CONTACT INFORMATION:
View contact information...
CARRIER OBJECTIVE:
Five Years Experience in thermal power plant and utilities operation, Especially in DCS Operation, 2400 MW Power Plant, Commissioning of Steam Turbine, Oil and Gas Firing Boiler Equipments. Eager to pursue challenging career in healthy and competitive environment.
PERSONAL DETAILS
Date of Birth: 10.06.1982.
Gender: Male
Marital Status: Single
Nationality, State: Indian – Tamilnadu.
Languages Known: English, Tamil.
EXPERIENCE SUMMARY
1. SABIYA POWER & WATER DESALINATION PLANT-KUWAIT
Company: 3B GENERAL TRADING AND CONTG.EST, Kuwait
Duration: July 2005 to till date
Position: Operation Engineer
2. METTUR THERMAL POWER STATION - INDIA
Company: NELLAI CONTRACTORS, Mettur, Tamilnadu, India.
Duration: 19 May 2003 to 22 June 2005
Position: Operation Engineer
PROFESSIONAL QUALIFICATION
BE – MECHANICAL ENGINEERING in Dr.Sivanthi Aditanar College of Engineering, Tiruchendur, under Manonmanium Sundaranar University, Tirunelveli Dist, Tamilnadu, India.
Year of Completion: April 2003
Performance: 82%-First Class with Distinction
Achievement: University Rank Holder
Best Outstanding Student in Mechanical Engg.
WORK EXPERIENCE
1. SABIYA POWER & WATER DISTILLATION PLANT- KUWAIT
DESIGNATION: Operation Engineer
PERIOD: 23.07.2003 to till date
PLANT CAPACITY: 2400 MW (300MW x 8 Units), Steam Turbine Power Plant,
Designed by MITSUBISHI HEAVY INDUSTRIES, JAPAN.
DISTILLATION UNITS: 100 MIGPD (8 × 12.5) MSF Distillation Plant With Recarbonation.
Designed by DOOSAN HEAVY INDUSTRIES, KOREA.
BOILERS:
o Water Tube, Natural Circulation, Radiant Reheat, Rear Firing Oil (HFO, Crude Oil, Gas Oil) and Gas combined with Mixed Firing Option, Forced Draft.
o Working Parameters @140bare, 540 ˚C, Capacity of 960 T/hr HP Steam @MCR.
STEAM TURBINES:
o Two Cylinder(HP-IP, LP Turbine), Tandem Component, Double Flow Exhaust, 1 stage Reheat,6 Stages of Extractions for feed water heating.
JOB PROFILE
 Familiar to Start up and Shut down of 300 MW Unit through DCS.
 All Routine tests, weekly protection tests and equipment change over carried.
 Equipments Handled: Forced Draft Fans, Flue Gas Recirculation Fans, Regenerative Air Heaters, Fuel Oil Pumps, Boiler Feed Water Pumps, Condensate Water Pump, Circulating Water Pumps, Condenser Vacuum Pumps, Cooling Water Pump, LP / HP Heaters, HP / LP Bypass Systems etc..
 Commissioning Activities: All Protection Test and Start Permissive Conditions for all Boiler and Turbine Equipments tests carried, NO-LOAD and ON-LOAD Tests for 11KV Equipments,
Vibration Balancing for Motor with Pumps or Fans, Boiler, Turbine, Plant Interlocks carried,
Line through-up for Cooling water System, Feed Water System, Circulating Water System, Air and Flue Gas System, Super Heater/ Reheater Systems, Fuel Oil and Gas Systems.
 Aware of Station auxiliaries operation like R.O.Plant, Make Up, Service Water, Fuel Storage and Pumping Stations, Instrument Air and Service air compressors (General Auxiliaries).
2. METTUR THERMAL POWER STATION- INDIA
DESIGNATION: Operation Engineer
PERIOD: 19 May 2003 to 22 June 2005
PLANT CAPACITY: 840 MW (210MW x 4 Units), Steam Turbine Power Plant,
Designed by Bharat Heavy Electrical Ltd, INDIA.
JOB PROFILE:
* To coordinate and arrange maintenance support services through the use of service work order.
* Coordination of plant operations, performance of start up, shutdown, and emergency procedures for safe plant operation.
* Annual Functional Testing of Plant Systems-i.e. Feed Water, Air and Flue Gas systems and Boiler Burners Monitoring systems.
* Maintenance of plant logs, records, and data sheets. Operation, trouble shootings, Monitoring and controlling all parameters through DCS.
* Supporting operations and maintenance during shutdowns and turnarounds.
* Participating in technical audits and safety reviews.
* Aware of all equipment and various auxiliaries used in thermal power stations such as FD Fan, ID Fan, ESP, Feed Pumps, Circulating Water Pumps, Condensate Pumps, Vacuum Pumps and Cooling Water Pump.
SYSTEMS KNOWLEDGE AND COMPUTER EXPOSURE
Management Systems: Quality Systems-ISO 9002, MIS CONCEPT
Instrumentation Systems: DCS (Yokogova), PLC (Modicon)
Operating Systems: Windows 9X, Windows 2000, UNIX, and XP.
Computer Languages: C, C++.
Design Software: Auto CAD 2004, 2007, Pro/E 2000i
Planning Software: Primavera 6.0, MS Project 2007
Others: MS Office, Internet Access, Basic Computer Hardware Knowledge.
View contact information... |