PROFESSIONAL EDUCATION

LAWRENCE TECHNOLOGICAL UNIVERSITY; Southfield, MI
1976 to 1979
BSCE Construction Engineering
Magna Cum Laude
Top of Class, Civil Engineering Department
Member Tau Beta Pi, National Engineering Honor Society

TECHNICAL SKILLS

COMPUTER PROFICIENCY
Primavera P3, P3e/c, 5.0, Expedition Expert 10+ yrs
(Project Manager, Methodology Manager, Profile Analyst, MyPrimavera, Cost Manager )
MS Project Expert 15+ yrs
WinEstimator Expert 4 yrs
Timberline & MC2 Advanced 4 yrs
MS Word, Excel, Power Point Expert 20+ yrs
MS Visio Advanced 3+ yrs
Snag-It, Internet, Adobe Acrobat, Photoshop Exp/Adv

PROFESSIONAL CAREER

SENIOR PROJECT CONTROLS SPECIALIST
11/2006 TO PRESENT VECO ALASKA/VECO CYPRUS
Senior Scheduler/Planner
Vankoroil Oilfield Development; Siberia, Russia
Develop & Maintain EPC Project Schedules (Primavera e/c 5.0)

SENIOR PROJECT CONTROLS SPECIALIST
05/2006 TO 11/2006 JACOBS CATALYTIC LTD.
Senior Scheduler/Planner
Suncor Energy Oil Sands Tar Island Refinery, MPG Tie-In Package
Develop & Maintain Overall Project Schedule (Primavera P3 & P3e/c)
Develop, Coordinate & Maintain all Miscellaneous Project and Outage Schedules

SENIOR COST ANALYST
12/2005 THRU 4/2006 C3 SUMMIT, LLC/JACOBS ENGINEERING
Contract Consultant to Jacobs Engineering
Suncor Energy Commerce City, CO Refinery; Odyssey Clean Fuels Project, $400MM Renovation & Expansion
Responsibilities:
Gather, review and analyze current cost data
Prepare cost reports and forecasts in support of budgeting and funding efforts

PRIMAVERA P3E/C PROJECT PLANNING CONSULTANT
4/2005 THRU 10/2005 TPS TECHNICAL STAFFING/WE POWER; MILWAUKEE, WI
Contract Consultant to Wisconsin Electric Power Company
Responsibilities:
Develop user specific guidebooks and manuals for Primavera P3e/c Project Manager Applications
Teamed with Cost Controls Specialist to Integrate P3e/c Project Manager and Cost Management w/ SAP
Provide Training and Mentoring for New Project Controls System Implementation

PROJECT PLANNER/ESTIMATOR/CONSTRUCTION ENGINEER
3/2001 TO 4/2005 HONEYWELL PAI; FT. COLLINS, CO
Anheuser-Busch Ft. Collins Brewery $300MM Expansion
Responsibilities:
Develop & Maintain Overall Project Schedule (Primavera P3 & P3e/c)
Develop, Coordinate & Maintain all Miscellaneous Project and Outage Schedules
Outage schedules included:Complete brewery shutdown for maintenance, renovation and new systems tie-ins
Powerhouse shutdown for ammonia compressor maintenance, replacement and new equipment tie-ins
Complete system shutdown (one of two brewhouses) for controls change from Allen-Bradley to Siemens
Can and bottle line shutdowns for conveyor, pasteurizer, bottler, labeler, can lid and packer maintenance, replacement, renovation and reorientation
Bottle line shutdowns for installation of new plastic labeling machines and associated conveyor installation and reorientation
Miscellaneous short duration outages on critical production and operational systems
Coordinate Contractor Labor Performance, Schedule and Manpower Planning, Analysis and Reporting
Prepare Site Manager's Project Manpower and Labor Performance Reports for Corporate Submittal
Develop Cost Estimates for Corporate Project Funding
Develop Cost Estimates for Field Orders & Change Orders
Evaluate all Contractor Estimates for Field Orders & Change Orders
Develop Informational and Training Power Point Presentations for Site Manager's Use
Coordinate Misc. Project Design Development, Bid Document Prep, Bid Review & Award, Prime Contract Management

ESTIMATOR/PROJECT MANAGER
08/1999 TO 02/2001 THE LATHROP COMPANY; FARMINGTON HILLS, MI
Industrial & Automotive Construction Projects $5M to $30m

CHIEF ESTIMATOR/PROJECT MANAGER
09/1997 TO 08/1999 BORBOLLA CONSTRUCTION, INC.; CLINTON TWP, MI
New Business Development; Strategic Planning, Marketing and Sales
Training & Development; Jr. Estimators, Proj. Mgrs. & Engineers
Construction Contracts & Project Management
Lump Sum Estimate Preparation
Project Experience
Industrial/Automotive Construction & General Contracting
Ford Motor Company
Michigan Truck Plant - 1) Industrial Truck Maintenance Shop, 2) Renovation & Maintenance Projects
Wayne Stamping Plant - Masonry Wall Replacements, Concrete Floor Repair & Misc. Steel Guard Rail & Hand Rail Repairs & Replacements
Wayne Assembly Plant - New Tool Crib & Maintenance Repair Facility
General Motors Corporation

Pontiac TPC Validation Center - 1) Vehicle Assessment Building Renovation, 2) Truck Entry Renovation, 3) Masonry Wall Replacement
Pontiac East Assembly - Inbound Receiving Security Gates, Fencing & Pavement Replacement & Upgrade
Orion Assembly Plant - Employee Cross-Over Renovation
Romulus Engine Center - 1) Medical Area Expansion & Renovation, 2) Hourly Employee Cafeteria and Break Room Expansion & Renovation
Hamtramck Assembly Plant – 1)Weld Tear-Down Area Relocation, 2) Welding & Machining Area Lubricant/Coolant Flume Extension
Additional Clients
Detroit Edison Company
EBI Detroit, Inc.
Selfridge ANGB
Detroit Water & Sewer Department
John Carlo Construction

INDUSTRIAL GROUP MANAGER/PROJECT MANAGER/ESTIMATOR
01/1996 to 09/1997 GEORGE W. AUCH COMPANY; PONTIAC, MI.
Chief Estimator, Project/Contracts Manager, Director Marketing and Sales
Design/Build Construction, Industrial and Warehouse Construction
Project Experience
Gateway Industrial Center - $10MIL; 320,000sf, High Bay Warehouse
Mercury Metalcraft Co. – 25,000 sf Industrial Manufacturing Facility Expansion
Walled Lake Schools – 50,000 sf Food Service Warehouse

ESTIMATOR/PROJECT MANAGER
10/1986 to 12/1995 WALBRIDGE ALDINGER CO.; DETROIT, MI
1993-1995; Estimator - Industrial, Institutional, Commercial, Public Works Projects
1986-1993; Project Manager - Industrial, Institutional & Commercial
Project Experience
Industrial/Automotive
Ford Motor Company
Livonia Transmission Plant, 1) $20MIL, 200,000 sf, Experimental Fab Facility, 5 Month Fast-Track Schedule; 2) $15MIL, 50,000 sf, 30-Cell Dynomometer Test Lab
Rawsonville Plant, 1) New Fuel Handling Component Test Lab Facility, 2) In-Plant Machining Line Flume And Floor Alteration And Restoration
Dearborn Stamping, 1) Press Pit And Machine Base Demo And Replacement, 2) Structural Reinforcement
Chrysler Corporation
Dayton, Ohio, 75,000 sf Manufacturing Plant Renovation
Acustar Corporation
Evart, Michigan Glass Plant, New 100,000 sf, Windshield Manufacturing Facility, 6-Week Fast-Track Schedule; Excavation, Concrete Building Foundation, Machine Bases And Pits, Structural Steel Shell
National (Great Lakes) Steel Corporation
$15MIL Coil Steel Pickling Line Machinery Foundation Rehab and Underpinning
$10MIL Coil Steel Pickling Line Flume Renovation and Expansion
100,000 sf Coil Storage/Staging/Train Loading and Shipping Facility

Institutional
Brother Rice High School, $7MIL Media Center and Classroom Addition
Bloomfield Hills Schools, Seven, Fine Arts Bldg. Additions
Cottage Hospital, OB Birthing Center Expansion & Renovation
Cottage Hospital, 750 Space, 4 Level Parking Garage
Rehab Institute of Michigan, Renovation Shipping/Receiving Area
Wayne State University, Walter Reuther Library

Commercial
Ford Motor Land Development/Taubman, 220,000 sf Shops at Fairlane Meadows Strip Mall incl. Target, Duhnam's & Mervyn's Anchor Stores
Mervyns Department Stores, 4 Simultaneous Bldg. Foundations and Shell Projects
Detroit Edison Company, 75,000 sf Office Space Renovation

Miscellaneous
BFI, Inc., 400 Acre Light Industrial & Warehousing Site Development
Detroit Edison Company, Fire Water Reservoir and Pumping Station, General Contract and Construction Management Contracts to $20MIL

PROJ. MGR, ESTIMATOR,SUPERINTENDENT, FIELD ENGR
10/1981 to 07/1986 ASR MULTI CONSTRUCTION, INC.; TROY, MI.
Project Experience
Three Municipal Wastewater Plant Projects, $18 M Total of General Contracts; Morgantown, Fairmont & Parkersburg W.Va.

ASSISTANT SUPERINTENDENT, FIELD ENGINEER
06/1979 to 10/1981 R.E. DAILEY CO.; DETROIT, MI
Project Experience
Institutional Renovation Project; Sate of Michigan; Oakdale Center, Lapeer MI; $18MIL
Municipal Wastewater Treatment Plant; City of Burlington, IA; 20 MGD Facility Expansion; $20MIL

HEAVY & HIGHWAY CONSTRUCTION
03/1970 to 08/1976 THE MORRISON COMPANY; TRENTON, MI
Laborer, Machine Operator, Truck Driver, Mechanic/Tireman
Yard Foreman, Field Foreman, Project Superintendent

NON-PROFESSIONAL ACTIVITIES

GYMNASTICS COACH & TRAINER (evenings & weekends)
1990 thru 1996; GYMNASTIC TRAINING CENTER; ROCHESTER HILLS, MI
Vault, Uneven Parallel Bars, Floor Exercise & Tumbling
Flexibility and Strength Development Coach
Women's Levels; Developmental, 5, 6, 7, 7optnl
Nationally Certified (USA Gymnastics) Class 2 Competitive Coach
Nationally Certified (USA Gymnastics) T.O.P.S. Trainer & Coach
National Safety Certification (USA Gymnastics)

VOLUNTEER WORK EXPERIENCE
THE VINYARD CURCH OF FORT COLLINS
Hospitality team leader; Ushering & Greeting
Resident mentoring at Harvest Farm in Wellington, CO
KENSINGTON COMMUNITY CHURCH (4 yrs)
Planning & Development Team (Building Committee), Usher & Greeter, Set Tear-Down Team
Small Men's Group Leader, Couples Small Group Leader, Special Topics Small Group Leader
Mission Team Leader (Team Paris, October '99)
Treasure Island 4th & 5th Grade Children's Leader
ROYAL OAK PUBLIC SCHOOLS & SHRINE ELEMENTARY SCHOOL (3 yrs)
Chaperone for Classroom & All-School Special Events, Driver for Field Trips
Speaker to Students re. Professions in Construction Industry, Avoiding Drug & Alcohol Abuse
COACH COMMUNITY YOUTH ATHELTICS (4 yrs)
Troy Youth Baseball Assn
Royal Oak Youth Soccer Assn
Royal Oak Girls Softball Assn
MEALS ON WHEELS (2yrs)

View contact information...
«« previous resume next resume »»
Search Results (Resumes 1401 to 1450 of 2500)Go to Search Parameters...
Brief Description
Experienced process control professional skilled in both Onshore and Offshore Oil/Gas operations. Worked in the UK and overseas. A versatile team player with excellent organisational and interpersonal skills. Proven record in Construction, Commissioning and Start up projects.
Warehouse/Supply Management,/Logistics co-ordination and purchasing skills.
Work experience Education Additional information Skills Abilities Hobbies
I am working with Engro Chemical Pakistan Ltd., since start of 1999, as a Chemical Plant Operator at Urea Unit, and wish to join else where in the world.
Professional Heavy Equipment Operator rated with Class B+, Professional Driver for both cars and Heavy Vehicles, Knowledge in Purchasing, Surveying.
piping design, supervision on large projects, estimating/cost and budget control
Landman, Title Research, Leases, Negotiations
Planning Engineer- Production & Materials Having 8 years experience
Mechanical engineer with TRAGS qatar,Lab Technician 1 with Schlumberger, Qatar
An experienced engineering manager, project manager, and program manager with Department and Division operations experience at engineering and construction, and consulting firms. Experience in multi-disciplinary infrastructure projects and environmental remediation.
Sr. Project Controls Specialist
Techno - commercial Professional, Service Planner with 4+ years of experience in Oilfield Services, Currently working with Leading Multi national Service company.
Night Drilling Supervisor
Five years increasing responsibility and leadership in Power Plant, Analytical Chemistry, Mechanical Operations and Maintenance. Expert in the fields of Water Sampling , Maintenance Planning, and Record Audits
ROV Pilot Training, BOSIET, HUET. Offshore Medicals, STCW 95
Chemical Engineer, Project and Quality-Security-Environmental Management
Power Plant Operation And Maintenance Management
Construction management, real estate development, heavy industrial construction, construction claims, cpm scheduling, fluent spanish, mining construction
Extensive international experience in Plant Operation, Production & Maintenance in Oil & gas facilities onshore & offshore.
Bachelor of Chemical Engineering and Bachelor of Geology degrees, over 10 years field experience in the oil /gas industry around the world. Worked offshore and onshore. Valid IADC Supervisors Wellcap certificate. Vaild OPITO offshore card.
PERSONAL ATTRIBUTES:
All aspects of mineral processing plant construction
3 yrs Oil and gas production operator
Key word : Power Plant Engineer, Boiler Operation Engineer, Boiler Maintenance Engineer, Turbine Operation Engineer, Turbine Maintenance Engineer,Field Service Engineer, Field Supervisor, Boiler Estimate Engineer, Boiler Shift Supervisor, Boiler Operator,Boiler Performance Engineer,Start up Engineer
I have done Diploma in Chemical Engineering with total experience of 8 years & about 4 years experince in Oil & Gas field.
I am working as Process Operator in Crude/Vacuum Distillation unit of Refinery and having 5.2years experience
Free! Carried CDL for 6 years, 12 years driving fork lift, 13 years auto mechanical work, 1 year refridgeration installation, 6 years managing warehouse shipping and receiving.
I am a certified electrical engineer with 15 years experience
As an, QC/ R&D Professional in Laboratory & Process areas with 17Yrs of Extensive experience in Plant operation, Chemical analysis by classical & instrumental methods in chemical, cement ,Ores , minerals, Ceramics Refractories & Metal industries ,wishing to work with the professional
Results-driven business/systems analyst with 10 years of diversified experience in the successful identification and management of high-level business development strategies and large-scale IT solutions with extensive expertise in developing critical design requirements and functional specifications
Electrical Engineer/Manager in Petrochemical Industries and Electrical Power Companies in Testing, Commissioning, Design, Projects, Plant Engineering, Maintenance, Operation, Technical Services, Training. Developement, System Improvements, Problem Solving, Analysis, System Study, etc
Technical manager of Construction & Services Companies - Manages all the company activities, adiministratives excluded.
9 Years Mining experience, Overhead Crane Operator, Driver, Entry Level Job Seeker
Knowledge of engineering theories and practices and an understanding of environmental principles involves with exploration, drilling, production and development operations.
Completion - Well Testing supv, Wireline logging engineer
I am a safety practitioner with wide experience in construction, mining, dredging and marine, onshore drilling, etc. I have a good knowledge in MS Word, MS Excel and MS Powerpoint.
Millwright/Industrial mechanic and industrial construction mauntenance mechanic
Maintenance & Operations Manager / Team Leader with extensive experience in the forest, mineral, petroleum, and pulpmill industries of Canada. Formally trained, experienced, and certified in Operations and Maintenance Management, as well as in Millwright, Heavy Duty Mechanic, and Welding trades.
35 Years Experiance in Most Aspects of Oil Production, Drilling and Operations Offshore and Onshore
Maintenance Engineer with 7 years experience onboad merchant vessels trading internationally
Project Interface Manager, Stategy Planning, Engineering/Projects Development/Management/Controls
An experienced Rig Mechanic with high level knowledge on Mining industry
Bachelor in Engg. working As Quality Assurance Engg In A korean MNC for Mobile manufacturing having 3 year experiance, ISO, Six Sigma, SPC, Training, MIS, Quality Operation
49CFR HAZMAT Technical Trans (D.OT., ADR, RID, IATA, IMDG); HAZCOM (1910.1200)
Shift Supervisor Shift Foreman Plant Operator
I have been working in the Safety, Health and Environmental (SHE) field for more than 9 years. Throughout these years I have been exposed to various SHE related requirements and problems. One of my key competency area will be managing workplace day-to-day safety, health and environment issues and
Operation Manager, International Pipe Inspector by DS-1, (Level II UT, RT, MT & PT) - ASNT-TC-1A
Instrument Quality Engineer/Inspector & Instrument Engineer and Commissioning Coordinator
To pursue a career that will give me the opportunity to fulfill my ambition, acquire the training and experience necessary for professional and personal growth, to be able to share my competent, skills, knowledge, hard work and discipline in this company.
Senior Professional Geologist
1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   [ 29 ]   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50  
Seach Parameters

Change search parameters...
CATEGORIES: Operations;
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2008 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com