I have 8 years 6 months experience in Detail Engineering, Basic Engineering, Concept Study and Estimation for Onshore and Offshore platform design, Living Quarters, FPSO, Well Head Platforms, Process Platforms, RMS and Production Station Piping, Refinery Piping, Power Piping, Chemical Plants piping etc. My experience in the field of piping includes Preparation of Plot Plans, Equipment layouts, Key Plans, GA drawings, Isometrics, Piping Bulk MTO, Preparation of Piping Material Specifications/ Valve Specifications, Data sheets for Specialty items, Vendor document review, RFQ¡¦s, TBA¡¦s/TBE's etc. My experience also includes Site survey for both onshore and offshore facilities, Preparation of Basic Piping Study Drawings, Study and reviewing of P&ID¡¦s, Checking of Stress Analysis Reports, Involvement in Hazop¡¦s, Design Reviews, IDC's etc. My experience is also involved in Pre-bid engineering and proposal engineering and help EPC to submit their proposals. My experience also involves supporting EPC in execution of a project.

APPROVALS:

Petroleum Development of Oman/ Shell approved Piping Engineer.
Bechtel approved Piping Engineer.
Have conducted Campus Interviews and interviews in piping design campuses in India.
Certified ISO-9001 2008 Internal quality Auditor.

Experience Details:

1. Larsen and Turbo-Valdel Limited
(September 2008 till date)

Designation: Lead Piping Engineer - Offshore Exploration and Production

Client -1 Oil Natural Gas corporation of India

Project: B-193 Development - Offshore Process Platform- Prebid and Basic Engineering

Project involved 5 Well Head Offshore Platforms, One Process cum Well Platform, Living Quarters, and Modification Job on Existing Platform. As Lead Proposal Engineer my job involved the following activities:

- Going through the bid and raising TQ¡¦s/ queries
- Preparation of Preliminary Equipment layouts, Basic Piping studies, Preliminary MTO
- Preparation of Piping Specs and data sheets for specialty items.
- Support EPC to submit proposals.

Project: RS-12 and RS-14 Well Platform Project- Offshore Well Head Platform:

Project involved Well Head Offshore Platforms, Modification Job on Existing Platform.. As Lead Proposal Engineer my job involved the following activities:

- Going through the bid and raising TQ¡¦s/ queries
- Preparation of Preliminary Equipment layouts, Basic Piping studies, Preliminary MTO
- Preparation of Piping Specs and data sheets for specialty items.
- Support EPC to submit proposals.

Project: Detail Engineering for MHN Process Platform - Offshore Process Platform

Project involved Detail Engineering of MNP Process Platform Complex.

Activities Performed:

1. Preparation and Finalisation of Equipment Layouts.
2. Basic piping studies.
3. Preparation of Piping Bulk MTO.
4. Review of P&ID¡¦s.
5. PDS Model Review using Navis works.

Client -2 MODEC, Singapore - FPSO

Involved in 2 modules of FPSO project (Layouts).

Activities Performed:

1. PDMS Model Review using Navis works.
2. Checking of Isometrics.
3. Checking of MTO¡¦s
4. Preparation of data sheets for specialty items.
5. Involved in Design Reviews.

2. Tebodin and Partners LLC, Muscat, Sultanate of Oman
( From April 2007 till September 2008)

Designation: Lead Piping Engineer- Onshore Exploration and Production

Client 1 - Petroleum Development of Oman/ Shell
Project Name - DD for SNGP Booster Compressor Station- Onshore Well Head and Production Station

Project involved detail engineering of Nine Gas Wells, Remote Manifold Station, New Booster Compressor, it's utilities (H.P Flare, L.P Flare, Compressed Air, Main Gas Line, Seal Gas Line, Condensate line, Drain Line etc). All the lines where tied-in to the existing plant. Standard followed for the project was Shell Standard (MESC system, SAP System, SP¡¦s).

Activities Performed:

1. Site Visit.
3. Discipline Check of PEFS ( P&ID¡¦s)
4. Specifications for Specialty items like (X-mas tree interconnecting flange, Casasco fittings, Specification for big size pipes and fittings).
5. Preparation of Plot Plans and getting approval from the client.
6. Preparation of GA drawings and Key Plan.
7. Coordination with other departments for developing their deliverables
8. Preparation of Isometrics.
9. Preparation of stress analysis report using CEASAR -II for the above lines
10. Preparation of Preliminary, Intermediate and Final MTO for the project.
11. Handling Site Queries
12. Final As-built Drawing.
13. Execution ( Construction Support)

Project Name - DD for RMS-11 and GRE Pipe Lines

Project involved detail engineering of 28 Oil Wells, Remote Manifold Station, it's utilities (H.P Flare, L.P Flare, Compressed Air, Gas Lift Line and drain Line). Bulk Oil line and Flare line where tied-in to the existing plant. Standard followed for the project was Shell Standard (MESC system, SAP System, SP¡¦s).

Activities Performed:

1. Site Visit.
2. Discipline Check of PEFS ( P&ID¡¦s)
3. Specifications for Specialty items like (Multiport Selector Valve, Gas Lift Manifold, Specification for big size pipes and fittings).
4. Preparation of Plot Plans and getting approval from the client.
5. Preparation of GA drawings and Key Plan.
6. Coordination with other departments for developing their deliverables
7. Preparation of Isometrics.
8. Preparation of stress analysis report using CEASAR -II for the above lines
9. Preparation of Preliminary, Intermediate and Final MTO for the project.
10. Handling Site Queries
11. Final As-built Drawing.
12. Execution ( Construction Support)

Project Name - DD for LEK-C Manifold to LPS Production Station

Project involved detail engineering of interconnecting piping from LEK-C Manifold to LPS production Station, Bulk Oil line and Flare line where tied-in to the existing plant. Standard followed for the project was Shell Standard (MESC system, SAP System, SP¡¦s).

Activities Performed:

1. Site Visit.
2. Discipline Check of PEFS ( P&ID¡¦s)
3. Specifications for Specialty items like (Multiport Selector Valve, Gas Lift Manifold, Specification for big size pipes and fittings).
4. Preparation of Plot Plans and getting approval from the client.
5. Preparation of GA drawings and Key Plan.
6. Coordination with other departments for developing their deliverables
7. Preparation of Isometrics.
8. Preparation of stress analysis report using CEASAR -II for the above lines
9. Preparation of Preliminary, Intermediate and Final MTO for the project.
10. Handling Site Queries
11. Final As-built Drawing.
12. Execution ( Construction Support)

Other projects handled in the company includes:
1. Concept Study for Fahud and Qarn Alam Fire Water System Upgrade
2. BFD for Sayyala and Sadad Booster Pumps,
3. DD for Oil and Gas Wells for Lekhwair area
4. DD for Burhan West Development,
5. DD for Alhuwaisah Water Injection Facility etc and
6. Involved in estimation of man-hours for detail engineering Projects.

Client 2- Occidental, Oman

Project involved detail engineering of pipelines from Bulk Manifold Station to production Station. The pipeline was almost 5 kms. Bulk Oil line was tied-in to the existing plant.

Activities Performed:

1. Site Visit.
2. Discipline Check of PEFS ( P&ID¡¦s)
3. Preparation of Plot Plans and getting approval from the client.
4. Preparation of GA drawings and Key Plan.
5. Coordination with other departments for developing their deliverables
6. Preparation of Isometrics.
7. Preparation of stress analysis report using CEASAR -II for the above lines
8. Preparation of Preliminary, Intermediate and Final MTO for the project.
9. Handling Site Queries
10. Final As-built Drawing.

3. Saudi Arabian Kent Co. Limited, Saudi Arabia (From Jan-2006 till April 2007)
Designation: Piping Engineer

Client-1 Eastern Petro Chemical Company ( SHARQ)- SABIC / Foster Wheeler, UK.
(Jan-2006 till Sep-2006)- Refinery Project

„« Designing of utility pipelines like Ethylene, Oxygen, Nitrogen, Caustic Soda, Ethane, Natural Gas, Butane, Instrument Air, Portable water from metering skid to different utility locations.
„« Preparation of Plot Plans and Isometrics for utility lines.
„« Preparation of tie - in packages for the above lines.
„« Preparation of Piping Layout drawings for E/W and N/S Pipe rack
„« Preparation of Piping layout and Isometric drawings for Royal Commission.
„« Preparation of stress analysis report using CEASAR -II for the above lines.
„« Preparation of Layout Drawings and Isometrics for RC Corridor.

Client - 2 Jubail Chevron Philips Petro Chemical Company (Jan-2006 till Sep-2006)- Refinery project

„« Preparation of Plot Plans and Isometrics for utility lines.
„« Preparation of stress analysis report using CEASAR -II for the above lines.
„« Preparation of Plot Plans and Isometrics for utility lines.
„« Preparation of tie - in packages for the above lines.

Client - 3 New Doha International Airport - Qatar Kent/ BEMCO/ Bechtel
(Sep-06 -April 2007)- Infrastructure Project

Was a part of Utilities Package where I was involved in Vendor discussions and checking technical portions for the following items:

Generator, Chillers, Air Handling Units, Fire Water, Potable water, Irrigation Water, Lift Station, Diesel Transfer Pumps, Expansion Tank & Air Separator, Diesel Storage Tanks, Pipes& Fittings ( Cast Iron, Ductile Iron, HDPE, Copper Pipes, Pre-insulated & Carbon steel Pipes), Valves ( Manual Valves, MOV¡¦s, Control Valves, Pressure Relief Valves, Balancing Valves etc)Duct and Accessories ( Louvers, Grilles, Acoustic Silencer, Dampers etc.), Fire Protection System ( Fire Extinguishers, FM 200 System etc) & Waste Water Treatment Plant.

Systems Handled:

Potable, Fire water, Waste Water & Irrigation Water System
Chilled Water System

„« Preparation of Technical Submittals & Materials and getting approval from Client.
„« Preparation of BOQ for material take- off.
„« Technical Co-ordination with Bechtel, Worley Parsons & Parsons International.
„« Preparation of Method statements and getting approval from Client.
„« Preparation of Project Specifications to get approval from Client.
„« Preparation of construction isometric piping drawings/ plumbing drawings.

4. Metallurgical Engineering Consultants of India Limited (From Sep - 2001 to Jan 2006)
Designation: Assistant Engineer -Piping

Client-1 Indian Oil Corporation Limited, Panipat, Hariyana

„« Preparation of Plot Plans and Isometrics for utility lines.
„« Preparation of tie - in packages for the above lines.
„« Preparation of Piping Layout drawings for Pipe racks.

Client-2 High Grade Pellets Limited, Vizag

„« Designing of compressed air pipelines.
„« Preparation of technical specification for air compressor.
„« Preparation of Detailed Project Report for 33 MW coal fired Captive Power Plant.

Client-3 SeaBird, Karwar

„« Involved in designing of compressed air pipelines
„« Preparation of technical specification for air compressors.
„« Design of Compressor room.

Client-4 Jindal Vijayanagar Steel Limited, Bellary

„« Involved in designing of High Pressure steam pipelines for interplant piping from JVSL Power Plant to Turbo Blower House as part of inter plant piping.
„« Preparation of technical specification for Pressure Reducing and Desuperheating Unit.
„« Involved in preparing of P&ID's for Converter Gas Cooling System and Preperation of Gas Cooling Pump Layout, foundation details, load data's and it's piping drawings.
„« Preparation of Technical specification of 10 Tons/hr Corex Gas Fired Boiler and piping drawings as part of in plant network.
„« Preparation of technical Specification for compressed air and preparation of piping drawings.

Client-5 Kerala Minerals and Metals Limited, Kollam

„« Involved in preparation of Detailed Project Report for 2X20 MW Coal fired Captive Power Plant. Design of Compressed Air and Steam Pipe Lines.

Client-6 Naval Physical Oceanographic Laboratories, Kochi

„« Project Planning, Take up Break Up and Scheduled Maintenance, Discussion with Contractors, Preperation of Schedules as part of Annual Maintenance Contract,
„« Preparation of budgetary costs, financial bills, collection of reimbursable and non-reimbursable costs, Preparation of tender documents for equipments as part of AMC. Preparation of note for approval from Tender Recommendation Committee.

Client-7 TTPL, Trivandrum

„« Preparation of Technical Specification of Boilers.
„« Designing of Compressed Air and Steam Pipelines as part of in plant network.

Client-8 VISL, Bhadravati

„« Preparation of Technical Specification of Boilers of 20 Tons/hr furnace oil fired boiler.

Client-9 Essar Steel, Hazira

„« Preparation of Technical Specification of Boilers.
„« Designing of Compressed Air and Steam Pipelines as part of in plant network.

EDUCATION DETAILS:

SSLC 72% (Karnataka State Secondary Education Board)

PUC 70% (Karnataka Pre - University Board)

B.E (MECH): 76% (BANGALORE UNIVERSITY)
DR.AMBEDKAR INSTITUTE OF TECHNOLOGY, BANGALORE
P.G D In
Power Plant Engineering: 70 %( National Power Training Institute, Neyveli)

Computer Knowledge:

Operating System: Windows, DOS.
Mechanical Software: Auto CAD-2000, Navis Review, CAD Works, CAE pipe, Caesar-II, Valve Sizing, Cost Model.
Other Software: Microsoft FoxPro, Microsoft Project, Microsoft Office

Standards:

Have knowledge in IS, BS, ANSI, SABIC, ARAMCO, SHELL standards.
Have knowledge in CS, DSS, SS etc.

Personnel Details:

Date of Birth 09/01/1979
Pass Port Details No. H8027249 Date of expiry - 12.10.2019
Languages Known English, Hindi, Kannada
Hobbies: Reading Books, Watching Movies, Playing Cricket etc.

References:
Will be provided

View contact information...
«« previous resume next resume »»
Search Results (Resumes 1251 to 1300 of 7054)Go to Search Parameters...
Brief Description
B. Tech in Metallurgical Engg, 27 years experience in Corrosion & Inspection function in refineries
Senior Piping Designer with experience through both contract and direct work assignments, with major emphasis in the areas of Specialty Chemicals, Pharmaceuticals, Petrochemicals, Sulfur Recovery, Heavy Industry, Gas Turbine & Power Generation.
B.sc Petroleum Engineering, Model 204, SAS, Oracle, Oil and Gas Database Conversion, Production Engineering, Reservoir Engineering, Supported Petroleum Engineering application (Pipeflow, Pipesim)
Senior Petroleum Engineer with long experience in Oil & Gas Industry
Experienced LNG & Petrochemical plant commissioning and maintenance activities in Electrical field. Petrochemical and Utility plants instrumentation experience is an additional experience
Instrumentation Engineer, Detailed Engineering for offshore, FPSO, oil/gas,steel plants
Mech Engr with 22 yrs exp in power plant projects, working with Thermax Babcock & Wilcox Ltd.
Expert in Industrial Gas & oil separation plants (GOSP), Gas Terminals and Stations.
MANAGEMENT Able to make sound prompt decisions encompasing a diversity of areas: From design and implementation through to resources and progress strategies.
Experience in reliabilty centered maintenance and Mechanical Integrity. Extensive experience with Project engineering.
I introduce myself, i am an Electrical Engineer worked in IRAN under Hyundai Engineerung & construction co. for South pars Field Developement Phase 4 & 5 and before Phase 2 & 3 also.
Experiences: Oil / Gas Field Facilities, Pipeline and Production Plant Operations, Commissioning and start up
Professional Drilling Consultant
PIPING DESIGN ENGINEERING
For the past 15 years I have been employed in petrochemical piping & Power Plant design & drafting utilizing Autocad, Microstation, 3D CADWORX, Plant 4D Programs and Field surveying using Total station and 3D Leica ScanStation 2, using Cyclone and CloudWorx programs to obtain as-builts of existing f
Free! An MBA graduate with 6 years of work experience in the oil and service-related industries. Experience in ESP, HPS, VSDs, PLCs, HMIs, and SCADA systems. Additionally, I have experience in project management.
Planning Engineer, Workshop Management, Maintenance and Material control, Safety Officer, AutoCAD, Fleet Management System Software(FMS),IVMS Download, Internet Skill, MS Word, Ms Excel, Corel Draw, Primavera Project Planner (P3), Ms Project, Power Point, Ms Dos, Publisher, Page Maker, Etc
Having more than Twenty (20) years of experience in the field of Supervision and Inspection of Welding, Piping Fabrication and Installation in the Heavy Industrial construction such as Oil and Gas Plants, Power Generating Plants, Petro-Chemical and other Industrial Insta
Free! All round drilling expertise from driller up to management. Managed on- and offshore drilling campaigns world-wide. Shell Round II. Currently head of drilling rig planning, acquisition and divestment for Shell Malaysia. Analytical and problem-solving capabilities. Broad engineering background.
Subsea systems (Controls, Trees and Wellheads). Service and Manufacturing of downhole drilling tools, BHA components, DD equipment & fabrication. Project team, QS, FAT, MC & ITP. Internal/external Audits, Procedural writing and MRB’s. ISO 9001:2008. UT, MP & UT Level 2.
self starter, great communication skills, great with microsoft programs, familiar with oilfield environment
13 years of experience in Engineering Projects & Maintenance, design engineering, construction and commissioning of instrumentation in petrochemical and chemical industries involving detailed engineering including, project estimation, preparation of instrument specification, comparison statement ,pr
18 years petrochemical experience, senior engineer
10 Year experience in FEED & Detail engineering of Electrical System in Oil & Gas, onshore Plat-form, Petrochemical Plant, Automobile sector and Pharmaceutical Industries
Numerical Simulation (Eclipse/Petrel RE), Analytical tools(PROSPER/MBAL), Well testing, reserves estimation, material balance,decline curve analysis, production testing
Chemical Laboratory Analyst / Chemical Process Technician.
Quality Engineer
Seven years of Process/Project engineering experience encompassing process design, process safety management and regulatory compliance, Project scope development, Project scheduling, Project execution strategy. Areas of process design specialization include relief system design, equipment design.
Process Engineer
Experience in developing PFD’s and P&ID’s to IFD and to IFC.Experience in line sizing, pump sizing, control valve sizing, relief valve sizing and vessel sizing. Experience in preparing LDT documents, Rev Lists. Proficiency in process design software like ASPEN PLUS,HYSYS, PRO II.
Trouble shooting of problems in various field instruments, DCS (Honeywell – TDC3000), I Have deep knowledge in Gas Turbine and Compressor related instrumentation systems
I have drilled over 100 wells, both explorational and development. I have directly planned and executed major drilling, recompletion, and completion programs. I have designed well logging programs. I have also participated in extensive reservoir characterization studies.
Experienced distribution center in-charge, materials planning and control handler, and warehouseman (total 14 years) and mechanical engineer in practice as power plant maintenance and engine tender. Computer literate, resourceful, constructive decision maker. Easily adapts to any working environment
Construction/Commissioning Instrumentation & Control Superintendent, or Project Management (PMC-role), or I & C Field Engineer/Supervisor, or I & C Maintenance Engineer
16 Years of Experience; Experience in managing the Quality control & Quality assurance activities for large integrated engineering projects. Exposure in vendor documents, correspondences with client, vendor, carrying on stage & final inspection with client. Exposure to International code
Planning & Scheduling by Primavera P3; Structural Design by STAAD-PRO 2004
From 2005 Clough Engineering & Integrated Solutions (CEIS) Pty Ltd
Structural draughtsman, working sice last 14 yeards, with 2 yrs. gulf experience,
Boiler Purchasing, erection, commissioning, startup, troubleshooting experience.
Versed in blasting and painting for the past 20 years
Chemical Engineer with more than 20 years experience in construction, testing, precommissioning and commissioning of utility plants in Oil & Gas, Fertilizer and Petrochemical industries.
I'm a Science Graduate. B.Sc., from Andhra University, INDIA in 1985, Working as Comissioning Engineer With LURGI team since Sep-2007. well versed with Pre commissioning, commissioning, start up, Normal/ Emergency shutdown activities and performance test of PDH (Propane D ehydrogenation) Plant.
Over 20 years (5-1/2 years in India and 15 years in Gulf) of experience in the field of Pipelines in reputed Engineering Consultancy firms. Worked as a Lead Pipeline Engineer for various PDO (Oman) and Saudi Aramco Oil/Gas cross country pipelines and in-plant pipeline tie-in projects.
Metallurgical/Materials Engineering, failure analysis of gas turbines components, remaining life assessment, gamma prime growth morphology in nickel-base superalloys, high temperature coating degradation and failure mechanism, creep behavior of the alloy, fatigue crack initiation and growth
Corrosion control, cathodic protection
Electrical and electronics engineer with 24 year experience in a major fertilizer, chemical and petrochemical industry. Also have a strong back ground in communication field
Over 16 years of experience working as a Process Engineer including 5 years as Lead Engineer supervising/coordinating engineering design teams in multidiscipline engineering companies. Has executed Conceptual Design, Front End Design and Detailed Design projects in Oil and Gas, Refineriese etc.
More than 20 years of professional experience in engineering design, construction and project management. Familiar with international standard including Saudi Aramco Engineering Stds. & design practice. Well verse in engineering software for electrical power system design analysis.
Industry and project experience in developing, analyzing, training and implementing simulation and advanced process control for refinery, chemical, and petrochemical operations.
A Senior / Chief Estimator level experienced in Oil & Gas, Mining, Power plants, Manufacturing. Representing Owner, EPC and EPCM companies, Over 25 Years.
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   [ 26 ]   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
CATEGORIES: Engineering/Technicians;
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com