CONTACT INFORMATION:
View contact information...
WORK EXPERIENCE:
Company Empl.: Medco Moeco Langsa Ltd
Position / Year: FPSO and Terminal Representative / 2004 till now
Client: Medco Moeco Langsa Ltd.
Platform: Langsa Crude oil Block I Langsa on FPSO MV8 Langsa Venture with daily crude production abt. 5,500 BOPD by 3 sub sea well of natural flowing.
Company Empl.: Wood Group Indonesia, PT.
Position / Year: Control Room Operator / 2002 - 2004
Client: BP Indonesia
Platform: Tanjung Priok Terminal Onshore Gas Receiving Facilities (TP-ORF) in BP West Java, that is place of BP gas delivery facility to PT. Indonesia Power (PLN Partner) with energy contract nomination 180 BBTU equal 600 MW or 170 MMSCF gas comsumtion.
Company Empl.: Promosindo Midia Tenaga, PT.
Position / Year: Plant Operator / 1999 - 2002
Client: BP / ARCO Indonesia
Platform: Ardjuna Sakti LPG Storage Barge (FPSO) in Offshore Nort West Java (ONWJ) is part of processing and terminal facilities for LPG liquefaction, expansion, reliquefaction (vapor recovery), storage and cargo transfer handling. There are 12 storage tanks with a total capacity of 4,320,000 BBLS equal 359,700 Metric Tons. LPG production 10,230 BPD.
Company Empl.: Sapta Well, PT.
Position / Year: Plant Operator / 1996 - 1999
Client: ARCO Indonesia
Platform: NGL plant (central plant) offshore North West Java (ONWJ). The central plant provides for crude gathering and stabilization to saparate crude from water and light end fraction, and gas gathering to recover 70-30 % propane-butane mix and heavier Natural Gas Liquid (NGL) from Arjuna Field gas. The facilities were designed to recover NGL from 180 MMSCFD of gas and to remove lightends from 285,000 BPD of crude.
Company Empl.: Jack & Brothers Corp. PT. (Engineering Consultant)
Position / Year: Ass. Geology Eng. / 1994 - 1996
Client: PT. PLN (Persero)
Project: Feasibility Study and Detail Design PLTA LAMO I Project in North Maluku
Company Empl.: Intimulya Multikencana (Engineering, PT. Consultant)
Position / Year: Ass. Geology Eng. / 1993 - 1994
Client: Departemen Pekerjaan Umum
Project: - Detail Design of Bank Indonesia Building Jakarta
- Road and bridge design ToL Jagorawi
--------------------------
EDUCATION & CERTIFICATION:
--------------------------
Education:
- Technical High School Majoring Geology Mining 1992 (Program 4 years)
- Sucessfully Diploma III Majoring Mechanic Engineer 2005 (Academic 3 years)
- Inprogress Extension to Bachelor Program, Majoring Mechanic Engineer
Formal Training:
- Basic Safety Training for Contractor, PT. Saptawell Technicatama, Jakarta, 14 May 1998
- Safety Training Observation Program (STOP), Dupont Safety Course, Jakarta, 17 – 18 April 2000.
- Water Survival, BP West Java Ltd, Jakarta, 11 May 2000
- Fire Fighting Course, Jakarta Offshore Training Center, Jakarta, 12 – 13 July 2000
- First Aid and CPR Course, BP West Java Ltd, Jakarta, 13 July 2001
- Helichopter Underwater Escape Training, Jakarta Offshore Training Center, Jakarta, 21 August 2001
- Team Building Course, Reinforcement Program 2002, BP Export Operation, Jasmine Hotel Puncak, 1 -3 April 2002
- Fire Prevention & Fire Fighting Course, First Aid & CPR Course, Sea Survival Course, Sekolah Tinggi Ilmu Pelayaran, Jakarta, 3 – 5 February 2004
- Hydrogen Sulfide Safety, PT. Pandu Utama, Jakarta, 3 September 2004
- Basic Safety Training, in accordance with the provision of SCTW 1978 as amended in 1995 regulation, Diksus PKK Pertamina, 6 – 16 September 2004
- ISPS Code Training, "Introduction & Plan of ISPS Code", Langsa Terminal, 19 – 21 October 2004
- Loka Karya K3LL (HSE Workshop) PT. Pertamina EP TH 2005, Patra Semarang Convention Hotel, 5 -7 December 2005
- Pencegahan dan Penanggulangan Bahaya Gas H2S, Institute of Training in Energy and Mineral Resource, Cepu, 14 – 15 February 2006
- How to Improve HSE Performance through Developing Safety Culture and Behavior Modification, Langsa FPSO PTE Ltd, Bandung 21 – 22 April 2006
Informal Training
1999 - Basic Operation Training Series (BOTS) 10 module at Ardjuna Sakti
2000 - Operation and maintenance gas turbine training at Arjuna Sakti
- Crane operation and basic rigging training
- Basic refrigeration training at Arjuna Sakti
- DCS Rosemount System3 training at Arjuna Sakti
2002 - Confine space training at Arjuna Sakti
- Team Building intensive course at puncak-Bogor, sponsor BP Indonesia
- The Maximo software course at Arcadia Building
2003 - Operation of Daniel flow computer at TP-ORF
- Operation of SCADA at TP-ORF
- Oil and Gas Custody Transfer Training at PT. Radian Jakarta.
- Gas chromatograph training at PT. Control System
2004 - Helychopter handling at PT. Travira (Halim Perdanakusuma Airport)
-----------------------
ADDITIONAL INFORMATION:
-----------------------
Place/ date of birth: Aceh November 21, 1970
Nationality: Indonesia
Status: Merried, 3 kids
Sex: Male
Religion: Moslem
View contact information... |