Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #3867
next resume »»
CONTACT INFORMATION:
View contact information...
PERSONAL DETAILS
DATE OF BIRTH: 24th December 1963
NATIONALITY: German
EDUCATIONAL BACKGROUND
1982 - 1985 IMPERIAL COLLEGE, UNIVERSITY OF LONDON
B. Sc, (Eng) Hons. in Metallurgy & Materials Science, Royal School of Mines
CAREER SUMMARY
Multi-talented, goal driven manager/engineer with a broad base of technical know-how and skills that allows driving fast-track projects from all the angles required to ensure parallel development of engineering, safety concerns, cost control, procurement, construction, procedures and implementation. Ability to tackle new challenges and areas of development not concurrent with background. Team leader who makes the end goal a group driven success. Has tackled some very big challenges in past work including project killers and has the experience to make hard decisions or choices when necessary.
Areas of Experience
Total Cost of Ownership Initiatives
Project Management
Fast-tracking
Parallel Engineering and Execution
Cost vs. Financial Gain / Loss Engineering
Financial Control
Logistic Planning
Early Production Facilities
General Operations Engineering
Fabrication verification
Underbalanced Drilling Systems
Closed System Drilling
Managed Pressure Drilling
Hostile Fluid Drilling
H 2 S Safety
Overall Safety Plans
QHSE systems
Drill Stem Testing & Production Testing
Tender & Contract Preparation
PVT data verification
Installation Auditing
WORK EXPERIENCE
Jan 01 – current Impact Engineering Solutions Ltd., Operations Manager
* Operations planning and supervison
* Development of Patented Technology for Managed Pressure Drilling
* Advisor to Repsol-YPF on 'Global Supply Chain Strategy'
* Facilitator for TCO 'Total Cost of Ownership' Initiatives
* Contracts & Tender Adviser to various clients
* Advisor on Underbalanced Operations specializing in surface systems and design
Nov 01 – Jan 03 PT Impact Solutions Indonesia
Underbalanced Drilling Project Manager
* Seconded to ExxonMobil Oil Indonesia Inc.
* Planned 2nd UBD intervention in Arun gas field
* Complex UBD through 10" monobore completions with high surface flow rates at very low pressures.
Aug 99 – Dec 00 Impact Engineering Solutions Ltd., UK
Project Manager
* Joint Industry Project (JIP) 'Drilling with Lightweight Fluids from a floating drilling installation'.
* Responsible for the technical implementation
* Chairing and follow-up of the HAZOP
* Review and verification of system design
* Development and review of operating procedures
* Technical assistance and expertise for integration of drilling rig and surface system
* Successful implementation carried out in December 2000
OilFlow Consulting Ltd. 1991 – 1999
Mar 99 - Jul 99 Oil Flow Consulting Ltd.
Business Development
Nov 96 – Feb 99 Mobil Oil Indonesia Inc., Sumatra, Indonesia
Full Time Engineering Advisor
* Operations Engineering
* HAZOP preparation
* Closed System Drilling
* Sour gas Safety
* Underbalanced Drilling Systems
Nov 95 – Nov 96 Various early production project bids and studies.
Apr 95 – Oct 95 EPF New Orleans, USA
EPF Project Manager
* Procurement, construction & commissioning of a Mobile Production Unit (EPF)
Jan 92 - Mar 95 Schlumberger Port Harcourt, Nigeria
Consultant
* High Rate Testing
* 15K psi Pressure Control
* Testing Supervisor
* Project Manager Integrated Services
* Project Manager for Enhanced Production of Isobo field.
SCHLUMBERGER 1985 – 1991
Jan 91 - Sep 91 Warri, Nigeria
Field Service Manager (Testing)
Feb 89 – Dec 90 Port Gentil, Gabon
* General Field Engineer
* Field Service Supervisor for Well Testing and Early Production Services
* Testing and Production Services, Technical Engineer at District Level
Jun 85 – Jan 89 Nafoora, Libya
Stavanger, Norway
Gt. Yarmouth, UK
* Senior Field engineer
* Field Engineer
PROFESSIONAL TRAINING
1986 - 1991 Internal Schlumberger
- Course in Well Testing/Drill Stem Testing
- Nodal Analysis, Interpretation of Well Test Data
- Course in Downhole Gauge Technology
- Pressure Control Certification
- Computerized Data Acquisition
- Schlumberger Wireline Course
- Production Logging Course
- Wireline Perforating, Setting Plugs & Packers
- Fluid Properties Evaluation and PVT Analysis
- Tubing conveyed Perforating
- Drill Stem String/Test Design and Advances
- Basic Petroleum Engineering
- Offshore Survival, Firefighting
2001 Effective Negotiation
COMPUTER SKILLS
Proficient with standard office software including MS Project
PUBLICATIONS
1. "Mobile Production Unit for Offshore Nigeria", 1996 Mike Guerra, Christian Leuchtenberg (Mobil Oil Publication).
2. "Development and Performance of Surface Equipment for High Temperature Underbalance Drilling in a Sour, Severely Under Pressured Formation", ASME Energy Sources Technology Conference, Houston, Texas, February 1999. C. Leuchtenberg, P. R. Brand, P. V. R. Suryanarayana, D. Eberhard, P. J. Frink
3. "System for Drilling an Offshore Shallow Sour Gas Carbonate Reservoir", SPE/IADC 52808, R. Quitzau, Mobil International Drilling Services; P. R. Brand and B. A. Tarr, Mobil Technology Company; P. J. Frink, Mobil Oil Indonesia; C. Leuchtenberg, Consultant
4. "Drilling with Aerated Fluid from a Floating Unit. Part 1: Planning, Equipment, Tests, and Rig Modifications," Paper IADC/SPE 67748, presented at the 2001IADC/SPE Drilling Conference, Amsterdam, 27 Feb-1March, 2001.
5. "No-Damage Drilling: How to Achieve this Challenging Goal?", Paper SPE 77189, presented at the 2002 IADC/SPE Asia Pacific Drilling Technology held in Jakarta, Indonesia, 9-11 September 2002.
6. "Increasing Leakoff Pressure with New Class of Drilling Fluid", Paper SPE/ISRM 78243, presented at the 2002 SPE/ISRM Rock Mechanics Conference held in Irving, Texas, 20-23 October 2002
7. "Micro-Flux Control: The Next Generation In Drilling Process", Paper SPE 81183, presented at the 2003 SPE Latin American and Caribbean Petroleum Engineering conference held in Port-of-Spain, Trinidad, West Indies, 27-30 April 2003.
8. "Micro-Flux Control: The Next Generation In Drilling Process for Ultra Deep water", Paper OTC 10562, presented at Offshore Technology Conference in Houston, Texas, USA, 5-8 May 2003.
PATENTS
* Drilling System & Method, US Application No. 09/737851 filed 18th December 2000, granted May 2003.
LANGUAGES
1. English (bilingual)
2. German (bilingual)
3. French (basic)
MAJOR PROJECTS ACCOMPLISHED
1. Mobile Production Facility for Mobil Producing Nigeria, 1995.
* Capacity 40,000 BPD Oil, 20 MMSCFD GAS.
* Project Manager for Schlumberger Overseas Inc.
* Contract scope included:
- Procurement of rig for conversion
- Conversion of rig and associated engineering
- Production Top sides EPC
- Installation and Commissioning
- Provision of Operators and Maintenance
* Time from initial discussions to first oil was 212 days
* Was key player in initial marketing of concept, cost vs. profit evaluation, with subsequent pricing.
* Managed all aspects including but not limited to:
Rig procurement, Financial Control, Topsides Design, Rig Conversion Design, Contracts
Construction, Classification ( ABS ), Transportation, Installation, Commissioning.
* Project was a success. Less than 1.8% downtime over 2.5 years of operations.
2. Development of Severe Lost Circulation, Overpressured Sour Gas Reservoir, 1996-1999.
Three-phase development:
Phase 1: Drilling of 9 wells through a sub-sea template.
Phase 2: Installation of Jacket and Topsides.
Phase 3: Completion, stimulation and clean-up of wells.
Drilling Phase
* Closed drilling system using Rotating BOP's, Large Mud Gas Separator, Custom Flaring System.
* Gas reservoir with 33% CO2 and 2% H2S.
* Scope included:
- Design verification
- Flare Design
- Procedure verification
- Installation verification
- H2S Plan
- Evacuation and overall Safety Plan
- DST design
- DST supervision
Completion Phase
* Preparation of contracts for coiled tubing, clean-up of wells
* Design of clean-up layout, equipment spec. for cleaning up 9 wells at rates up to 80MMSCFD
* Planning of completion rig layout on platform
* Coordinating with Platform Construction Team and Drilling/Completion department
* Logistics planning
* Safety plans, H2S plan during completion phase
* Design, fabrication and installation of a complete fire-water system and accessories for platform.
(Firewater system was eliminated for production based on risk analysis for unmanned operations. However Completion operations with large numbers of personnel and flammable fuel on board required a fire system)
3. Pilot Test of Underbalanced Drilling in Arun field and subsequent Drilling of 6 wells, 1998
Underbalanced Drilling was the only viable option to drill in the sour, severely underpressured, ARUN formation in North Sumatra. ARUN was one of the first HPHT fields in the world to be developed (1978). In addition to corrosive environment (60 ppm H2S and 15% CO2), and low pressure (1.8 ppg equivalent), expected downhole temperatures were in excess of 350 degrees F. Moreover, Natural Gas produced in the field was determined to be the only commercially viable gas phase for the gas-water drilling fluid. As a result, development of surface and downhole equipment were two of the major challenges in the implementation of underbalanced drilling.
I was the project engineer instrumental to development, installation and performance of a purpose-built surface system to handle high-temperature, corrosive, gas-water-foam returns. In order to keep the costs under control, existing inventory was used to build the surface equipment in-house. The system therefore uses typical mud gas separators, settling tanks, controls and choke systems to create a fully-closed underbalanced returns-handling system. An innovative recycling cooling system was also designed, in order to cool the returns to allow liquid condensation before separation. The system was installed and used to collect data during the pilot project. It performed successfully and was used to drill 8 wells, and in slightly modified form drilled 4 wells in PASE field.
Key areas that I developed or supervised:
* Assessment of the drilling rig and modifications necessary to make it safe for UBD
* Hazop preparation, review of drilling procedures, and other safety issues to pass a full safety review of the project.
* Supervision of the design, procurement and installation of the equipment. Surface equipment was complex because of the restrictions of operating in a production cluster, between producing wells. Also due to limitations in UBD drilling models for ARUN conditions, a lot of data had to be gathered resulting in data acquisition, process control and command center being run from a control building.
* Design of the pilot test to ensure that sufficient data was collected to enable successful planning of subsequent drilling.
* Personnel training, fire protection of site, deluge systems were also part of my scope.
More detail on Pilot Test goals
The ARUN field is a prolific gas and condensate producing carbonate field located in upper Sumatra, Indonesia. The field has been producing for 20 years with peak production exceeding 2,000 MMSCFD. The pressure in the reservoir has dropped from 7600 psi to 900 psi, due to production. Conventional drilling is no longer possible. The last attempt at conventional drilling, in 1995, resulted in total loss of returns and 31 cases of stuck pipe. In an effort to increase production, Mobil Oil Indonesia initiated a study to determine if underbalance drilling was a viable technology for the field.
The environment in the ARUN reservoir posed many problems not encountered previously with UBD. The bottom hole temperature is 354 degrees F. This temperature precluded the use of conventional PDM motors typically used in UBD operations. The temperature also exceeded the limits of wireline directional and pressure sensor tools.
The temperature along with the make up of the produced gas, also raised the question of the correct fluid that should be utilized. In an effort to answer the questions of model accuracy and to determine the correct fluid to be used, the decision was made to conduct a flow test, prior to drilling the first well. The flow test was devised to test multiple fluid types, motors and simulator models to determine the optimum system to be used in the drilling campaign.
A system for handling the return fluid, collecting the required data for analysis and separating the fluid at surface was required. Analysis of commercially available systems showed that they were not capable of handling the anticipated surface temperatures and flowrates at low-pressure heads. Inquiries into the cost of modifying a system and leasing it for the drilling campaign showed that this would be cost prohibitive. The decision was made to develop a purpose built system for the project, using redundant equipment from the ARUN production facility.
4. Drilling with Light Weight Fluids 1999-2001
In 1998 a Joint Industry Project was formed under the umbrella of the university foundation COPPETEC and Petrobras, the Brazilian state oil company. Members include several major operators and service companies: Amerada Hess, ExxonMobil, Shell, Weatherford, Alfa Laval and Impact. The project aims were the development of technology to deliver the benefits of underbalanced and low head drilling to the floating drilling industry, and in particular deep water.
Impact personnel have been involved from initial conceptualization, and the company became formally involved in the project as members at commencement of Phase II. During this phase my contribution was:
* Prepare HAZOP * Chair and follow-up HAZOP * Chair second HAZOP * Provide technical advice for implementation of the field test * Advice and verification of new surface equipment design * Review of calculations and P&ID's * Verification of rig installation * Preparation of detailed procedures * Close out of HAZOP items
Project Description
An initial Phase I of conceptualization and development was followed up with Phase II, the planning and implementation of a field test of the conceptual system on a semi-submersible drilling unit. The concept developed involved the injection of both drilling mud and Nitrogen through the drillpipe to reduce the overall fluid density to a near balance condition. It was then necessary to cap the drilling riser to divert multi-phase returns through a surface separation system.This involved decoupling the riser at the balljoint, locking the slip joint closed and operating with an unhinged riser configuration.This was a new operation for Petrobras and also utilised some unique equipment developments as outlined below:
1. Utilisation of a Rotating Control Head to cap the top of the riser whilst drilling in the reservoir.A key difference between onshore and floating vessel applications of light weight fluids drilling is the operational procedures and precautions necessary to control pressures in the riser. The riser is not designed to tolerate high pressures. The semi-submersible rig is equipped with a 21" riser, which has a collapse resistance of 660 psi when full of gas and can tolerate an internal pressure of 500 psi before leaking. For this well the riser can stand full evacuation.2. Utilisation of a purpose built fluids separation system with a reduced footprint to allow installation within the space limitations imposed by a floating vessel. The design incorporates advanced control technology to handle the variations in flow volume and pressure common during such operations.This system, with the associated new procedures, was an industry first. It involved the installation of several new facilities and modifications to the existing rig equipment. Hence, to ensure the potential hazards were effectively managed and that appropriate controls were put in place, a hazard and operability (HAZOP) assessment was made of the overall installation, procedures and process several months prior to the test.
The Field TestPetrobras XVII was selected as the test rig to drill Albacora 64H development well in the Campos Basin as the test well. Modifications to the rig commenced in June and the test was successfully conducted in December 2000 in 300m of water depth offshore Brazil.
The field test was essentially a dress rehearsal prior to full system implementation. As such the objectives were realistic, aimed at establishing the feasibility of the concept. In summary these objectives were:
* Test and refine the newly developed operational procedures * Inject Nitrogen to reduce the hydrostatic head while drilling (while maintaining overbalance) * Demonstrate the ability to cap the drilling riser * Test Surface System capacity to handle 3 phase separation: solids, liquids & gas * Test the total system's capability to handle nitrified drilling fluid * Collect data for system * Gain experience in lightweight fluid operations from a Semi-submersible
5. Complex UBD Intervention in Arun Gas Field 2001 - 2003
Based on my previous experience in Arun, ExxonMobil Oil Indonesia Inc. contracted Impact Engineering Solutions and I was seconded to project manage the UBD section of the last new drills in Arun field.
An existing UBD surface handling systems was extensively modified and new procedures developed based on original Arun experience to drill 6 new wells with 9-5/8" – 10" monobore completions.
Reservoir pressure was very low, 400 – 700 psi, but flowrates still very high when drilling up to 25 mm SCFD at 50psi surface pressure. Safety was a key concern and the whole project was completely run under the ExxonMobil Oil Indonesia Inc. OIMS system (Operational Integrity Management System) which was a first full achievement for a complex drilling operation in Indonesia.
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 251 to 300 of 2479)
Go to Search Parameters...
Brief Description
I am a drilling supervisor with more than 19 years experience. Great experience with all drilling operations running casing/liner cementing fishing hole problems like losses & pipe string stuck. Great experience with different base mud also heavy weight mud over 17.7ppg and different bits & PDC
3-year degree with 25 years experience gained in working for major Oil Companies at Supervisory and Management levels. Successfully trained and developed local staff and adaptable to various social cultures.
operation and monitoring
I have wide industry experience in leadership, engineering, commissioning, maintenance and production mainly in the Oil and Gas industry. This experience includes both onshore and offshore production facilities including 7 years on an offshore production and drilling platform.
Throughout more than 18 years of Field/Head office experience in petroleum engineering.
I have 19 years experience in petrochemical plants since 1986, as a SENIOR PROCESS OPERATOR. Please read my cv and give me reply immediately. Present I am working the Andhra petrochemical plant as a senior process operator.
Multi-talented, goal driven manager/engineer with a broad base of technical know-how and skills that allows driving fast-track projects from all the angles required to ensure parallel development of safety, cost control, EPC, procedures and implementation.
i have 9 years experience in well testing as well test operator and well testing supervisor and have tested all kind of well and reseviors
Oil and Gas processing Engineer
Process Assistant Shift Supervisor, Maintenance Coordinator, Turnaround Coordinator, Process Control Room Operator
I am a post graduate in Chemistry as well as Ecology and Environment. I have worked with Petrochemical industries for the past 18 years. Presently I am working with Veba oil Operation, Libya for the last 2 years as water treatment specialist. I am well experienced in DCS operated production also.
09 years of experience in an oil refinery as field operator at coke handling unit with Kuwait National Petroleum
Seismic data processing, acquisition.
Senior Drilling Supervisor for 12 years. 19 years in oil industry. •Enthusiastic, determined, adaptable and focused with a good sense of humor. •Excellent management and team working skills, experienced in a wide range of cultures and environments.
working as senior production trainer refinery at petrosa south africa. was shift supervisor commissioned 3 refinery units from scratch as shift supervisor, see resume
To obtain a job in the in the Oil and Gas Industry that will challenge my abilities.
I,m familiar to operate with various analytical Instruments Laboratory such as Gas Chromatograph, AAS, Spectrophotometer (Visible, UV,IR) , bomb calorimeter, viscosity meter, flash point meter, pH meter, turbidity meter, conductivity meter, glass ware apparatus for titrimetric method.
Coil Tubing , 18 yrs worldwide, Coordinator, CT Drilling Systems, Project Engineering/Manager
Can setup run &standardise petroleu testing lab. Familiar with all petrleum product testings, full acquainted with ISO-9002 Quality assurance system & with MS Office & email/internet applications. Accredited as Petroleum Inspector from IFIA, UK. Neatness, accuracy, thoroughness in work
Operates processes in the plant and handled control room DCS or PLC, mostly equipment such waste gas treatment plant, waste water treatment plant, chiller, air compressor, kneader, calciner, cooling tower, furnace and knowledge in the tank farm activities, some analysis required in the process
Control Room Operator (DCS)Honeywell Chief Operator/Step-up Chief Operator Honeywell TDC2000/3000/Plantscape Refinery Unit Trainer - Classroom/OJT Technical Writer/Author (Procedures) Refinery Unit Start-up/Shut Down Commission New Equipment/Processes Precommissioning Coordinator Safety
Dear Sir/Madam: My goal is to obtain a entry level position in a drilling crew in offshore, anywhere around the world.
1997 I am joint as schlumberger company in batam.as warehouse man.2001 transfer to jakarta this same company as field operator.2003 as crew barge for java sea for other job:cementing job,stimulation job,and filtration job.
Production/Process/Panel Operator in Oil & Gas upstream Industry.
10 YRS EXP IN TERMINAL OPERATIONS
Iam an innovative, dedicative, initiative and dynamic HSE person. I have experience 15 years in HSE OIL and Gas Industry, especially in develop HSE Management System, Environmental Management System ISO 14001 and Contractor HSE Mnagement System.
Experienced Rig Safety Officer capable of performing Audits to verify compliance to company’s Policies and Procedures. Conduct SMS audits on Rigs to. Conducted Training sessions to rig personnel in Safety and Emergency Procedures. Cooperate with all disciplines to improve effectivness of the SMS.
DCS OPERATOR
Process / Systems / Operations
Drilling Superintendent - Senior Drilling Supervisor, International Positions Only
Objective: To share knowledge on Best Practices on Health, Safety and Environment (HSE) in the development and implementation of HSE Management System and promote a culture of Continuous Improvement.
I have extensive experience in Production Operations in the oil and gas industry.
Experience in Exploration and Development Geology, having involved in exploration of new areas and Enhancing of Oil Recovery in the fields of Northern Potwar Deform Zone and Middle Indus Basin of Pakistan. Day to day duties include studying the current reservoir properties via interpretation of geop
Oil and gas Utilities Senior Operator, start up, power plant shift enginner
My name is Garry Jennings and I would like to introduce myself as a possible candidate for the fulltime Operations Technicians positions.
TECHNICAL QUALIFICATIONS:
Master Degree Of Science Major In (( Synthesis of cascaded refrigeration systems)), *PUBLICATION:F. Rabea, S. aly and M. awad," Fuzzy approach for cascade Refrigeration Synthesis ", HYDROCARBON PROCESSING March 2008.VOL.87 NO.3,** HYSYS PROCESS SIMULATOR , Word – Excel – Power pointInternet,windows*
Oil wells,oil process,gas dehydration,control room DCS,storage & dispatching etc
i am chemical engineer and have 11 years experience
Logistics /Material Controller
Batchelor Degree, Chemistry with 17 years of exeperince in Process Industry
Business unit management to include multiple sites
Wellsite Geologist onshore and offshore drilling rigs.
I have experience in mud logging since 7+ years, both national and international, presently working in gabon as data engg in geolog international company, i have studied MSc., Applied geology, i was work in vertical/directional/drain hole.
I am a Petroleum Engineer with BSC degree. I am working at Oasis( Waha) Oil company for about 14 years. I worked in many section drilling & Workover as Company man on rigs, supervisor at Waha office, Production operator, foreman, Prod Supvr. 28 weeks Drillg & Prod. in U.K, 4 weeks Hor. Drlg Canada
Graduate in chemistry having 17yrs experience in the field of refinery operation including 12yrs overseas experience,currently working SaudiAramco-ExxonMobil refinery in yanbu,saudi arabia,having experience in precommissioning,commissioning and start up of the refinery, looking for a suitable job.
I currently hold the position of Marine Superintendent for BP Americas. I have an OIM license with Barge Supervisor endorsement.
I have four Years of experience in Desert at the Yemen. 1. Maintenance automatic systems at the Oil &Gas Field, Oil &Gas processing, pipelines and terminals.Maintenance CAMP equipment. 3. I make the orders on spare parts for Equipment.
Control-Room Panel operation involving, supervision of continuous operations and experience in monitoring and control operations involving production and process control in petrochemical and Oil & Gas production facilities using DCS (Distributed Control System).
Flexible, skilled mechanical engineer, specialised in high safety Operations like the Ariane 4 Launcher Assembly, Team leader, excellent English and French, search for job from Companies interested to increase business abroad
1
2
3
4
5
[ 6 ]
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Seach Parameters
Change search parameters...
CATEGORIES:
Operations;
INDUSTRIES:
Petroleum/Oil/Gas;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2008 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com