CONTACT INFORMATION:
View contact information...
Career Objective:
Seeking a challenging position in a dynamic & reputable organization, where I can use my experience & skills in the field of Plant Operation as a Process & Utilities Operator/ Supervisor.
Academic & Professional Qualification:
3 years diploma of Associate Engineers in Chemical Technology (DAE Chemical) from GOVT College of Technology Multan (Board Lahore) with 1st Division in 1997
.
Expertise on Equipments':
Air Separation Unit, Distillation Columns Operation, Vaporizers & Condensers, Oil & Gas Separators, Pumps (Centrifugal, Reciprocating, Cryogenic), Compressors (Multiplex Centrifugal Turbo Compressor & Multiplex Reciprocating Compressors), Heat Exchangers (Shell & Tube Type, Plate & Frame Type, Fin Fan Type), Reactors, Reformers, Converters, Vessels, Storage Tanks, Stripping Columns, Absorbers, Ejectors, Instrument Air Multiplex Reciprocating Compressor, Gas Compression Unit, Multiplex Centrifugal Turbo Compressors, Nitroge/ Oxygen, Argon Production Unit (ASU), Thermal Swing Adsorption Unit (Dryer), Cooling Towers (Induced Draft), Chillers, Pumps (Centrifugal, Turbine, Reciprocating, Rotary, Cryogenic), Cryogenic Storage Tanks, Loading & Unloading/ Tanker Filling Pumps etc.
Experience History:
Total Experience =11 Years
Process & Utilities Operator =5 Years
Panel Operator =3 Years
Management Experience = 3 years
EXPERIENCE PROFILE:
British Oxygen Company, Pakistan (Now a part of LINDE Group)
Shift Engineer = 2000 to Present.
At present I am working as a Shift Engineer (ASU PLC Panel Operator) on Air Separation Unit (Cryogenic Distillation Process-) w.e.f. 2000 to till date.
This Air Separation Unit-ASU Port Qasim Karachi having capacity of 100TPD. we are producing Liquefied & Gaseous Atmospheric Gases (Oxygen, Nitrogen and Argon) by Cryogenic Distillation (Fractionation).
Main Sections of Air Separation Unit are:
Air Compression Unit, Pre- Purification (PPU) Dryers, Refrigeration units cooling towers, Main Cold Box having HP, LP Distillation Columns, Argon Purification Unit,
Crude and Pure argon columns, Main Cryogenic Heat Exchanger, DPS to HMC Back Up Section, Cryogenic Products Storage & Handling Section, Loading & Unloading Section. Tanker Filling, PCCs filling. Permanent gases cylinder filling at High pressure, Cylinder Test shop. Oxygen compression (MED/ IND both)
BOC Pakistan Limited (LINDE Group) Acetylene Plant:
I have run the D. Acetylene plat (Wah) with 12 persons in 3 shifts for 1 year
The Acetylene plant having 70 M3/ hr DA generation capacity
The main sections off DA plant are:
Calcium Carbide storage and handling, Acetylene generator, hydraulic main, gas holder, driers, Acetylene compressor, Cooling tower, cylinder filling, cylinder handling, cylinder test shop and acetone storage/ handling.
BOC Pakistan Limited (LINDE Group) Hydrogen Plant:
I have also managed the hydrogen plant for 1 year which is utility plant of LTE engineering Hassan Abdal.
Hydrogen plant having 28 M3/ hr production capacity with Electrolyzer, RO unit, gas holder, purification unit, compressor, cooling tower, hydrogen storage batteries and cylinder filling at 2000 PSI.
Qurshi Industries Pvt. Ltd, Pakistan.
I had also worked in herbal medicine and health supplements manufacturing industries as supervisor for 1 year.
Trans Chemical Pvt. Ltd, Pakistan. (A multinational Company)
Worked as a Shift Supervisor (Panel Operator) for 1 year
This Hydrogen peroxide plant was 1 TPD production capacity and it was a Chinese technology.
Main Sections of Hydrogen peroxide plant were:
Working solution preparation section, Hydrogenation reactors, Oxidation Tower, Diminiral water section, Water separation towers & packing area.
I am working on the following Sections / Plants / Units:
Air Separation Unit-ASU (Nitrogen Production Facility)
Process Condensate Treatment Section
Water Chilling Unit
Air, O2, N2, Argon, Acetylene & Hydrogen Compression Section
Commissioning Activities:
I have also worked as a "Commissioning Operator" with Linde Engineering, Germany during Pre-Commissioning, Commissioning, Operations & Start-Up of 100 TPD Air Separation Unit (ASU ) Port Qasim, Pakistan.
I had also worked on:
NOSA (National Occupation Safety Association)
Five Star Health, Safety and Environmental Audit System
IMSS (Integrated Management Standards System)
PTW (Permit to Work System)
SAP (Systems Application Program).
HIRA (Hazard Identification and Risk Assessment)
Engineering And Safety Audits (Manage as Auditee of 6 Nos. Safety and Engineering Audits of ASU, Acetylene Plant, Hydrogen Plant, Permanent Gasses filling and Cylinder Test Shop)
EMOC (Engineering Management of Change)
Safety Champion scheme:
I have won the safety champion award 2 times in FY 08 and 3 times in FY, 09.
MANAGEMENT EXPERIENCE
Running of Dissolved Acetylene Plant Site,
Running of Hydrogen Plant Site.
Compression of Permanent gases and cylinder filling at 2200PSI & 3600 PSI pressure.
including control of man power 60 nos, control of cast, control of gas losses, maintenance of equipments.
View contact information... |