CONTACT INFORMATION:
View contact information...
EDUCATION:
University degree in civil engineering (M.S.), Bachelor degree in Economics
LANGUAGES English, German, French, Dutch, Portuguese and Mandarin Chinese (Basic)
AREAS OF EXPERTISE
(1) Management of projects covering Design, procurement, fabrication, construction, installation, hook up and commissioning for projects involving:
(2) CALM buoys and Offshore terminals (refer to Sungai Udang, Sirte Oil, Cilacap, Upper Zakum, Girassol(deep water buoy), Erha (deepwater buoy), Ash Shirh terminal projects)
(3) FPSO's (refer to MISC FPSO, Espoir field development, Girassol and Rospo Mare projects), including topsides.
(4) Pipelines (refer to SHG, I-MNTW,SHW field development projects, Upper Zakum Main Oil Line & Loading lines, IPC-Heera trunk line project)
(5) Onshore pipelines and pump stations (refer to extension of Indian Oil terminal at Salaya and Sungai Udang projects)
(6) Jackets and decks (refer to SHG and I-MNTW projects)
(7) Hook up works (refer to SHG,I-MNTW,SHW, upgrading of BPB and wellhead platforms in Bombay high field)
In depth knowledge of contractual terms and conditions, keen commercial negociator.
Computer skills Extensive programming experience in C, FORTRAN, and Visual Basic languages.
Enthusiastic PC user, fully conversant with the use of word processing, spreadsheet, scheduling and data base software. Fully conversant with drafting programs such as AutoCad 2004, Microstation, Primavera planning package.
PROFESSIONAL EXPERIENCE
2004 September - present Pegasus Inc.
Position: Client representative
Responsibilities:
Management/Supervision of offshore pipeline installation contract on client's behalf (temporary replacement for incumbent)
Installation of Ashdod to Hadera pipeline with related onshore tie in works, offshore Israel, client Israel Electric Corporation Ltd.
The project encompasses the installation of a 30 inch pipeline, parallel to the coastline between the cities of Ashdod and Hadera, with landfall and tie-ins at 5 locations. Personal responsibilities covered interactions with authorities to secure permits for the works, coordination of IEC's (Israel Electric Corporation Ltd = Owner ) supplies with offshore works. Day to day coordination of works with the various parties involved, supervision of pipe-lay contractor.
2003- 2004 Stolt Offshore Services S.A.
Position: Deputy Project Manager
Responsibilies:
Management from engineering through field installation, including subcontract and vendor management of FPSO mooring and deep water offloading system.
PROJECTS
Erha Field, offshore Nigeria, client Exxon Mobil Exploration and Production Nigeria Ltd.
The project comprises the design, procurement, fabrication of suction mooring piles for FPSO anchoring system, CALM buoy deep water buoy providing support for off offloading lines, capable to transfer 4200 BOPH. The offloading buoy will be the largest buoy ever fabricated. Design phase was completed April 2004, fabrication started February 2004,
2002--2003 Intec Engineering SEA Sdn Bhd
Position: Construction Manager
Responsibilities:
Management of all aspects of the works performed by shipyard, topside fabricator and bow turret designer and fabricator. Starting with contract negotiations with shipyard, coordination of day to day works, interface management with contractors and suppliers. Project schedule and cost control
Projects
Conversion of MT "Bunga Kertas" to FPSO –Penara & North Lukut field, offshore Peninsular Malaysia- Malaysian International Shipping Corporation.
2001- 2002 Canadian Nexen Inc.
Position: Project Manager
Responsibilities
Management of all works related to the installation of second buoy and associated pipeline at Nexen's Ash Shihr Export Terminal. Starting project definition, budgeting followed by preparation of tender document, evaluation and contract award.
Projects
Second loading buoy and associated pipelines at Ash Shihr Export Terminal –Offshore Yemen-Canadian Nexen Petroleum Inc.
2000- 2001 Prosafe Production Pte Ltd (company formerly called Nortrans Offshore Pte Ltd. before take over early 2001)
Position: Project Manager
Responsibilities
Management of all activities related to a FPSO conversion project, covering the design, procurement & fabrication of all equipments, components for a floating production system. including its installation. Interface with client, supervision & coordination of design activities performed in house and by outside consultants, subcontractor and vendor supervision and inspection. Responsible for performance of all project activities within the budget, and in accordance with project schedule.
Projects
FPSO for Espoir field development – Espoir field offshore Ivory Coast – Client Ranger oil Cote D'Ivoire SARL – Processing capacity 45,000 BCPD and 40 MMSCF of gas per day
1998-2000 MPG – Mar Profundo Girasol – joint venture between Buoygues Offshore and Mc Dermott ETPM (Stolt Offshore)
Position: Project Manager loading buoy and FPSO mooring
Responsibilities
Management of all project activities related to the design, fabrication, transportation of an offloading system and installation of loading buoy & FPSO, both located in 1400 m water depth. Coordination and supervision of in house design work on loading lines and their interface with the loading buoy & FPSO. Contract negotiation, approval of design, site supervision and quality control of the works undertaken by the buoy manufacturer. Profit and loss responsibility for this part of the project. Emphasis was on the technically challenging aspects buoy project, the CALM buoy in the world's deepest waters, and the commercial complicated nature of this state of the art project. For the FPSO mooring system activities covered the design, procurement of the different components, and integration of these in the floater's hull. Development of detailed procedures for installation of both mooring buoy and FPSO on location.
Projects
FPSO laid out to process 200'000.-BOPD & Installation of a loading buoy and associated export lines, capable to receive 400'000 dwt tankers at MPG location offshore Angola, client Elf Exploration Angola
1997-1998 Intec Engineering, Houston, USA
Position: Construction Manager
Responsibilities
Overall management of Construction projects undertaken by Intec's regional office in Kuala Lumpur, Malaysia. Duties covered the overall coordination of the works design review & approval, contract negotiation, supervision and quality control of procurement activities and subcontracts, progress assessment, payment control, interfacing with client on a day to day basis and by formal presentation to client's board of directors. This position required a wide hands-on experience in contractual and technical matters. Training and education of local staff was part of the assigned responsibilities. Preparation of bid packages and pricing of new projects.
Projects
Installation of SPM system for 350'000 Dwt tankers at Sungai Udang (Melaka), client MRC, management of EPC contract
1995-1997 Company: GAL Offshore Services limited. Bombay, India
Position: General Manager/vice president Construction
Responsibilities
Set up from grass roots of offshore construction department Execution of all offshore works undertaken by the company.
Projects
My duties with this company started with setting up an offshore construction department to perform all activities from price preparation, commercial negotiations with client, project execution, till financial phase out of the project. Recently the company has merged with Great Eastern Shipping Company.
Installation of three replacement pipelines in the Dorood field, client Oceaneering, Owner, National Iranian Oil Company (NIOC),Location Kharg Island, Arabian Gulf
Upgrading of BPA-BPB platform's, subcontractor to Essar Oil Limited, Owner, Oil and Natural Gas Corporation, Location Bassein field, offshore India.
SHG remedial works, subcontractor to Daewooo shipbuilding and heavy Industries, Korea,, Owner, Oil and Natural Gas Corporation, Location Bombay High field, offshore India
Upgrading of wellhead platforms in Bombay High field. Subcontractor to Mazagon Docks,, Owner, Oil and Natural Gas Corporation, Location Bassein field, offshore India.
1991 - 1995 Company: National Petroleum Construction Company Abu Dhabi, United Arab Emirates
Position: Deputy Project Manager
Responsibilities
Overall project management responsibility for major Offshore Installation and Hook up Works for jackets and pipelines.
Projects
SHG Process complex client Oil and Natural Gas Commission, location Bombay High Field offshore India
The contract for these works was placed with a consortium formed between Daewoo Shipbuilding of South Korea, responsible for fabrication works, and N.P.C.C., covering all the offshore installation works. NPCC's scope of work included the installation in the Bombay High Field of the SHG platform, comprising a 8 legged jacket (weight 5500 mt), with 4 main piles and 16 skirt piles, and topsides(6 compressor modules and generator cum living quarters packages) and associated modification works on remote platforms, and laying of the related pipelines. Project management of all works involving daily management of in house departments, consultants, suppliers and subcontractors, for design, transportation, installation testing and commissioning of the platform and of 188 km of pipelines with diameters 10 through 28 inches, co¬ordination of procurement activities, interface with client and consultants, supervision of subcontractors. The contract value of 120 million US $, represented 50 percent of the yearly turnover of the company. Hook up works included modification works at 18 platforms in addition to the SHG decks. During the installation phase I was heading the Bombay based site office, with full responsibilities for client contacts, operational and logistic management of 4 installation barges spreads executing simultaneously the field works. An This project was completed on time on 31/04/1994 and within the budget.
l-MNTW infill platform project, subcontractor to Larsen and Toubro, Owner, Oil and Natural Gas commission, Location Bombay high field, offshore India
This project was run simultaneously with the SHG project described above. My personal tasks during this project were the same as for the SHG project. The project involved the installation of 4 wellhead Platforms (each 4 legged jackets, with 4 main piles and 4 skirt piles) and their topsides (one main deck and one helicopter deck) and a combined length of 78 km of pipelines in sizes ranging from 4 though 16 inches. This project was timely completed on 28/03/1994.
SHW project, Subcontractor to Daewoo Shipbuilding, Owner, Oil and Natural Gas Commission, location Bombay High Field offshore India.
Personal responsibilities were the same as described for the SHG & I-MNTW Projects. This Project consists of the installation of water injection platform and topsides, together with the laying of 16 km of pipelines of diameter. The scope of work covered by N.P.C.C. was launching, upending and setting of the jacket (weight 4500 mt) and it's associated deck. The scope of work for pipelines consisted of design, supply, coat and wrap, transportation, laying, testing and commissioning.
IPC-Heera trunk line, Client Oil and Natural Gas Commission, Location Bombay High & Heera Field, offshore India.
Installation of 120 km long 30 inch pipeline between the ICP and Heera platforms, with 5 laterals (branching),and 18 km long 22 inch branch line to the SHP platform. The water depth along the pipeline varies from 50 to 80 m. The pipeline is trenched to a cover of 1.2 M. Contractual sum was 60 mil US $.
1985– 1990
Company: Single Buoy Moorings, Monaco
Position: Manager Installation Department
Responsibilities:
Preparation of detailed procedures for installation Mooring Buoys, Floating Production Units, including loading lines and intra field pipelines. Development of Bid Packages for Installation Works, negotiation of contracts for execution of same. Monitoring of execution of offshore works, end of contract settlement and claim negotiation.
Projects
Installation of Mooring Buoy including Design, Procurement and Offshore pulling of 32 inch deballast line, Client Sumed, Location Sidi Kerir (Alexandria) Egypt
This project was carried out in co-operation with a local contractor, the technical emphasis was on the development of simplified techniques for survey and execution of the installation works(pipeline pulling, and trenching, buoy installation works with locally available barge). The project involved
The design and testing of a purpose built trenching machine that was to be used for post trenching the pipeline in the shore approach area.
Installation of spread mooring with a LPG loading line and associated vapor return line, client ENPPI location Red sea, Egypt.
Design and construction of 8 and 6 inch lines. The concrete coated pipelines were simultaneously pulled from onshore make up site to sea., with PLEM attached. The spread mooring consisted of four buoys, tied to the seabed by anchors. The contract included the installation of land lines (10 km) connecting the terminal to the onshore facilities.
Repair of 1O inch oil line at Ekpe platform client Mobil Oil Nigeria, location offshore Nigeria
Procedures and project management (including hands on offshore management of construction works) for repair of a 10 inch pipeline at Mobil's Ekpe platform The repair was carried out from a dynamic positioned diving vessel that was used to lift the pipeline to the surface where the tie in was made. During these works extensive use was made of ROV's to perform most of the subsea works.
Repair of a 6 and 8 inch pipeline, client ELF, location offshore Gabon.
Procedures and project management for repair of a 6 and 8 inch pipeline, including a study to install a lay ramp for small diameter pipelines on board of a dynamic positioned diving support vessel.
Installation SBM and 48 inch loading line at Sirte oil terminal, client Sirte oil Cy, Offshore the Libyan coast.
Design, fabrication and construction of a 48 inch loading line, installed by beach to sea pull using a subsea installed linear winch
Installation of 3O kV electrical cable at Djeno terminal client Elf Congo, location offshore Congo
Project management for installation of 30 km long electrical cable between an offshore platform and the onshore oil terminal.
Fabrication and installation of SBM, with associated extension of 42 inch oil line at ADCO oil terminal, client ADCO oil Cy, location offshore Abu Dhabi
Project management for design and construction phase of pipeline extension at ADCO's Abu Dhabi oil terminal, including the re-use of existing pipe supports and combined pipe cum plem installation from a lay barge.
1981 - 1985 Company Bouygues Offshore, Paris, France
Position: Project Manager Offshore projects
Responsibilities:
covered all aspects related to offshore contracting such as preparation of bids, design engineering, development of installation methods, follow up during execution of the works. Technical aspects included for platforms: jacket launching, upending and pile driving ;for pipelines: design (hydraulic, stability, weight coating design), detailed procedures for pipe laying riser installation, specification for all materials and services required for the project. Client relations from bid till claim settlement stage.
Projects
Installation of jacket, topsides and associated flow lines for process platforms in the Kambala and Takula fields, Client Gulf Oil Co., location offshore Cabinda.(West Africa)
Project management of the outfitting of lay ramp on the BOS 400 barge
1978 - 1981 Company: R.J. Brown and Associates Rijswijk, The Netherlands
Position: Project Engineer
Responsibilities:
Design of pipeline systems and supervision of construction activities on sealine installation works
Projects
Development of the Upper Zakum field, Client ADNOC, location Arabian Gulf offshore Abu Dhabi
48 inch pipeline across the Firth of Forth, client British Gas, location Scotland
24 inch gas line from North Rankin platform to Dampier client Woodside Petroleum Offshore Western Australia.