Summary: Eleven years of extensive hands-on experience in Oil and Gas, Refineries, Petrochemical and Power industry in the field of Mechanical/Piping installation, field engineering, inspection, testing and operations. Work exposure in Middle East, Far East and South East Asia. Skilled in the areas of Field Engineering, Contractor Supervision, QA/QC, Bid proposals and Estimate, Planning and Scheduling, Computer Aided Design and Drafting, Material Control and Purchasing. Exposure to international Codes and Standards such as API, BS, ASME, and ANSI, etc…
Qualifications: Licensed Mechanical Engineer (Professional Regulation Commission - Manila)
Life Member, Philippine Society of Mechanical Engineers (PSME)
B.Sc. Mechanical Engineering grad., 1988-1993, P.B.M.I.T. – Batangas
Work Experience:
03/2009 – to present IMCO Engineering Corp. Mechanical Engineer
06/2008 – 12/2008 Hyundai E&C Co., Ltd. QA/QC Piping Engineer
02/2006 – 02/2008 Titan Chemicals Corp. Bhd. QC Mech'l./Piping Inspector
11/2004 – 10/2005 Sejong Electro/Mechanical Est. QA/QC Piping Inspector
08/2003 – 08/2004 Hyundai Engineering Co. QA/QC Piping Engineer
07/2002 – 03/2003 Joannou & Paraskevaides (O) Ltd. QA/QC Engineer/Supervisor
10/2000 – 06/2001 Hyundai Engineering Co. Mechanical/Piping Engineer
11/1999 – 06/2000 ABB SOIMI SPA Mechanical/Piping Engineer
03/1999 – 10/1999 Formosa Plastic Corporation Co. Mechanical/ Piping Field Engineer
01/1998 – 11/1998 Plant Engineering Const. Pte. Ltd. QA/QC Piping Inspector
10/1997 – 12/1997 RCC/Mitsubishi Heavy Industries Ltd. QC Piping Inspector
07/1996 – 08/1997 Kharafi National Company QA/QC Piping Inspector
05/1995 – 06/1996 M.S. Al Suwaidi Company Material Engineer/Controller
Training/ AUTOCAD training (Computer Aided Drafting & Design)
Skills: Visual Basic, Visual FoxPro (Computer Programming course)
Knowlegeable on MS Word, Excel, Powerpoint, Access, and MS Outlook
Personal Details:
Civil Status: Married
Date of Birth: July 01, 1968
Nationality: Filipino
Address: P. Laygo St., Sabang, Lipa City
Batangas 4200 Philippines
Expected Salary: negotiable
Availability: Immediately
EMPLOYMENT DETAILS:
Duration: Mar 2009 – Up to present
Company: IMCO ENGINEERING & CONSTRUCTION CO. W.L.L.
Project: Miscellaneous Mechanical Modifications within the Dukhan Oil Fields
Location: P.O. Box 22803 Doha, Qatar
Position: MECHANICAL ENGINEER/SUPERVISOR
Duties:
* Check accuracy of approved construction drawing and document for execution, check the availability of stock item and raise purchased of requisition if required and carried out construction kick-off meeting with contractors.
* Carry out progressive test / line check on completion of mechanical works and ensure that the contractor develop the punch list for follow up till completion before hydrostatic test.
* Review contractor procedures. Develop construction procedure if required. Ensure adequate design documentation & standards procedures are available for testing & construction. Ensure drawings are updated if there are changes.
* Witness and approve QA/QC inspection on mechanical/piping installation as per mechanical documentation such as P&ID's, General Arrangement Drawings and Isometrics drawings, etc.
* Develop work plan with contractors, operations, maintenance and all relevant parties for execution with minimum interruption to operating plant.
* Ensures that construction & testing meet the project schedule. Coordinate with EPC Contractor to resolve job issues to ensure smooth job progress and monitor work progress, quality of works and HSE compliance.
Duration: June 2008 - Dec. 2008
Company: HYUNDAI E&I CONSTRUCTION COMPANY
Project: Ammonium & Fertilizer Plant for Q-ONE Project
Location: Seoul, South Korea
Position: QA/QC PIPING ENGINEER
Duties:
* Ensure Project Quality Plan is correctly implemented and meets all requirements of work undertaken, updating and amending if necessary.
* Coordinate with project staff in the creation, preparation and control of quality documentation such as Inspection and Test Plans (ITP), Process Procedures, Work Method Statements (WMS), Welding Procedure Specification (WPS), Inspection Checklist, etc….
* Review and verify Approved Contract drawings and Shop drawings. Review contractor inspection procedures. Develop inspection procedures if required. Ensure adequate design, documentation and standard procedures are available for testing and construction. Ensure drawings are up-dated if there are changes.
* Strictly implemented scope of supply and scope of work, material approval, installation masterpiece approval, QA coordination, issuance of site instructions, resolved field mismatch and queries, interpretation of drawings and procedures, field surveillance and review against project specifications, and assisted contract surveyors in work measurements.
* Witness and approved pipe pressure test and ensure QA/QC test carried out are properly recorded, verified and submitted to owner. Ensure that construction and testing meet the project schedule. Coordinate with the client engineers to resolve job issues to ensure smooth job progress.
* QA/QC works include field surveillance, punch listing, system walk-downs, inspection with clients, report generation and documentation of all test reports, inspection, material approval and certifications to QC dossiers.
Duration: Feb. 2006 – Feb. 2008
Company: TITAN CHEMICALS CORP. BHD.
Project: H-114 Furnace Project, BD & C3 Project, Terminal Storage Tanks Project
Location: Pasir Gudang, Johor, Malaysia
Position: MECHANICAL/PIPING INSPECTOR
Duties:
* Responsible for carrying out Quality Assurance & Quality Control of construction, calibration, testing & pre-commissioning of Equipment & Piping in accordance to mechanical design documentation, procedures & standards so that constructed plants are free for defect or non-conformant for smooth plant startup with minimum or no loss time in safe manner. Butadiene and Propylene plant size is 100,000 MTA and 115,000 MTA respectively.
* Working as owner representative and final authority in the acceptance of installation and quality aspects of the project.
* Review contractor procedures. Develop inspection procedure if required. Ensure adequate design documentation & standards procedures are available for testing & construction. Ensure drawings are updated if there are changes.
* Witness and approve QA/QC inspection on equipment/piping installation as per mechanical documentation such as P&ID's, General Arrangement Drawings, and Isometric drawings, etc.
* Witness and approve equipment/piping pressure tests and ensure QA/QC tests carried out are properly recorded, verified and submitted to owner. Carried out pre-commissioning test with EPC Contractor.
* Ensures that construction & testing meet the project schedule. Coordinate with EPC Contractor to resolve job issues to ensure smooth job progress.
* Coordinated with area superintendent and supervisors in the last stages of the project to expedite system-wise handover with strict conformance to quality procedures to meet deadline and start-up dates.
* Responsibility involves work in Storage Silos, Packaging and Bagging, Air and Gas Compressor systems and Waste Water Treatment systems.
Duration: Nov. 2004 – Oct. 2005
Company: SEJONG ELECTRO MECHANICAL EST.
Project: Umm Al Nar 1,550 MW IWPP Project
Location: Abu Dhabi, U.A.E.
Position: QA/QC PIPING INSPECTOR
Duties:
* Monitor piping and welding activities as per work instruction procedure and conduct visual inspection (fit up and welding inspection).
* Handles document such as vendor drawings, piping and instrument diagram and perform punch listing (line checking), review test package prior to testing (Hydro testing and Pneumatic testing).
* Conduct site inspection as per approved ITP (Inspection Test Plan), WPS (Welding Procedure Specification), approved inspection procedures. In-charge for the overall piping inspection for the assigned plant area. Work items includes: pressure and leakage tests, including support inspection.
* Review/prepare hydro test package for all piping system and ensure that all piping erection conforms to project specification and standard.
* Review and revision of installation work packages, assessed constructability of AFC drawings and issued corresponding FCN (Field Change Notice) and Site Instructions.
* Performed punch clearing activities, punch-out priority systems and conduct pre-commissioning assistance.
Duration: Aug. 2003 – Aug. 2004
Company: HYUNDAI ENGINEERING COMPANY
Project: South Pars Field Development On-Shore Facilities (Phases 4 & 5)
Location: Asalluyeh, Republic of Iran
Position: QA/QC PIPING ENGINEER
Duties:
* Strictly implemented scope of supply and scope of work, material approval, installation approval, issuance of site instructions, resolve field mismatch and queries, interpretation of drawings and procedures, field surveillance and review against project specification and assisted site engineer in work measurements.
* Handled material control, approval, specifications and purchasing of mechanical/piping materials and test equipments, preparation of quotation request to local vendors. Supervised material storage of consumable materials as well as storage of field materials as per QC storage procedures.
* Conduct field inspection of piping works as per approved ITP (Inspection Test Plan), WPS (Welding Procedure Specification), approved inspection procedures.
* In-charge for the preparation of documents, compilation of test packs and certificates and final congregation of documents into Mechanical/Piping QC dossiers and handed over to client for assessment and approval.
* Performed quantity survey of piping work items including man-hour calculations. This is used for final contract negotiation of quantities and prices (Bill of Quantities) with the main contractor.
Duration: July 2002 – March 2003
Company: Joannou & Paraskevaides (O) Ltd.
Location: Tripoli, Libya
Position: QA/QC ENGINEER
Duties:
* Prepare welding inspection report (WIR). Review test packages and conduct visual inspection on site with approved Inspection Test Plan (ITP) and approved inspection procedures. Prepare as-built drawings for all revised and field run pipelines.
* Prepare Project Quality Plan (PQP), Project Specific Procedures (PSP), Method Statement (MS), Quality Control Procedure (QCP), Inspection and Test Plan (ITP), Check Sheet and related quality documents.
* Ensure all test are done witnessed and inspected for Mechanical/Piping works such as: NDT (RT, PT, UT & MPI), Holiday Test, Pressure Testing (Hydro testing and Pneumatic Test, etc….
* Ensure site staff/key workforce members and sub contractors understand the Project's quality objectives and detect response requirements as set down with the contract and provide trainings in the Quality Systems and necessary skill functions.
* Review work practices and assist in the development of techniques to deliver improvements and efficiency to the management of work processes.
* Monitoring Non-Conformance's and closing out by corrective / preventive actions and prepare statistical data's which will show quality trends.
Duration: Oct. 2000 – June 2001
Company: HYUNDAI ENGINEERING COMPANY
Project: South Pars Field Development On-Shore Facilities (Phases 2 & 3)
Location: Assalluyeh, Republic of Iran
Position: MECHANICAL/PIPING ENGINEER
Duties:
* Responsible for the Equipment/Piping installation according to design drawing, applicable codes, standard, project specifications, referenced procedure and general practice for mechanical/piping works.
* Responsible for the preparation, safety precaution and implementation of pressure test works. Also responsible for the erection and installation of equipment and piping and their associated works.
* Prepare construction procedures for performance administrative, project, and design tasks in accordance with contractual obligations.
* Direct and monitor engineering functions including monitoring of progress, preparation of procedures and bulletins, documentation of communications and meetings and identification/evaluation of project issues and problems.
* Conduct and/or coordinate meetings related to project operations, internal issue resolution and communications with the client.
* Assist in management and coordination of activities among all project functions and engineering activities including identification of deviations and management of change.
Duration: Nov. 1999 – June 2000
Company: ABB SOIMI SPA
Project: Shurtan Gas Chemical Complex
Location: Uzbekistan, Russia
Position: MECHANICAL / PIPING ENGINEER
Duties:
* Prepares manpower requirement, equipment utilization schedule, materials take-off for procurement and delivery schedules and assist for the preparation of shop/field drawings form Auto Cad from time to time.
* Handles document such as vendor drawings, piping and instrument diagram and perform punch listing (line checking), review/prepare test package prior to testing (Hydro testing and Pneumatic testing)and ensure that all piping erection conforms to project specification and standard.
* Preparation of Quotations for Bidding, make proposals, layouts/details of plans subject for revision, additional plans as per suggestions and discussions for approval of the client.
* Review/prepare hydro test package for all piping system and ensure that all piping erection conforms to project specification and standard.
* Review and revision of installation work packages, assessed constructability of AFC drawings and issued corresponding FCN (Field Change Notice) and Site Instructions.
* Analyze Pre-bid Construction schedule; coordinate with client in the proposed project for ocular site inspection, site condition and evaluation.
* Ensuring Risk Assessment/Job Hazard Analysis is done in advance of commencement of activities and ensuring all preventive control measures are in place.
Duration: Mar. 1999 – Aug. 1999
Company: FORMOSA PLASTIC CORPORATION CO.
Location: Mai-liao, Yun-Lin County, Taiwan
Position: MECHANICAL/ PIPING FIELD ENGINEER
Duties:
* Review of Pre-bid documents/Project Design Packages (Drawing and Scope of work) prior to final approval for contract bidding and implementation.
* Prepare and conduct kick-off meeting with the Proponent and the winning Contractor for necessary site information, required preparations, construction technicalities, safety on site and quality.
* Ensuring the Site is supplied with the correct drawings and materials, in sufficient time meet the project schedule. Interface with other departments within the project as required, including support to the interface and change management procedure.
* Review/prepare hydro test package for all piping system and ensure that all piping erection conforms to project specification and standard.
* Review and revision of installation work packages, assessed constructability of AFC drawings and issued corresponding FCN (Field Change Notice) and Site Instructions.
* Assist in technical preparation of responses to variation proposal of the contractor. Acting on risk register of points related to piping activities.
* Ensuring Risk Assessment/Job Hazard Analysis is done in advance of commencement of activities and ensuring all preventive control measures are in place.
Duration: Jan. 1998 – Nov. 1998
Company: PLANT ENGINEERING CONSTRUCTION PTE. LTD.
Location: Jurong, Singapore
Position: QA/QC PIPING INSPECTOR
Duties:
* Conduct field review of as-installed piping and pipe components to check for conformance to industry standards, project specification, engineering documentation and good engineering practice.
* Detailed checks include adequacy of as-installed piping supports, verification of provisions for thermal expansion, bracing/gusseting of small bore connections per project specifications and evaluation of as-installed pipe/support adequacy for vibrating/multi-phase service.
* Prepare "punch list" based on field walk-down and review with appropriate engineering personnel.
* Review/prepare hydro test package for all piping system and ensure that all piping erection conforms to project specification and standard.
* Conduct field inspection of piping works as per approved ITP (Inspection Test Plan), WPS (Welding Procedure Specification), approved inspection procedures.
Duration: Oct. 1997 – Dec. 1997
Company: RCC/MITSUBISHI HEAVY INDUSTRIES LTD.
Location: Simlong, Batangas City, Philippines
Position: QA/QC PIPING INSPECTOR
Duties:
* Inspection to the yard with the prescribe standard and quality, conduct weld mapping, preparation of piping system for pressure testing, review/check P&ID's for defining the test boundaries.
* Detailed checks include adequacy of as-installed piping supports, verification of provisions for thermal expansion, bracing/gusseting of small bore connections per project specifications and evaluation of as-installed pipe/support adequacy for vibrating/multi-phase service.
* Prepare "punch list" based on field walk-down and review with appropriate engineering personnel.
* Review/prepare hydro test package for all piping system and ensure that all piping erection conforms to project specification and standard.
* Conduct field inspection of piping works as per approved ITP (Inspection Test Plan), WPS (Welding Procedure Specification), approved inspection procedures.
Duration: July 1996 – Aug. 1997
Company: KHARAFI NATIONAL COMPANY
Location: Al-Safat, Kuwait
Position: QA/QC PIPING ENGINEER/INSPECTOR
Duties:
* Conduct Welder Qualification Test (WQT) as per ASME Section IX/ESL 22/23, AWS D1.1, AWWA M11/C206, API 1104.
* Monitoring and inspection of welding in fabrication and in site installation activities of Carbon Steel and Copper Nickel piping as per API 1104 and Project Specification for pipeline project (Common Cooling Water Project).
* Prepare "punch list" based on field walk-down and review with appropriate engineering personnel.
* Review/prepare hydro test package for all piping system and ensure that all piping erection conforms to project specification and standard.
* Review and witness NDE, Conduct field inspection of piping works as per approved ITP (Inspection Test Plan), WPS (Welding Procedure Specification), approved inspection procedures.
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 1651 to 1700 of 7051)
Go to Search Parameters...
Brief Description
11 years experience in Oil & Gas, Refineries, Power Plant and computer literate
Cad Draftsman, I have 15 years of experience as draftsman, most especially in structural work, I am fully dynamic worker and workaholic. Once I employed I will gave all the best, to the company I work and most of all the Sincerity to the company.
I am diploma in mechanical engineering having 15 years experience in refinery,chemical,oilfield offshore in mechanical maintenance ,various rotating equipemnts gas turbines steam turbines gas centrifugal compressors and various pumps and stationary equipments.
Instrument & Control Services with Computing Machines and Devices Engineering Degree.
IIW Intrnational Welding engineer, Ph.D on mechanical Engineering, Osaka Uni.,
BACHELOR OF ELECTRICAL ENGINEERING (FULL TIME 4 YEAR PROGRAM) & POST GRADUATE ADVANCED DIPLOMA IN MAGAMENT , EXPERT IN SOLAR, ABB STAL, KAWASAKI GAS TURBINE OPERATION & MAINTENANCE, ALSO THOROUGH IN EXTRA HIGH VOLTAGE(EHV) POWER SYSTEM OPERATION AND MAINTENANCE
Good Keyboard Skills, Computer Literacy, Fully Competent with Surveying Projects from small repairs to full Power House Rebuilds, Competent with World Travel meting Foreign Nationals using tact & diplomacy with all customers, Capable of working within a team or on my own, Competent in training Forei
14 years of experience as a Contracts Engineer, Contracts Administrator
I am an Electronics Engineer & working in Instrumentation Field.
A professional and experienced Petroleum Geologist having 25 years of varied experience in Upstream oil industry. Developed expertise in Basin modelling and Sequence stratigraphy, operations and administration . A team player can deliver results with best time mangement
12 years experience in Chemical, Fertilizers and Petrochemical industries in Electrical Maintenance & Testing and Maintenance Planning. I am an excellent technical writer and presenter my paper “Concept of Electrical Energy Conservation & Improvement in Equipment Design” in Middle East Petrotech'06
Corrosion Technologist with 10 years experience in the Oil & Gas industry in a variety of professional roles including project manager, consultant and contractor in the disciplines of pipeline integrity, cathodic protection, power and communications. Graduate of Electronic Engineering Technology.
A stress analyst with ~7 years experience in the aerospace industry. Proven ability to performs structural analysis on wing of F35 aircrafts, and substantiation modifications of Boeing aircrafts by classical hand analysis, familar with Boeing and JSF tools.
Drilling Engineer, DEepwater, ERD wells, Directional drilling, Well Engineer
I have 12 years experience as a welding & inspecting engineer, both in manufacturing and refinery facilities. I had six assignments in Egypt, which had provided me with valuable experience in working overseas and in particular the Middle East.
Quality control Chemist/supervisor in oil/gas Industry
H.N.C, Faculty of Material Engineering SHEFFIELD Halam University
Instrumentation & Control Superintendent performing Basic Engineering, Detail Engineering, Construction Supervision, Pre-Commisioning, Commissioning & Start-Up in Oil, Refineries & Petrochemical Facilities, 16 years experience.
Mechanical Engineer
I am working as a oil and gas profesiional since last 8 yrs and developed my skills as drilling engineer. I have got experience in working both in on shore & offshore & planning & operational supports for exploration, appraisal & development wells.
B.E.mech.presantly working in ukraine as a production manager in reputed scaffolding manufacturing company
Electrical Design Engineer
Results oriented, assertive professional engineer with a clear goal of the RE role in an oil company: build value for the company. 8 years of experience in the oil industry with a strong emphasis on Reservoir Engineering. A sound background in Reservoir Geology and Reservoir Simulation Engineering.
Drilling fluid engineer
DRILLING engineer/ drilling supervisor
Geological engineer, I have worked as a Evaluation engineer in a Drill Bit organization, and I have worked as a Drilling Engineer and Directional Engineer
I & C Maintenance Engineer in Research Nuclear Institution. 10 Years, Wireline CH & OH Logging Field Engineer. 4 Years,
Instrument, Control Systems Designer, Commissioning Engineer, Field Engineer, Construction Coordinator, Worldwide Experience, AutoCAD, MS Office, English, Basic Indonesian - Malay
Experienced (17 yrs) Project Manager in oil & gas
Control System’s Designer / Engineer, Construction/Commissioning Experience in China of Field Instruments, DCS Systems, ESD, PLC. Intergraph INTools, PDS, Oracle, Access and Autocad
Over 14 years in all aspects of geophysical applications, including 2-D and 3-D seismic data processing and QC, data acquisition QC, survey design, seismic interpretation and mapping. Highly experienced in technical supervision and quality control of seismic projects worldwide.
PhD candidate in petroleum engineering with more than three years of experience as a reservoir engineer
2008 -MSc. Mining Engineering- To defend Thesis by December 2008. - University of Mines and Technology, Tarkwa. Ghana Strong Human Relationship Skills . Sound written and communication skills. Strong Technical Mine Planning and Production skills. Strong computer skills,MS Office, AutoCad, Surpac
Senior Electrical Technician- Plan and supervise the day to day maintenance, repair, of a wide range of Electrical Equipment, including, power generation, distribution and controlequipment and switchgear, supervising the activities of Company employees and contracted technicians.
Drilling Supervisor. Mud and Cement Supervisor.Drilling Engineer.Mud and Cement Engineer.
Ûtructural design and construction site supervision in the oil/gas fields
Oil & gas instrumentation installation supervision, commissioning and maintenance of control systems.
Physical metallurgist and Welding engineer Steel design, Corrosion etc Willing to travel extensively Is looking for exciting employment, international carrier (e.g. Petroleum & Mining)
PhD-educated geophysicist with 12 years of experience in petroleum exploration industry and research institutions. Seismic interpretation of 2/3D for oil/gas targets in Australasia. Strong background in a variety of seismic data analysis, including AVO, LFP and depth conversions.
Control & instrumentation for oil &gas plants/pipelines, FEED &detailed engineering, HAZOP, TBE, vendor documents review, cost estimation, man-hours evaluation.
15 years of professional experience in Business Development, Technical Marketing and Consulting Services in the Engineering Software Industry.
Please see Resume Body.
Working 18 years with multinational companies of Power Sector (includes related Water & Waste Water treatment and Oil & Gas systems). Now working as Site Representative (Manager)and reporting directly to Project Director. See the CV
15 years of progressive experience and responsibility with documented success in the areas of drilling, workover, completions, engineering, operations and supervision at various organizational levels. I¡¦m seeking a challenging position as a Drilling &/or Completion Engineer.
My areas of specialty include Turbo Machinery Dynamic Analysis, Predictive Maintenance and Reliability Engineering in Rotating Equipment.
Project Engineer/Refinery Reliability Engineer/Turnaround Coordinator Over 13 year career of both domestic and international refinery and engineering experience spanning major areas of the oil and petrochemical industry.
Preparing design criteria, datasheet, specification, mechanical calculation and prepare calculation and shop drawing for storage tank and pressure vessels,
Highly motivated and experienced MAINTENANCE SUPERVISOR.
ndt, api, aws inspections supervisor 35 years exp. chemical palnt, pipeline and oil field, currently 17 years at chemical plant supervise mech. Intgrity and PSM programs, plant site maintenance supervisor, ground, rr track, ditches, building, etc
30 yrs commercial experience in upstream petroleum; Tenneco Oil commercial manager Gulf of Mexico; Co-founder of Newfield Exploration (NYSE: NFX); Consultant to domestic, international, and national oil companies; BS geology MA business; excellent Excel/Monte Carlo project finance evaluations
First
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
[ 34 ]
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
CATEGORIES:
Engineering/Technicians;
INDUSTRIES:
Petroleum/Oil/Gas;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com