Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #83746
next resume »»
CONTACT INFORMATION:
View contact information...
BRIEF RESUME
Twenty-nine years experience in production operations, twenty-five years in an offshore oil and gas environment.
Current employment is as Plant Superintendent (operations) for government gas commission. Oversee of new build, existing plant, green field and brown field gas plant upgrade. Amine sweetening of 2% H2S gas at 150mmscfd throughput. Supplying Emirates northern grid and other customers throughout the region
Previous employment is with large independent oil company in Canada as Production Supervisor/Deputy OIM on the FPSO Searose on the Grand Banks.
Previous position was Production Superintendent for Exxon aboard the FPU Zafiro Producer (ZP), Offshore Equatorial Guinea, and On Board Advisor for the Kizomba 'C' project which included two FPSO's, the Mondo and the Saxi Batuque.
Prior to the above I was with Oceaneering International as Production Superintendent on the FPSO Ocean Producer, block 4/26 offshore Angola.
Before my overseas experience, I was employed by Atlantic Power as Field Foreman on the Amoco, North West Hutton oil & gas production platform.
Prior to this employed by Ipedex, contracted to BP, As operations technician on the OPV Seillean, single well oil production system (FPSO SWOPS), prior to this employed by Dietsmann and Dan Smedvig Technical Resources, contracted to Texaco on the Tartan Alpha platform as production operator.
Production Supervisor/ Deputy OIM Offshore East Canada. Employed because of my experience on FPSO's, the resultant effect this would have on the rest of the team, and the ability to lead a team in a challenging environment
Part of OBRT (Exxon) for client during FEED in Europe and construction in Singapore. Spent 6 months as client representative in contractor engineering offices in Holland. Participated in document review, HAZOP, FAT's and development of O&M procedures. Liased closely with main contractor.
Operations Representative during Construction and through mechanical completion and static/dynamic commissioning of pumping module for FPSO. Responsible to ensure all systems were as per company specifications, that systems were checked by contractor and involved in Tri party walk down and punch listing. Responsible to ensure all operations team are trained in start up/shutdown and steady state operations procedures. Directly involved in the development of same.
Shutdown Manager for various shut downs on the facility. Relief for the OIM on various facilities.
Trained as Deputy OIM.
Current training experience includes permit to work, management of change, JD Edwards Mtce system, SAP statistical process control/variation, platform & vessel issuing/area authority, work place risk assessment, COSHH assessor, D32 D33 process plant assessor and verifier.
MCI level four NVQ - Supervisory Management.
Continuous improvement, Incident Coordinator, intimate knowledge of all clients safety management systems and safety case. In the past been responsible for wire line and well service activities including ROV and diving operations, C.I. team leader and part of platform and vessel management teams.
Experienced in the supervision/training of multi national work force in all areas of oil and gas production & process.
PERSONAL DETAILS
DATE OF BIRTH 22.12.60
MARITAL STATUS Married, 2 Children
NEXT OF KIN Elaine Smith
EDUCATION Northfield Academy
Aberdeen
QUALIFICATIONS 'O' LEVEL Passes Attained
Math, Arith, English, History, Eng. Drawing, Metalwork MCI Level 4 NVQ Supervisory management
D32 D33 process Plant Assessor and Verifier.
Studying 'Higher' level mathematics. Distance Learning.
TRAINING CURRENT BST (survival and HUET)
OPITO Approved OIM Assessment in MOME.
CURRENT FIRST AID
CONFINED SPACE AWARENESS
MED A1
OIMS REGULATIONS
MCI LEVEL4 SUPERVISORY MANAGEMENT (NVQ)
FIRE TEAM/FIRE TEAM LEADER/INCIDENT COORDINATOR
STOP (behavioral awareness)
F.O.C.U.S (behavioral awareness)
Taproot Investigations
MANAGEMENT OF MAJOR EMERGENCIES
COMPETENCY ASSESSMENT D32/33 Process Operations
JD EDWARDS MTCE SYSTEM - SAP
MANAGEMENT OF CHANGE
STATISTICAL PROCESS CONTROL/VARIATION
PERMIT TO WORK, ENERGY ISOLATION
WORK PLACE RISK ASSESSMENT, HAZOP AND HAZID
COASTGUARD S & R
COSHH
CAMCO GAS LIFT OPERATION AND DESIGN
FRAMO MULTI PHASE SUB SEA PUMPS
SOLAR TURBINES
WIRELINE APPRECIATION
RADIATION PROTECTION SUPERVISOR
EXCEL, WORD, E mail, POWER POINT, MS PROJECT, VISIO
H2S AWARENESS
RAKGAS Commission LLC
Ras Al Khaimah
UAE
Oct 08 - Present
Currently employed by the RAK Government Gas Company as Plant Operations Superintendent. Receive and supply gas through treating and sweetening facilities and provide fuel for users throughout emirate and supply to the regions northern grid. LPG recovery through Cryo plant and storage for sale to customers throughout the region. Condensate stabilization to tank farm for offloading at SPM
Provide relief for and support to the Plant Operations Manager. Manage both production and maintenance teams to ensure full plant capability and capacity is realized at all times to ensure contractual delivery and supply to users
Plan and develop recruitment drive as plant expanded. Drive continuous improvement program and provide the requirements for training and coaching of individuals and teams in the best practices now enjoyed and enforced in the industry
Oversee major plant modification supervising third party contractors and sub contractors. Oversee new build from FEED to online and increase throughput safely and with customer's requirements being managed
Achievements
* Upgrade to plant to handle 2% H2S
* Installation of DCS for all plant new and upgraded facilities
* Oversee upgrade of 25 year old facility
* Installation of 60MMscfd sweetening plant
* Implement manning strategy and increase manning level by 150%, develop and ensure competency levels adhered to
* Installation of waste water handling units (environmental improvement)
* Increase throughput of plant through correct planning with customers and suppliers to ensure maintenance schedules and production plans were aligned
* Plan, design, develop with consultant agency the upgrade of SSOW
HUSKY ENERGY
St John's NL
Eastern Canada
Feb 07 – Sep 08
Production Supervisor/Deputy OIM on the FPSO Searose. Turret moored oil and gas production facility on the Grand Banks.
Responsible for all production and safety matters within the production supervisor's realm of responsibility. Lead the team by example and mentor my direct reports as part of the succession plan for future on board requirements. Plan all production/shutdown – turnaround activities. Oversee the PTW and energy isolation procedures. Review process documentation to ensure prescriptive auditing/monitoring measures being met.
Oversee competency program. Work closely with reservoir and sub sea group to ensure field strategies are sound and being managed properly.
Provide support and advise the installation manager in all areas regarding the operation of the facility. Attend HAZOP/HAZID risk assessment, shutdown meetings etc when onshore at company headquarters.
EXXONMOBIL
FEB 02 – JAN 07
On Board Advisor (Prod Supt)
Onboard advisor for the contracted company operating the vessel for Exxon. Part of the on site OBRT in engineering office in Schiedam. The Netherlands. Attended all reviews, HAZOP, HAZID. Part of the O&M procedure development team. Part of the site overview team in Singapore during construction. Be part of the completion team for same, and remain on the vessel during start up advising operator on all Sub Sea and topside production issues
OCEANEERING I.A.G.
HOUSTON
SEPTEMBER 99 – JANUARY 02
CLIENT: EXXON MOBIL
PRODUCTION SUPERINTENDENT
Responsible for all operational activities on the process facility and related equipment on the FPSO Zafiro producer, situated 40 miles offshore from Equatorial Guinea's Bioko Island.
Plant: 116 TBD light sweet crude, 200 TBD water injection, 50-mmscfd-gas compression. 56TBD produced water, 3 x 4.0 mw solar powered main generation
Actively involved in the commissioning of the 'Framo' sub sea Multi phase pumps,
New production & water injection wells, MARS solar gas compressor,
Acting company representative during sub sea control module change outs. Liaison with personnel on FPU and ROV support vessel.
Responsible for direct supervision of UK/USA/Filipino expatriate process crew. And for the training of Guinean nationals to the position of process operator.
Responsible for all third party contractor services on board when troubleshooting/dealing with process plant abnormalities and Sub Sea well intervention/work.
Work closely with OJTs to direct national training program. Work closely with technical writers developing Exxonmobil operating procedures for FPU
Part of vessel management team, active promotion of the continuous improvement programme. Permit to work area authority. Actively involved on the emergency response team and the promotion of safety related subjects to subordinates. E.g. STOP.
Actively participate in risk assessment. Assisting in the planning of major work projects and shutdowns, score carding key performance indicators on a weekly/ monthly /annual basis reporting directly to the OIM on each months 'goals and results'. Directly involved in the reservoir management programme. Responsible for the direct process budget requirements. Chemicals, training etc.
Assist operations engineers in planning/assessing future projects. Assist facilities engineers in new projects. Liase closely with vessel operations and vessel maintenance departments, to ensure continued safe and efficient operations.
Recent achievements include:
* XOM on site operations representative during construction of 220 TBOPD pumping module in the USA. Responsible for ensuring mechanical completion/system static comm. and dynamic comm./start up was completed as per XOM procedures when module arrived in the field. Responsible to ensure training is identified and developed for operations personnel
* As the Shutdown Manager, flawlessly executed the (various/numerous) planned shutdown of the facility for de-bottlenecking operations. Completed this shut down, incident and accident free and on schedule.
* Led the Operations team offshore, to successfully complete the unplugging of one of the remote well clusters flow lines to enable production to be re-established from this part of the field.
* Led the offshore team, including the Surveillance Engineer and third party contractors in establishing stabilized front end pressures to the MARS GL compressor to achieve steady GL flow to wells
* Assisted Operations Engineering to complete the change out of FMC sub sea control pods that had suffered loss of communication to the facility
* Developed 3 local trainees to the point that they satisfied entrance examinations to Universities in Spain and the USA
* Developed the procedures for the testing of the SSV SCSSV and USV for compliance with Exxon Mobil Operational Integrity Management.
* Developed with third party Engineering Contractor the procedures for the continued operation of the sub sea multi phase pumping system to allow continued operation with valves that can no longer be operated by facility personnel and require ROV intervention
* Developed the standard for assessing all operations personnel as per competency assessment guidelines, (as per Operational Integrity Management System). Lead the effort to have this effectively in place and complete for current personnel through 2005-6
* Assisted recognized Pipeline Engineering Company to develop and test rigorously flow line cleaning tools and the procedures for same. Trained personnel offshore in these techniques (no pigging program on the facility for the previous 7 years)
OCEANEERING I.A.G.
HOUSTON
DECEMBER 97 - SEPTEMBER 99
CLIENT: SONANGOL
PRODUCTION SUPERINTENDENT
Responsible for all operational and maintenance activities on the process facility and related equipment on the FPSO ocean producer, situated in block 4/26 offshore Angola in the Kiabo field.
Responsible for day and night shift Filipino process crew and for the training of Angolan nationals to the position of process operator and lead process operator.
Responsible for all process modifications, materials, service schedules and reporting to the client, Sonangol. Part of vessel management team, active promotion of the continuous improvement programme. Ensuring the optimization of gas lift was maintained whilst producing the field to the clients stringent controls and reservoir management policies
ATLANTIC POWER
SALVESEN TOWER
BLAIKIES QUAY
ABERDEEN
APRIL 91 NOVEMBER 97.
CLIENT: AMOCO
POSITION, FIELD FOREMAN.
FEB 94-NOV 97
Responsible for: the safe and efficient operation of the North West Hutton production facilities.
Platform PTW issuing authority, assisting in the continuos improvement of the platform emergency response capability by assisting in development, execution and de brief of exercises.
Development of CCR emergency response team. Rigorous application of the platform PTW system and isolation procedures.
Promotions of the near miss programme, ensuring all incidents of a production nature are thoroughly investigated to a successful close out.
Actively participate in risk assessment. Assisting in the planning of major work projects and shutdowns, monitoring production losses monthly and implementing any improvements identified,
Ensuring the optimization of the gas lift is being maintained, general supervision of all operations personnel (days & nights).
Responsible for controlling and tracking of wire line, well work, chemical and general production facility costs, providing monthly spread sheet and graphs detailing expenditure with accompanied documentation.
Ensure business plan objectives laid down for NWH are passed onto Subordinates and specific objectives are met.
Ensure dedicated operations team members receive the necessary training, assessing three monthly utilizing the Amoco performance management system, providing coaching in any areas of identified weakness.
Responsible for the oversight of the daily production report ensuring accuracy and providing relevant information for on pass to co venturers and Brent system operators
Nov.91 to Feb.94 position, Chief Operator.
Responsible for the, safe and efficient operation of the process plant, on my shift. Reporting directly to the field foreman in all matters regarding production operations. Responsible for maintaining oil, produced water and overboard water specifications to within controlled guide lines and ensuring all logs and routine records are kept up to date.
Conduct production well tests, SCSSV tests, corrosion monitoring and non-routine activities as directed by the field foreman.
Control the application of the permit to work system as defined in procedures. Development and training of operators in plant operating techniques, operating procedures and emergency procedures.
Promotion of CI initiatives and co ordination of emergencies as fire team leader.
April 91 to Nov. 91 CCR/Plant operator.
General duties on oil, gas, utilities and in CCR
Plant consisting of two parallel first stage separation, single second stage separation, three phase separation, oil metering and test facilities.
Two-train gas and sales gas compression, fuel gas system comprising gas import, NGL stabilization and re injection, and glycol de-hydration.
De hydration, sour gas treatment and power generation.
Conduct production well tests, SCSSV tests, corrosion monitoring and non-routine activities as directed by the field foreman.
Control the application of the permit to work system as defined in procedures.
IPEDEX
MARKET STREET
ABERDEEN.
FEB. 88 TO APRIL 91 PLANT OPERATOR (FOR B.P)
Contracted to BP. On the OPV Seillean, single well oil production system (SWOPS). Joined the ship in Harland and Wolff shipyard in Belfast during the commissioning phase. Went offshore for first oil in the Cyrus field during the first quarter of 1989. General duties on process plant and CCR
Eventually training the second and third engineers to take over the day to day running of the plant.
DIETSMANN U.K.
THISTLE ROAD
DYCE
ABERDEEN
APRIL 83 TO FEB. 88 PLANT OPERATOR (FOR TEXACO)
Contracted to Texaco on the Tartan Alpha, initially employed as trainee operator, advanced to plant operator after 9 months. Involved in all aspects of oil and gas production. Duties included three stage three phase separation, gas lift. Di glycol amine plant, three stage gas compression, water injection.
MICHELIN U.K
WELLINGTON ROAD
ABERDEEN
JULY 79 TO APRIL 83 PRODUCTION OPERATOR.
Involved in all aspects of electro plated wire production, the last two years of employment as quality control operator.
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 301 to 350 of 2686)
Go to Search Parameters...
Brief Description
Free!
Versatile individual with 29 years of experience, 25 of which have been in the upstream oil industry performing in plant maintenance, operations field management, and mechanical integrity, also managed implementation of maintenance driven projects
I an am executive with 24 yrs of experience with success in start up, strategic planning, product management, sales and marketing, cost control, technology transfer of engineering/equipment /turnkey system being part of global cross functional team for strategy building and success in the region.
Twenty five years in managing remote area field construction and logistical operations through out Asia. Construction of air strips, heli-pads, camp facilities, drilling location. Subsea Fiber Optic cable landing operations and post lay burial operations on and off shore.
Dear sir, I would like to submit my application form for a suitable post of production engineer. Here is my CV below. If you want other document or information, please let me know.
Seasoned professional with extensive and diverse experience in the petroleum industry, looking for a challenging and rewarding operations supervisory position. Interested in either domestic employment or international rotational assignments. Will consider domestic relocation.
I am expert in pre-commissionnig, commissioning, start up petrochemical plant spcialy in ethylene plant, consruction, field engineer familar with engineering and procurment activity, computer kwnolage, opration ethylene plant
Completion / well services /Intervention Supervisor
I am applying for welding supervisor and i have 15 year experiance in welding
Having 16 years experience in the oilfield, I am a highly motivated, conscientious and experienced professional with a proven ability to work beyond the parameters of the role and to prioritise effectively to meet deadlines.
Directional Drilling Operator,Locator and Site Supervisor.ITI Electronics
Geophysicist with more than 20 years experience, out of which 9 years in marine seismic data acquisition, QC, Party Manager & HSE. Good academic background with an M.Sc. in Geophysics and MBA in Admin.Management, with wide experience working in 2D & 3D seismics.
Production foreman with twenty years of experience in oil and gas industry.
Total of 27 years experience in Inspection, Quality Control and Non Destructive Testing of Pressure Vessels, Heat Exchangers, Piping and Structures for Petrochemical Plants, Power Plants, Rigs, Ships and Storage Tanks both at the time of fabrication and on-stream stage.
I am wireline supervisor and consultant - I have a long experience
More than 30 years on operations,pre-commissioning and commissioning
Welding Suprintendent / Supervisor
B. Sc. with Chemistry along with the 14.5 years of professional and project in petrolium refinery . Precommissioning & commission assistance in, LPG RECOVERY , ACID GAS REMOVAL , FUELGAS/NAPTHA RECOVERY
Free!
All round drilling expertise from driller up to management. Managed on- and offshore drilling campaigns world-wide. Shell Round II. Currently head of drilling rig planning, acquisition and divestment for Shell Malaysia. Analytical and problem-solving capabilities. Broad engineering background.
Process Technician with 9+ years of experience
A well-rounded production person having worked at all levels from production operator through control room lead tech to supervisor. Trained in all aspects of the oil and gas industry (well heads, 3-phase separation, compression, reciprocation, turbine, centrifugal, refrigeration, gas lift, gas injec
I have 30 years experience working in Oilsands Upgraders as a control room operator and start-up and commissioning operator. I am currently working on expansion and growth plans of Suncor for their MNU Project. I work with Engineering houses to include operations input for operability and safety in
Chemical Engineer with more than 20 years experience in construction, testing, precommissioning and commissioning of utility plants in Oil & Gas, Fertilizer and Petrochemical industries.
I'm a Science Graduate. B.Sc., from Andhra University, INDIA in 1985, Working as Comissioning Engineer With LURGI team since Sep-2007. well versed with Pre commissioning, commissioning, start up, Normal/ Emergency shutdown activities and performance test of PDH (Propane D ehydrogenation) Plant.
Experienced and dedicated Land Acquisition specialist. Numerous major projects. Qualified and creditale references. Available soon. John Kellock
I graduated Texas A&M University '99 with a degree in Management, and now look to continue my career in Oil and Gas, either offshore or onshore and to dramatically increase my responsibilities and push my limits. Seeking a position as a Safety Coordinator or in Production or Operations.
General Manager - Latin American Based. International standards.
Have 22+ years of professional experience in carrying out all Operation related jobs in Gas Processing & Petrochemical units. These relate to both Commissioning & Startup. Also, well versed in Process modification / plant debottlenecking schemes.
I have twenty years experience as an operational & developmental geologist. Currently involved with Barnett Shale development in the Fort Worth Basin. Desire and qualifications for both management and operational positions with the ability to generate prospects and revenue..
an industrious, focused minded person with great leadership qualities and skills able to build teams that will think creatively and design profitable organizational changes
DCS Panel Operator in Oil refinery/Petrochemical plant
Worked on prestigious projects for multinational organizations like Saipem-Eni FPSO (Floating Production Storage and Offloading) Vitoria BRAZIL, TOTAL ELF PETROLEUM, IOOC-IRAN, HYUNDAI ENGINEERING CO., LTD, like LIBYAN Sirte Oil Company (SOC), Snamprogetti-Eni (Group), in QATAR PETROLEU
Having 15 yrs of petrochemical,oil& Gas and LNG plant experiences.
Senior registered Professional Engineer with over thirty years of experience in management, drilling and production engineering, planning and operations.
WELL TESTING & WELL HEAD OPERATION , CONTROL ROOM , CENTRIFUGAL & RECIPROCATING COMPRESSOR AND PUMP OPERATION „« WATER INJECTION, CHEMICAL INJECTION & GAS INJECTION „« DAILY PRODUCTION CALCULATION & SHUTDOWN OPERATION „« UTI
Chemist with more than 6 years experience in field of Thermal & Power and Desalination plant
I completed B.S. Chemical Engineering and I have 19 years working experience in Refineries and Gas plants in which 9 years worked as a Shift Supervisor. At present I am working with multinational workforce in Adnoc, Ruwais Refinery, Abu Dhabi, UAE.
Twenty-nine years experience in production operations, twenty-five years in an offshore oil and gas environment.
Looking for QHSE MANAGER position in international operations. 20 years experience in Oil&Gas. International work experience in Russia (West Siberia), Canada, Kazakhstan, Turkmenistan, Azerbaijan, Oman, Georgia, Cameroon. Bi-Lingual (English and Russian.
Ingeniero de Petróleo en Operaciones de Producción. Pozos Productores y métodos de Levantamiento: Artificial por Gas y Bombeo, Flujo Natural y Cretácicos. Manejo de Estaciones de Flujo, (almacenamiento, tratamiento, separación, prueba de pozos, instrumentación y automatización).
Science 20 years in production operations, hydraulic fracturing, Matrix acidizing, well completions, Coil Tubing, nitrogen services, water/sand control operations, user of software STIM Plan, fracproPT for fracturing, I am a permanent resident of Canada.
Olefins Plant/Production/Project/Engineering Management. Project Controls. Skilled troubleshooter. Results-driven leader who strengthens competitive position by providing outstanding client service, focused on profit, responsibility and discipline.
Working as an international geologist with differant companys and differant countries gave me a very good chance to acheeve a high degree of commumication and interpersonal skills.
College Study with 13 years oil & gas Logistics Experience
Certified Lead Auditor in ISO9001 and coversant with 14001, Trainer of ISO QMS, Plastic Technologist and expert in Quality Control of entire production, In-charge of resolving customer complaints and overall expertise in devoloping new furniture and engineering plastic products
Chemical Engineer, Project Manager, Process Operator in oil and gas
I have oilwell service experience with wireline, swabb have ing, fishing and rental tools. I24 years experience with manufacturing and machine work on oilfield equipment. I am an hands on hard working man with good hand eye coordination that likes the challange of working on oilwells.
I have over 19 years of experience in Procurement area including over 3 years of reservoir management and production management for oil company. I possess good knowledge in Purchase Order Processing, Inventory, Quality Assurance, Expeditor, Production (both Surface and Sub-surface).
A successful, experienced and qualified Commissioning and Production Operations Start up Shutdown Coordinator and Start up Specialist with over 17 years extensive experience (both onshore and offshore) within the oil, gas & petrochemical industry.
Operational, process, construciton, commissioning jobs
I have more than 27 years of petrochemical experience in a very wide field, including Methane Reforming, Air Separartion, LNG Storage, Tank Farm and Despatch (pipe line, rail, road and ship), Process design and Utilities (water treatment). Also extensive construction and commissioning experience.
First
1
2
3
4
5
6
[ 7 ]
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
CATEGORIES:
Operations;
INDUSTRIES:
Petroleum/Oil/Gas;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com