for utility lines.
„« Preparation of tie - in packages for the above lines.
Client - 3 New Doha International Airport - Qatar Kent/ BEMCO/ Bechtel
(Sep-06 -April 2007)
Was a part of Utilities Package where I was involved in Vendor discussions and checking technical portions for the following items:
Generator, Chillers, Air Handling Units, Fire Water, Potable water, Irrigation Water, Lift Station, Diesel Transfer Pumps, Expansion Tank & Air Separator, Diesel Storage Tanks, Pipes& Fittings ( Cast Iron, Ductile Iron, HDPE, Copper Pipes, Pre-insulated & Carbon steel Pipes), Valves ( Manual Valves, MOV¡¦s, Control Valves, Pressure Relief Valves, Balancing Valves etc)Duct and Accessories ( Louvers, Grilles, Acoustic Silencer, Dampers etc.), Fire Protection System ( Fire Extinguishers, FM 200 System etc) & Waste Water Treatment Plant.
Systems Handled:
Potable, Fire water, Waste Water & Irrigation Water System
Chilled Water System
„« Preparation of Technical Submittals & Materials and getting approval from Client.
„« Preparation of BOQ for material take- off.
„« Technical Co-ordination with Bechtel, Worley Parsons & Parsons International.
„« Preparation of Method statements and getting approval from Client.
„« Preparation of Project Specifications to get approval from Client.
„« Preparation of construction isometric piping drawings/ plumbing drawings.
4. Metallurgical Engineering Consultants of India Limited (From Sep - 2001 to Jan 2006)
Designation: Assistant Engineer -Piping
Client-1 Indian Oil Corporation Limited, Panipat, Hariyana
„« Preparation of Plot Plans and Isometrics for utility lines.
„« Preparation of tie - in packages for the above lines.
„« Preparation of Piping Layout drawings for Pipe racks.
Client-2 High Grade Pellets Limited, Vizag
„« Designing of compressed air pipelines.
„« Preparation of technical specification for air compressor.
„« Preparation of Detailed Project Report for 33 MW coal fired Captive Power Plant.
Client-3 SeaBird, Karwar
„« Involved in designing of compressed air pipelines
„« Preparation of technical specification for air compressors.
„« Design of Compressor room.
Client-4 Jindal Vijayanagar Steel Limited, Bellary
„« Involved in designing of High Pressure steam pipelines for interplant piping from JVSL Power Plant to Turbo Blower House as part of inter plant piping.
„« Preparation of technical specification for Pressure Reducing and Desuperheating Unit.
„« Involved in preparing of P&ID's for Converter Gas Cooling System and Preperation of Gas Cooling Pump Layout, foundation details, load data's and it's piping drawings.
„« Preparation of Technical specification of 10 Tons/hr Corex Gas Fired Boiler and piping drawings as part of in plant network.
„« Preparation of technical Specification for compressed air and preparation of piping drawings.
Client-5 Kerala Minerals and Metals Limited, Kollam
„« Involved in preparation of Detailed Project Report for 2X20 MW Coal fired Captive Power Plant. Design of Compressed Air and Steam Pipe Lines.
Client-6 Naval Physical Oceanographic Laboratories, Kochi
„« Project Planning, Take up Break Up and Scheduled Maintenance, Discussion with Contractors, Preperation of Schedules as part of Annual Maintenance Contract,
„« Preparation of budgetary costs, financial bills, collection of reimbursable and non-reimbursable costs, Preparation of tender documents for equipments as part of AMC. Preparation of note for approval from Tender Recommendation Committee.
Client-7 TTPL, Trivandrum
„« Preparation of Technical Specification of Boilers.
„« Designing of Compressed Air and Steam Pipelines as part of in plant network.
Client-8 VISL, Bhadravati
„« Preparation of Technical Specification of Boilers of 20 Tons/hr furnace oil fired boiler.
Client-9 Essar Steel, Hazira
„« Preparation of Technical Specification of Boilers.
„« Designing of Compressed Air and Steam Pipelines as part of in plant network.
EDUCATION DETAILS:
SSLC 72% (Karnataka State Secondary Education Board)
PUC 70% (Karnataka Pre - University Board)
B.E (MECH): 76% (BANGALORE UNIVERSITY)
DR.AMBEDKAR INSTITUTE OF TECHNOLOGY, BANGALORE
P.G D In
Power Plant Engineering: 70 %( National Power Training Institute, Neyveli)
Computer Knowledge:
Operating System: Windows, DOS.
Mechanical Software: Auto CAD-2000, R-14, CAE pipe, Caesar-II, Valve Sizing, Cost Model.
Other Software: Microsoft FoxPro, Microsoft Project, Microsoft Office
Standards:
Have knowledge in IS, BS, ANSI, SABIC, ARAMCO, SHELL standards.
Have knowledge in CS, DSS, SS etc.
Personnel Details:
Date of Birth 09/01/1979
Father's Name Govindan Kutty
Pass Port Details No. Z1329935 Date of Issue - 12.12.2001, Date of expiry - 11.12.2011
Languages Known English, Hindi, Kannada, Malayalam, Tamil, Telugu
Hobbies: Reading Books, Watching Movies, Playing Cricket etc.
Notice Period 45 days
References:
Will be provided
View contact information... |