EDUCATION
Tertiary: University College, Cardiff
B.Sc. (hons.) Civil & Structural Engineering
: Postgraduate Diploma in Environmental Decision Making (O.U.)
Computer literacy: M.S. Project, Word, Excel, M.S. Office applications
Courses attended: CITB 5 day Safety for Site Managers
: Environmental Issues in Construction
: Leadership and Motivation
: Network Planning
: FIDIC 4 Conditions of Contract
: NEC Conditions of Contract
: ICE 5 Conditions of Contract
Languages (10 = Fluent in speech & writing, 1 = Basic.)
: English 10; French 6; Swahili 2.
SUMMARY EXPERIENCE
Broad experience of oilfield infrastructure, water and sewage treatment plants, gas turbine stations, oil pipelines, rig sites, commercial and industrial building, housing, earthworks, rail and general civil, mechanical and electrical works in UK, Africa and Asia. Project and Site Management in a variety of challenging locations.
KEY ATTRIBUTES
* Self reliant with the ability to manage projects in remote areas involving forward and contingency planning.
* Commercially aware.
* Ability to motivate local staff and labour to achieve results.
* Ability to interface diverse cultures.
* A flexible approach to problem solving.
EXPERIENCE DETAILS
February 2003 - Present
Christian International Ltd. –
August 2006 – Present: Seconded to Woodside Energy, Tripoli, Libya
* Tripoli based Civil Superintendent responsible for enabling works (Roads, Water Wells and Rig Sites) for exploration drilling campaign in remote desert locations in Libya. Management of civil Contractors and Company personnel, planning, Contract preparation, cost monitoring and control.
February 2003 – August 2006: Seconded to Veba Oil Operations, Tripoli, Libya.
* Lead Construction Engineer responsible for management and coordination of all construction operations, manpower requirements and NDT services.
* Acting Project Execution Superintendent from September 2005 to August 2006.
* Project Engineer responsible for the survey and repair / replacement of 630km of 30"/36" oil pipeline and for all ongoing pipeline survey and repair projects.
o Preparation of Project Scope of Work and Budget.
o Preparation of Bid Documents for material supply and construction packages.
o Evaluation of Bids received and preparation of Contract Documents.
o Monitor physical and financial Project performance and deal with all Contractual issues and claims.
o Deal with all QHSE issues.
January 2002 – January 2003
Rockson Engineering Ltd, Rivers State, Nigeria; Construction Manager.
Management and supervision of civil works for a turnkey project to construct a 6 x 25MW gas turbine power station. Co-ordination with Design department. Establishment of Site Management control systems, QA/QC and Safety Procedures. Liaison with Mechanical and Electrical installation staff. Liaison with overhead line contractor. Responsibility for co-ordination of the overall Project programme.
August 2000 – January 2002
David McLean Contractors; Contracts Manager.
Installation of LPG facilities at Shell filling stations throughout Britain. Management of operations and specialist subcontractors in the field, implementation and monitoring of QA/QC and Safety Procedures while operating in Hazard zones. Preparation of risk assessments, method statements, liaison with planning and fire Authorities and conducting start-up safety inductions. Carrying out regular safety, environmental and quality audits on sites under my control.
January 2000 – June 2000
Relocation from Zimbabwe to Britain.
October 1997 – December 1999
Skanska Africa, Tanzania
1. 1. Project Manager responsible for civil and building works for the expansion of Mwanza Brewery, value £5m. Full operational, financial and contractual control of the project, direct liaison with the Client and with Mechanical and Electrical specialist installers and vendor representatives. Responsibility for motivation and welfare of expatriate and local staff.
2. Responsibility for operation and reorganization of Central Services division comprising clearing and forwarding, transport logistics throughout the East African region, overseas and local procurement, stores, fabrication shop and pre-casting operations.
Oct. 1994 – Oct. 1997
Self employed being the Proprietor and Manager of a civil & building contractor based in Nyanga, Zimbabwe. Work undertaken comprised smaller works of construction, engineering consultancy and included a three month management service for Chimoio e Beira Construtores Lda. for supervision of civil works for a 400kv substation in Songo, Mozambique, liaison and co-ordination with M & E contractor and transformer installation contractor.
June 1992 – Sept. 1994
ICIL, Tanzania; Contracts Manager
Responsibility for the day to day operations of an M&E contractor comprising management, motivation and welfare of expatriate and local staff; liaison with current and prospective Clients; preparation of valuations and invoices; follow up of debtors and collection of payment; preparation of financial reports for all projects; ordering and follow up of all imported material inputs. 50% of my time was spent visiting sites spread throughout Tanzania to monitor operations, safety, programme and progress, anticipate problems and deal with any concerns of main contractors and clients.
M&E Subcontract, Pangani Falls rehabilitation project, value £2m. Electrical and water supply installation, supply erect and commission modular water treatment plant.
M&E Subcontract, Dar es Salaam port rehabilitation, value £3m. LV and HV installations; replacement of fire water ring mains and installation of new domestic services to port buildings.
Erection (structural steel supplied by main contractor) of heavy locomotive repair shop for TAZARA in Mbeya, value £0.5m.
Construction of 160km of 33kv overhead power line in the Southern highlands, value £5m.
Jan. 1991 – May 1992
Wade Adams Construction; Contracts Manager
1. Zambia Expedite progress on concrete shaft lining, Mufulira mine, value $0.5m. Expedite progress on refurbishment of Mosi-o-Tunya hotel and Rainbow Lodge in Livingstone, total value $5m.
2. Uganda Expedite progress on Port Bell ferry terminal involving marine piling and offshore concrete structures in Lake Victoria and earthworks / trackworks for Port Bell to Kampala Railway, value $8m (excluding free issue piling and trackwork materials). Management of quarry operation for production of rail ballast and concrete aggregates.
3. Zaire Mobilization for $7m Tailings Leach Plant at Likasi.
Feb. 1990 – Jan. 1991
Biwater Projects Ltd., Malaysia
Malaysia rural water supplies scheme. Sub Area Manager with responsibility for all work on water treatment and supply schemes in Perak State, reporting to Area Manager (Peninsular Malaysia – West).
Feb. 1982 – Feb. 1990
Wade Adams Construction
Malawi 1987 – 90
Project Manager, Second Lilongwe water supply project
Scope: Water treatment works (Upward flow clarifiers, filters, on site reservoirs, river intake and forebay, 4 remote reservoirs (2 elevated "mushroom" type, 2 on ground)
Value (Civil works): £7m.
Project Manager. Full responsibility for construction of the VIPLY project comprising bulk earthworks, sawmill, plywood factory and complete infrastructure: power transmission and distribution, water supply and treatment, roads. 17000 sq. m of industrial building, houses and all external works, value $12m. Close liaison with mechanical installation contractor to ensure optimum efficiency and completion of the project.
Management of quarry producing aggregates for all company projects in Northern Malawi.
ADMARC grain storage facility, Mzuzu, value $1m.
Tanzania 1986 – 87 Project manager. Full responsibility for building and mechanical works Contract in Dar es Salaam Harbour, value $7m. Additional responsibility for coordination of all works in the coastal region.
Zambia 1985 – 86 Project Manager. Full responsibility for construction of Northern, Luapula and Eastern Provinces microwave link, value $6m (excluding free issue tower materials) comprising roadworks, bulk earthworks, foundations and tower erection.
Construction of Katanshya bridge, value $1.5m.
Zimbabwe 1982 – 85 Site Agent. Full responsibility for the construction of various sewage works and slipform silo projects valued up to $3m
March 1981 - Feb. 82
Delkins Ltd., Zambia Site Agent responsible for the construction of 42 high/ medium cost houses in Chambeshi.
June 1979 – March 81
Norwest Holst Ltd. Site Agent responsible for various drainage and reclamation projects in South Wales valued up to £0.5m.
1973 – 1979 Site Engineer / Senior Engineer on various LNG projects and sewage works in Britain.
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 1451 to 1500 of 2510)
Go to Search Parameters...
Brief Description
I am a Quality Health and Safety Management Consultant with more than 16 years experience in Middle East . I am a Lead Auditor for ISO9001:2000; ISO14001:2004 and OHSAS18001:2007. Apart from this I am NEBOSH-UK Certified HSE Advisor . Has rich exerience in evaluating Management systems
Highly Skilled Civil Engineer
Having more then Six years of experience in operating and controlling trouble shooting of high-pressure Oil and Gas plants .
Training/HR Professional, Accredited Vocational Assessor with experience in the areas of Performance Consultancy, Personnel Development, Recruitment, Competence Based (NVQ) Training Systems and Certification, Training Needs Analysis and Evaluation within Oil/Gas, Nuclear, Defense and Railway Industr
manager/worhop/service/electrical
Senior management professional with extensive experience in Management & Operations of IT & Telecom Networked Infrastructure and Systems, Managed Services, Information Security, Process Modeling, SAP Implementation, Consultancy etc across industry segments.
MWD/LWD Field Service Engineer (4 yrs), Drill Bits Evaluation & Sales Engineer (2 yrs)
Technical assistance, as control system field engineer (speedtronic MKV specialist), during installation of two Gas Turbine model PGT-25-DLE compressor driving. Training, as control system field engineer during performance test of Steam Turbines and Centrifugal compressors also training course on Ga
I am Electronics and Communication Engineer and I have more than Three and half years experience in marketing and business development in Dubai and Indian subcontinent.
Manual Drafting, CAD; I can do just about anything well. I'm retired and would like to find a job that doesn't require CAD, but uses Manual drafting.
DCS /C & I Engineer with 3 years of extensive experiences of working with Yokogawa DCS systems.
I have been in the construction industry for 16 years. 7 years in in the Drywall trade, all phases, including owning a Drywall Company. I have framed houses, poured concrete, and been a general laborer. Most recently I have been in the glass industry. Estimating, ordering, installing and managing.
Project Manager, BPO Mobilization Lead, SAP Consultant, ERP tool Administrator
IT/Business/Analytical professional with experience in the Gas, Safety, and Welding industries as well and inventory planning and forecasting in the auto industry.
Amos RAST Database builder, PMS Engineer, Marine Engineer Liscensed, Support, Maintenance, Planning
I am an experienced medic, with some 16 years offshore experience in the offshore Oil & Gas industry, both on floating and fixed installations in the UK sector of the North Sea, ROV construction and support and, most recently, offshore wind farm construction vessels off the UK coast.
Offshore/abroad experience
Safety & Environmental Specialist with excellent knowledge and experience. Please refer my resume with complete details available.
Experienced Ops Engineer
Petroleum Engineer, 4 years industry experience in Logging, reservoir and drilling fluids.
Performing the day-to-day maintenance activities of the oil and gas plants in coordination with DCS Technicians and Sr technicians.
Programming VB6, ASP,COBOL,Oracle,MS SQL server,MS Access, Lotus Notes R5,
Senior Process Operator
Well site supervisor with southeastern New Mexico/West Texas drilling experience. Experienced with PDC bits, High pressure, Drilling with brine and weighted mud, Lost circulation/ seepage issues, Have current well control card. I am a safety leader and apply my knowledge to every task.
Electrical Engineer with 16 years experience in the field of Electrical & Instrumentation. Engineering and Project Management
„« Project Erection & commissioning in Pidilite Industries Ltd, Vapi ¡VGujarat having FOXBORO DCS (Micro I/A Series ) as control system.
CV for AutoCAD Operator, Document Controller & Technical Assistant
High School Graduate- Entry Level
Graduate in chemical engineering having 11 years of expereince in Projects and Production.In depth knowledge in Sulphuric and Phosphoric acid technology for production and implementation of projects.Having overseas experience for handling project activities.
Broad experience of oilfield infrastructure, water,sewage treatment , gas turbine stations, oil pipelines, rig sites, industrial building, housing, earthworks, rail & general civil, mechanical & electrical works in UK, Africa & Asia. Project and Site Management in a variety of challenging locations
Deep knowledge of refinery process, engineering development and construction expertise. I have experience as Plant and Project engineer in the direct coordination of the execution of the work during start-up, commissioning and operation stage, control of contracts, administration and engineering.
MDT field specialist
Bachelor Degree & especial training in Plant Operation from Institute of Engineering & Technology (National Fertilizer Corporation) Pakistan
Worked in Honeywell Automation india Ltd as Engineer. Trained in Honeywell Automation India Ltd for DCS EXP R210,SCADA,PLC
Field Engineer , 2 years experience with Schlumberger Wireline.
I have 2 1/2 years experience in the pumping industry working as an acid and cement pumper operator and 4 1/2 years experience as an acid and cement supervisor. I am knowledgeable in acidizing primary and remedial cementing. I am looking forward to furthering my career internationally.
Diverse technical back ground including hydraulic power plant technician ,fresh water analyst, pump mechanic, maintenance coordinator, maintenance mechanic, and valve installation repair
Instrumentation
Ability to identify the client’s needs, to provide an intervention of quality, to encourage human development and to train junior consultants. The developement of my communication and natural leadership skills help me to innovate and to implement new ideas.
I am a Chemical Engineering graduate having 17+ years experience in the field of Safety, Occupational Health &Environment.
Mechanical design engineer (Prepare Design & Development plan for new product)Bachelor of Engineering (mechanical)
38 years old, Civil Chemical Engineer 4 years of experience in operational activities in Chemical Mining Industry, including leaching process management, SX and special chemical process.
LOOKING FOR JOB IN ANY POSITION
Prepare shift report to Shift Supervisor for the working activities based on data received from subordinates.
Plant Operator
Science graduate having Over six years experience as offshore/onshore Chemist, present employment in FPU & FPSO (Tahara) PY3 oil field EastCoast Of Bay of Bengal. operated by M/s.Hardy Exploration & Production Inc., as Chemist (Offshore Operations)@28/28 rotaion basis.
Twenty-six years experience in most aspects of oil and natural gas production, processing, and transportation.
Looking for suitable operation. vacancy
Project, Operation,Logistics, Site & General Management Expertise, Excellent communication & negotiating skills, ability to evaluate, prioritise & act on issues. A proactive attitude, hands on approach & a successful problem-solving manner. Strong financial organisational, logistical, planning .
Metallurgist and MBA with expertise in reducing costs associated with wear, maintenance and repair. Skilled at business analytics and internet savvy.
First
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
[ 30 ]
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
CATEGORIES:
Operations;
INDUSTRIES:
Petroleum/Oil/Gas;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2008 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com