Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #88366
next resume »»
CONTACT INFORMATION:
View contact information...
OBJECTIVE
Seeking a position to utilize my skills and abilities in the field of Instrumentation Industry that offers security and professional growth, while being resourceful, innovative & flexible.
Profile
„« Enthusiastic and a self-starter, who is eager to meet challenges, quickly assimilate skills and ideas.
„« Motivated achiever and a creative problem-solver, who works hard and loves a challenge.
„« Honest, reliable and highly analytical team player who exceeds expectations.
„« Good relationship-builder with special interpersonal, communication and presentation skills.
Academic Qualification
►Diploma in Electrical and Electronics Engineering
Elumalai Polytechnic, Villupuram,
Batch 1994 ¡V 1997
► BSC ¡V ELECTRONIC SCIENCE
ANNAMALAI UNIVERSITY, CHIDAMBARAM,
Cv Overview
I am working in the field of Instrumentation with 11 years experience in process control Instrumentation field. I have principally been involved in maintenance fields of continuous process plants. I have actively participated as key member in various projects.
Present Employment
M/S. ALMEER TECHNICAL SERVICES CO. W.L.L, KUWAIT
Period: JANUARY 2008 ¡V APRIL 2009
Designation: INSTRUMENT SUPERVISOR
KUWAIT
Client:
SAFWAN PETROLEUM TECHNOLOGIES. CO.W.L.L
KOC, NORTH KUWAIT
KUWAIT
CONFIGURATION: EPF OF 50 MBOPD CAPACITIES FOR NORTH KUWAIT
JURASSIC PRODUCTION-INSTRUMENTATION WORKS.
Nature of Job
* Supervise and approve construction activities and co-ordinate inspection, mobilization of personnel at site, checking of detailed drawings and other documentation, maintaining Daily Record of Progress noting special comments and preparation of weekly and monthly progress reports. Report to the manager and clients regarding any work anomalies or contractual deviations and corrective actions. Liaise with Quantity Surveyors in determining amount of completed work for the preparation of related monthly physical progress and certification of Invoices.
* Liaising with client, vendor representatives and other disciplines to minimize interface problems and ensuring the instrumentation work completed in efficient manner within project constraints.
* Assisting the Field engineering Department for Technical clarification regarding the site work.
* Supervision for Fiber Optic cable laying, Cable Tray installation, cable laying, impulse tubing to field instruments, Erection of field instruments Loop Checking, Interlock checking, Trip and Sequence testing and Trouble shooting in Field instruments and Control room.
* Site surveys, detailed engineering works, preparation of data sheets, loop drawings and related engineering drawings. Submittal and approval of documents and drawings from the client side
1. M/S. ALMEER TECHNICAL SERVICES CO. W.L.L, KUWAIT
Period: SEPTEMBER 2006 ¡V DECEMBER 2007
Designation: Instrument Engineer, Iraq.
Client:
Kellogg Brown & Root Services, Inc. (KBR),
IRAQ.
System Handled
ALLEN BRADLEY SLC500.
Nature of Job
„X Function and loop check assistance (from field to the PLC in control room).
„X Calibration of all instruments related to compressor trains and de Hydration skid, Glycol flash tank, Re Boiler skid, Degassing towers.
„X Commissioning and Start-up Assistance and Supervision.
„X Inspection/troubleshooting and function check of all PLC Software and Hardware items.
„X Inspection/troubleshooting assistance of all associated field instruments.
„X Provide technical assistance to the current General Subcontractor when required during installation and pre-commissioning & commissioning.
1A. M/S. ALMEER TECHNICAL SERVICES CO. W.L.L, KUWAIT
Period: APRIL 2005 ¡V SEPTEMBER 2006
Designation: Instrument Supervisor.
Client:
Joint Operation (K.G.O.C & S.A.T) KUWAIT.
Presently working as Instrument Supervisor Joint operation, Wafra site.
System Handled
DCS: Foxboro (V 6.2), Rosemount (Delta V), Yokogawa (CS 3000)
PLC: Allen Bradly & Hima PLC (ESD &FGS)
Process Units& Instruments
Gas Fired Heaters, Electrostatic Desalters, Separators, Crude Transfer Units, Crude& Water Tank Farms, Degassing\Stripping Tower, PMP Water Injection Unit, Agar probe controller, Bentley Nevada vibration monitoring system (3300 series)
Nature of Job
Maintenance activities related to DCS, PLC, field equipments, final control elements and equipment maintenance of
„« DCS, PLC control panel maintenance, loop forcing, modification & implementation of DCS channels & loops, changed the faulty channel address to spare channel.
„« Control valves, displacer type leveltrols, Level, Flow, and Pressure switches I/Ps and all type of positioners.
„« Pressure Transmitters, Differential Pressure Transmitters, Ultra sonic type transmitters, pneumatic Leveltrols with controller.
„« Loop checking and Commissioning of all type of instruments in Compressors,HP & LP Separators, Desalters, Heaters, KO Drum, HP & LP Scrubbers, Coolers, Feed pumps, Booster pumps, PMP high pressure injection pumps and all type of Tanks.
„« Trouble shooting of all process equipments mainly heaters, pumps using P&I Diagram, Loop Diagram, Logic Diagram
„« Maintenance & calibration of Agar probe controller using Desalters& crude and water tanks for level measurement
„« Maintenance and Calibration of Tank safety equipment HUTCH valve, Breather valve, self actuating control valve and all.
Previous Employment Details
2. NAME OF THE COMPANY: HYUNDAI ENGINEERING &CONSTRUCTION COMPANY LTD, IRAN.
PROJECT: IRAN SOUTH PARS GAS FIELD
DEVELOPMENT PHASES 4 & 5,
ONSHORE FACILITIES, IRAN.
CONFIGURATION: 2000 MMscfd of Wellhead Fluid (on drybasis) (500 MMscfd X 4 Trains)
CLIENT: AGIP IRAN BV (ENI Group, ITALY.)
POSITION HELD: INSTRUMENT TECHNICIAN
CONTRACT PERIOD: 17t OCT 2003 TO 02ndNOV 2005
JOB PROFILE: SUPPORTING TO YOKOGAWA CENTUM CS 3000 VENDORS,
HIMA PLC H51Q-PLC VENDORS IN CCR.
Worked in Hyundai Engineering & Construction Ltd ¡V SOUTH PARS Phase 4 & 5 (Seconded to ENI Group, Italy) IRAN GAS TREATMENT PLANT, There I was worked in CENTRAL CONTROL ROOM, My job profile is to Co-ordinate with YOKOGAWA VENDORS, HIMA PLC VENDORS and loop test team. My work includes following commissioning activities, DCS (Process), PLC (Emergency Shut Down System and Fire and Gas Service system), and Calibration of all process instruments, Marshalling Cabinet work, System Cabinet work, Net Work Cabinet work and DCS logic modifications, reliability operation and plant normal operation coordinate with maintenance team different work to permit systems applied in the plant and extraction of maximum work from CENTUM CS 3000 DCS and HIMA PLC operation to achieve the target.
NATURE OF JOB
* Assigning of ( AI, AO, AIr, AOr, DI, DO, DIr, DOr,) tags in the card address, modifications done in system Cabinet and Marshalling Panels, Updated Master Database, Wiring Diagrams, and TSLDs (Trouble Shooting Loop Diagrams).
* Commissioning of Fire water Pump Sequence, Deluge system Sequence, and Total Plant Shutdown sequence (TPS), Blow Down Sequence, Emergency Shutdown Trip Sequence.
* Assigning & Modifications of all inter wiring in PCS, ESD and FGS signals in all ITR's (instrument technical room) & Central Control Room (CCR).
* Good experience in Trouble shooting system side and field side.
* Cause and Effect Matrix for ESD & FGS Document Modification.
* All ITRs Energisation of
„« Power Distribution Panel (PDP),
„« Network Station Cabinet,
„« Field Control Station (FCS),
„« Marshalling Cabinet and
„« MIH (Maintenance Inhibit Stations).
HIMA SAFETY SYSTEM PLC H51Q (ESD & FGS)
Coordinating with HIMA Vendors & Loop test team for forcing DO Signals, bye pass the ESD trip signals & OTP done in utilities, Process and Offsite area. Commissioning of USS (Ultimate safety system), EIS (Electrical Isolation System) for all ITR's (Instrument Technical Rooms), AND HIPPS (.HIGH INTEGRITY PRESSURE PROTECTION SYSTEM).
3. Integral services company W.L.L: Worked as an Instrument Technician in
Kuwait Al-zour south power station (Boiler capacity1100TPH * 8 & Turbine capacity 33MW * (From 25.01.2002 to 22.03.2003)
4. M/s.Chemin Consulting Engineers: Erection of Instrumentation & Electrification work
Pondicherry
Project Site: At Surat (G.I.P.C.L.125MW Power plant)
Nature of work: Involved in calibration of all types of
Instrument erection, Loop checking for analog inputs and Outputs,Digital inputs &outputs (From 01.08.1997 to 30.11.1998)
5. M/s. E.I.D.Parry (I) ltd.: Sugar & co-generation power plant ¡V 30MW
Nellikuppam (TATA Honeywell DCS-TDC 3000)
As an Instrument Apprentice Trainee.
(From 03.12.1998 to 02.12.1999)
6. M/s Jayam consultants Pvt. ltd: Instrument supervisor
Chennai
Project Site: M/s. E.I.D. Parry (I) ltd.
Pudukottai
Nature of Work: Erection, Commissioning & Maintenance of
Boilers 51.5 TPH & 29 TPH.
Related to PLC: Modicon PLC, Ver3.3, CPU. TSX57102.
(Logics Electronics Pvt. ltd, Chennai)
Loop wiring, Loop checking for and Outputs
(From 04.12.1999 to 15.07.2000)
7. M/s. E.I.D.Parry (I) ltd.: Instrument Technician
Pudukottai
Nature of Work: Erection, Commissioning & Maintenance of All instruments in sugar process control (2500 TCD)
Related to DCS: Foxboro DCS, IA system, CP-60, AW-51D.Loop wiring, Loop checking for analog inputs and Outputs & Digital inputs &outputs.
(From 16.07.2000 to 15.01.2001)
8. M/s.Arunachalam Sugars Ltd.: Instrument supervisor
Thiruvannamalai
Nature of Work: Maintenance of Boilers instrumentin co- generationPowerplant18MW&Sugarautomation (From 16.01.2001 to 20.01.2002).
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 2001 to 2050 of 7051)
Go to Search Parameters...
Brief Description
I have 6.5 years experience in Instrumentation and Control System Engineering. Involved in Proposal works, Basic Engineering Design, Detail Engineering Design, start-up, pre-commissioning and commissioning activities. Experienced with DCS and ESD System.
Prefer to jobs that generate/analyze data in quantitative or qualitative
I am a B.Tech degree holder in Instrumentation passed out from Madras Institute Of Technology, Madras, India and I am having Sixteen years of experience in the field of Instrumentation in maintenance, construction, commissioning and design in petrochemical, refinery, power plants
MS in Civil and Mechanical Engineering, in Alaska, Russian and English language, experienced in Numerical Wave Modeling, Coastal Engineering, Hydrographic Survey, adaptable to changing projects and work schedules and have a proven ability to quickly train on different subjects.
•Engineering, Project Management, Construction Management, Cost Control & Sub-Contract Co-ordination •Oil & Gas, Petro-chem, Cross country Piping •Shutdowns/ Tie-ins •Equipment Installation/ maintenance and commissioning •Structural Fabn & Erecn •Manpower and Resources Planning
I have been working in the UAE since October 2001 as Mechanical Maintenance Supervisor/Commissioning Engineer in the Oil/Gas and Power Industry. Prior to that I held senior positions in the Military as Ship's Chief Engineer, Engine Room I/C, Instructor and In charge of training.
Total work experience of 5 years as Chemical engineer. Core competency on steady state process simulation, optimization & de-bottlenecking in the field of Petrochemical & Refinery
Large Water treatment plant like RO plant, DM Plant, Ultra filtration plant, Pretreatment plant Operation, Maintenance and analysis. Large Power plant Boiler(High Pressure Boilers) Water Chemical Treatment and Analysis, Cooling Tower water chemical treatment and analysis, Environmental(Ambient air,
22 years of overall experience in Oil & Gas Industry in Operations, Project Management, Subsea Works, Facility Engineering, etc.
Geologist/Hydrogeologist, 18 years experience, environmental, sedimentary and glacial bedrock and soil deposits, 3-dimensional characterization of fracture zones in bedrock, LNAPL and DNAPL migration pathway analysis.
9 and half Years of working experience in Petrochemical Refinery and Oil & Gas Production / Processing Plant's Instrumentation field (Reliance petroleum Ltd. India, Petroleum Development Oman (Shell-Oman govt joint organization), and Ras Gas-Qatar) as Maintenance Foreman/Technician-Analyzers.
A highly qualified and skilled Reservoir Engineer with over 7+ years of Domestic and International experience for the long-term management, development and optimization of large, mature fields and associated satellites.Expertise in Production/Petroleum and Reservoir Engineering particularly (expe
Extensive Work Experience
Fourteen years experience in E&P oil industry. Good knowledge in drilling and production engineering. Extensive experience in well engineering operations in Completion, clean-up, DST, Stimulation, Coil-tubing, Logging, Well survey etc. Good skill in planning, organizing, communicating, interpersonal
An experienced Offshore Procurement Lead
14+ years of experiance in Engineering,Design Engineering specialising in Instrumentation field.
Process Instrument & Control and Analytical Insrument Specialist
I have 20+ years experience in all aspects of electical work, i.e. construction, testing and inspection and commissioning at home and abroad, onshore and offshore.
Reliability Engineer
A good team player with proven communication skills and ability to Motivate People, drive changes and strive for continual Improvement; Excellent People Management and Interpersonal Skills.
Scaffolding engineer Certified from CITB UK.
I have a M.S. in Petroleum Engineering with emphasis in flow assurance issues. Through my experience I have gain great communication and technical writing skills. Also been in a project has gave me the ability to work well both in teams and individually.
Piping designer, Pipe stress engineer
Mechanical Engineer (Piping- Lyout/PDS)
Working as a instrument technician in al- jubail petrochemical plant saudi arabia. involve in on line instrument and maintenace in low low density poly ehthelene plant(LLDPE) AND (LDPE) low density poly etheylene plabnmt.good knowlawdge of all type honey well ,yokogawa,foxboro and rosemount fisher
Designer/Drafter with Inventor experience.
Thorough technical/commercial knowledge and long experience on design, fabrication and sale of process equipment for oil/gas and energy industries
I am a Certified PeopleSoft Technology Consultant and a Certified PeopleSoft Installer and have worked as a PeopleSoft Systems Administrator for 7 years. I have implemented/upgraded Student Admin, Portal, HRMS and Fin. PeopleSoft systems on various platforms and can implement on any platform.
instrument supervisor libiya.
Drilling Engineer with 4 years experience ,working for a leading Exploration and Production Operator.• Responsible for planning and executing well designs and workover programmes for producer and water injection wells.• Monitor follow all phases of the daily drilling and completion operations, perfo
i am project manager assistant in pressure vessel and road tanks,cylider and on/offsure projects in industrial inspection company
INSTRUMENTATION & CONTROLS ENGINEER with proven leadership skills, vast experience in the petrochemical and oil & gas industry. Worked for Technip, Tractebel, PDIL, GS E&C in india and aboard.
working as intrument and control technician in Total oil and gas platform Abu dhabi . Involved mainly in Trouble shooting and commissioning activities.
A competent and qualified Mechanical Engineer with over 20 years experience in functional areas of Project Management, Strategic Management, Mechanical Maintenance, Process Engineering, refurbishment, as well as other allied operations. Presently associated with Saudi Arabia Basic Industries Corpora
Thirteen years of experience in the field of project management, feasibility Studies, front end engineering, conceptual design, Project proposals, detail design, flexibility Analysis, procurement assistance in piping/pipeline design.
Process Engineer in Oil & Gas Consultancy.
Area of Interest AVO/AVA, Inversion, Reservoir characterisation using Pattern Recognition and Spectral Decomposition and Attenuation.
Completion and workover engineer (11.5 years experience)
Experience in field development plan, identification of workover requirements, well completion, acquisition of subsurface data, optimization of well performance and project management,
Schlumberger 17 years Coiled Tubing / Nitrogen services/Fracturing
Design and drafting OIl and Gas processign facilities, Structural, Piping, Civil. 7 Years experience with 3D CADWORX modelling on Canadian and international projects. Recently worked on Enterprise's Meeker II facility as well as Green River Gas Plant (PROPAK) early 90's.
Bilingual English-Spanish Project Manager with over 6 years of experience working for diverse industries including the Oil, the light and heavy construction, and the Steel Production.
I would like to apply with your company for the position of a INSTRUMENT SUPERVISOR /TECHNICIAN I have 11 years of oilfield ,gas plant ,power plant and some process plants experience as an SUPERVISOR, TECHNICIAN . I am having good work experiance with clients like ENI , IRAN PHASES 4 & 5 KOC -
Responsible for crude evaluation, expansion project related configuration studies, perspective planning and scenario analysis and retro analysis.
I have completed my Masters degree in Chemical Engineering from Lamar University. I have experience in ASPEN PLUS, ASPEN DYNAMICS, HYSYS, PRO-II for two years. I did my internship in Dynamic Engineering Purity Inc. for six months.
HYSYS simulations, process design, optimization, Process flow diagrams (PFD) and P&ID
Presently I am working with M/s B. S. Chaudhry & Co. as a Mud Engineer on E 760-II (1600 HP SCR), M 900-1 (900 HP), M 750 (750 HP), Cardwell-6, & Cardwell-7 since Jan.-2007 to till date continue at Mehsana Asset under MMC contract with ONGCL
Having experience in Mechanical Engineering in the field more than 10 years of Oil and Gas and Manufacturing industries mostly in engineering and inspections. Has worked in INDIA,and SINGAPORE on Onshore & Offshore.
Substation Automation engineer with 5 years of experience
DCS, Control system and Maintenance Engineer
First
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
[ 41 ]
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
CATEGORIES:
Engineering/Technicians;
INDUSTRIES:
Petroleum/Oil/Gas;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com