CONTACT INFORMATION:
View contact information...
COUNTRIES WORKED:
Nigeria, China, Malaysia, Bangladesh, India, Vietnam, Canada, Colombia and Venezuela.
RIG & WELL TYPES:
Drill Ship, Semi-Sub, Jackup, Platform, Jacknife and Telescopic, land pads.
HP/HT, Simultaneous Operation Platforms, Vertical, Directional, Lateral, Multi Lateral, Orientated Re-Entry Short Radius Directional, Land Based Drilling Pads, Power Drive, Auto Trak.
KCL/PHPA, Silica, Aphrons, OBM, SBM, Diesel/Poly, Cutter "D", Trysol, Gel/Chem, N2 UBD Fluid, N2 UBD foam, Membrane Produced and Cryogenic.
EDUCATION AND PROFESSIONAL DEVELOPMENT:
Stuck Pipe Prevention, Aberdeen Drilling Schools 2006
Marine Engineering Technician, Canadian Naval College, Halifax, Nova Scotia
IWCF – Combined Surface & Sub Sea #5519731/TH427/058, expiry date 29 August 2007
HUET & Sea Survival # 001/004/0104 January 2004
Fire Prevention & Firefighting, Pelican Marine Academy 2003
Personal Safety, Int. Marine Academy 2003
Personal Survival Techniques, Int. Marine Academy 2003
First Aid, Int. Marine Academy 2003
H2S, Marine Academy 2003
Stuck Pipe Prevention, BP
First Aid-CPR, St. John Ambulance
Loss Control Prevention, University of Austin
Team Power, Halliburton, Colombia
Stop Safety, BP Colombia
Under-Balanced Drilling, PITS
Coring Applications, SDBS Brussels
Down-hole Tool Applications, SDBS Brussels
PDC Applications, Houston
Roller Cone Applications, Houston
Regulatory Awareness for Wellsite Supervisors, PITS
Safety Management for Wellsite Supervisors, PITS
Off Highway Defensive Driving, PITS
COMPUTER SKILLS:
Proficient in all aspects of Windows, Microsoft Office, internet, Drilling software and Landmark DIMS.
CAREER HISTORY
2006 - Current Addax – Oryx, Nigeria - Senior Drilling/Completions Supervisor
Scarabeo 3 – Semi Submersible
ND-3H- Drill 36", 26",17.5", 12.25", 8.5", cased to 9475' @ 85 degrees, install Vetco HSST. W/D 450'.
ND-4H- Drill 36", 26",17.5", 12.25", 8.5", cased to 9115' @ 85 degrees, install Vetco HSST. W/D 450'.
ND-5H- Drill 36", 26",17.5", cased to 1750'. W/D 450'.
ND-6PH- Drill 36", 20" and 12.25", drill 8.5" directional pilot hole to 12,000', 60 degrees and plug. KOP @ 6000' build to 89 degrees @ 9,590' and drill horizontal section to 12,100', install Vetco HSST, drill 1,500'lateral section. W/D 450'.
OK-13- Complete Vetco HSST, 4.5"tubing and 3 x ROSS, MER flow test 3 zones to FPSO, water depth 480'.
OK-14- MER flow test 3 zones to FPSO, water depth 480'.
OKPORO-1X - Drill 36", 26",17.5", 12.25" to 8,350', 21.5 degrees, evaluate, P&A, recover RGB and WH.
NDW-2A – Drill 36", 26", 17.5", set 13.375" @ 3,900', Drill 8.5" pilot hole to 11,322', set balanced plugs and KO Plug, Drill 12.25" to 7,100' building to 65 degrees, set 9.625', drill 8.5" @ 40 degrees to 11,305'.
OK 15A-OK15ST1 - Drill 36", 26",17.5", set 13.375" @1750', drill 12.25"to 6400',
May - December 2005 ExxonMobil, Nigeria - Senior Drilling/Completions Supervisor
OSO 63H- Re-enter existing wellbore, abandon existing perforations, set whipstock, mill window and drill 8.5" hole from 7500' - 15717' at an inclination of 55 degrees, run 7" liner,
(Ensco 100 - Guerrilla Jackup, 16 slot platform)
OSO 61H- Re-enter existing wellbore, abandon existing perforations, set whipstock, mill window and drill 8.5" hole from 7500' - 14280' at an inclination of 53 degrees, run 7" liner, run 4.5" production tubing, wireline perforate 60', AOF well @ 9400 BOPD.
(Ensco 100 - Guerrilla Jackup, 16 slot platform)
EDOP 53C – Complete re-drill, perforate TCP, gravel pack from 9040' to 9375', jet and stimulate with coil tubing, flow well through testers to production platform, AOF to burner @ 4200 BOPD, pump 100 Bbl's 12% acid and squeeze, jet well, AOF to burner @ 6600 BOPD, tie in to sales line.
(Ed Noble – Jackup, 16 slot platform)
OSO 60H – Re-enter existing wellbore, abandon existing perforations, set whipstock, mill window and drill 8.5" hole from 11223' – 17318' at an inclination of 80 degrees, run 7" liner and TCP 280', run 4.5" x 5.5" production tubing, jet with N2 coil tubing, flow to clean up and test @ 8900 BOPD.
(Ensco 100 - Guerrilla Jackup, platform)
OSO 59H – Wireline perforate 60' from production platform, produce through sales line to production platform.
Usari 20B – Re-enter original hole and set whipstock, mill window and drill 6" hole from 4300' – 8709' at an inclination of 90 degrees, complete with 2800' of reslink screens.
(Adriatic 8 – Jackup, platform)
March – May 2005 Kerr McGee, China
Senior Drilling Supervisor
Senior Drilling Supervisor, directional well off platform using a Chinese Jackup Drilling Unit.
December 2004 – February 2005 Petronas Carigali SDN BHD, Malaysia
Senior Drilling Supervisor
Senior Drilling Supervisor, supervise drilling directional exploration well with an 8 anchor drill ship in the South China Sea to 2350 tvd, KCL/PHPA.
(Energy Searcher – Drill Ship)
March 2003 October 2004 Niko Resources India, Bangladesh
Drilling and Completions Superintendent'
First Slant well in India to 2,200 m, SBM completed with Frac pack, Land based drilling platform with a total of 28 wells producing 3.85 mmM3/d, drilled 4 wells using SBM gravel pack completions, exploration drilling 8 wells to 1800 m, KCL/PHPA. 16 well platform design and tendering (office based). Drilling Superintendent Bangladesh 2 - 3800 m wells.
(Jack knife Triple, Slant Rig, Telescopic Double)
2002 – 2003 Apache Canada Ltd
Senior Drilling/Completions Supervisor
Senior Drilling and Completions Supervisor, Drilling & Completing Horizontal wells in North Eastern British Columbia. Re-entry whip-stocking out of original wellbore, short radius directional, to formation top and drilling into formation with UBD package and 4 phase separation equipment, HP/HT, H2S to 11%, 2,310 TVD 3,200m.
2002 – 2002 Samedan Energy Inc, Vietnam
Drilling Supervisor
12W-TN-2X Swan Block, 300 miles offshore Vietnam. Appraisal vertical well to 4,328Mkb using a Cantilever Jack-up Drilling Unit. Supervise all drilling operations in a multi-cultural environment. Coordinate Logistics with shore based Supervisors.
2000 – 2002 Alberta Energy Company, Canada
Senior Drilling Supervisor
Co-ordinate all on-site personnel for the Drilling of Horizontal Under-Balanced wells Drilled in North Eastern British Columbia. N2 mist, Under-Balanced, Horizontal, HP/HT, H2S to 6%and all HSE Policies of AEC, reporting directly to Drilling Manager. 1,500m TVD – 3,000m MKB, 18 wells drilled.
1998 – 1999 GHK Petroleum, Colombia
Drilling Supervisor
All duties pertinent to Company Man for the Drilling of Directional wells, using air drilling. Wellsites located in the Colombian Jungle near the town of Guaduas.
1994 – 1998 Security DBS Latin America
Coring and Downhole Tools Manager
Co-ordinate Coring, Hole Openers, Shock Subs, Jars, PDC and Roller Cone Bits. BHA Design, Logistics Supervision for all Field Engineers. Training in HSE Policies for all field Engineers. Program wells and Liase with Oil companies Operation staff. Run all series of Coring, Hole Openers, PDC Bits and Motors.
1992 – 1994 Security DBS Canada
Drilling Supervisor
Supervise turnkey operations of running PDC bits and motors in the Rocky Mountain area of Canada.
1979 – 1992 Regent Drilling, Nabors Drilling
Driller
All duties associated with drilling land Wells in the Rocky Mountains of Canada, Average depth of Wells 5900 meters. Operator was Shell Canada, using 10/15k BOP and surface equipment, H2S to 30%, HPHT.
View contact information... |