Professional B.S. in Mechanical Engineering, with 18 years of experience at production fields in onshore and offshore areas and Power Generation Facilities. Turbomachynary and Rotating equipment, performance diagnosis, nondestructive inspection techniques, asset management and reliability centered maintenance applied for correct and proper maintenance policy. Develop, use and audition of CMMS as SAP-PM, Maximo and JDEdwards for improve maintenance/production management goals. Background in Reliability Centered Maintenance, Asset Management, Turbo machinery Diagnosis, Rotating Equipment Operation,CMMS and Maintenance Planning and Maintenance Policies, Responsibilities include operation and maintenance for Gas Generators and Turbines models: General Electric LM-2500 (CF6), Frame 5, Frame 6B, Frame 6FA, Frame 9E, Rolls Royce RB-211 (24A,B,C,F,G), Rolls Royce Avon,/Maxi Avon/Super Maxi Avon, Pratt and Whitney FT-8, Solar Mars, Centaur, Saturn. Ruston TA-1500 /TB-1750,Dresser DJ-270 /Dj-290 / DR-61Cooper Bessemer RT-48 / RT -62, Trained in Turbomachinary Alignment and Measured Thermal Growth using LASER (Opt Align and Perm align equipments),Trained and Certified in Life Cycle Cost, Risk Cost Analysis, Root Cause Analysis, Reliability Centered Maintenance, Trained and Certified in Tribology, Trained and Certified in Vibration analysis Level I,II,III. Duties also include 10 Years experience in Endoscope Inspection for Gas Turbine such as: General Electric LM-2500, Rolls Royce RB-211/Avon, Solar (Saturn, Centaur and Mars), Pratt and Whitney.10 Years experience in rotative equipment selection and diagnosis, such as Bornemann (Progressive Cavity pump), Waukesha (Rotary type displacement positive compressor), Dresser Rand (Centrifugal Gas Compressor), Cooper -Bessemer (Centrifugal Gas compressor), Elliot (Centrifugal Gas Compressor), Solar (Centrifugal Gas Compressor) and others. Expert in Inspectors Checklist design according with API-Standard such as: API- 616 (Gas Turbines for the Petroleum, Chemical, and Gas Industry Services) API -617 (Centrifugal Compressors for Petroleum, Chemical, and Gas Service Industries)API -619 (Rotary-Type Positive Displacement Compressors for Petroleum, Chemical, and Gas Industry Services API - 670 (Machinery Protection Systems) API - 674 (Positive Displacement Pumps - Reciprocating) API - 676 (Positive Displacement Pumps - Rotary) Trained and Certified in SAP-PM (As Planner, Programmer, Admin.Technical Database )
CURRENT ASSIGNMENT
06/08 – 04/09 Granite Service Int. Inc. – Venezuela
Mech. TA, Responsibilities include Providing Technical Support and Mechanical Advisory on GE – Turbomachinary Major Maintenance Task. Some projects done so far include:
1.- 24/02 – 30/04 Mechanical T.A. MI Train 8 MS-5002 / Compressor Wilpro Energy Service Pigap II. El Tejero. Venezuela
(High Pressure Gas Injection Plant II) Unit MS5002C with Nuovo Pignone Compressor Set. This is the World Largest and Higher on Volume & Pressure, Gas Compression Plant which handle aprox. 1440 MMSCFD @ 9.000 PSI for Deep Well injection done by a single plant.
2.- 12/01 – 12/18 Mechanical T.A. MI Unit MS6001FA. MACHALA POWER. Machala Ecuador.
3.- 11/06 – 11/26 Mechanical T.A. CI - plus TRINGEN II Unit MS5001N. YARA Trinidad. Trinidad & Tobago.
4.- 08/08 – 09/08 Mechanical T.A. MI Train 6 MS-5002 / Compressor Wilpro Energy Service Pigap II. El Tejero. Venezuela
(High Pressure Gas Injection Plant II) Unit MS5002C with Nuovo Pignone Compressor Set. This is the World Largest and Higher on Volume & Pressure, Gas Compression Plant which handle aprox. 1440 MMSCFD @ 9.000 PSI for Deep Well injection done by a single plant.
5.- 07/08 – 08/08 PSTX-TS- OJT Mechanical T.A. MI 9FA Unit JB2 on GAS Atacama Power Plant. Mejillones. Chile.
PREVIOUS ASSIGNMENTS
11/07-05/08 LCA Power Plant, Margarita Island, Venezuela.
Power Plant Manager, Responsibilities include Coordinate all mayor Operation & maintenance Task, supporting budgetary Mayor Maintenance Task, coordinate with OEM representative schedule, task and price. Release for buy spare parts & material necessary for keep operational continuity. Support in Budget all future actions (OPEX and CAPEX). Handle all Power Plant Human Resource development according with Plant necessities include new personal assignations. Manage fuel oil inventory according with heat rate demands. Apply HSE standards for an industrial Power plant trying to mitigate effects.
12/05-11/07 LCA Power Plant (CMS Energy Company) Margarita Island, Venezuela.
Maintenance Chief, Responsibilities include Coordinate all Preventive, Predictive and Corrective maintenance task perform by internal maintenance crew for Thermoelectric power plant which include 07 Frame 5001 units, 02 Frame 6B units, 10 Caterpillar mod. 3516 units and 06 EMD units. Duties also include involved with shutdown schedules, planning, oversee general plant maintenance, directing field crews, interfacing with OEM representatives and 3 parties contractors, solving plant maintenance problem, and working with planning and scheduling software. Develop plant maintenance and planning optimization programs (which include predictive, CBM, FEMA, RCA, etc.) and policies which include procedure management, quality management, emergency and safety plans. Also providing technical support in direct in - depth working/implementation MP2. And Work coordinates with Operations in order to improve operational task and operational procedures.
10/04-12/05 FSR-TURBOPET, Solar Turbines of Venezuela.
Service Engineer, Responsibilities include Provide Technical support in all areas related to Industrial Power Generation, Provide Technical on site Service for clients using Solar Turbines. Support during Installations, Commissioning, Maintenance and Operations and Troubleshooting. Solar Turbines models Saturn 20, Centaur 40/50, Mars 90 and Taurus 60.
03/03-09/04 ICS Group S.A. Venezuela.
Senior Technical Advisor, Responsibilities include Providing Technical Support and Management skills in all areas relate to maintenance department, optimization of maintenance policies, Implementation of CMMS such as SAP-PM, Maximo and JD Edwards. Some projects done include: Optimization of Preventive maintenance plans in Water Inj. Facilities (Offshore-Maracaibo Lake -Venezuela) which include Orenda, Ruston TA-1500 /TB-1750 turbines and prognosis of performance and maintenance budget for Venezuelan -Woodgroup Turbine Division. Duties also include Optimization and Implementation of JD Edwards maintenance module for Alfonzo Rivas and Cia. two manufacturing and process plants which include: develop WO system, training crew, fix roles and responsibilities, Asset Code, BOMs, design Maintenance Plans, Scoreboard, spare parts management and other items more.
12/98-02/03 PDVSA, Venezuela
Maintenance Planning Supervisor, Responsibilities include Ensure that all requirements of the Operations were include into Maintenance Annual Plan / budget, Coordinating and Providing Hands on and supervisory skills for Planning Crew in charge of develop all maintenance plans on gas Compression Plants, Power Plants, all Mayor and Minor Piping Network (onshore and Offshore), Oil Flow Stations Facilities (Onshore and Offshore Based), and others facilities. Involved with shutdown schedules, planning, oversee general plant maintenance, directing field crews, interfacing with OEM representatives, problem solving plant maintenance, and working with planning and scheduling software. Develop plant maintenance and planning optimization programs (which include predictive, CBM, FEMA, RCA, etc.) and policies which include procedure management, quality management and emergency plans. Also providing technical support in direct in - depth working/implementation with Computerized Maintenance Management Systems (CMMS) SAP-PM. Duties also include interfacing directly with Maintenance Managers and Crews in different Facilities with different Operational context plants. Accomplish Annual Maintenance Plan and Budget and work out preventive/predictive maintenance goals with the overall goal of increasing plant availability and decreasing forced outages/ Cost/ Risk. Duties also include work with SAP-PM implementation as Database builder, Planning and Work Order Tutor for field maintenance crews.
11/90-12/98 PDVSA, Venezuela
Predictive Maintenance Supervisor, Responsibilities include Troubleshooting and repairing large Rotating Equipment; perform Root Cause Analysis and developing improved Predictive and Preventive Maintenance processes for Gas Compression, Oil Flow Stations Facilities, Process Plant and Power Plants; as well as, work with plant personnel, other company groups, contractors and consultants to minimize outage (duration, cost, etc.) As senior Engineer makes recommendations for improving rotating equipment maintenance techniques in order to enhance equipment reliability and availability or repairs, updating standards and work specifications and work procedure. I used to inspect (Vibrations, Lube oil Analysis, Performance and Operational Parameter, Efficiency Test, etc,) units undergoing overhaul to monitor extent and quality of repairs in order to improve equipment availability and reliability. Duties also include used to prepare technical reports required by the department which will evaluate cost, maintainability and reliability of proposed maintenance engineering decisions. Perform implementation of MAXIMO as Preventive Maintenance programmer (Maraven).PDVSA- Exploration y production Occident. Zulia-Venezuela.
EDUCATION AND TRAININIG
* BSc. Mechanical Engineer. Universidad Central de Venezuela 1990.Caracas Venezuela
* MSc. Process Engineer. Universidad de Carabobo. 2005. Valencia. Venezuela. (In progress)