Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #55580 next resume »»
CONTACT INFORMATION:
View contact information...

A Professional Engineer with more than 27 years oil & gas experience. P. Eng Status current.
Facilities Team Leader, Project Management, Construction Experience.
Senior Management & Engineering positions for a wide variety of gas processing facilities.
Project Management experience with engineering design, construction, commissioning and operation of gas processing facilities.
Staffing, Budgeting and organization development
Process engineering and hands on trouble shooting skills.
Computer literate (Hysis, MS Office Suite, MS Project, various Engineering programs)

EMPLOYMENT HISTORY

January 2005 to Present JOB Pertamina HESS (Jambi Merang) LTD.
Project Manager

Project Manager for the Jambi Merang development, value U$250 million, which is the simultaneous development of two gas / condensate fields that will produce 150 mmscfd of raw gas and approximately 15,600 bbls / day of LPG's and condensate.

Manage the overall project EPC phase and the operation of the project group itself. Handle all interfaces with EPC contractors and direct the company project personnel working for the owners' side of the project.

As signing officer of the JOB, approve invoices and sign financial transactions for the day to day running of the company.

Responsible for the development of the POD, (Plan of Development), submitted to the government authorities for approval of the project. Developed the concept and process selection for the field development as well as cost estimates, staffing plan and facilities selection for inclusion in the POD.

Put in place the AFE's to allow the technical engineering work for the EPC bid proposal to proceed and the survey of the plant site and pipe line right of ways to be completed.

Prepared the EPC bid strategy and documents to tender the project.

Provided and executed staffing plans for creation of the project group that is now executing the EPC phase of the project on behalf of the company. Provided organization charts for a future operating organization to operate the plant and field facilities.

Oct 2002 to December 2004 AMERADA HESS INDONESIA LTD.
Senior Project Engineer

Senior Project Engineer for the Ujung Pangkah gas processing facility and sales gas pipeline. This project is for a complete gas processing plant that produces sales gas and condensate product from sour feed gas with a design capacity of 150 mmscfd and 2500 bbls per day of liquids.

Responsible for the preparation of the bid technical and contractual documents, bid process and execution of the engineering design, procurement, and construction of the plant facility and 10 km 20" sales gas pipeline. Preparation of the preliminary operating philosophy, staffing plan and operating cost estimates for use in the corporate economic modelling evaluation. In charge of the project engineering team to oversee the EPC contractor's execution of the work.

Jan 2000 to Oct 2002 GULF INDONESIA RESOURCES LTD.
Senior Project Engineer

Senior Project Engineer for the installation of field compression. The project was for the installation of 4000 hp of compression complete with cooling, separation and control. Developed the design concepts, prepared the bid technical documents and analyzed the technical aspects of the EPC contract, interfaced directly with the EPC contractor engineers, to oversee all aspects of the project. On this project the company directly purchased the compressors and associated equipment for issue to the EPC contractor saving significant project schedule.

Recommended changes to another field compression project design resulting in more than 5 million dollar reduction in capital cost.

Jan 98 to Jan 2000 GULF INDONESIA RESOURCES LTD.
Chief Engineer / Team Leader

Employed by Gulf to supervise the plant engineering group at the Gulf Grissik Gas Plant, (a 300 mmscfd high CO2 processing plant utilizing membrane separation technology combined with an MDEA treating system, refrigeration and dehydration), in south Sumatra. The engineering group, consisting of one expatriate and four national engineers, provided support for the central gas plant and four field facilities feeding gas to the plant.

Oct 93 to Oct 97 WAHA OIL COMPANY
Senior Supervisor P&M Section

Waha Oil Company is the largest national oil company in Libya, formerly Conoco, Marathon, and Amerada, producing approximately 500,000 barrels of oil per day.

Senior Supervisor of the Process and Mechanical section of the Waha Oil Company Engineering Department, with 25 engineers, expatriate and nationals, reporting to me. This section of the engineering department handled all company project work, and supported the operation of the surface facilities from well head to the ship loading terminal; with an annual budget of approximately 100 million.

The P&M engineers worked on production and operations problems related to oil production, gas processing, water flood and gas pressure maintenance schemes to enhance oil recovery. Typical work projects were, installation of separation and dehydration units, tie in of new wells, design of changes to process schemes to suit current operations requirements, development of new procedures and implementation of work orders and safety procedures to modify facilities as needed for maintenance or operations.

1982 to Oct 93 WOLCOTT GAS PROCESSING LTD.
Manager of Engineering

Wolcott Gas Processing was a private Canadian company that operated processing facilities on behalf of production companies. The company was the operator for several gas processing plants including sour gas plants, LPG plants, and cryogenic plants (very cold temperature operations).

Managed several projects which expanded and enhanced the plants productivity including:

The expansion of a cryogenic plant capacity from 350 to 600 mmscfd including the installation of a new turbo expander.

Replacement of a plant panel mounted control system to a video display microprocessor based control system.

Revamped and re-commissioned an ammonia plant.

Worked with UOP in Chicago and with H&G Engineering in London providing operating input for a methanol / MTBE plant

1980 to 1982 DOME PETROLEUM LTD.
Plant Engineer

Stationed at a large Cryogenic Processing plant (1.5 BCF/DAY)
Worked on the project to install two 25,000 hp electric motors
Worked on the design planning for a 2 BCF/day expansion

EDUCATION

Completed Bachelor of Science in Mechanical Engineering from the University of Saskatchewan, Canada, 1980.
Received matriculation from Wakaw High School, Wakaw, Canada in 1976

MEMBERSHIPS

Registered with the professional engineering association of the province of Alberta, in Canada.

OTHER INTERESTS

Golf, Swimming, Skiing
Hold a private pilots license

PERSONAL

Married with two children
Excellent Health

View contact information...
«« previous resume next resume »»
Search Results (Resumes 701 to 750 of 2721)Go to Search Parameters...
Brief Description
I had more than 20 years experience in Gas Processing plant, previous company I worked for LNG Plant and last position as Utilities Senior Operator and Present company I have been working for Gas Processing as field operator.
I would prefer to work as Commissioning Supervisor in the Middle East.
I accumulated 22 years of experience in the oil industry, most of the time with the Schlumberger service company in the area of Oilfield Services management, Reservoir Evaluation Wire line and Testing.
WORK EXPERIENCE I have 14 years of experience in plant F.C.C ( Fluid Catalic Craking ).Refinery El Palito in Venezuela ( PDVSA ) and experience in Pre commissioning
Operate, commission and monitor equipment in assigned areas, maintaining parameters with the guide lines of the operating manuals and procedures of 80,000BPD three phase separation multi train crude separation units, 110 MMSCFDgas compression& treatment plants
I’m an international Petroleum Engineer, currently working in Turkish Petroleum Int.Co.Ltd. as a Completion/Workover Supervisor back to back Ankara/TR to Aktjubinsk/KZ, experienced about 20 years on land and offshore, in offices in many companies and projects.
Twenty nine years of engineering management experience for which 24 years in the oil, gas and shipping industry -EPC projects which includes: Project management, conceptual, feasibility studies, FEED and detailed design engineering, procurement, planning, organizing, QA /QC, construction.
32 years Oil Industy experience in Drilling Fluids / waste Manging / Cementing / Drilling Engineering / Business Develeopment / Project Management. Degree. experience of Cpld weatehr, HTHO, deep water, H2S wells.
Experienced Instrument and Control Technician, with more than 20-year hands-on work experience. My experience covers working for Petroleum Refineries, Petrochemical facilities and Offshore oil/gas production facilities.
Shift supervisor at worlds largest butane to maleic anhydride facility. Qualified in all assignments including control room and field.
Well Test Supervisor for Canadian Superior, based in Port of Spain and offshore Trinidad. Responsible for onshore planning and Wellsite supervision of High Rate Gas Well Tests.
Field Manager/ Operations Supt. with experience managing international oil/gas projects.
BE Chemical Engg. Experience in Multinational Storage terminal Ship loading/ unloading of Acids, petrochemicals and LPG.
A Mechanical Engineering Graduate with a total of 13years experience in oil & gas, petrochemical and food processing plant.
CRO/LEAD OPERATOR. OFFSHORE Oil/Gas production platform. Three phase seperation, wellbay, hydrocyclones, compression, dewpoint control, asociated utillities. Gas plant H2S removal, adsobsion, solvent regen, sulphur recovery, tail gas unit. Cryogenic N2 removal, mol sieves, cold box etc. Refinery exp
My expertise includes waste-to-energy facilities along with gas and oil fired boilers and all their associated equipment. I have experience in turbines up to 70 MW’s. I would make a good fit into any type of power plant weather it be in operations, maintenance, supervision or management.
Geodesist/Land Surveyor/Geomatics/GIS consultant
33 years experience in drilling industries, started as rig hand, since 15 years drilling supervisor, drilled several types of wells in different countries on and -offshore.
29 years oilfield experience from roustabout to site manager.
A highly experienced and reliable Operations Superintendent with 24 years offshore experience. An enthusiastic team member possessing a good sense of humour, capable of working on own initiative, with the ability and willingness to train and develop new team members.
To lead extra heavy oil production optimization; lifting, transporting, liquid-gas separation, pumping, dehydration, desalting and distillation. Coordinate, supervise and implement commissioning, maintenance and budget. To prepare economic evaluations. To implement and audit Iso-9002 systems.
Over 22 years experience in oil & gas production, plant management, maintenance supervision, environmental & safety, loss control. Extensive knowledge of oilfield technology. Available for immediate employment.
Objective: A self-starting, highly motivated team player looking to contribute to the goals and advancement of an organization through Health, Safety, and Environmental services.
Thirty years experience in the international field of Oil well Drilling
Rig supervisor during 25 years with ESSO France. Applying for a senior or junior rig supervisor onshore.
My objective is to continue my career as an international, and domestic, offshore oil & gas production operator/supervisor/trainer.
I have Eleven years experience in OIL/GAS/Petrochemical sector out that ten years with multinational companies in Gulf. Worked in Maintenance, Commissioning and Installation areas
Maintenance Supervisor
Functional summary Twelve years of experience in emergency medicine and international projects. Five years experience as a health and safety advisor on major oil and gas projects. Computer literate, excellent supervisory skills, creative thinker. Russian language ability.
22 years in oil field industry. Drilling and completion supervisor
My previous experience has been working offshore for Dubai Natural Gas Company for over 20 years. During this time I was promoted to Platform Chief after working as a Process Technician and Shift Supervisor.
My strength is in rig management and in particular jack-up rigs in the international market. In excess of twenty years diversified experience in execution and management of drilling and workover operations worldwide onshore and offshore.
OIL AND GAS SUPER/CONST 30 EXP US AND INTERNATIONAL
A Professional Engineer with more than 27 years oil & gas experience. P. Eng Status current
Broad experience in mid-stream and upstream oil and gas production and facilities. B.S. double major Petroleum and Chemical Engineering. M.S. Environmental Engineering
Talented and accomplished Management professional with strong background in logistics, materials management, and business development. International expertise in coordinating materials and logistics operations, including shipping, imports/exports, duty/customs functions, procurement.
9 years Experience in Oil and Gas offshore production process platforms as Production operator, Plant Operator. Worked in IRAN Petropars Gas development Project phase 6,7&8 as Field Operator through the employer DAELIM Ind. Co. South Korea, Well experience in Commissioning and Plant start-up also.
Recycle Hydrogen System,Recycle Gas Scrubbing,H2S Handling ,Amine Treating,Reactor Effluent Water Wash,Vapor/ Liquid Separation,Hydrogen Purification,Stripper,Off Gas Absorber ,NHT,PLATFORMING,CCR
Have all Oilfeild tickets
Relatively young well test engineer/testing supervisor with 10 years hands-on experience in well testing. ex-service hands with direct knowledge of how things worked and troubleshooting. Good interpersonal skill and work hard.
I am a chinese,39 years old.I graduated from DALIAN MARITIME UNIVERSITY.I have 5 years experience on Oil Tanker as Junior Deck Officer and 10years on FPSO as DPO & Cargo Operator.I hold Chief Officer Certificate.
Senior Operations Technician with over 25 years of experience as control room panel man/ field operator of LNG Plant, Jetty coordinator LNG. High pressure hydro cracker (isomax), hydrogen plant, CDU, Vacuum distillation and Visbreaker units. National Diploma in Technology Chemical Engineering
Free! A highly motivated professional who excels and thrives on challenging work. Self-managing; results oriented – used to working under pressure, with the ability to prioritise work tasks and meet deadlines. Excellent communication and organisational skills, and leadership qualities.
Presently working as Control Room Operator in a Natural Gas Plant & Shallow Water Platform for almost 5 years. Had also worked in Abu Dhabi with GASCO (NGL Plant) as process/utilities/control operator for 4 years & 7 months. Senior operator with Brunei Shell Petroleum (LNG Plant) for 4 years.
Objective To obtain a job in the in the Oil and Gas Industry that will challenge my abilities. Safety is my number one priority. Highly motivated individual with 29 years experience in the oil and gas industry.
A highly experienced Manager with exceptional analytical and problem solving skills. A goal oriented professional with the ability to develop effective and efficient teams and lead organizations to achieve aggressive goals.
Drilling consultant Tunisia, offshore Ecuador, the Permian Basin, the US Gulf Coast. Expatriate in Saudi Arabia. Directional Driller for Sperry-Sun. Drilling Supervisor Texaco E & P. Computer literate. B.S. in Petroleum Engineering.
The wellsite supervisor is responsible for directing and co-ordinating all employers at the wellsite to achieve the goals of the work planned by the operator and ensure compliance with all legislation pertaining to that work at the wellsite.
I have 28 years experience in the drilling & completion industry. I have worked as a operations manager, drilling superintendent, drilling consultant, directional & horizontal supervisor. I have 10 years offshore experience. I have hpht, 25000'+, h2s, deviated hole experience
OBJECTIVE To offer total drilling management experience in radial, multi-lateral, horizontal, underbalanced, directional and conventional drilling techniques.
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   [ 15 ]   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
CATEGORIES: Operations;
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com