CONTACT INFORMATION:
View contact information...
SKILLS AND TECHNICAL EXPERIENCE
Ä 26+ years in the Oil and Gas Industry Drilling Rigs, mostly onshore, with some Jack-up, Barge and Platform experiences. 35 total accumulated, various fields.
Ä Worked on NOV Joy stick, Bomco Variable Frequency Drive, Mechanical, Hydraulic, as well Diesel and electric power (SCR) rig systems as Driller, Toolpusher, Rig Manager and Senior Rig Manager.
Ä Experienced with Epoch, MD Totco, Canrig Rig Smart, Pason and other electronic drill recording equipment.
Ä Top Drive Experience since 1982, Both Hydraulic and Electric AC.
Ä IADC Well Cap, Supervisors Well Control Certificate Current, Jan. 2008
Ä States worked in: Alabama, Mississippi, Florida, Louisiana, Texas, Arkansas, Oklahoma
Ä Countries worked in: Africa, Kuwait, UAE, Ascension Island, Saudi Arabia & East Siberia Russia, Algeria
Ä 14 years VP, President & CEO, National US Incorporation. Liquidate assets & Equipment
WORK EXPERIENCE
Nabors Drilling International, Hassi Messaoud, Algeria: Jan. 2009- present
Rig Manager, Leapfrog configuration, 1320 National w/ Pyramid 1.0 Million Mast Structure, as well as U 1220 Mid Continent w/ Pyramid 1.0 Million pound mast and structure, working Ourhoud Field Algeria. Well depth 3400m, vertical. Team, awarded letter of excellence for completing wells in 25 days.3 Day rig moves.
Nabors Drilling International……………………………………………………….2008
Project Manager,: Millenium project, Russia
* Senior Rig Manager
* VCNG Oil & Gas
* Managed 2000 HP Bomco, Variable Frequency Drive Rig. Horizontal Multi-well Pad up to 12 wells per location pad. Horizontal wells @ 98%, MD 10,500 to 10,800.
* Responsible for direct Supervision of two National Russian Toolpushers as well as 75, Rig hands, Office staff, Catering. Directly responsible for overall HSE Performance standards, economic and efficient operation of the rig in accordance with Nabors Rig Management System (RMS) and in a manner that meets or exceeds the Operator's expectations. Planned and Managed Drilling Activity. In conformance with applicable legislation and standards.
* Work with the Operator's representatives and those of other contractors at site to optimize the use of resources, achieve cohesion of the inputs to drilling operations and to create a spirit of cross-company teamwork
* Applied experience directly in the event of non-routine activities on the rig and to assume control and manage the crews and resources in the event of an incipient or actual emergency or incident
* Advise the Field Superintendent/Area Manager and Operator's representative of all issues which could merit their attention
* Maintain, and enhance as appropriate, the rig and associated equipment to retain its asset value and marketability, and to continuously develop improvements to rig site practices so as to enhance safety and performance
*
Parker- Al Rushaid Drilling Company (New Iberia, LA.)…………………Jan. 2008 – June 2008
* Senior Rig Manager (Saudi Arabia)
* Saudi ARAMCO
Worked as Sr. Rig Manager on Shedong Keruei, H & H 1500hp NOV Joystick Cyberchair, Varco Top Drive rig with 3 – 1,600hp H & H triplex pumps and 1.3 million pound derrick. Horizontal Oil wells, Hawiyah Field Saudi.
* Managed Operations of personnel, Rig, Camps, Logistics etc. Oversaw all rig operations and personal up to 88 people + third party contractors per day.
* Drilled horizontal lateral wells with MD of 11,100'-11,500' with TVD of up to 7500'.
VariDrill Drilling Rig & Equipment Company/ Southern American Marketing, Inc. ….1999 - present www.varidrill.com
CEO, President
Sales of Drilling Rig and Related Equipment. National Asset Liquidator. Drilling
Superintendent Assistant, Superior, under Direct Supervision, Larry Strong, Strong
Consulting.
American Merchandise Liquidators……………………………………………………1993-1999
Vice President, International and National Sales.
Broughton Offshore………………………………………………………………………….. 1993
Driller, Jack-up, G.O.M. National Drilling Equipment, Tesco Top Drive
Al Mansoori Specialized Engineering, Abu Dhabi, U.A.E
Project Manager, Liason to KOC, Kuwait, to plan and drill, Oversee Drilling Contractor in country to drill deep salt water wells to cool and extinguish burning wells which
Iraq set, during First Gulf War………………………………………………………………….1991
Noble Drilling Company, Tulsa Oklahoma,
Driller; National Equip, Jackup pontoon Barge Rig, Nigeria Africa, British Shell, ……………………..1989
Ensco Drilling Company, Lafayette Louisiana, Driller, South Texas, Oilwell Equip. & National 1320 UE w/Varco TDS Top Drive System……………………………………………………………………………………1988
Parker International, Driller, Ascension Island coast Africa, Government DOD-DOE Volcanic Geothermal well, Downrange Nuclear Tracking Station, Heli-rig ™ 2000 O.I.M.E …………………………………………………………………………………1987
Parker Drilling Company, Driller, Toolpusher/Rig manager, 30,000 ft OIME 2,000 - 3000 Hercules series SCR, & National 110 compound Equipment South Louisiana,
South Texas………………………………………………………………………………1985
Continental Drilling Company, Oklahoma City, OK,
Toolpusher/ Rig manager, 30,000 ft. Ideco C-2, C-3 Ross Hill SCR Rigs, Top Drive Drilling, Varco. Manage the Building of NEW Rigs in Tyler Texas. Drilling in Oklahoma Anadarko HPHT. Vertical and deviated wells……………………………………………………………….1983
Resource Drilling Company, Lafayette Louisiana,
Tool Pusher/ Rig Manager, South Texas,& Oklahoma, Anadarko Basin from Chickasha to Sayre. 25,000 ft, 1320 National UE Equipment, Nat. 12-p-160 mp, Rig Management and Rig Building.
……………………………………………………………………………………………1981
Penrod Drilling Company Dallas Texas,
Derrickhand, Driller, Toolpusher South Louisiana, South Texas., National 1320 UE, & Nat. 1600 DE w/ National 1600 hp 12-p-160 and 10-P-130 Triplex pumps, 25-30,000 ft. capacity..1977
Noble Drilling Company, Tulsa Oklahoma,
Derrickhand, Alabama, Mississippi 16,000-18,500' wells……………………………….1976
Richards Drilling Company, Bay City Texas,
Derrick hand: South Texas………………………………………………………………..1974
Otis Russel Drilling, Bay City, Texas
Derrickhand, South East Texas…………………………………………………………..1972
TECHNICAL TRAINING RECEIVED
Class Description Training Company Month Year
H2S Parker Drilling Jan 2008
Bloodborne Pathogens Parker Drilling Company - Houston, Texas Jan 2008
First Aid Parker Drilling Company - Houston, Texas Jan 2008
IADC Well Cap, Supervisors Level Parker Drilling Company - Houston, Texas Jan 2008
Fall Protection Parker Drilling Company – HoustonTexas April 2008
Rigger Training Parker Drilling Company - Houston, Texas April 2008
Survival and swimming Shell, Nigeria Africa Dec. 1991
First Aid, CPR Red Cross International Dec 1991
MMS Well Control Randy Smith, Lafayette, LA. Dec 1990
Management Dale Carnegie Management 1996
Well Control, Supervisor IADC Parker Drilling, Lafayette LA. July 1984
Well Control, Supervisor IADC University Oklahoma @ Norman Feb. 1983
Well Control, IADC University of Southern Louisiana, Lafayette LA Oct 1980
Supervisors in Management & Communications University of Southern Louisiana, Lafayette LA Oct 1980
Derricks, Substructures and Foundations University of Southern Louisiana, Lafayette LA Oct 1980
Safety at the Drilling Rig University of Southern Louisiana, Lafayette LA Oct 1980
Detection and Control University of Southern Louisiana, Lafayette LA Oct 1980
Draw-works, Traveling and Rotary Drilling Equipment University of Southern Louisiana, Lafayette LA Oct 1980
Prime Movers University of Southern Louisiana, Lafayette LA Oct 1980
Geology University of Southern Louisiana, Lafayette LA Oct 1980
Drilling Bits and Hydraulics University of Southern Louisiana, Lafayette LA Oct 1980
Drill String University of Southern Louisiana, Lafayette LA Oct 1980
Hole Deviation and Surveys University of Southern Louisiana, Lafayette LA Oct 1980
Special Well Control considerations & Mud Pumps University of Southern Louisiana, Lafayette LA Oct 1980
Mud Pump Fluid Ends University of Southern Louisiana, Lafayette LA Oct 1980
Mud flow systems and Mud Control University of Southern Louisiana, Lafayette LA Oct 1980
Differential Pressure Sticking & Pipe Handling Equipment University of Southern Louisiana, Lafayette LA Oct 1980
Directional Drilling University of Southern Louisiana, Lafayette LA Oct 1980
Open Hole Logging, Formation Evaluation & Perforating University of Southern Louisiana, Lafayette LA Oct 1980
Drilling Rate data & Diamond Bits University of Southern Louisiana, Lafayette LA Oct 1980
Casing, Tubing and Liner Design University of Southern Louisiana, Lafayette LA Oct 1980
Well Heads, Liner Hanging & Cementing Equipment University of Southern Louisiana, Lafayette LA Oct 1980
Fishing and Fishing Tools University of Southern Louisiana, Lafayette LA Oct 1980
Handling Pipe Under Pressure & Production Packers University of Southern Louisiana, Lafayette LA Oct 1980
Primary Cementing & Cementing Tools University of Southern Louisiana, Lafayette LA Oct 1980
Lost Circulation University of Southern Louisiana, Lafayette LA Oct 1980
Pollution Control and Drilling Well Planning University of Southern Louisiana, Lafayette LA Oct 1980
Economics of Contractors and Operators University of Southern Louisiana, Lafayette LA Oct 1980
Contractors and Company Relations University of Southern Louisiana, Lafayette LA Oct 1980
REFERENCES
Will be provided
View contact information... |