Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #88240 next resume »»
CONTACT INFORMATION:
View contact information...

EDUCATION State University of New York at Buffalo, Bachelors of Science in
Electrical and Computer Engineering

COMPUTER Intools, Siemens Moore, 4mation, Wonderware, RSView, Unity, Concept
SKILLS Control Logix 5000, RS logix 500, RS logix 5, Intellution, Active Factory, OSI PI Process Book, Industrial SQL Server, XLReporter, AutoCAD, Visual Basic

EXPERIENCE Chicago Bridge & Iron, Houston, TX (8/2007 – 9-2009)

* Instrument & Control System Lead Engineer for new construction natural gas liquids (NGL) production facility project in Angola, Africa. The plant control system included a DCS, Fire & Gas and Public Address & General Alarm System (PAGA). The DCS system hardware platform was the Yokogawa Centum CS 3000 plant wide control system (PCS) and the Yokogawa ProSafe safety instrumented system (SIS). The DCS system included (5) dual screen HMI work stations, (1) engineering HMI work stations, (2) plant asset management work station, (1) OSI PI server workstation, (10) skid mounted Control Logix PLC's, 2,500 hardwired I/O points and (133) motor control buckets (MCC) controlled via Device Net. The project staff that I managed on the project was from (4) departments and included (13) people.

* Instrumentation & Control System Senior Engineer for new construction LNG port storage and distribution facility project. The facility included (2) ship berths, (5) storage tanks. The DCS hardware platform was the Yokogawa Centrum CS 3000 PCS and ProSafe SIS system. The DCS system included (8) dual-screen HMI work stations, (7) engineering HMI work stations, (2) historian work stations, (1) plant asset management work station, (11) skid mounted Control Logix PLC's, (2) CEMS systems, custody transfer meters and reporting, 2,100 hardwired I/O points and (48) MCC buckets controlled via Device Net.

American Electric Power, Dallas, TX (9/2001 – 5/2003, 5/2004 – 8/2007)

* Lead Electrical & Control System Engineer and Programmer for electrical co-generation power plant/refinery combination DCS and telecommunication upgrade project. Project included upgrade to and integration of plant wide DCS, telecommunication, electrical dispatching and corporate wide are network (WAN) communication assets. The Power Plant control systems integration included (3) Westinghouse gas turbine generators (GTG), (3) HRSG units, (1) Westinghouse WDPF DCS system, PLC-5 & SLC-505 PLC's and (16) ION Power meters. The WAN communication system upgrades included voice over IP telecommunication system integrated with (6) legacy local analog phone lines over T1 service. The WAN integration included a General Electric D20 RTU and OSI PI Process Book SQL reporting for dispatching interface and custody transfer reports. The RTU and dispatching interfaces utilized were DNP 3.0 TCP/IP, Modbus TCP/IP, Harris Protocol 5000 Serial, and Modbus Serial via spread spectrum radio. 10,000 hardwired I/O points. The project staff that I managed on the project was from (23) companies, (37) departments and included (147) people.

* Lead Control System Engineer and Programmer for electrical co-generation power plant expansion project. The expansion included (6) gas turbine generators and (3) HRSG units. The plant DCS system was the Siemens Moore APACS system with (2) quad-screen HMI work stations, (2) dual-screen engineering HMI work stations, (6) single-screen HMI work stations, redundant tag server, (1) historian work station, (2) alarm group printers, on-demand SQL reports and 3,600 hardwired I/O points. The plant wide control system included (26) skid mounted PLC's including PLC-5's, SLC-505's, GE 90/70 and 90/30 PLC's, (2) CEMS systems, (6) pairs of redundant Ethernet switches.

* Lead Control System Engineer and Programmer for electrical power plant Steam Turbine Generator (STG) controls system upgrade project. The control system hardware platform was redundant PLC-5's and redundant Control Logix communication bridges with Wonderware HMI stations. Upgrades to each of three steam turbine generator units included (2) dual-screen HMI work stations, (1) dual-screen historian work station, (2) redundant Control Logix network bridges for Ethernet to Data Highway Plus communication to redundant PLC-5 controllers and 1,300 hardwired I/O points.

* Lead Electrical & Control System Engineer and Programmer for electrical power plant water system upgrade project. The project included the raw water processing, ultra-filter and demineralizer water conditioning and the boiler feeder water system. The control system hardware platform was redundant Control Logix 5000 PLC's with Wonderware HMI stations. The control system included (4) dual-screen HMI work stations, (2) dual-screen HMI engineering work stations, redundant tag servers, redundant Ethernet communication, redundant Control Logix 5000 PLC's and 1,400 hardwired I/O points and (32) MCC buckets controlled via Device Net.

* Lead Control System Engineer and Programmer for electrical power plant Steam Turbine Generator (STG) controls system upgrade project. The control system included (1) STG and (4) gas suppliers. The DCS hardware platform was the Siemens Moore APACS system. The control system included (4) quad-screen HMI work stations, (2) engineering HMI work stations, redundant tag servers, (1) dual-screen historian work station, (2) dedicated alarm group printers, custody transfer SQL reporting and 1,300 hardwired I/O points.

* Lead Electrical & Control System Engineer and Programmer for electrical power plant water system upgrade project. The project included the raw water processing, demineralizer water conditioning and the boiler feeder water system. The control system hardware platform was redundant Control Logix PLC's with Wonderware HMI stations. The control system included (2) dual-screen HMI work stations, (1) dual-screen engineering HMI work stations, redundant Ethernet communication, redundant Control Logix 5000 PLC's and 600 hardwired I/O points.

* Control System Engineer responsible for the installation and commissioning of (23) power plant continuos emission monitoring systems (CEMS). Each system included a NOX, CO2 and Opacity analyzer.

Camp, Dresser & McKee, Dallas, TX (5/2003 - 5/2004)

* Lead Electrical and Control System Engineer for Central Texas Lake Level Management wide area network (WAN) and control system upgrade project. Project responsibilities included writing budgetary proposal, presenting proposal to Corporate Board of Directors, project design and bid proposal assessment. The control system hardware platform was redundant Schneider Quantum PLC's with Intellution HMI stations. The project included (9) remote pump stations, (8) remote monitoring sites and two main SCADA monitoring and control centers. The control system include Quantum PLC's and IFix HMI stations a frame relay communication infrastructure with three levels of packet priority with voice over IP phone system, (7) remote HMI engineering work stations, (2) remote historian work station, (9) spread spectrum radio master sites and 1,500 hardwired I/O points.

Kimark Systems, Dallas, TX (9/2000 - 9/2001)

* Lead Electrical & Control System Engineer and Programmer responsible for upgrades to and maintenance of a PC/PLC based wide are network and data acquisition system for a municipal potable and waste water treatment system. System included (1) master polling station, (20) remote slave sites, (5) remote stand-alone operator work stations, (1) HMI work station, (21) Schneider Momentum PLC's, leased and public phone lines, spread spectrum radios, telephone and application phone interface (TAPI) and audible alarming.

Technomation, Dallas, TX (9/1998 - 9/2000)

* Lead Control System Engineer and Programmer for pharmaceutical manufacturing upgrade project. The control system hardware platform was SLC-504 PLC's with Wonderware HMI stations. The control system was a FDA validated local area network (LAN) application for level 3 pharmaceutical manufacturing. System included multiple source SQL data archiving, SPC analysis and reporting of critical product process data, recipe management, Ethernet and DH+ communication, (8) stand alone operator work stations, (4) network work groups, (14) SLC-504 controllers and 1,100 hardwired I/O points.

* Lead Control System Engineer and Programmer for new construction dry wall manufacturing facility. The control system hardware platform was Schneider Quantum PLC's with Wonderware HMI stations. The control system included (8) HMI work stations, (2) engineering HMI work stations, (2) pairs of redundant tag servers, (2) redundant Windows servers, (8) Quantum PLC's, (200) variable frequency drives controlled via Modbus Plus, (130) MCC buckets, recipe management and multi-zone security and 9,500 hardwired I/O points.

* Control System Engineer and Programmer for municipal potable water treatment facility upgrade project. The control system hardware platform was Texas Instruments 550 PLC's with Intellution HMI stations. The control system included (5) stand-alone HMI work stations, (6) PLC's, redundant SQL data archiving and SPC reporting of critical process data, TAPI alarm annunciation to facility personnel and (20) remote SCADA stations interfaced via Modbus serial communication over microwave radios.

* Control System Engineer and Programmer for helicopter transmission manufacturing facility upgrade project. The control system hardware platform was PLC-5's with Wonderware HMI stations. The control system included (6) transmission test cells, (1) Windows domain server, (1) network application development (NAD) server, (2) engineering HMI stations, (8) stand-alone HMI work stations, (6) PLC-5 controllers and (6) variable frequency drives and redundant Ethernet and Data Highway Plus communication.

* Control System Engineer and Programmer for SCADA data collection and reporting system for oil refinery facility. The control system hardware platform was redundant PLC-5's with Wonderware HMI stations. The control system included (2) operator work stations, (1) redundant PLC-5 and (12) flow controllers, multiple source SQL data archiving, SPC analysis and reporting of critical process data and custody transfer.

Plasmaquest, Dallas, TX (9/1997 - 9/98)

* Electrical Engineering Department manager responsible for the control system design for a product line of semiconductor reactors. Responsibilities included design of control systems and the maintenance of the bill of material (BOM) database, management of engineering and drafting staff, employee work assignments, hiring and performance evaluations. The typical PC based control system had 150 hardwired I/O points.

Permclip Products, Buffalo, NY (2/1996 - 8/1997)

* Facility Electrical and Control System engineer responsible for upgrades to and maintenance of controls system for industrial web conversion line upgrade project. The control system hardware platform was RSView and Reliance Automax PLC's. The control system included (3) HMI work station, 26 variable frequency drives, dual turn roll unwind station with accumulator for on the fly change out capabilities, recipe management, 20:1 tension range and 3,500 hardwired I/O points.

CIR Electric, Buffalo, NY (9/1993 - 12/1995)

* Electrical Construction Project Manager for a variety of industrial and institutional multi-million dollar construction projects. Responsibilities included management of electrical estimation staff, management and scheduling of project equipment and manpower activities and requirements, contract and subcontract negotiations.

Koike Aronson, Arcade, NY (9/1990 - 9/1993)

* Electrical & Control System Engineer for the design of a product line of steel cutting and welding equipment. Responsibilities included design of control systems and the maintenance of the bill of material (BOM) database and manufacturing resource planning system (MRP), management of drafting staff and AutoCAD file system. The typical control system included (1) CNC and (1) PLC controllers, (3) axis servo drives with bridge configured synchronization circuit, dual rotating plasma head with capacitance height control, and multiple acetylene gas cutting stations with water spray nozzles.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 151 to 200 of 7051)Go to Search Parameters...
Brief Description
AutoCAD drafting, Drawing, Painting (Acrylic, Oil, Water Color), Airbrushing, Faux Finishing, Murals, and Computer Graphics /Illustrations. Software: Adobe Illustrator, Adobe Photoshop, Adobe Streamline, Adobe 3D, Flash, Fractal Painter, Quark Xpress, Microsoft Word, Power Point and various scanning
Instrumentation, Control and Safety Systems Design Engineering - Projects
A Professional Engineer with over 18 years' experiences in Process Control Systems for the design, development & implementation of process control applications, oil storage, movement & blending applications and process training simulations. Extensive knowledge in Honeywell Distributed Control System
(Maintenance with Procurement Exposure)
Initial four (4.0) years of Detail Design experience is in the field of Civil and Structural design of various Multi storey Buildings, Bulk drugs (Ranbaxy Module 5), Auto Industry, Chemical industry, Oil & Gas, Captive Power Plants, Machine Foundations, including Sub & Super structures for various i
Instrumentation and control engineer and instructor Phd neural fuzzy modelling and identification, optimization using genetic algorithms
21 years experience in corrosion engineering, monitoring and applying corrosion mitigation strategies to oil/gas/petrochemical industry. Detailed experience in cathodic protection (CP), pipeline integrity, chemical treatment, corrosion monitoring, coatings and corrosion/mechanical damage assessment.
21 Years Experience of Process Engineering in Refinery/Oil & Gas
A geologist currently working with a major oil companies, specialized in reservoir characterization, formation evaluation, operation geology and geosteering in clastic reservoirs. Develop expertise while working in Australia, Saudi Arabia, North Sea, India and several other international projects.
To be fair to everybody. Shared gain knowledge¡¦s and experienced for the benefits of all and to obtain a position with a progressive company that will utilize my experience, broaden my Knowledge, and offer opportunities for advancement.
Possess a career that spans for over 25 years within the Oil & Gas, Construction, Operation and Maintenance and Manufacturing Industries, performing contract formation and administration work.
Specialised in the design and structural engineering calculations for high integrity mechanical handling systems up to 25,000 tonnes SWL.
B.E(chemical from dharwad karnataka)
Free! 19 years experience in Production Engineering, Production Operations, workover and service rigs for Artificial Lift equipment, operations supervision and administration.
CHEMICAL ENGINEER HAVING TWENTY FOUR EXPERIENCE IN PETROCHEMICALS MANUFACTURING
I have been working for Shell for about 21 yrs now. I joined Shell as a wellsite peterolem engineer in August 1988. Before then I worked for 4 years in Gas and steam electric generating station rising to the post of senior mechanical engineer. I have a Bachelors degree in Mechanical Engineering
Project Controls Engineer, Cost and Schedule, 1984 Civil Engineering graduate
A challenging position as a Geophysicist which will provide an opportunity to use my geophysical skills.
I am a team player and enjoy the challenges every project brings. I am also very capable of independently completing and working on projects alone. I have been involved with a variety of projects, and taken many of them either to IFC or as built stage as required.
Over 18 years Oil and Gas experience and have been involved at all levels of conceptual, Front End Engineering, Detailed Design and operational support
Having more than 18 years of working experience as a Wellsite geologist, Mudlogger in Oil & Gas, Geotechnical investigation, Hydrogeology, research & Management. Worked on horizontal, directional & vertical wells for conventional & oilsand coring projects, to examine & describe drill cuttings.
Workover and completion operations engineer
Bachelor Science degreed as Civil Engineer with 23 years of professional experience in different job positions in petrochemical, fertilizer, power plant and open coal mine, related with design, engineering, construction and maintenance of reinforced concrete structures and steel structures.
Engineer - Geologist of Oil and Gas Exploration
I would like to apply for a position as Chief Engineer / Maintenance Supervisor with your company where my experience, training and good work habit will be asset to your company. The attached resume covers my 33 plus years of offshore / oilfield / maritime experience as Maintenance Engineer
Specialist in Offshore Installation Inspection in Mechanical & Piping
Sr.Planning Engineer / B S Mechanical Engineer / Diploma in Mechanical / Certified PMP / Primavera 3.1, P5E, P6E, MS Project, MS Office
Piping detail and design
drilling fluids engineer(mud engineering), field, supervision and mangement
Rotating Equipment Engineer, Maintenance Engineer, Mechanical Engineer with 22+years of experience
23 yrs of experience in wet chemistry procedures, also have operated and maintained HPLC, GC, AA
Worked in a position of "Senior Chemist" for a period of 13 years and 4 months (1981-1994) in a Modern Thermal Power Station and Large Desalination Plants with Sharjah Electricity and Water Department in the United Arab Emirates.
experience on quality comissioning completion of piping crude oil.experience on welding .having certificates on welding CSWIP 3.1 and quality G.O.C certþficate.also HS certificate from BP Golden Rules and from METU University HS certificate
Sr Piping Designer/Checker
Senior production engineer / technologist, + 30 yrs experience, BSc, M. Eng Pet Eng
Senior Process Engineer (Indian) with about 24 years experience available for Senior assignments in Oman / UAE with reputed oil & gas companies
Sorption, desorption, refining, distillation, demineralization, extracting (demulsification with surface-active agents), absorption, rectification, water purification (ion-exchange, ultrafiltration, reverse osmosis and so on). Responsibilities: „Ï water pre-treatment system of plant u
More than 30 years experience in civil structural design, consulting and supervision in upstream, downstream, and pipeline of oil and gas fields
Control System Engineer
CCC Certified, MBA, Cost Controller / Project Controller expert in Advanced Excel, MS Access
Accomplished professional with over 19 years of experience in all phases of the oil and gas drilling industry as a Roughneck, Motorhand, Derrick Hand, Assistant Driller, Driller and Relief Rig Manager. Demonstrated proven track record of recent operational success as Directional Driller, Trainer, Te
commsioning for L N G Process Plants
Very experience cementing engineer/specialist
Senior Applications Software Engineer with broad experience in design, development and implementation of highly technical applications. In-depth experience with multiple MMI intensive applications such as EMS SCADA, geological and geophysical workstations.
Welding Inspector
Geophysicist/QHSE Advisor
I have very good skills for work in team, a like part of the team and with the capacity of leadership to be leader of the team. I apply a proper self direction naturally, I work by means of a good communication between colleagues and the bosses, good organization, intensive diligence, strong initiat
I am a graduate mechanical plus first class boiler engineer and have 20 years experience of process and pwer generation industries.Iam in search of some engineering job in managerial position keeping in view my qualification and experience.
Mud Engineer/Drilling Fluid Consultant 31 years of experience
Well versed in boiler construction, piping fabrication and installation, machinery installatio
First   1   2   3   [ 4 ]   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
CATEGORIES: Engineering/Technicians;
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com