CONTACT INFORMATION:
View contact information...
Date/Place of birth: 1971 –Syria.
Language: English / Arabic
Relevant Qualifications q Petroleum Engineering, Albaath University (Syria)/ 1994.
q Completion design work shop engineer q Well services supervisor q Beampump senior supervisor q Safety advisor q Production technologiest (engineer level 1), beam pump focal point,
Relevant Training and Development
LOCATION COMPANY
1995- 2008 Attitudes and behaviorfor supervisors, all HSE courses( PTW, SHOC, fire fighting, emergency response, H2S, NORM, Incident Classification, Investigation & Reporting, Safe Systems of Work …..EXT), Driving to excellent Syria AFPC
Nov- 2001 Beam pumping design Egypt INTEX
Jan- Nov 1995 Completion design, completion test Syria AFPC, Baker
2000 Wire line operation Egypt Gharib
May 2003 Well performance and artificial lift Egypt Tri-Star
Jun 2004 Production technology. Egypt Tri-Star
May 2005 Well test analysis& rod pumping operation Egypt INTEX
Jun1999 Sucker rod Syria PTS
2003 Immpower ( MIV, MR, WOR, WO, ) Syria AFPC
Sep 2002 Safety skills for supervisor Syria Tri-Star
Sep 1995 ESP Syria, Damascus Tri-Star
Oct 1999 Insert pump Syria SPC
Apr 2002 Beam pump installation Syria I.T.C
2003 IWCF course, I presented three days but due to family reason I cut this course, but I reviewed it alone later Syria
2006 Beam pump & cavity pump operation Cairo Triastar
2006 Well surveillance operations Cairo Sapesco
2006 HSE site & maintenance planning Damascus Tristar
2007 Beam pump operation Cairo Tristar
2007 Risk Assessment Damascus Tristar
2008 Basic production technology Damascus INTEX
2008 Production logging interpretation Damascus INTEX
2008 Artificial lift system Dubai petroskills
2008 Well integrity damascus shell
2008 Soft ware( prosper, MABL, GAP), integrated field modeling solutions Damascus Petroleum experts LTD
Career History
Year Job title Company
1995-1997 Well Services Work Shop trainee supervisor ( completion) AFPC
1997-1999 well services Supervisor Shell Syria (AFPC)
1999-2004 Well services & Beam Pump Supervisor Shell Syria (AFPC)
2004-2007 Beam Pump senior Supervisor Shell Syria (AFPC)
2007- Production technologist ( engineer level 1) Shell Syria (AFPC)
Skills
English Language Speaking & Writing (Fluently)
French language Desirable( little bit)
Computer Computer Literate in Microsoft word, Excel, power point, out look and Internet Explorer.
Ensuring safe, efficient and cost effective execution of the well services programme.
- I started my work as completion engineer in work shop where I spend 2 year as part of well services section, our responsibilities was to collect all completion parts as the design and test it to confirm that it will be ready to send to Rig.
¨ then I have Worked as well services supervisor from 7/02/96 to 2007 where I get a lot of experience in wire line, coiled tubing operation(drift, PLT, TDT, perforation, FBHP, well head maintenance, fishing, N2 lift, acid, stimulation, tag, kill wells, subsurface safety valve operation, BHP and THP survey, open and close SSD -----ext), during my work on well services I joined to Artificial lift( Beam Pump ) team from 1999 till 2007 in charge of all activities like( Dynagraph, Sonolog, change stroke length, change SPM, change S/B packing, install new beam pump unit, beam pump maintenance, change V. belts, install electric motor, commissioning, space out polished rod calculation, pulling and running the pumps,
¨ Safety advisor for artificial lift( incident reports, HSE issues, Safety meeting organizer, Unsafe act and condition, Audits, EXT)
¨ from the mid of 2007 I joined to production technology section on Damascus as Senior Engineer ( ASH field PT Engineer +beam pump focal point) where I get new experience which include prepare proposals for most the jobs which is run on the field ( completion, stimulation, beam pump installation, beam pump design, beam pump failure analyses, beam pump fluid level calculation, rod star and web,s soft ware) perforation, drift, PLT, BHPS, BHTS, work over recovery plan, drilling evaluation, set plug, water shut O ff, UTC( unit technical cost), plus sand and cement plug calculation cost, SCMT evaluation, cement remedial, participate on PA session, WRM, FDP, Drilling of the new candidate wells plan, Drilling cost, drilling wells design, wells developments, and I am still getting a lot of experience on this section).
View contact information... |