Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #24274 next resume »»
CONTACT INFORMATION:
View contact information...

CURRICULUM VITAE
QUALIFICATIONS:
1984 City & Guilds Electrical installation Work Part 1
1986 City & Guilds Electrical installation Work Part 2
1988 City & Guilds Electrical installation Work Part 3
2000 City & Guilds 16th Edition IEE Regulations
2001 City & Guilds BS2391 Inspection and Testing of Electrical Installations.
2001 COMP'Ex' Hazardous Areas Inspection and Verification.
2004 National Grid Transco 'SCO2' Live Gas Site Appointed Person
2004 National Grid Transco HV Apointed Person

I am an experienced electrical superintendent seeking employment within the Australian construction industry, where hopefully my varied knowledge and experience can make not only a positive contribution to any prospective employers but also from a personal point of view, where I can continue to develop and expand my experience and ultimately further myself within the business. I have a wealth of experience and feel I could make a positive contribution to any prospective employers.

PROFESSIONAL HISTORY
Sept 98 – Present AMEC Group Limited – Darlington, UK
I am currently employed as an Electrical Construction Superintendent. My current duties include the co-ordination of the electrical construction team to ensure that all works are carried out to project specifications, to the installation program and in line with both AMEC's and the clients SHE (Safety, Health, and Environmental) procedures. I am an authorised signature within the AMEC Group purchasing system and I am responsible for material co-ordination, selection and procurement. I report directly to the Project Manager on all construction issues. I attend construction and SHE meetings with the customer, I am the first line of contact for technical problems, offering either direct solutions or seeking solutions through our recognised technical query procedures.

Dartford Cable Tunnel (National Grid Transco) – Site Superintendent (30 Men)
Due to the increased Electrical demand within central London, National Grid Transco (NGT) the UK gas and electricity utilities group, commissioned AMEC Group to construct a new 3 meter diameter cable tunnel from Essex to Kent running under the river Thames. The tunnel will carry a new 400KV cable ring to cope with the new demands on the grid and also have scope to provide expansion for the future. Upon completion the site will be unmanned and be controlled via the new SCADA system from a satalitte office.

Bathgate Compressor Station (National Grid Transco) - Site Superintendent (80 Men)
To keep up with the increased demand within the UK for Natural Gas especially in the southern section of England, NGT commissioned AMEC group to design, build and commission a new 90 Mega Watt compressor station at Avonbridge, Edinburgh, such was the strategic importance of the site it consisted of 2 x 45 Mega Watt NUOVO PIGNONE compressor trains, one duty and the other standby with the option of running simultaneous on demand. This is part of a nationwide program of upgrading the national gas transmission system. The whole site was deemed a hazardous area and as such the installation had to conform to the current ATEX (ATmosphere EXplosive) certification. My duties on the project where to coordinate the electrical construction team including the inspection and testing team, to ensure that the project was carried out safely, on program and the installation was to the high standards that ATEX certification requires. My responsibilities included the day-to-day organisation of 6 supervisors each having a 10-man team of electricians and 2 x 6 man cable gangs

AMEC Netcom - Commercial Department (Review and Allocation of Sub Contracts)
AMEC Netcom is a Telecommunications division of the AMEC Group. During the time that I worked for the division we were actively involved in the 3rd generation mobile communications rollout program, consisting of the installation of rooftop and greenfield telecommunication cell sites for Vodaphone, Orange, O2, T-Mobile and 3. My duties on the rollout program were originally to assist with the logistics associated with the utilisation of labour and the distribution of materials involved with a nationwide contract, offering technical support and ensuring quality assurance requirements were met. In order to transfer the risk of variable volume of work we took the decision to subcontract sections of the build program. I was responsible for identifying suitable sub contractors, agreeing rates and conditions, expediting AMEC's vendor approval process, awarding actual cell sites to sub contractors, resolving technical queries and agreeing final accounts. At the peak of our involvement during the rollout program we were building 40 sites per month and employed some 80 electricians and 50 sub contractors.

Melinar 5 (DupontSA) – Site Superintendent (30 Men)
To counter the increased international demand for PTA (Pure Terephthalic Acid), DupontSA – Europe's leading manufacturer of polyester commissioned AMEC Group to carry out the extension, shutdown and overhaul of their PTA plant – Melinar 5 - at Wilton International petrochemical plant, Teesside. The project was classified as hazardous area Zone 1 & 2 and involved interface between the existing plant and the new extension which included the installation of new main and secondary containment, instrumentation – both intrinsically safe and non-intrinsically safe, small power and lighting, motor drives, control and instrument panels and switchboard extensions. The plant was shutdown for 90 days in which time, working under the DupontSA Permit To Work system, we had to integrate the new installation, overhaul the existing and have the site back in production.

Dupont HMD – Site Superintendent (25 Men)
As part of Dupont UK's ongoing commitment to continual improvement to it's UK operations AMEC Group were contracted to carry out the routine shutdown, upgrade and maintenance of it's HMD Acid works at Wilton International petrochemical plant, Teesside. The project was classified as hazardous area Zone 1 & 2 and involved interface between the existing plant and the upgrade, which included the installation of new instrumentation – both intrinsically safe and non-intrinsically safe, lighting, motor drives, control and instrument panels and modifications to the existing switchboards. The project had a 90 day program which necessitated the plant to be partially shutdown for 30 days in which time, working under the Dupont Permit To Work system, we had to integrate the new installation, overhaul the existing and have the plant back in production.

Pfizer – Site Superintendent (140 Men)
As part of their continued expansion to their UK research facilities Pfizer – the world's largest research based Pharmaceuticals Company contracted AMEC Group to design and build their new research and development facility in Sandwich, Kent. The project consisted of both building services – offices, Labourites etc. and the construction of 'clean' production area's where all installation materials were of stainless steel construction and the installation was to be classified as zone 2 hazardous area. Due to the critical timescale of the program of works the project was based around 24hr working. My position on site was to supervise the night shift construction works which included all cable installation (400,000mtrs) as well as the installation of all switchboards, control and instrumentation panels. At its peak we had 10 supervisors and 140men on site including our subcontractors.

Heerema – Site Supervisor (12 Men)
AMEC group where subcontracted by Heerema – the Oil and Gas construction group – to carry out the electrical and Instrumentation installation on the - Dunbar - offshore oil exploration platform they were constructing for TOTAL Oil. The installation was classified as hazardous area zone 1 & 2. Due to the extreme environment in which the platform would finally be positioned, all containment materials were to be of stainless steel construction and cabling to be of offshore rubber external sheath and stainless steel armour protection.

PREVIOUS EMPLOYERS
Jun 98 – Sept 98 EI-WHS Electrical Engineers
Employed as Approved Electrician by WHS for work on their contract at Heerema – the Oil and Gas construction group – to carry out the electrical and Instrumentation installation on the – Corvette and Viking - offshore oil exploration platforms they were constructing for SHELL Oil. The installation was classified as hazardous area zone 1 & 2. My duties included installation of cable trays and support systems, the installation of light fittings, control panels and switchboards, termination of power and instrumentation cabling and final testing to ensure integrity of the installation.

Apr 98 – Jun 98 Aker Maritime
Employed as Approved Electrician by Aker Maritime at their Oil and Gas offshore construction yard, to carry out the electrical and Instrumentation installation on the – Banff FPSO - the oil tanker they were converting into a deep-sea oil exploration vessel for RANFORM Oil. The installation was classified as hazardous area zone 1 & 2.

Aug 96 – Sept 97 R & H UK Limited
Employed as an electrical supervisor by R & H UK for work on their contract at Heerema – the Oil and Gas construction group – to carry out the electrical and Instrumentation installation on the – Glas Dowr FPSO - the oil super tanker they were converting into a deep-sea oil exploration vessel for Bluewater Oil. The installation was classified as hazardous area zone 1 & 2. Due to the critical timescale of the program of works the project was based around 24hr working. My position on site was to supervise part of the night shift construction works, which included cable installation as well as the installation of all switchboards, control and instrumentation panels and the fire and gas protection system. My responsibilities included the day-to-day organisation of a 12-man team of electricians and a 10-man cable gang.

June 96 – Aug 96 EI-WHS Electrical Engineers
Employed as Approved Electrician by WHS for work on their contract at British Steel Teesside to carry out the electrical upgrade to the 42" universal rolling Beam Mill.

Feb 96 – June 96 CAXIOS Limited
Employed as Approved Electrician by Caxios ltd. on their contract for DupontSA – Melinar 5 - to carry out the new electrical and instrumentation installation. The project was classified as hazardous area Zone 1 & 2.

Oct 94 – Feb 96 AMEC Group Limited
Employed as Approved Electrician by AMEC Group Ltd for work on their contract at Heerema – the Oil and Gas construction group – to carry out the electrical and Instrumentation installation on the – Douglas - offshore oil exploration platform they were constructing for Broken Hill Petroleum. The installation was classified as hazardous area zone 1 & 2. Upon completion of the onshore construction works I undertook an offshore survival training program, and went offshore with the platform, as part off the electrical hook-up team. Offshore the platform forms 3 separate parts, accommodation platform, production platform and wellhead. My duties included installing the cables between the various platforms and carrying out final connections and testing for integrity

Jan 94 – Oct 94 EI-WHS Electrical Engineers
Employed as Approved Electrician by WHS for work on their contract at SLP Offshore Teesside, to carry out the electrical and Instrumentation installation on the – Brent field – replacement offshore gas compression modules for SHELL Oil

July 93 – Jan 94 AMEC Group Limited
Employed as Approved Electrician by AMEC Group for work on their contract with British Gas – to carry out the electrical and Instrumentation installation on the new North Morcombe Bay Gas Terminal. The installation was classified as hazardous area zone 1 & 2.

April 93 – July 93 EI-WHS Electrical Engineers
Employed as Approved Electrician by WHS ltd. on their contract for ICI at their Nylon plant, Wilton International petrochemical plant, Teesside - to carry out the new electrical and instrumentation installation. The project was classified as hazardous area Zone 1 & 2.

Feb 93 – April 93 N.G. Bailey Limited
Employed as Approved Electrician by N G Bailey for work on their contract at Heerema – the Oil and Gas construction group – to carry out the electrical and Instrumentation installation on the – NINIAN - offshore oil exploration platform they were constructing for CHEVRON Oil.

Oct 92 – Feb 93 Redpath Engineering Services
Employed as Approved Electrician by Redpath Engineering Services for work on their contract at Redpath Offshore (Lin Din Yard) Teesside, to carry out the electrical and Instrumentation installation on the – EAST BRAE – offshore oil exploration platform they were constructing for MARATHON Oil. The installation was classified as hazardous area zone 1 & 2.

Jan 92 – Oct 92 W.A. Boulting Limited
Employed as Approved Electrician by W A Boulting ltd for work on their contract at SLP Offshore Teesside, to carry out the electrical and Instrumentation installation on the – Tiffany – offshore Accommodation module for AGIP Oil. The installation was classified as hazardous area zone 1 & 2.

Mar 91 – Jan 92 EI-WHS Electrical Engineers
Site British Steel Teesside and ICI Wilton
Project Various Petro-chemical and heavy industrial
Position Approved Electrician

Sept 84 – Mar 91 Haigh And Ringrose Electrical Engineers Limited.
Served 4-year apprenticeship undertaking both day and block release at college. With this company I worked on installations varying from Schools, Retail Malls and Hospitals to Major petro–chemical and Heavy Industrial installations. The company ceased operating in 1991

I have been a member of the JIB - Joint Industry Board for the Electrical Contracting Industry since 1984 and now hold the grade of Technician, which is the highest electrical trades grade available in the UK.

REFEREES
Should you require any further information, any of my previous employers may be contacted.

I am currently going through the skilled independent visa application process, utilising George Lombard Consulting Ltd an agent based in NSW - TRA submitted awaiting confirmation – as my occupation is on the MODL it will be given priority status and I am hoping to granted residency in Australia by the 4th quarter of 2005. At present I haven't decided on a place to reside as waiting to evaluate the work prospects available in the different states, so still open-minded.

Should you require any further information regarding my application then it would be my pleasure to further assist. May I take this chance to thank you for your time in taking interest in my application for future employment with your company.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 901 to 950 of 1338)Go to Search Parameters...
Brief Description
MWD / LWD Field Service Engineer III. Versed in all Positive Mud Pulse, Electro-Magnetic (EM), Wired Pipe Technology (IntelliServ), MCLS, MWD probe and collar based tools. Knowledge of Directional Drilling principles, and downhole vibration management.
Master Electrician with 26 yrs experience in the construction field
10 yrs R&D Lab experience - incl. Instrument analysis & troubleshooting, Inventory & ordering, supervisory role with students
Driving hotshot for constuction material:sheetmetal, pipe, concrete. have drivin allover alberta, operated dodge half ton with 20' heavy duty bumper hitch trailer, F550 flatdeck with 30' gooseneck trailer, various other pickups and flatdecks, also have some experiance with driving an F650 flatdeck
I prefer to work in a friendly environment and look forward to learn new knowledge & skills. Keen to learn and excel in job field to become a knowledgeable and experienced.
A skilled and dedicated Administrative Assistant with more than 15 years’ experience in the oil & gas industry; coordinating, planning and supporting daily operational and administrative function. Able to provide comprehensive support for senior and middle management.
Industrial Electronics + Journeyman Licensed Technician coupled with 20+ years sales
Experienced Construction Project Management Engineer
Diploma in electrical engineering with12 years experience of electrical intallation and commissioning in Oil and Gas , Pectrochemicals projects
Crane/Rigging Trainer, Crane/ Lifting Equipment Inspector, Safety Advisor, Crane/ Maintenance Engineer, Rigging Supervisor, Terminal Supervisor
APPLICATION LETTER
HVAC Central Air Conditioning
I have been working as a diesel mechanic.
Dynamic professional with BS in Mechanical Engineering from UCI seeking a challenging career in the oil refinery and/or power industries where technical and engineering leadership and direction are sought to execute projects from the developmental process to a finished state
Dual Post Graduate Mechanical Engineer with 10 years of experience
Power Engineer/Operator Resume
If you read my work history you will see a great amount of experience in very relative systems to the position I am applying for. I can't say I know it all, but I have been exposed to most of it. As Manager or Superintendent, I have administered and negotiated labor, materials and services.
All elements of safety implementation and instruction
Over 16 years of installation and troubleshooting experience within the instrumentation field in various chemical plants. Also have four years of process chemical operating, troubleshooting, and making recommendations for plant safety, quality and quantity of plant production.
Broad experience in Petroleum Exploration and Production With cross-functional expertise in Operating, Commissioning, Maintenance, Testing, Training and Safety / Environmental Compliance.
Free! I am able to effectively perform set tasks, successfully fulfil the task objectives and meet their dead-lines. I report information to the necessary authorities by means of written and/or verbal reports which are reliable and accurate.
Lead Engineer for Aramco Transmission projects and Systems integrator also for Various overseas projects.
skills and qualifications include: Commercial Diving, Underwater construction I am skilled in all kinds of works underwater, pipeline inspections and repairs, flange ups, Locating, equipment maintenance. welding, burning, non destructive testing levels 1 and 2. and underground coal mining.
I have a University Degree in transport engineering. I’ve 3 years experience as cadet and OS. This year I’ll finish professional course and acquire navigator diploma. As beginner in offshore industry I’m ready to start at the bottom and begin my career on an oil rigs from entry–level positions.
QC Mechanical, API 570, API 653, CWI & NACE coatings inspector
Expert in Natural Gas and LPG Pipeline,Metering with 14 years experienced in operations and maintenance field. Lead a group of technician troubleshoot and maintaining gas facilities such as valves, cathodic protection,pipeline inspection, regulating station etc..
I rely on over 14-year experience in Instrumentation & Control Engineering in FEED & Detailed Design Engineering, Construction, Supervising, QA/QC, Commissioning, Testing and Maintenance of Oil & Gas (Offshore, Onshore), Refining, Petrochemical and other major projects.
Accountant with data analysis and auditing skills, able to create Applications for Database and all Financial Systems,able to manage any recruitments at any field
Enviromental Process Engineer/Technician
Control room and plant operator, 10 + 2 +3 yrs of education, adequate computer knowledge, reciprocating,centrifugal pumps and compressors, handling DCS systems, experience-2yr 3 months in Oman,
Mark up Leading hand, Blast crew member, Westrain Plant Operator Training Course
NSW Electrical Contractors Licence, OHS Safety Consultant Ticket, Qualified Electrical Fitter-Mechanic, Senior First Aid trained.
Qualified health and security manager. Experienced in leading H&S supervisor on oil and gas plants or on remote site. Also have experience on construction site. Implementation of H&S programs, accidents and incidents investigation.
3 years of safety experience and seeking more.
Journeyed Industrial Electrician
Management, business, trading, oil and gas, adminstration, HR, petrolium
Welltest, Snior Operator, Supervisor. 5 years experience. Worked Worldwide.
Experienced Electrical Superintendent seeking employment within the Australian construction industry, where hopefully my varied knowledge and experience can make a positive contribution to any prospective employers and also where I can continue to further develop myself within the business.
Time served pipefitter with 12 years experience.
PLANNER SMELTER
Handled operations Batch Chemical Processes, Fermentation, Distillation, Extraction, Evaporation, Plant Utility Section, Pumps & Compresors, Safety of 3M's and Housekeeping, Maintenance & Overhaul of Operations, Troubleshooting, Startup & Shutdown of the operations in the cGMP environment etc.
Mechanical Equipment Specialist with 20 years of Heavy Industrial Experience
As a CADD designer at C Faulkner Engineering, I put together review, and construction drawings for Telecommunication sites. I would create marketing drawings for the clients, showing site location and improvements
Bachelor of Engineering (Electronics & Communication) ,A.I.V.,A.M.I.E.
Worked in chemical Industry for 14 years.
I am an Instrumentation Technician and Instrument/gas fitter with oil,gas, and industrial experience. Skills: AC/DC generator, chemical injection, I&C, PLC, panel tech, compressor, automation, integration, etc.
7.5 Technical experience, guidance and command in all analytical and environmental based activities, services, management and techniques.
I did both undergrad and master's in mechanical engineering with broad range of experiance both in mechanical engineering along with IT
I am a Coiled Tubing Engineer and Supervisor. I have worked both on and offshore for Schlumberger and Halliburton in various parts of the world over the past 5 years and have a very good track record.
My 19 years of experience reflect 13 years of project detailed engineering as a Control & Instrumentation Engineer and 4 years in maintenance and upgrade projects in a reliability based environment, applying amongst other the following typical standards and practices: ANSI, IEC, BSA, DIN, API
1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   [ 19 ]   20   21   22   23   24   25   26   27  
Seach Parameters

Change search parameters...
CATEGORIES: Trades/Skilled;
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2008 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com