Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #77261 next resume »»
CONTACT INFORMATION:
View contact information...

Project Manager. Civil-Structural Engineer. Lead Planning Engineer

Professional Construction management, supervision and design of Industrial Complex
Experience and Facilities such as Oil Refineries, Floating Platform Storage & Offloading (FPSO), Offshore Oil Platform, Power Plants, LPG Treating Plants, Manufacturing Facilities and Factories, Commercial and Condo Buildings (Reinforced Concrete and Structural Steel Buildings), Land Development, Roads & Drainage, Piers and Harbors, Dams & Spillways, Bridges and Piles Driving Works, Structural Steelworks and Survey Works.

Other experiences - Contract Review and Evaluation, Planning and Scheduling (using Primavera Project Planner Version-3.1 & 6), Cost Engineering & Estimates, Quantity Surveying, Bid evaluations, Structural Engineering (using computer software such as STAAD3/PRO, SAP 2000, & ETABS), Detailed Engineering Design and Front End Engineering Design, Geo-technical Engineering, etc.

Professional Philippines Institute of Civil Engineers (PICE): Member – 1985 to Present
Memberships Geodetic Engineers of the Philippines (GEP): Member – 1995 to Present
Association of Structural Engineers of the Philippines (ASEP):
Member – 1985 to Present

Education Bicol University College of Engineering, Legaspi City, Philippines Graduated with the degree of Bachelor of Science in Civil Engineering 1981-82

Completed with the course of Civil Engineering Technology (Building) 1992
The ILO – Association of Japan Inc. / International Skill Cooperation Center
Ohsaki Institute of Construction Technology, Tokyo, Japan

Professional Passed the Licensure Exams for Civil Engineer – 10th Placer
Qualifications Passed the Licensure Exams for Jr. Geodetic Engineer

Computer Literacy STAAD-PRO 2005/2007,SAP 2000, ETABS Ver. 8,
Primavera Proj Planner P3 & P5.0/P6.0, Pertmaster Risk Analysis,
Primavera Expedition/P3e Enterprise / Sure Trak Project Manager
Microsoft Project Prof./ Excels / Word / Microsoft Point

Professional Experience
(As Project Manager, Design Manager, Civil - Structural Engineer, Lead Planning Engineer)

COMPANY: CHIYODA –HYUNDAI CONSORTIUM
Project: Qatar Pearl GTL-FGP Project
QPG Site Office, P.O. Box 12051
Ras Laffan, State of Qatar
Dates - From June 11, 2008 to Present
Position - Lead Scheduler /Assistant Planning Manager
Duties - Work as Area-C Lead Scheduler / Asst. Planning Manager; planning and scheduling on the procurement, construction, pre-commissioning and commissioning of Feed
Gas Preparation Unit(FGP) that will support and feed gas to main GTL /LNG Processing Plant.
- Planning and scheduling the interfacing works within the areas of the GTL / LNG
Processing Plant (Total of 9-Contract Package Areas in the Plant)
- Monitor project progress using the computer softwares, i.e.,CPMS (Construction Progress Monitoring System), and Primavera Project Planner(P3.1 & P6 version)

COMPANY: CONSOLIDATED CONSTRACTORS COMPANY W.L.L
Project: Rabigh Independent Water Steam Power Plant Project (Rabigh WSPP)
Rabigh Olefins Plant Project (Ownwer: PetroRabigh)
Rabigh, Saudi Arabia
Dates - From October 20, 2006 to February 15, 2008
Position - Lead Planning Engineer
Duties - Work as Planning Head - Mechanical Section, supervising and managing group of planners/schedulers for the planning and scheduling on the procurement, construction, pre-commissioning and commissioning of Steam Power Plant (9-
Boilers/9 x 390 MW Steam Turbine) and Desalination Plant that will generate power and water supply for Rabigh Olefins Petrochemical Plant.

COMPANY: SAMSUNG HEAVY INDUSTRIES
Project: PM2 / Production Div. 2 / Fabrication Shipyard Dock 3
Jangpyeong, Geoje City, South Korea
MODEC STYBARROW FPSO LNG Project (from Jan.'06 to Aug. "06)
LUNKOYE(LUN-A) Topside Sakhalin II,
Phase 2 Development Offshore Project (from October 2005 to December 2005)
Dates - From October 7, 2005 to August 24, 2006
Position - Planning Engineer
Duties - Planning and scheduling of FPSO and Topside Construction i.e., from Basic
Engineering Design, Construction Drawings, Procurement, Production /Fabrication
(Cutting, Outfitting & Hull Assembly), Construction(Blocks Assembly and Intergration),
Test/Commissioning, and Delivery.
- Planning and scheduling for the mechanical completion works (MC Packages) & Commissioning of the fabrication and installation of LUNKOYE (LUN-A) Topside for Sakhalin II Phase 2 Dev. Project.

COMPANY: RANHILL PETRONEEDS JOINT VENTURE
RANHILL ENGINEERS & CONSTRUCTORS SDN BHD
21th flr Empire Tower, No. 182 Jalan Tun Razak 50400
Kuala Lumpur, Malaysia
Project: Melut Basin Oil Development Project (Upstream)
Four(4) Pacakge Projects are: Palogue Field Production Facility / Al Jabalayn Central Production Facility / Operation Base Camp /Produced Water Pipelines -250 Kms & Raw Water Pipeline Project (45 Kms) & 8MW Combined Cycle Power Plant, located in Palogue & Al Jabalayn, Khartoum, Republic of Sudan
Dates - From August 1, 2004 to September 15, 2005
Position - Project Control Engineer / Planning Engineer
Duties - Work as Lead Project Control / Planning Engineer for the Four(4) Package
Projects which includes planning and scheduling, contract management, coordination, monitoring, setting up controls for the engineering, procurement, construction and commissioning (EPCC) of upstream crude oil production (dewatering/pre-heating/chemical treatment) facilities for Al Jabalayn Central Processing Facility(CPF) and Palogue Field Production Facility(FPF), and other utilities such as the Power Plant (8MW Combined Cycle), Water Treatment Facility, Raw Water Pipelines & Produced Water Pipelines, and Operation Base Camp.

COMPANY: YANBU STEELCOMPANY (Formerly PDM - SAUDI ARABIA)
P.O. BOX 30075
Madinat Yanbu Al Sinaiyah
Kingdom of Saudi Arabia
Projects Involved: Different Saudi Aramco Projects such as Medina Bulk Plant Project,
And many Other Tanks Constructions for Bulk Plants & Tank Farm
Projects; Jubail United Petrochemical Plant(JUPC) Projects; Saudi
Arabian Fertilizer Company (SAFCO) Projects, Arabtank Terminal Ltd,
Saudi Arabia Mobile Refinery (SAMREF), Saudi Yanbu Petrochemical
Plant (YANPET), Gulf Farabi Petrochemical Company,etc
Dates - From May 14, 2003 to May 14, 2004
Position - Scheduler / Estimator
Duties - Planning, scheduling and setting up cost control on the fabrication (pre-engineered)
and construction of different storage tanks and its appurtenances, pressurize vessels, drums & internals, piping lines and structural works for petrochemical plants, oil refinery, desalination plants, etc.
- Estimates, quantity take-off and cost estimates, cash flows, schedules, manhour cost estimates, equipments utilizations, prepare vendor documents, and other sublet documents, etc. of different storage tanks (plate / structural materials & other tank appurtenances) such as Naptha Storage tanks, Kero Tanks, Diesel Tanks,etc.

COMPANY: ICC-IMPSA CONSTRUCTION CO. / CBK POWER LTD.
Caliraya-Botocan-Kalayaan Hyrdroelectric Power Plants Project, NPC Compound,
Kalayaan, Laguna, Philippines
Project: The Build, Rehabilitate, Operate, Transfer (BROT) & EPC Project
Caliraya-Botocan-Kalayaan Power Plants Complex
National Power Corporation
Dates - From April 3, 1999 to July 31, 2002
Position - Design Manager (Civil-Structural) / Sr.Civil-Structural Engineer
Duties - In-Charge of all the detailed engineering design for the rehabilitation of different facilities of the Caliraya-Botocan-Kalayaan Hydroelectric Power Plants(HEPP), which includes the rehabilitation of Steel Penstocks and accessories from intake to surge tank, then to bifurcator, then to power house; additional steel structures, equipments and transformer foundations, dams and spillways, roads and drainages, bridges, etc.

COMPANY: TECHNOSERVE INT'L CO. /JGC PHILIPPINES
TIC Bldg, 1606 Trade St. cor. Investment Drive,
Madrigal Park, Ayala-Alabang, Muntinlupa City, Philippines
Project: Caltex-Owned - LPG Treating Facilities Upgrade Project,
Caltex Oil Wharf & Pipelines Project,
White Oil Pipelines Project
Shell-Owned - TCCU Fuel Efficiency & Mixed Xylene Project,
HCS Rundown Manifold Project
KERO Hydro Sweetener Modification Project,
NAIA JOCASP Aviation Fuel Storage Project
British Petroleum- Bataan Polyethylene Plant Project
Dates - February 2, 1997 to March 15, 1999
Position - Project Control Manager / Sr. Project Engineer
Duties - In-Charge of the project control engineering on the front end engineering design and detailed engineering design, procurement of the lead equipments & instruments, and management for the above-mentioned projects.
- Review and technical auditing of different designs for civil, mechanical, process, instrumentation, electrical plans and design output based on the internationally accepted standard codes and specifications such as ASME, API STD 650/12F, ACI, AWS, AISC, ASCE, JIS, British Standard (BS) Code / BS 5500, etc.
- In-charge for the preparation of the engineering and construction proposals which includes planning and organizing the proposal team, review of the bid documents, contracts and other bid conditions; cost estimates and preparation of all items included in the Technical Proposal and Commercial Proposal for the proposed EPCC Projects

COMPANY: JGC CORPORATION - SONATRACH
Project: LPG Recovery Project
Hassi Messauod, Algeria
Dates - July 11, 1995 to November 28, 1996
Position – Planning Engineer
Duties - Planning and scheduling on the construction of Administration building, control house, and switch gear building, equipment foundations/pump foundation, gas turbine foundation, tanks & vessels foundations, cable trenches, slab works, and other accessory offsite works
- Planning and scheduling for the construction and erection of equipments such as cryogenics storage tanks, drums, vessels, heat exchangers, coolers, and its stairs and platforms, booster pumps and surge pumps, etc.

COMPANY: CONSOLIDATED CONTRACTORS INT'L CO. (S.A.L.)
Project: Adgas Third LNG Train Project
Das Island, Abu Dhabi, U.A.E.
Dates - February 21, 1994 to January 19, 1995
Position - Project Engineer / Planning Engineer
Duties - Supervision, planning and scheduling on the construction of civil structures and mechanical equipments erection and installations included in the LNG Process Facilities-Train 3, i.e. structural foundations for cryogenics storage tanks, vessels and drums, pumps, heat exchanges, air coolers, air compressors, boilers, gas turbine generators, etc.

COMPANY: OVERSEAS OHSAKI CONSTRUCTION CORP.
Ermita, Manila, Philippines
Project: Ohtsuka Manufacturing and Polytechnic of the Philippines Project, Cabuyao, Phils.
Ciudad Del Sol Townhomes Project, Taytay, Rizal, Philippines
10-Storey Ferguzon Bldg. Project, Ermita, Manila
Dates - September 28, 1992 to October 31, 1993
Position - Project Manager
Duties - Management, supervision, design and construction of the manufacturing facilities such as the production bldg, administration bldg, canteen bldg, generator house, and warehouse bldg for the Ohtsuka Manufacturing & Polytechnic of the Philippines
- Management, supervision, design and construction of the subdivision, i.e. land development and earthworks, housing units, roads and drainage, bridges and river rip rapping, elevated water tank, deep well drilling, water distribution system, and electrical distribution system for the Ciudad Del Sol Townhomes
- Management and supervision in the construction of the ten (10) storey building from bored pile works, foundation works, concreting and rebars works, plumbing and architectural works

COMPANY: OHSAKI CONSTRUCTION CO. LTD / TAIYO CONST.
Yoyogi, Tokyo, Japan
Project: Fourteen (14) Storey Lions Mansion Condominium Project
Higashi, Chiba-ku, Japan
Dates - September 6, 1991 to August 27, 1992
Position- Asst Project Manager / Trainee
Duties - Site management and supervision and assist the Japanese Project Manager on the management for the construction of the fourteen (14) storeys Lion Mansion Condo-
Building.

COMPANY: TRESTECH DEVELOPMENT CORP.
No. 51 Gil Puyat Avenue Cor.Dian Street,
Makati City, Philippines
Project: Nabua Public Market Project, Narvacan Public Market Project
Narvacan Storm Drainage, Roads & Bridge Construction Project
Dates - February 7, 1990 to August 30, 1991
Position - Project Engineer /Structural Engineer
Duties - Overall supervision and management, inspection and monitoring on the construction of public markets facilities which includes buildings, bridges and main storm drainage roads and drainage, mechanical and electrical system, water tanks and water distribution system, water treatment, oil & water separator
- Structural design of different vertical and horizontal structures based on ASME, (mechanical designs), API STD 650/12F (tankages), ACI (concrete structures), AWS /

COMPANY: PEOPLES RUBBER MFNG & STEELWORKS
No. 40 Asian Road, Canumay East, Valenzuela,
Metromanila, Philippines
Project: Paracale Mines Vents Shafts and Winder House Project
ASTRA Pharmaceutical-Steel Building Project
People Rubber Fabrication Shop
Dates - February 2, 1988 to February 5, 1990
Position - Civil Engineer / Estimator
Duties - Supervision on the erection of structural steel members of ventilation shafts and winder house for the gold mine pits, construction of water distribution pipelines, water treatment facilities and its pipelines, pumps and motors.
- Quality inspection of different shop fabricated steel structures, Steel Oil Well Rigs, Pipe spools & manifold, and fittings, pressurized tanks and vessel, storage tanks, etc. based on ASME CODE Sec. VIII Div. 1 & 2, American Welding Society (AWS), American Institute of Steel Construction (AISC) Code, American Petroleum Institute (API 650/12F) Code, British Codes for Steel Structures & Pressurized Vessels

COMPANY: ENGINEERING EQUIPMENT INC.(EEI) / KUWAIT NATIONAL
PETROLEUM CO.(KNPC)
Project: Mina Al-Abdullah Oil Refinery Project (KNPC-BTC PROJECT )
Fahaheel, State of Kuwait
Dates - December 8, 1985 to December 15, 1987
Position - Field Engineer
Duties - Supervision, planning and scheduling on the construction of civil structures and erection of mechanical / process equipments for the oil refinery / crude desalting and crude distillation unit, i.e., pre-heaters, furnace, feed pumps, reactors, pressurized vessels, drums, fractionators, heat and air exchangers, air fan blowers, booster pumps and surge pumps, and other equipments included in the oil refinery.

COMPANY: ATLANTIC GULF & PACIFIC CO. OF MANILA (AG&P) -KUWAIT NATIONAL PETROLUEM CO. (KNPC)
Project: Refinery Modernization Project / Further Upgrading Project
Mina Al-Ahmadi, State of Kuwait
Dates - November 19, 1983 to August 29, 1984
Position - Field Engineer / Rigger Chargehand
Duties - Assigned in the Erection Section of JGC Corporation- estimates and take-off materials and internal parts for vessel, reactors, heat exchangers, fractionators, drums, tanks, pipe racks, elevated pipelines and pipe spools, etc.
- Prepare materials and accessories needed for the erection of vessels and tanks, reactors and towers, fractionators, air-fan blowers, heat exchangers, condensers, and other equipments included in the oil refinery.
- Inspection, monitor, and supervision on the installation of vessels and drum internal parts, prepare punch list for final inspection and for pre-commissioning.

COMPANY: AG & P – MARINDUQUE MINING & INDUSTRIAL CORP/
NATIONAL POWER CORP/ BATANGAS MARINE FABRICATION YARD(BMFY)
Project: MMIC Coal Conversion/Nickel Mining Project, Nonoc Island, Surigao City
Calaca-Batangas Coal –Powered 300MW Thermal Plants Project
Calaca, Batangas, AG&P Batangas Marine Fabrication Yard
Dates - November 9, 1982 to November 11, 1983
Position - Field Engineer / Draftsman
Duties - Assigned in NPC 300mw Thermal Plants -supervision, planning, scheduling, and inspection for the construction of coal unloading piers and harbor, sea wall abutments, sea wharf and jetty, mooring dolphins and conveyor foundations.
- Assigned in Batangas Marine Fabrication Yard – Supervision, planning of fabrication of floating vessel such as barges, tug boats, ship steel hull assembly and accessories, floating oil rigs, top sides and jackets and other accessories. Supervision on the construction of the desalination pond and water separator, chlorinator house, water treatment pond, and reinforced concrete water tanks.
- Assigned in MMIC-Nickel Mining Project-Supervision, drafting, planning, scheduling of the construction of FOSTER WHEELER boiler and structural steel house, burner piping, and soot blower piping/ boiler parts.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 1301 to 1350 of 2722)Go to Search Parameters...
Brief Description
Environmental, permitting, regulatory compliance work. Mining, power plants, and transmission permitting work. Academic background in range science and ecology. Reclamation experience. Operations, corporate, and international experience.
As an experienced civil/Building engineering (more than twenty years) I am willing to participate in your construction projects.
SENIOR PETROLEUM ENGINEER
HSE/QA Advisor, Coordinator, Manager, Supervisor
A proactive, result-oriented hands-on planner. A graduate of physics and also holds a post-graduate diploma in information and computer technology, with 12 years of post graduation experience and over 9 years of work experience in the oil and gas industry.
Hands on
worked as a asst. wireline operator for 2 years in middle east oil field on offshore & onshore with schlumberger. hold high school qualification.
Proven SR Manager with Project Management Skills, SAP, ERP, eSolutions, SQL, and SOA. Have strong, SAP, ERP, eSolutions, Data Management, Process Management Maturity Assessment (PMMA) and SOA Compliance process experience. Lead start-ups, systems integrations/automations, rollouts, operational impro
Operations manager
Senior operator/panel operator
HND in Industrial Engineering Polytechnic Calabar 2008, Diploma in Applied Computer Studies. Baccalauréat De Brevet De Tehnicien in Electro-mechanical Maintenance
I am interested in working for your organization. Presently I am employed at Sultanate of Oman. My responsibilities are Vessel berth assignments for the Container Ships, Bulk Cargo Ships, Passenger Ships, Oil and LPG Tankers calling in Port. My responsibilities also include Plan, Manage and Monitor
i am a qualified Chemical and petroleum engineer with a masters degree, with upto 2 years experience in the exploration and production sector of the oil and gas field both in the field and design while using various softwares.
Production engineer, with strong knowledge in Rod Pumping, ESP, Gas Lift and softs related. Also production and inyection follow-up, project evaluation. Additionally experience in managment and operation.
20+ years of experience working in Materials Management, Inventory Control, Materials Planning Scheduling & Logistics, in both home office and field site locations on the construction of large petrochemical plants, natural gas plants, electrical power plants, and mining facilities.
B.E(mech) working in oil drilling rig of company "Nafta Pila" as HSE officer
Hard Working, Reliable, Ready to Learn and Friendly.
More than 4 years of mechanical maintenance supervision experience, Business Analyst and Service Planner
Open Pit Slope Design, Tailings Dams, Plant Foundation Investigations, Earthworks
Experienced Senior Electricial Technician in oil refinery. Familiar with maintenance motors, transformers, generators and protection for the sames, frequency converters, power regulators, installing and programming PLCs etc.
I have skills, experience in maintenance work in the operations for resolving gas escapes and pipe repair work under strict deadlines. I am very interested in getting involved in operations. I am quick to learn, hardworking, could adapt to difficult situations and have strong team working skills
B. Tech Applied Geophysics Second Class Upper Division Experience in seismic and well log interpretation, petrophysical calculation, volumetrics, Drawing of geologic cross-section. ·Drawing of Geologic cross-sections. Deep Operations Wellsite Geologist (MG Hulme Jr Rig)
PRODUCTION/PROCESS/OPERATION ENGINEER
I am looking for a job as a wireline technician.
-Planning and scheduling using Primavera Project Planeer P3.1 &P6, Microsoft Project Professional / Structural Engineering Design Using Computer Softwares such as STAAD-PRO 2007, ETABS, SAP2000
I have 6 years experience in multidiscipline oil-gas companies with every stage of drilling , completion and workover operations as planning , supervision , technical services , logistic , maintenance.
I hold a valid clean, class 3 drivers license with an air brake (Q) endorsement. I am hardworking, dependable and i am willing to relocate if need be.
Solid management experience in professional Procurement (purchasing, quality control and logistics)
I am a chemical engineer with 15 year experienced in oil, gas processing and petrochemical plants (Polyethylene-LLDPE/HDPE/LDPE). Extensive experience in gas separation, purification, refrigeration, all type of compressors. Day to day activities of production plant and catalyst manufacturing.
Experience, professionalism, skills, physically fit, able to work long hours in tough environment and stressful conditions, availability for traveling abroad.
Country/Sales Manager Africa
Seeking position as HSE/Training/Emergency Management for Petrochemicals or Refinery Operations
Oil and Gas Drilling Professional
Demin plant chemist/operator
Transformational Human Resources Manager with strong business orientation and multi-site experience in a broad range of HR Generalist functions including recruiting, staffing, talent development, HRIS, organizational development, staff management, and many others.
I had completed M.Sc in Geology from Maharaja Sayajirao University of Baroda. I am working as a Processing Geophysicist in Asian Oilfield Services Ltd. from June 2008
Highly motivated professional, Multi skilled, with a broad range of hands on well site and design experience of both Coiled Tubing and Stimulation operations.
M.Sc marine geophysics, seismic interpretation, marine seismic survey, Geophysicist, Heramec Ltd, Hyderabad, AP. India,
self motivated, graduate in mechanical engineering with certificate course of certified petroleum manager having 10 years hands on experience in petroleum terminal operation.
Helicopter view, fast analysing, creative in finding solutions, mind setter for safety
LARGE AND STRATEGIC PROJECTS MANAGEMENT - BUSINESS AND OPERATIONS MANAGEMENT
I have extensive experience in coal analysis, material distribution systems, combustion systems, power generation and all associated chemical processes
6 years experiance in Air seapration Plant
Handling of Benzene,O-xylene,Ethylene,Panel operation (SCADA),Jetty operation and ship Unloading
Diploma in Chemical Technology working with BJ process and pipe line services as an operator having precommissioning and commissioning exp
Have 10 years experience in oil and gas / petro chemical process area, Hydrotreaters, Delayed cokers, Vacuum distillations, Frac. towers, Strippers vessels, etc.
Proven track record of ten years in Senior Management pertaining to broad base Logistical Support, Marine Control, Supply Chain Management, Procurement, and Warehousing fields I have met exacting deadlines of delivery ensuring continuum of multi-million contracts.
Summary of Experience
Geophysicist Seeking a challenging research position in the field of Geophysics where I can prove my capabilities.
Skilled in PVR, Roughneck PM, Smart Alek, great written and communication skills, ability to troubleshoot and take corrective action on projects, Extensive background in the design, installation and service of satellite communications equipment; VPN, VoIP, networking and great computer knowledge.
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   [ 27 ]   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
CATEGORIES: Operations;
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com