Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #3867 next resume »»
CONTACT INFORMATION:
View contact information...

PERSONAL DETAILS

DATE OF BIRTH: 24th December 1963
NATIONALITY: German

EDUCATIONAL BACKGROUND

1982 - 1985 IMPERIAL COLLEGE, UNIVERSITY OF LONDON
B. Sc, (Eng) Hons. in Metallurgy & Materials Science, Royal School of Mines

CAREER SUMMARY

Multi-talented, goal driven manager/engineer with a broad base of technical know-how and skills that allows driving fast-track projects from all the angles required to ensure parallel development of engineering, safety concerns, cost control, procurement, construction, procedures and implementation. Ability to tackle new challenges and areas of development not concurrent with background. Team leader who makes the end goal a group driven success. Has tackled some very big challenges in past work including project killers and has the experience to make hard decisions or choices when necessary.

Areas of Experience
Total Cost of Ownership Initiatives
Project Management
Fast-tracking
Parallel Engineering and Execution
Cost vs. Financial Gain / Loss Engineering
Financial Control
Logistic Planning
Early Production Facilities
General Operations Engineering
Fabrication verification
Underbalanced Drilling Systems
Closed System Drilling
Managed Pressure Drilling
Hostile Fluid Drilling
H 2 S Safety
Overall Safety Plans
QHSE systems
Drill Stem Testing & Production Testing
Tender & Contract Preparation
PVT data verification
Installation Auditing

WORK EXPERIENCE

Jan 01 – current Impact Engineering Solutions Ltd., Operations Manager

* Operations planning and supervison
* Development of Patented Technology for Managed Pressure Drilling
* Advisor to Repsol-YPF on 'Global Supply Chain Strategy'
* Facilitator for TCO 'Total Cost of Ownership' Initiatives
* Contracts & Tender Adviser to various clients
* Advisor on Underbalanced Operations specializing in surface systems and design

Nov 01 – Jan 03 PT Impact Solutions Indonesia
Underbalanced Drilling Project Manager

* Seconded to ExxonMobil Oil Indonesia Inc.
* Planned 2nd UBD intervention in Arun gas field
* Complex UBD through 10" monobore completions with high surface flow rates at very low pressures.

Aug 99 – Dec 00 Impact Engineering Solutions Ltd., UK
Project Manager

* Joint Industry Project (JIP) 'Drilling with Lightweight Fluids from a floating drilling installation'.
* Responsible for the technical implementation
* Chairing and follow-up of the HAZOP
* Review and verification of system design
* Development and review of operating procedures
* Technical assistance and expertise for integration of drilling rig and surface system
* Successful implementation carried out in December 2000

OilFlow Consulting Ltd. 1991 – 1999

Mar 99 - Jul 99 Oil Flow Consulting Ltd.
Business Development

Nov 96 – Feb 99 Mobil Oil Indonesia Inc., Sumatra, Indonesia
Full Time Engineering Advisor
* Operations Engineering
* HAZOP preparation
* Closed System Drilling
* Sour gas Safety
* Underbalanced Drilling Systems

Nov 95 – Nov 96 Various early production project bids and studies.

Apr 95 – Oct 95 EPF New Orleans, USA
EPF Project Manager

* Procurement, construction & commissioning of a Mobile Production Unit (EPF)

Jan 92 - Mar 95 Schlumberger Port Harcourt, Nigeria
Consultant
* High Rate Testing
* 15K psi Pressure Control
* Testing Supervisor
* Project Manager Integrated Services
* Project Manager for Enhanced Production of Isobo field.

SCHLUMBERGER 1985 – 1991

Jan 91 - Sep 91 Warri, Nigeria
Field Service Manager (Testing)

Feb 89 – Dec 90 Port Gentil, Gabon
* General Field Engineer
* Field Service Supervisor for Well Testing and Early Production Services
* Testing and Production Services, Technical Engineer at District Level

Jun 85 – Jan 89 Nafoora, Libya
Stavanger, Norway
Gt. Yarmouth, UK
* Senior Field engineer
* Field Engineer

PROFESSIONAL TRAINING

1986 - 1991 Internal Schlumberger
- Course in Well Testing/Drill Stem Testing
- Nodal Analysis, Interpretation of Well Test Data
- Course in Downhole Gauge Technology
- Pressure Control Certification
- Computerized Data Acquisition
- Schlumberger Wireline Course
- Production Logging Course
- Wireline Perforating, Setting Plugs & Packers
- Fluid Properties Evaluation and PVT Analysis
- Tubing conveyed Perforating
- Drill Stem String/Test Design and Advances
- Basic Petroleum Engineering
- Offshore Survival, Firefighting

2001 Effective Negotiation

COMPUTER SKILLS

Proficient with standard office software including MS Project

PUBLICATIONS

1. "Mobile Production Unit for Offshore Nigeria", 1996 Mike Guerra, Christian Leuchtenberg (Mobil Oil Publication).

2. "Development and Performance of Surface Equipment for High Temperature Underbalance Drilling in a Sour, Severely Under Pressured Formation", ASME Energy Sources Technology Conference, Houston, Texas, February 1999. C. Leuchtenberg, P. R. Brand, P. V. R. Suryanarayana, D. Eberhard, P. J. Frink

3. "System for Drilling an Offshore Shallow Sour Gas Carbonate Reservoir", SPE/IADC 52808, R. Quitzau, Mobil International Drilling Services; P. R. Brand and B. A. Tarr, Mobil Technology Company; P. J. Frink, Mobil Oil Indonesia; C. Leuchtenberg, Consultant

4. "Drilling with Aerated Fluid from a Floating Unit. Part 1: Planning, Equipment, Tests, and Rig Modifications," Paper IADC/SPE 67748, presented at the 2001IADC/SPE Drilling Conference, Amsterdam, 27 Feb-1March, 2001.

5. "No-Damage Drilling: How to Achieve this Challenging Goal?", Paper SPE 77189, presented at the 2002 IADC/SPE Asia Pacific Drilling Technology held in Jakarta, Indonesia, 9-11 September 2002.

6. "Increasing Leakoff Pressure with New Class of Drilling Fluid", Paper SPE/ISRM 78243, presented at the 2002 SPE/ISRM Rock Mechanics Conference held in Irving, Texas, 20-23 October 2002

7. "Micro-Flux Control: The Next Generation In Drilling Process", Paper SPE 81183, presented at the 2003 SPE Latin American and Caribbean Petroleum Engineering conference held in Port-of-Spain, Trinidad, West Indies, 27-30 April 2003.

8. "Micro-Flux Control: The Next Generation In Drilling Process for Ultra Deep water", Paper OTC 10562, presented at Offshore Technology Conference in Houston, Texas, USA, 5-8 May 2003.

PATENTS

* Drilling System & Method, US Application No. 09/737851 filed 18th December 2000, granted May 2003.

LANGUAGES

1. English (bilingual)
2. German (bilingual)
3. French (basic)

MAJOR PROJECTS ACCOMPLISHED

1. Mobile Production Facility for Mobil Producing Nigeria, 1995.

* Capacity 40,000 BPD Oil, 20 MMSCFD GAS.
* Project Manager for Schlumberger Overseas Inc.
* Contract scope included:

- Procurement of rig for conversion
- Conversion of rig and associated engineering
- Production Top sides EPC
- Installation and Commissioning
- Provision of Operators and Maintenance

* Time from initial discussions to first oil was 212 days
* Was key player in initial marketing of concept, cost vs. profit evaluation, with subsequent pricing.
* Managed all aspects including but not limited to:
Rig procurement, Financial Control, Topsides Design, Rig Conversion Design, Contracts
Construction, Classification ( ABS ), Transportation, Installation, Commissioning.
* Project was a success. Less than 1.8% downtime over 2.5 years of operations.

2. Development of Severe Lost Circulation, Overpressured Sour Gas Reservoir, 1996-1999.

Three-phase development:

Phase 1: Drilling of 9 wells through a sub-sea template.
Phase 2: Installation of Jacket and Topsides.
Phase 3: Completion, stimulation and clean-up of wells.

Drilling Phase

* Closed drilling system using Rotating BOP's, Large Mud Gas Separator, Custom Flaring System.
* Gas reservoir with 33% CO2 and 2% H2S.
* Scope included:
- Design verification
- Flare Design
- Procedure verification
- Installation verification
- H2S Plan
- Evacuation and overall Safety Plan
- DST design
- DST supervision

Completion Phase

* Preparation of contracts for coiled tubing, clean-up of wells
* Design of clean-up layout, equipment spec. for cleaning up 9 wells at rates up to 80MMSCFD
* Planning of completion rig layout on platform
* Coordinating with Platform Construction Team and Drilling/Completion department
* Logistics planning
* Safety plans, H2S plan during completion phase
* Design, fabrication and installation of a complete fire-water system and accessories for platform.
(Firewater system was eliminated for production based on risk analysis for unmanned operations. However Completion operations with large numbers of personnel and flammable fuel on board required a fire system)

3. Pilot Test of Underbalanced Drilling in Arun field and subsequent Drilling of 6 wells, 1998

Underbalanced Drilling was the only viable option to drill in the sour, severely underpressured, ARUN formation in North Sumatra. ARUN was one of the first HPHT fields in the world to be developed (1978). In addition to corrosive environment (60 ppm H2S and 15% CO2), and low pressure (1.8 ppg equivalent), expected downhole temperatures were in excess of 350 degrees F. Moreover, Natural Gas produced in the field was determined to be the only commercially viable gas phase for the gas-water drilling fluid. As a result, development of surface and downhole equipment were two of the major challenges in the implementation of underbalanced drilling.

I was the project engineer instrumental to development, installation and performance of a purpose-built surface system to handle high-temperature, corrosive, gas-water-foam returns. In order to keep the costs under control, existing inventory was used to build the surface equipment in-house. The system therefore uses typical mud gas separators, settling tanks, controls and choke systems to create a fully-closed underbalanced returns-handling system. An innovative recycling cooling system was also designed, in order to cool the returns to allow liquid condensation before separation. The system was installed and used to collect data during the pilot project. It performed successfully and was used to drill 8 wells, and in slightly modified form drilled 4 wells in PASE field.

Key areas that I developed or supervised:

* Assessment of the drilling rig and modifications necessary to make it safe for UBD
* Hazop preparation, review of drilling procedures, and other safety issues to pass a full safety review of the project.
* Supervision of the design, procurement and installation of the equipment. Surface equipment was complex because of the restrictions of operating in a production cluster, between producing wells. Also due to limitations in UBD drilling models for ARUN conditions, a lot of data had to be gathered resulting in data acquisition, process control and command center being run from a control building.
* Design of the pilot test to ensure that sufficient data was collected to enable successful planning of subsequent drilling.
* Personnel training, fire protection of site, deluge systems were also part of my scope.

More detail on Pilot Test goals

The ARUN field is a prolific gas and condensate producing carbonate field located in upper Sumatra, Indonesia. The field has been producing for 20 years with peak production exceeding 2,000 MMSCFD. The pressure in the reservoir has dropped from 7600 psi to 900 psi, due to production. Conventional drilling is no longer possible. The last attempt at conventional drilling, in 1995, resulted in total loss of returns and 31 cases of stuck pipe. In an effort to increase production, Mobil Oil Indonesia initiated a study to determine if underbalance drilling was a viable technology for the field.

The environment in the ARUN reservoir posed many problems not encountered previously with UBD. The bottom hole temperature is 354 degrees F. This temperature precluded the use of conventional PDM motors typically used in UBD operations. The temperature also exceeded the limits of wireline directional and pressure sensor tools.

The temperature along with the make up of the produced gas, also raised the question of the correct fluid that should be utilized. In an effort to answer the questions of model accuracy and to determine the correct fluid to be used, the decision was made to conduct a flow test, prior to drilling the first well. The flow test was devised to test multiple fluid types, motors and simulator models to determine the optimum system to be used in the drilling campaign.

A system for handling the return fluid, collecting the required data for analysis and separating the fluid at surface was required. Analysis of commercially available systems showed that they were not capable of handling the anticipated surface temperatures and flowrates at low-pressure heads. Inquiries into the cost of modifying a system and leasing it for the drilling campaign showed that this would be cost prohibitive. The decision was made to develop a purpose built system for the project, using redundant equipment from the ARUN production facility.

4. Drilling with Light Weight Fluids 1999-2001

In 1998 a Joint Industry Project was formed under the umbrella of the university foundation COPPETEC and Petrobras, the Brazilian state oil company. Members include several major operators and service companies: Amerada Hess, ExxonMobil, Shell, Weatherford, Alfa Laval and Impact. The project aims were the development of technology to deliver the benefits of underbalanced and low head drilling to the floating drilling industry, and in particular deep water.
Impact personnel have been involved from initial conceptualization, and the company became formally involved in the project as members at commencement of Phase II. During this phase my contribution was:
* Prepare HAZOP * Chair and follow-up HAZOP * Chair second HAZOP * Provide technical advice for implementation of the field test * Advice and verification of new surface equipment design * Review of calculations and P&ID's * Verification of rig installation * Preparation of detailed procedures * Close out of HAZOP items
Project Description
An initial Phase I of conceptualization and development was followed up with Phase II, the planning and implementation of a field test of the conceptual system on a semi-submersible drilling unit. The concept developed involved the injection of both drilling mud and Nitrogen through the drillpipe to reduce the overall fluid density to a near balance condition. It was then necessary to cap the drilling riser to divert multi-phase returns through a surface separation system.This involved decoupling the riser at the balljoint, locking the slip joint closed and operating with an unhinged riser configuration.This was a new operation for Petrobras and also utilised some unique equipment developments as outlined below:

1. Utilisation of a Rotating Control Head to cap the top of the riser whilst drilling in the reservoir.A key difference between onshore and floating vessel applications of light weight fluids drilling is the operational procedures and precautions necessary to control pressures in the riser. The riser is not designed to tolerate high pressures. The semi-submersible rig is equipped with a 21" riser, which has a collapse resistance of 660 psi when full of gas and can tolerate an internal pressure of 500 psi before leaking. For this well the riser can stand full evacuation.2. Utilisation of a purpose built fluids separation system with a reduced footprint to allow installation within the space limitations imposed by a floating vessel. The design incorporates advanced control technology to handle the variations in flow volume and pressure common during such operations.This system, with the associated new procedures, was an industry first. It involved the installation of several new facilities and modifications to the existing rig equipment. Hence, to ensure the potential hazards were effectively managed and that appropriate controls were put in place, a hazard and operability (HAZOP) assessment was made of the overall installation, procedures and process several months prior to the test.
The Field TestPetrobras XVII was selected as the test rig to drill Albacora 64H development well in the Campos Basin as the test well. Modifications to the rig commenced in June and the test was successfully conducted in December 2000 in 300m of water depth offshore Brazil.
The field test was essentially a dress rehearsal prior to full system implementation. As such the objectives were realistic, aimed at establishing the feasibility of the concept. In summary these objectives were:
* Test and refine the newly developed operational procedures * Inject Nitrogen to reduce the hydrostatic head while drilling (while maintaining overbalance) * Demonstrate the ability to cap the drilling riser * Test Surface System capacity to handle 3 phase separation: solids, liquids & gas * Test the total system's capability to handle nitrified drilling fluid * Collect data for system * Gain experience in lightweight fluid operations from a Semi-submersible

5. Complex UBD Intervention in Arun Gas Field 2001 - 2003

Based on my previous experience in Arun, ExxonMobil Oil Indonesia Inc. contracted Impact Engineering Solutions and I was seconded to project manage the UBD section of the last new drills in Arun field.

An existing UBD surface handling systems was extensively modified and new procedures developed based on original Arun experience to drill 6 new wells with 9-5/8" – 10" monobore completions.

Reservoir pressure was very low, 400 – 700 psi, but flowrates still very high when drilling up to 25 mm SCFD at 50psi surface pressure. Safety was a key concern and the whole project was completely run under the ExxonMobil Oil Indonesia Inc. OIMS system (Operational Integrity Management System) which was a first full achievement for a complex drilling operation in Indonesia.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 351 to 400 of 2726)Go to Search Parameters...
Brief Description
College Study with 13 years oil & gas Logistics Experience
Certified Lead Auditor in ISO9001 and coversant with 14001, Trainer of ISO QMS, Plastic Technologist and expert in Quality Control of entire production, In-charge of resolving customer complaints and overall expertise in devoloping new furniture and engineering plastic products
Chemical Engineer, Project Manager, Process Operator in oil and gas
I have oilwell service experience with wireline, swabb have ing, fishing and rental tools. I24 years experience with manufacturing and machine work on oilfield equipment. I am an hands on hard working man with good hand eye coordination that likes the challange of working on oilwells.
I have over 19 years of experience in Procurement area including over 3 years of reservoir management and production management for oil company. I possess good knowledge in Purchase Order Processing, Inventory, Quality Assurance, Expeditor, Production (both Surface and Sub-surface).
A successful, experienced and qualified Commissioning and Production Operations Start up Shutdown Coordinator and Start up Specialist with over 17 years extensive experience (both onshore and offshore) within the oil, gas & petrochemical industry.
Operational, process, construciton, commissioning jobs
I have more than 27 years of petrochemical experience in a very wide field, including Methane Reforming, Air Separartion, LNG Storage, Tank Farm and Despatch (pipe line, rail, road and ship), Process design and Utilities (water treatment). Also extensive construction and commissioning experience.
Consultant Night Drilling Supervisor / Drilling Supervisor. Available for immediate employment. Minimum $650 USD per day (more for hardship/dangerous locations).
I have experience with several major international oil companies. I also have expertise in drilling, production, maintenance, construction, projects and operations. My experiences have been found at a local and international level.
Experienced in Management, operations and administration at upper levels in business related to Marine Operations, Business Development, Contracts Matters, Private Business and Coordination of Marine Repair and Refurbishment projects.
PROFESSIONAL SUMMARY Over 20 years of proven expertise in direct oil and gas operations. An experienced trouble-shooter and problem solver.
Extensive experience in the Gulf Coast and Gulf of Mexico in all phases of drilling, completion, remedial & production operations.
Professional career as an engineer, consultant, and manager in the petroleum and petrochemical industries in the United States and Overseas. Experience has ranged from process design, techno-economic studies, and corporate planning to managing companies involved in refining, marketing, and trading.
Managed and implemented product, equipment, and process design/modifications in manufacturing. Developed and managed concurrent design engineering initiatives, proto-typing, product development/validation (NPI), manufacturability, preparation of specifications and operational documents.
Public Affairs, Public Relations, Training, Cross Cultural emphasis. Managerial, Technical, Supervisor, Trouble-shooting and Training expertise in Oil/Gas production operations, one offshore. Proficient Macintosh/IBM PC comp. International work. Cross-cultural training, work and personal exp.
B.Sc. Chemistry degree and having 9 years experience in petrochemicals and refinery in process department
Free! Core Competencies: Project Management, Operations, Reliability & Integrity Improvement Process(ORIP), Drilling & Production Startups, Well & Pipeline Operations, Team Leadership & Collaboration, Process Improvements, Operational Performance Benchmarking, Oil & Gas Production Optimization, Drill Stem
Plant operator
Well test supervisor / engineer with Reservoir experience
I am having 17 years of experience in Pre commissioning/Commissioning /Start up and Operation of different Oil/Gas/Refinery/petrochemical/ plants/units/off sites/Utilities
I have been working at Mudlogging Operation more than 15 years. And have responsibility as:
Skills and Qualifications: 20+ years in the Oil & Gas Industry, Presently working as Operations Supt. in Kuwait, my goal is to move out of the Drilling Company side and into Production
To obtain a job in the in the Oil and Gas Industry that will challenge my abilities.
Logistics Coordinator - Offshore/Onshore, Base Operations Mgr. [2009]
I have over 25 years of experience in the petroleum industry, primarily focused in drilling operations and engineering. My diversity includes US domestic and international experience offshore and onshore. I am seeking any challenging opportunities to further my career.
Over 12 years of rich and extensive experience in Oil and Gas, Refinery and Petrochemical and currently serving at PETROFAC INT LTD. Kuwait in KUWAIT OIL COMPANY.
Drilling consultant with 15 years experience on land rigs.
I am an Engineering graduate with 13 years of operational as well as commissioning experience.currently working with Qatar LNG plant
+13 yrs exp in Well site geologist , Data Engineer
cnc machinist, edm die sinker, wirecut operator
Over 14 years of experience in wide range of core refinery operations like pre-commissioning, commissioning, operating ,optimisation, handling start up and shut downs etc of various process plants like FCCU ,SRU, Naptha HDS, CRU ,CO Boilers/ Meroxes/ N2 /benzene/toluene/Hexane extraction plants
Last 5 years employed rig manager, unit drilling, 19 years in drilling,texas panhandle
Dedicated professional with a strong background in Wireline operations, planning and support. Currently working as a Petrophysics supporting Wireline field data acquisition, real time data monitoring and QC, processing and interpretation.
Good knowledge of international QHSE regulations and standards as well as oil and gas operations and business.
Global experience in Supply Chain, Logistics, and Project Management
More than 20 years practical experience in the field. Preference is given to a position in AFRICA, ASIA or MIDDLE-EAST.
I am a drilling supervisor with more than 19 years experience. Great experience with all drilling operations running casing/liner cementing fishing hole problems like losses & pipe string stuck. Great experience with different base mud also heavy weight mud over 17.7ppg and different bits & PDC
Instituted and formulated the safety and health program for the Company in accordance with the guidelines prescribed for this purpose
A competent professional with over 8 years of experience in Plant Operations, Erection & Commissioning & Process Improvement.
Currently seeking a challenging & demanding position that allows me to acquire new skills and use of my unique skills and experience. Do desire a work environment that fosters teamwork & encourages independent responsibilities and challenges.
I am a experience plant operator seeking for a full time position in a goal oriented company
Rich experience in LNG panel operations.
Chief QC Geophysicist, Seismic Data Processor, Up Hole Observer
operation and monitoring
I have wide industry experience in leadership, engineering, commissioning, maintenance and production mainly in the Oil and Gas industry. This experience includes both onshore and offshore production facilities including 7 years on an offshore production and drilling platform.
Throughout more than 18 years of Field/Head office experience in petroleum engineering.
I have 19 years experience in petrochemical plants since 1986, as a SENIOR PROCESS OPERATOR. Please read my cv and give me reply immediately. Present I am working the Andhra petrochemical plant as a senior process operator.
Multi-talented, goal driven manager/engineer with a broad base of technical know-how and skills that allows driving fast-track projects from all the angles required to ensure parallel development of safety, cost control, EPC, procedures and implementation.
Process Assistant Shift Supervisor, Maintenance Coordinator, Turnaround Coordinator, Process Control Room Operator
First   1   2   3   4   5   6   7   [ 8 ]   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
CATEGORIES: Operations;
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com