CONTACT INFORMATION:
View contact information...
Experience Record
Time: From: July 1992 to: June 1996
Employer: Abu Zaabal, Fertilizer & Chemical Co.
Position: Instrumentation Engineer
Duties:
1-Operating and maintenance for all Kinds of instrumentation in phosphoric acid plants (PH, Conductivity, Temperature, Flow, level, Pressure, Control Valves).
2-Installation of instrumentation for process plant.
3-Prepare a list of required spare parts and maintenance tools.
Time: From: July 1996 to: Aug 2003
Employer: The Arab Co. For Engineering Works "CAIROMATIC".
Position: Instrumentation Engineer
Duties:
1-Prepare tender document and estimation for under study instrumentation works in water, waste water and oil / gas projects.
2-Prepare engineering Documents and detail drawing for awarded Projects (Hook- up Drawings, Loop diagram, Block diagram, P&I, Instrumentation location, Cable Routing, Alarm Window, Instruments Data sheet, Alarm list, Set point list).
3-Design of measuring and control loops.
4-Installation works for awarded projects.
5-Operating and maintenance for all kinds of instrumentation (PH, Conductivity, Temperature, Dissolved oxygen, Suspended Solids, Flow, level, Pressure, Control Valves).
6-Prepare a list of required spare parts and maintenance tools.
Projects related (Engineering – Installation works)
1-Suhag East and Akhmeem sewage treatment plant.
2-Tanta sewage treatment plant.
3-Abu-Znima sewage treatment plant
4-Suez Gulf industrial waste water treatment plant.
5-Fujairah water and power project compact sanitary and waste water treatment plant U.A.E.
6-Gantot Sewage treatment plant U.A.E.
7-Upgrading 10th of Ramadan water treatment Plant.
8-Abes sewage treatment plant
9-Faraskour sewage treatment plant
10-Esna sewage treatment plant
Time: From: Sep 2003 to: Jul 2004
Employer: Middle East Oil Refinery (MIDOR)
Position: Shift Supervisor Instrumentation Engineer
Duties:
1-Supervising the instrument engineers & technicians activities.
2-Responsible for carrying out overall maintenance of all types of instruments such as Foxboro, Fisher Rosemount, magnetrol and endress+hauser.
3-Responsible for carrying out overall maintenance of control valves such as Masonlien, Fisher, Rotork, ledeen.
4-Monitoring/evaluation subordinate staff and upgrading their capabilities by conducting the on-job-training especially for new engineers and technicians.
5-Suggest new modification & development for the instrument and equipment.
6-Ensuring that good safety performance is recognized and recorded especially for the work permits and isolation certificates before maintenance activity commencement.
7-Reporting to superintendent the final activities including recommendations & failures if found.
Time: From: Aug 2004 to Dec 2005
Employer: Indelec Europe
Position: Senior Instrumentation Engineer
Duties:
1-Prepare tender document and estimation cost for under study instrumentation works in water & Wastewater projects.
2-Prepare engineering Documents and detail drawing for awarded Projects (Hook- up Drawings, Loop diagram, P&I, Instrumentation location, Cable Routing, Alarm Window, Operation Philosophy, I/O List, Instruments Data sheet, Alarm list, Set point list).
3-Instruments Data sheet, Alarm list, Set point list).
4-Installation works for awarded projects.
5-Operating for all kinds of instrumentation (PH, Conductivity, Temperature, Dissolved oxygen, Suspended Solids, Flow, level, Pressure, Control Valves).
6-Prepare PO & Data Sheet For Instruments
7-Prepare a list of required spare parts and maintenance tools.
Projects related (Engineering – Installation works)
1- Egypt Utilities Management/Alexandria High Priority Projects (EUM/ALEX/HPP)
USAID Grant NO.: 263 0270 02 (Process Control & Instrumentation / SCADA System Upgrade for 9 WTP'S including Chlorination and Chemical Dosing Systems).
2- Egyptian Petrochemical Company (Instruments upgrade for RO Plants).
Time: From: Jan 2006 to: Dec 2006
Employer: Saudi Archirodon LTD. (Saudi Arabia)
Position: Senior Instrumentation Engineer
Duties:
1-Cost estimation for under study instrumentation & Control works in water, waste water and oil / gas projects.
2-Prepare engineering Documents and detail drawing for awarded Projects (Hook- up Drawings, Loop diagram, P&I, Instrumentation location, Cable Routing, Alarm Window, Operation Philosophy, I/O List, Instruments Data sheet, Alarm list, Set point list).
3-Design of measuring and control loops.
4-Prepare PO & Data Sheet For Instruments
Time: From: Jan 2007 to: Jun 2008
Employer: Khalda Petroleum Co.
Position: Senior Instrumentation Engineer
Duties:
1-Supervising the instrument installation, commissioning and start up work.
2-Review Material Required For Instrument Installation Work.
3-Suggest new modification & development for the Instrument Installation Work
4-Complete Missing Engineering Drawing needed For Instrument Installation Work
5-Supervising the instrument Calibration Work.
Projects related (Installation works)
1-QASR Gas Development Project (The project is Joint venture between Khalda Petroleum Co. and Apatchi oil Co.
Time: From: Oct 2008 to: Till now
Employer: GETCO. (Saudi Arabia)
Position: Senior Instrumentation Engineer
Duties:
1-Prepare tender document and estimation for under study instrumentation works in water, waste water and oil / gas projects.
2-Prepare engineering Documents and detail drawing for awarded Projects (Hook- up Drawings, Loop diagram, P&I, Instrumentation location, Cable Routing, Alarm Window, Operation Philosophy, I/O List, Instruments Data sheet, Alarm list, Set point list).
3-Design of measuring and control loops.
4-Installation works for awarded projects.
5-Operating and maintenance for all kinds of instrumentation (PH, Conductivity, Temperature, Dissolved oxygen, Suspended Solids, Flow, level, Pressure, Control Valves).
6-Prepare a list of required spare parts and maintenance tools
Projects related (Engineering – Installation works)
1-25,000 m3/Day R.O Water Treatment Plant At AL-AFLAJ.
2-10,000 m3/Day R.O Water Treatment Plant At AL-HAREEQ.
------------
EDUCATION & CERTIFICATION:
------------
B.Sc. Electronic and Communication Engineering Ain Shams University May 1992.------------
ADDITIONAL INFORMATION:
------------
Special Courses
Fundamental of Process Control Instruments.
Maintenance & Operation Practical Course for Field Instrumentation.
Computer Skills
Windows.
Microsoft office (Word, Excel).
Internet.
------------
View contact information... |