Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #87294
next resume »»
CONTACT INFORMATION:
View contact information...
Position Applied: Sr. Mechanical Rotating Sv
Profession: Licensed Mechanical Engineer
PRC License # 0032584
Summary of Experience:
More than twenty (20) years experience in the field of Engineering Construction in installation of all Rotating Equipment in Oil, Gas and Petro Chemical Project
Employment History (Present to Past)
Name & Address of CO: CBI LUMMUS/ TOYO JOINT VENTURE
Pular Ular, Singapore
Project: Ethylene Cracker Complex (ECC)
Position: Senior Supervisor Rotating Equipment
Date Employed: 19 Dec. 2007 up to 31 Dec. 2009
DUTIES AND RESPONSIBILITY
Responsible and supervised the installation and assembling of Boiler Package 3 units with Steam Drum High Pressure have design pressure 148 bar ga, design temp. 342 degree centigrade,test pressure 223 bar ga, volume 24.7cubic meter.
Including the Forced Draft Fan and all utility equipment. Supervised the installation of all
Pumps and compressors at utility areas. Reinforced safety rules and regulation.
Name&Address of Co.: JGC MIDDLE EAST FZE
Ras Laffan, State of Qatar
Project: Gas Compression Facilities
Position: Senior Rotating Equipment Supervisor
Date Employed: October 20, 2005 up to November 30, 2007
DUTIES AND REPONSIBILITY
Responsible and supervised for all rotating equipment installation which include leveling and coupling alignment of Compressor, Pumps and Motor (horizontal and vertical)
mixers, export gas compressor(Gas Turbine Rolls Royce Dresser Rand
USA), steam turbine generator (DEMAG Delaval Ind.Czech Republic). Refrigeration
Compressor (HITACHI LTD. JAPAN) Off Gas Compressor (MITSUI ENG'G JAPAN)
.
Name & Address of Co.: TECHNIP FRANCE
Yanquian, Daya Bay, Huizhou, Guandong, China
Project: CNOOC and Shell Petrochemical Project
Position: Senior Rotating Equipment Supervisor
Date Employed: May 26, 2004 to Oct 14, 2005
Responsible and supervised for the installation of mechanical equipment and alignment for Centrifugal Pumps, Heat Exchangers, Air Fin Cooler and Instrument Air Compressor.
Supervised and monitor daily activities of the subcontractor if they are conformed on project specification requirements. Ensure that all mechanical equipment that have been installed are documented as per project requirements. Reinforced safety rules and regulations.
Name & Address of Co.: SAUDI TOYO Engineering Corporation
PKPE JUBAIL, KSA
Project: Petro Kemya Poly Ethylene Project,
Position: Senior Rotating Equipment Supervisor
Date Employed: October 30, 2002 up to December 1, 2003
Responsible and supervised for the installation, alignment and assembling some parts for
Extruder Machines, 2 units of Cycle Gas Coolers, 2 units of Cycle Gas Compressor, 3
units of Instrument Air Compressors, 3 units of Nitrogen Compressor, 11 units of Chiller
Pumps, 2 units of Vent Recovery Compressor, 2 units of Refrigeration Compressor and
2 units of Cycle Water Pumps.
Name & Address of Co.: Siam Strip Mill Public Company Limited
SSP Industrial Park, Nonglalog, Bangkai, Rayong,
Thailand
Project: Hot Rolling Mills Steel Plant
Position: Hot Strip Mill Maintenance Specialist
Date Employed: July 16, 1999 up to September 20, 2002
Provided technical advise, expertise and supervision in the execution of mechanical installation, modification, up-grading, Preventive maintenance to the production
Equipment and other plant operating systems like hydraulic systems, pneumatic systems and central lubrication systems. Establish preventive maintenance planning and scheduling and standardization of routines and methods for the execution and implementation of maintenance work. Proper coordination to other departments in order to avoid delay of other works and production work. Training of subordinates and implementing safety and company regulations.
Name & Address of Co.: Mitsubishi Heavy Industries
(Main contractor of Siam Strip Mill Public Co. Ltd.)
SSP Industrial Park, Nonglalog, Rayong, Thailand
Project: Hot Rolling Mills Steel Plant
Position: Mechanical Supervisor
Date Employed: July 1, 1997 to June 30, 1999
Engineer in-charge for the installation and alignment of tunnel furnace & its rollers,
Roughing & Finishing Mills, Down Coiler, Plant Air Compressors, Descaling Pumps, pumps in Water Treatment Plant, Hydraulic Pumps & Overhead Cranes. Member of commissioning team that commissioned the whole Hot strip Mill from tunnel furnace to down coiler machineries. Daily preparation & planning of works to attain the optimum target of the project without delay. Keeping of important & commissioning data, which required in the hand-over of the project.
Name & Address of Co.: Hitachi Zosen Corporation
Petroleum authority of Thailand
271 Sukumvit Road,Maptaput, Rayong, Thailand
Project: PTT Gas Separation Project 3
Position: Mechanical Supervisor
Date Employed: November 1, 1996 – May 31, 1997
Daily work planning & preparations for subordinates. Coordinate construction procedure
& material preparations. Supervised all mechanical installation & millwright works to all rotating equipments under instruction of HZ Site Mechanical Manager. Supervised all maintenance works for all rotating machines in commissioning period such as: Gas
Turbine Generator, Gas Turbine Sales Gas Compressor, Refrigeration Compressor, Turbo
Expander Compressor, Regeneration Compressor, Instrument Air Compressor, Aircooled heat exchanger, Process as liquid centrifugal pumps.
Name & Address of Co.: Mitsubishi Heavy Industries Ltd. / ABB Lumnus Crest
Inc./ Marubeni Corporation Joint Venture
C/o Petroleum Authority of Thailand, 271Sukhumvit
Road, Map Ta Phut 21150, Thailand
Project: Parallel Pipeline
Position: Mechanical Engineer / Supervisor
Date Employed: Jun 15, 1995 to October 30, 1996
Responsible and supervised for the installation of mechanical equipment and alignment for Solar Gas Turbine, Centrifugal Pumps, Heat Exchangers, Air Fin Cooler and Air
Compressor. Supervised and monitor daily activities of the subcontractor if they are conformed on project specification requirements. Ensure that all mechanical equipment that have been installed are documented as per project requirements. Reinforced safety rules and regulations.
Name & Address of Co.: Mitsubishi Heavy Industries
San Rafael, Calaca, Batangas, Philippines
Project: Batangas Coal Fired Thermal Plant II,
Position: Auxiliary Equipment Supervisor
Date Employed: June 1994 – May 1995
Plans & coordinate auxiliary equipment program designed. To ensure the continuous flow of constructions consistent with established codes & standards. Formulates &
maintains the right installation & alignment of all equipment installed in Water Treatment
Plant & Boiler. Daily work planning & preparations. Material scheduling & preparations.
Name & Address of Co.: PHB Wserhutte Mina Ahmadi Safat Kuwait
Project: Sulphur Handling Facilities Plant
Position: Mechanical Supervisor
Date Employed: September 25, 1985 – August 15, 1986
Responsible and supervised for the installation and alignment of 4 units Sulfur
Handling Conveyor, Drive Gear Box at flaker house & circular Building. Responsible for the installation and alignment of refrigerating machine
Name & Address of Co.: Chiyoda Petrostar Ltd.
Yanbu, Saudi Arabia
Project: Yanbu Domestic Oil Refinery
Position: Mechanical Supervisor
Date Employed: October 1983-May 1985
Responsible and supervised for the installation of 4 units of Ingersol Rand Centrifugal Compressor; 4 units of Mitsubishi Reciprocating Compressor, Worthington centrifugal pump, Goulds Centrifugal pump, Mitsubishi pumps, &Toshiba Vertical Pump.
Name & Address of Co.: ESSO Production Malaysia Inc.
Kerteh State of Trengganu, Malaysia
Project: Trengganu Crude OilTerminal
Position: Mechanical Supervisor
Date Employed: December 8, 1982-September 15, 1983
Responsible and supervised for the installation and Alignment of Gas Turbine Generators,
Centrifugal Compressors, Gas Turbine Pumps & Centrifugal Pumps. Conduct
Calibration of relief valves & re-tubing of heat exchanger. Daily preparations & planning of works. Material preparations needed at site.
Name & Address of Co.: Sumitomo Heavy Industries Co. Ltd. Jeddah
Jeddah Saudi Arabia
Project: Desalination Plant
Position: Mechanical Supervisor
Date Employed: October 1979 - December 1982
Responsible and supervised for the installation and alignments of boilers, evaporator and auxiliary equipment & other mechanical equipment. Daily preparations of works & planning for material needed in site..
Name & Address of Co.: Union Glass Industries
Rosario, Cavite, Philippines
Project: Glass Plant
Position: Maintenance Foreman
Date Employed: July 1, 1975-September 30, 1979
Daily preparation & planning of Mechanical works. Responsible for the installation and
Alignment of power plant machinery Such as Diesel Generator, Pumps & Blowers.
Prepare maintenance program for equipment such as daily, monthly or yearly basis.
Personal Information:
Date of birth: May 29, 1952
Nationality: Filipino
Education: Bachelor Degree in Mechanical Engineering
University of Visayas Cebu Philippines
Professional License: Mechanical Engineer
Training And Seminars: Basic Supervisory Course
ISO 9000 Awareness And Implementation
Leadership And Supervision
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 101 to 150 of 7040)
Go to Search Parameters...
Brief Description
MS in Petroleum Engineering, 20+ Years experience as Reservoir Engineer. Skilled in Reservoir simulation, Field Development Plans and Well & Reservoir Management.
Sailed for lasat 18 years on board Chemical, petroleum, OBO and Bulk carriers. Extensive experience on drydocking and repair yard. Completed conversion of a ship to FSO at Keppel Shipyard.
I have 18 years experience in Oil & Gas Industry.Experience in completion execution: Completion activity and workover operation, Well Testing (Oil / Gas), Gravel Pack, Gas Lift, Submersible Pumps, Perforating Technique, Well Stimulation (Acid / Frac), Cement Squeeze Operation.
Well-developed interpersonal skills.
Senior Process and flow assurance engineer with full project cycle experience.
I am a licensed Canadian engineer with M.Sc. degree and 28 years experience in Instrumentation & Control Systems (DCS&PLC) design, instruments specification (InTools), purchasing, commissioning, start-ups, maintenance, and training. In past twelve years I worked with major EPC offices in Calgary
Piping Stress Oil/Gas, Off/Onshore, FPSO's and Nuclear - Caesar,Autopipe and PSA5
I am Petroleum Geologist with +20 years experience in subsurface projects. These experiences cover mostly production geology, drilling operations and a few exploration projects. I was also involved in heavy oil projects, including drilling operations, well geostering and geocelular 3D geologic model
Experience 14 years in Refineries (Fuels & Lube) as a Process Engineer to Technical Services Manager in India. 9 years in KNPC as a Process Design Engineer, in Project Department, implemented minor and major projects in 3 Refineries. 3 years in EPC Company, Canada, Designed SAGD utilities and SRU.
Over 30 years experience in Oil and Gas Petrochemical Industries onshore and offshore in the UK and overseas. Experience gained on various onshore projects, i.e. Power Plants, Chemical Plants, Pumping Stations, Alumina Plant, and Petrochemical Refineries ;BSc Mech. Eng..
Free!
I am an International Sr. Well Engineer with a wealth of worldwide experience and knowledge. I have a Petroleum Engineering degree and 27 years in the industry. I want to continue to contribute to the technological challenges of the energy arena, particularly offshore, subsea and deepwater.
Over 25 years of international oil/gas industry experience as a professional Geologist, I worked on Africa, Middle East, Canada, North Sea, India, Kazakhstan, Trinidad & others. Proven track record in geological exploration & development venues: prospect generation, new ventures andplay fairway
Drilling exploration production, per cv below
B.E. (Mechanical) - 1980
Petroleum Engineer with 26 years of professional experience mostly in Production Engineering. Spanish and English fluent speaker. Artificial lift, workover and well service recommendations. Well Completion programs. Well testing. Field Evaluation and Production Optimization.
30 + year mud engineer, experienced in all phases of drilling fluids & BOP.
I have more than 17 years experience in exploration and development domains. During my career, I have explored for hydrocarbon in the Algeria sedimentary basins. North Sea Norwegian sector, Libya and now I`m working in Canada for Fugro-jason.
23 YEARS EXPERIENCE IN PETROCHEMICALS -PROJECT , OPERATIONS ,ERECTION ,COMMISSIONING
Seasoned and versatile process engineer (Oil & Gas, Refining) seeking a Process Engineering position that utilizes my analytical and communication skills to enhance organizational growth and profitability.
Project management, Coordination with End User/ Vendors/Contractors/Consultants, Progress monitoring& reporting, Supervision, Quality/Safety assurance and Tender documents
Professional API 510 and AWS CWI Inspector
With thirty years experience in the workforce in industries such as oil & gas, mining, fabrication/construction, and marine engineering, I have a very strong mechanical aptitude in all disciplines and a strong commitment for OHSE having started with my apprenticeship as a Mechanical fitter/1st class
Petrophysicist
Over 15 years of experience in Instrumentation Engineering, Procurement, Construction, pre-Commissioning and commissioning of projects
Highly skilled and experienced Sr. Drilling Engineer, experience with land/offshore (including deepwater), having worked as Drlg Engineer through Drilling Engineering Supervisor for a large scale GoM deepwater developement project.
20 years experience in drilling/work
Engineering design, offshore and onshore pipelines and facilities, Report writing DBM, FEED, PEP
Production chemist involved in oil & gas flow assurance, development and validation analytical operating procedures, reliability plant engineering
B.E.(Mechanical); 22 Years total Industry Experience; Served with SABIC, Reliance, SPIC & Shell;
More than twenty (20) years experience in the field of Engineering Construction in
A professional, well-qualified MECHANICAL ENGINEER with extensive project management experience in the oil refining, gas, LNG/LPG, petrochemical and associated industries.
Senior Plant Inspection Engineer. Mechanical engineering graduate with 29 years of experience in Oil/ Petrochemical industries loking after Process Plant Inspection, Materials Inspection, NDT, Corrosion, Failure Analysis, Fabrication/ Welding inspection in running plants + new grass root projects.
Geologist, Heavy Oil and Oilsands. Experienced consultant, prospect generator, horizontal well planner for thermal and CHOPS applications.
I have 22 Years of experience in the Detailed Design and Engineering in the areas of Plant Design & Piping for Oil & Gas, Petrochemical, Chemical and Power Projects. I am presently working as a Head Piping.
With 20years O&G experience, my main experience has been on major projects during design. I have experience within Operations, Construction and Commissioning and also worked on site; offshore, pipeline construction and FPSO shipyard construction. I have Australian and British Citizenship.
Dedicated professional in Exploration and Production with 27 years experience working for the two largest major Oil Services Companies. Strong engineering background in Drilling and Completion Fluids as well as Drilling Waste Management through years of focused operational management.. Strong engi
Drafter & Designer experience in estimation and designing of transmission lines and poles. Facilitated department meetings for administration of projects. Have worked the industry for twenty-five years and have obtained a Bachelors of Science degree in, Business Administration. Ability to prioritize
Profile: A Specialist Seismic Interpreter with over 15 years experience in Oil & Gas exploration, in seismic interpretation and prospect generation. Having the ability to supervise seismic processing and acquisition activities and take on role as a Project Manager. Confident in ability to cont
Working with Transocean as a Drilling Manager in Integrated services Project started for 5 Jack up rig for Bombay High field with client -ONGC. Operation commence in Jan 2007.
Drilling Engineer offshore tender rigs jackups onshore land rigs
process engineer
a senior instrument & Controls engineer
Sr Piping Designer Oil & Gas 3D model
Senior Planner with more than 20 years experience in Oil & Petrocehmical Industries
Qualified professional Project Manager and licensed US chemical engineer, with 32 years oil and gas and refined products production and processing facilities, pipelines, stations and terminals.
Piping Engineer/Designer
Presently working as Drilling Manager with Transocean started up the project in India for 5 Jackup rig for ONGC along with Tony Flynn who was than our GM -Integrated services in May 2006. Direct responsibility is managing T12 and JTA ( 300' Jackup)on day to day coordination, planning and execution
AutoCAD drafting, Drawing, Painting (Acrylic, Oil, Water Color), Airbrushing, Faux Finishing, Murals, and Computer Graphics /Illustrations. Software: Adobe Illustrator, Adobe Photoshop, Adobe Streamline, Adobe 3D, Flash, Fractal Painter, Quark Xpress, Microsoft Word, Power Point and various scanning
Instrumentation, Control and Safety Systems Design Engineering - Projects
A Professional Engineer with over 18 years' experiences in Process Control Systems for the design, development & implementation of process control applications, oil storage, movement & blending applications and process training simulations. Extensive knowledge in Honeywell Distributed Control System
First
1
2
[ 3 ]
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
CATEGORIES:
Engineering/Technicians;
INDUSTRIES:
Petroleum/Oil/Gas;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com