CONTACT INFORMATION:
View contact information...
EDUCATION
* Project Management ProfessionalCertification (PMP) August 2005
Project Management Institute PMI, USA
* Master Degree in Construction Management November 1999
Faculty of Engineering, Cairo University
Title of the thesis "Application of Computer Integrated Construction in the Egyptian Construction Industry"
* Diploma in Construction Management (2 years) May 1995
Faculty of Engineering, Cairo University
(Rank 2nd /50 ~ Top 5%)
* Professional Program in Project Management February 1994
A.U.C (American University in Cairo)
* High Structural Diploma (2 years) June 1992
Faculty of Engineering, Alexandria University
* Bachelor of Civil Engineering June 1989
Faculty of Engineering, Alexandria University
- Final Grade: Good
- Graduation project: Surveying (Triangulation Nets)
- Project grade: "Distinction"
* Secondary Certificate June 1984
Victory College, Alexandria
WORK EXPERIENCE
* Senior Project Control Engineer June 2004 - Present
DAR-AL HANDASAH (Shair & partners)- Ranked 15th at ENR top 200 International Design Firms
15 Amr Street - El Mohandessien, Cairo, Egypt
Duties include:
- Developing Construction and Design schedules (Egypt, Saudi Arabia, Libya) covering Data Collection, Preliminary, Fundamental and Final Design – Tender documents phases. In addition to Fast Track Schedules with Contractors,
- Contract Administration for two projects (in Egypt and Saudi Arabia)
* Senior Project Control Engineer December 2002 – June 2004
DAR-AL HANDASAH (Shair & partners)- Ranked 15th at ENR top 200 International Design Firms
BJK Plaza, Süleyman Seba Street No. 92, B Block- Beºiktaº, Istanbul, Turkey
Project Name: TK0191 Turkey Infrastructure And Urban Reconstruction Project (Terra – 1) SSK Hospitals at: Adapazari (HSPW1),Bolu (HSPW2), Düzce (HSPW3)
Budget Cost: 65,000,000 Euro
Employer: Republic of Turkey - Ministry of Labour and Social Security - Directorate of Social Securities Institutions (SSK)
Contract: (FIDIC Red Book 4th Ed 1987)
Duties included:
- Assisting the contractors in the development of the project schedules which included all disciplines Civil, Architecture, Mechanical (HVAC, Plumbing and Fire Fighting) and Electrical (CCTV, MATV, Fire Alarm Systems etc…),
- Incorporating Long Lead items, Shop Drawings and Material Submittals activities in the project Schedule
- Representing DAR in monthly meetings with contractor and subcontractors,
- Assisting the Project Manager in the administration of the contract (FIDIC Red Book 4th Ed 1987)
- Awareness and utilization of other contract documents (Project Drawings and Specifications)
- Analysis, evaluating and forecasting current status against an established baseline schedule and report schedule status to all levels of project and Company management,
-Performing Claim Analysis and assessing the cost and Schedule impact on project deliverables,
- Performing Delay Analysis,
- Performing Earned Value Analysis
- Monitoring daily site supervision activities as well as contractor's performance and productivity (Labor and Equipment)
* Senior Project Control Engineer March 2001-December 2002
DAR-AL HANDASAH (Shair & partners)- Ranked 15th at ENR top 200 International Design Firms
15 Amr Street - El Mohandessien, Cairo, Egypt
Duties included:
- Developing Design Management project schedules (Egypt, UAE, Saudi Arabia, Qatar) covering Data Collection, Preliminary, Fundamental and Final Design – Tender documents phases. In addition to Fast Track Schedules with Contractors,
- Report schedule status to project and company management including the activities that effect and delay major milestones and the corrective actions that are made against it and the projects' performance Index (PI), Schedule index (SI),
- Analyse and evaluate current actual project cost against budget project cost, -Report earned value progress measurement (S-curve) and productivity reports including Cost Index (CI), cost overrun to project and company management,
- Develop a database for productivity standards for projects including actual activities durations for different work packages and productivity data, to assist in future schedule estimates for buildings projects.
* Senior Project Control Engineer Aug.1994–March 2001
Mena for Engineering & Construction Co
10 Gamal Abd El- Nasser St., Victoria, Alexandria, Egypt
Duties included:
- Responsible for the development of project schedules including factories, residential houses, and water and waste water facilities (above 5,000 activities and Budget over L.E. 40,000,000),
- Analysis, evaluating and forecasting current status against an established baseline schedule and report schedule status to all levels of project and Company management,
- Developing, implementing, and maintaining cost control support to provide project management, as well as the department and company management, with the tools for project cost control,
- Development and analysis of detailed cost management reports, scheduling and cost control systems, procedures and formats, earned value progress measurement and productivity reports,
- Developing and maintaining of in-house project controls procedures, guides and standards such as issuing standards and codes for activities, cost codes resources throughout the company.
- Appointed by the Chairman Executive Office to enhance the company's Project Controls System by developing a computer integrated construction project to integrate the company's departments under one centralized database, duties included:
- Standardizing company's resources (material, labor, equipment) by developing coding structures for these resources,
- Performing system analysis for the company's project controls system through out all the company's departments,
- Developing a relational Database management system module for the company's departments.
- Developing, implementing, and maintaining cost control support to provide project management, as well as the department and company management, with the tools for project cost control,
- Development and analysis of detailed cost management reports, cost control systems, procedures and formats, earned value progress measurement and productivity reports,
- Develop/ Prepare design standards and technical specification,
- Responsible for preparing the company's Strategy Plan,
- Participation in the company's Business Development Plan,
- Performing feasibility studies on new construction technology, methods and materials.
* Scheduling Engineer March 1996-Aug.1996
Seacor Services, Inc. (Subsidiary of Day & Zimmermann, Inc)
Alexandria Regional Control Center Project (A USAID funded project No. 263-0194.02)
Duties included:
-Responsible for the development project's Schedule activities (4,000 activities) including engineering, Mobilization, civil, mechanical, electrical works,
-Responsible for Monitoring project activities.
* Quality Control Engineer May 1993 - Sept.1993
Dillingham / ABB SUSA (Sakara Air Base project)
18 Victor Amanuel Square, Smouha, Alexandria, Egypt
Duties included:
- Daily monitoring progress in construction works,
- Checking compliance of construction works with project
Specifications and ACI (American Concrete Institute),
- Preparing daily progress reports on civil activities performed,
- Responsible for the inspection of approximately 40 buildings,
- Familiar with project drawings, specifications, ACI.
* Design Engineer Sept.1991-Sept.1993
C.E.O (Consulting & Engineering Office) Prof. Dr. M. A. Gouda
40 Safia Zaghloul St., Alexandria
Duties included:
- Design of several residential houses,
- Design of several structures in factories in 10th of Ramadan, New Amreya, Burg El Arab, those structures included frames, tanks, footings...Etc,
- Programmed several C-Language programs to aid in the design process,
- Drawing several structures using AutoCAD,
- Supervision and monitoring several projects,
- Preparing bills of quantities for several construction projects.
* Civil Engineer March 1990-June 1991
Behera Company (Projects & Studies Sector)
21 Talaat Harb St., Alexandria
Duties included:
- Design of pipelines and irrigation structures (culverts, weirs etc.)
& Drip and sprinkler irrigation networks and irrigation channels,
- Preparing bills of quantities and specifications for different works,
- Quantity surveying for concrete and finishes.
* Site Engineer Aug.1989-Feb.1990
EMAFCo. Construction Company
El Tair St., Boulkly, Alexandria
Duties included:
- Supervision and monitoring the construction of several residential buildings in Alexandria.
PUBLICATIONS
"Journal of Engineering and Applied Science" December 1999
Paper presented
"Applying CIC in Medium Size Egyptian Companies"
Participated in the 7th ICSGE Cairo 1996 Conference December 1996
Structural and Geo-Technical Engineering
Organized by Ain Shams University
17-19 December 1996
Paper Presented
"Application of Computer Integrated Construction (CIC) in the Egyptian Construction Industry"
TRAINING
Kaizen (continuous improvement) course conducted by April 2000
TMS Insight – UK
PRIVATE BUSINESS
- Development of the "Alexandria Renaissance Hotel Renovation" Project Schedule.
- Development of Estimating, Scheduling and Cost Control Procedures for "GINZA" for Construction company including forms and flowcharts,
- Developments of Cost Control Procedures for "MASS for Construction" a construction company including forms and flowcharts.
- Developed and instructed a course "Project Cost Control" in "GINZA".
SPECIAL SKILLS
Computer Skills
- Certified Oracle Developer/2000 Master Certificate ODMC June 2001
Oracle University, USA
- Proficiency in Primavera 3.1 under Windows
- Ability to work with Primavera Enterprise(P3e 4.1)
- Ability to work with Ra for Primavera.
- Ability to work with Expedition 9.1i
- Ability to work with Microsoft Project 2000
- Ability to work with Microsoft Project Central
- Proficiency in Microsoft Access 2003 and Visual Basic for Access.
- Proficiency in ABC FlowCharter 4.0 and Visio 2003
- Proficiency in Internet Explorer 6.0 and Netscape Navigator 4.5
- Proficiency in Microsoft Windows 2003, Excel 2003, Word 2003, PowerPoint 2003
- Proficiency in Surfer 6.0
- Ability to work with Windows 2000 Server, Exchange Server, SQL Server 2000
- Programming with C-Language
LANGUAGE
- Proficiency in written & spoken English.
- TOEFL Score of 253
INTERESTS
Squash, Tennis, Football & Travelling
References
Presented upon request
View contact information... |